Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.1 LAccepted-AOC 565 VPO BAYYANPUR DISTT SON 131001 | SONIPAT | HARYANA | 131001 | 1 | Accepted-AOC Allotted to 1st rank the jai dada monhan dass society | |
| 2 | 2₹3.4 L+₹25,065 (8.07%)Rejected-AOC | 2 | Rejected-AOC 2nd rand due to allotted 1st rank | |
| 3 | 3₹3.4 L+₹28,068.75 (9.04%)Rejected-AOC | 3 | Rejected-AOC 3rd rand due to allotted 1st rank |
Tender Value
₹3.4 L
EMD Value
₹6,820
Closing Date
15 Jun 2020, 11:00 amClosed
Executive Engieer
Executive Engineer D and P Public Health Engineering Division Model Town Sonepat
Mtc of Pumping Machinery of various Rural water supply scheme within the jurisdiction of PHE SDivn Kharkhoda Twell Boosting Stations and Water works Ch to Annual Mtc of various villages of Kharkhoda town Water Supply Scheme under PHESD Kharkhoda
2020_HRY_130960_1
SE Memo NO. 3125 DATED 04/06/2020
Open Tender
Civil Works - Others
Works
275 days
Kharkhoda Town
Refer to Tender Documents as per approved DNIT
6 documents required · 6 mandatory
₹500
Executive Engineer D and P PHE Division
₹6,820
Yes
8 Jul 2020
8 Jun 2020
15 Jun 2020
8 Jun 2020
15 Jun 2020
8 Jun 2020
Amount
Mtc. of submersible pumping sets for T/well, Horizontal pumping set for booster consisting mainly of motor, pump, starter, electrical control panel, all accessories sluice valves, return valves etc. including all appurtenances at the following T/well, B/stns & water works Horizontal pumps up to 20 HP 2 x 5 BHP = 10.00 BHP 2 x 7.50 BHP = 15.00 BHP 1 x 15 BHP = 15.00 BHP 5 x 20 BHP = 100.00 BHP Total = 140.00 BHP G. Total = 140.00 x 9 Months = 1260.00 BHP
Mtc. of submersible pumping sets for T/well, Horizontal pumping set for booster consisting mainly of motor, pump, starter, electrical control panel, all accessories sluice valves, return valves etc. including all appurtenances at the following T/well, B/stns & water works Machinery installed in 2018 Horizontal pumps up to 20 HP 2 x 7.50 BHP = 15.00 BHP Total = 15.00 BHP G. Total = 15.00 x 9 Months = 135.00 BHP
Mtc. of submersible pumping sets for T/well, Horizontal pumping set for booster consisting mainly of motor, pump, starter, electrical control panel, all accessories sluice valves, return valves etc. including all appurtenances at the following T/well, B/stns & water works for 12 months after date of commencement. Horizontal pumps more than 20 HP 3 x 30 BHP = 90.00 BHP Total = 90.00 BHP G. Total = 90.00 x 9 Months = 810.00 BHP
Mtc. of submersible pumping sets for T/well, Horizontal pumping set for booster consisting mainly of motor, pump, starter, electrical control panel, all accessories sluice valves, return valves etc. including all appurtenances at the following T/well, B/stns & water works Machinery installed in 2018 Horizontal pumps more than 20 HP 1 x 25 BHP = 25.00 BHP Total = 25.00 BHP G. Total = 25.00 x 9 Months = 225.00 BHP
Mtc. of submersible pumping sets for T/well, Horizontal pumping set for booster consisting mainly of motor, pump, starter, electrical control panel, all accessories sluice valves, return valves etc. including all appurtenances at the following T/well, B/stns & water works Submersiblel pumps up to 20 HP 1 x 3 BHP = 3.00 BHP 8 x 7.50 BHP = 60.00 BHP 15 x 10 BHP = 150.00 BHP 1 x 12.50 BHP = 12.50 BHP Total = 222.50 BHP G. Total = 222.50 x 9 Months = 2002.50 BHP
Mtc. of submersible pumping sets for T/well, Horizontal pumping set for booster consisting mainly of motor, pump, starter, electrical control panel, all accessories sluice valves, return valves etc. including all appurtenances at the following T/well, B/stns & water works Submersiblel pumps up to 20 HP Machinery installed in 2018 1 x 7.50 BHP = 7.50 BHP 1 x 10 BHP = 10.00 BHP 1 x 12.50 BHP = 12.50 BHP Total = 30.00 BHP G. Total = 30.00 x 9 Months = 270.00 BHP
Mtc. of submersible pumping sets for T/well, Horizontal pumping set for booster consisting mainly of motor, pump, starter, electrical control panel, all accessories sluice valves, return valves etc. including all appurtenances at the following T/well, B/stns & water works for 9 months after date of commencement. Submersiblel pumps up to 20 HP New Installed machinery (installation date 2019) 2 x 7.50 BHP 15.00 BHP Total = 15.00 BHP G. Total = 15.00 x 9 Months = 135.00 BHP
Kuchhal Enterprises
Anand Kumar Kuchhal
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .