Loading…
Loading…
Tender Value
₹25.4 L
EMD Value
₹50,827
Closing Date
13 Jul 2026, 3:00 pm5d left
CHIEF ENGINEER
NAGAR NIGAM BAREILLY
In Ward No. (80) Rabdi Tola, on the other side of the road in front of Amar Ujala Press, from Jannat Saday Haram office via Sufi Tolo Primary School to Abdul Salam house and up to Sakalani Manzil and Hidayatullah Manzil, work of constructing drain an
2026_DOLBU_1166651_1
176/CE/CD/NNB/26-27 (41 To 60) Sr No 60 Tender List 60 Date-02.07.2026
Open Tender
Civil Works
90 days
BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,950
Bareillye-tender.com
₹50,827
6 Jul 2026
6 Jul 2026
13 Jul 2026
6 Jul 2026
13 Jul 2026
6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantling of old damage BOE C.C. tiles Road work i/c stacking of dismantlled materials as directed by E/I.within a distance of 60.00M | 9.95 | CUM | 610 | ₹6,069.5 |
| 1.02 | Dismantling of old damage RCC slab | 2.11 | CUM | 1,315 | ₹2,774.65 |
| 1.03 | Dismantling of BOE ordamage cc tiles | 1 | SQM | 12 | ₹12 |
| 1.04 | Dismantalling of damage CC road | 170 | CUM | 70 | ₹11,900 |
| 1.05 | Disposal of malawa cartage 5km. | 153 | CUM | 183.5 | ₹28,075.5 |
| 1.06 | Eart work in excavation in ordinarysoil including lead upto 30.00m&1.5 m complete in all respect | 75.68 | CUM | 195 | ₹14,757.6 |
| 1.07 | Providing and laying cement concrete in 1:6:12 (1 cement : 6 Fine sand : 12 Brick ballast 40 mm gauge) and curing complete, including cost of form work in foundation and floors-completion of the work as per direction of E/ I. (S.I No. 273) | 25.23 | CUM | 3,600 | ₹90,828 |
| 1.08 | P/L of Granular sub base with coarse graded materials (Table 400-2 ) in granular sub base by providing coare graded materials, spreading in uniform layer with motor grader on preparing surface mixing by mix in place method with rotovator O.M.C. and compacting with power vibratory roller to achieve the desired density complete as per clause 401compected incluing lighting, guarding, barricating and maintance of diversion etc | 141.67 | CUM | 4,059 | ₹5,75,038.53 |
| 1.09 | First class brick work in 1:4 cement and fine sand of 1.25 FM. Mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. | 46.13 | CUM | 5,350 | ₹2,46,795.5 |
| 1.1 | 12 mm thick plaster in 1:5 cement & c'sand mortor over brick work minimume thickness not less then 10 mm including all supply of meterial , Labour T&P etc S.I.No. 584(i) | 367.61 | SQM | 210 | ₹77,198.1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 18.19 MB
BOQ_2188248.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid