Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.0 LAdmitted-Finance | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | HARILAL P.V L1 |
|---|---|---|---|---|
| 1.01 | Charges for Complete shifting of 500 kg/hr boiler and connected accessories
installed at Devaswom mess , relocation, installation and re-commissioning the
same @ new Devaswom mess in Annadhanamadapam The scope of work includes
the following
a. Dismantling the boiler - removing the burner, top cover, top refractory, water
pump, fuel pump, control panel base frame, economiser, coil, optimiser header etc,
b. Dismantling the HSD/water lines from the feed tanks
c. Dismantling the flue gas duct connecting the boiler with the common chimney
d. Charges for shifting of the boiler from the devaswom mess to the new mess in the
annadhanamandapam
e. charges for reassembling of boiler with new packings, gasket, etc
f.Leading, positioning and alignment of boiler to the new foundation | 2 | job | 1,36,000 ₹2,72,000 Lowest |
| 1.02 | Shifting and relocating the 1 KL capacity HSD day tank to the new location inside the building- the work includes dismantling the HSD lines to boiler , leading the tank to new location, | 1 | job | 21,000 ₹21,000 Lowest |
| 1.03 | Shifting and relocating the 2KL capacity water day tank to the new location outside the building- the work includes dismantling the water lines to the boiler, leading the tank to the new location, | 1 | job | 24,000 ₹24,000 Lowest |
| 1.04 | Supply, erection and fabrication of steam line, Fuel line. Water line, condensate, etc,with MS ‘C’ class pipe including fittings like flanges, bends, nipples, etc 50 NB | 30 | mtr | 2,150 ₹64,500 Lowest |
| 1.05 | Supply, erection and fabrication of steam line, Fuel line. Water line, condensate, etc,with MS 'C' class pipe including fittings like flanges, bends, nipples, etc 40 NB | 18 | mtr | 1,980 ₹35,640 Lowest |
| 1.06 | Supply, erection and fabrication of steam line, Fuel line. Water line, condensate, etc,with MS ‘C’ class pipe including fittings like flanges, bends, nipples, etc 25 NB | 90 | mtr | 1,480 ₹1,33,200 Lowest |
| 1.07 | Supply, erection and fabrication of steam line, Fuel line. Water line, condensate, etc,with MS ‘C’ class pipe including fittings like flanges, bends, nipples, etc 20 NB | 18 | mtr | 1,290 ₹23,220 Lowest |
| 1.08 | Supply, erection and fabrication of steam line, Fuel line. Water line, condensate, etc,with MS ‘C’ class pipe including fittings like flanges, bends, nipples, etc 15 NB | 24 | mtr | 950 ₹22,800 Lowest |
| 1.09 | Supply, erection and fabrication of steam line, with SS304 ‘Sch 40 pipe including fittings like flanges, bends, nipples, coupling, bolts/nuts, washer, etc 40 NB | 36 | mtr | 4,160 ₹1,49,760 Lowest |
| 1.10 | Supply, erection and fabrication of steam line, with SS304 ‘Sch 40 pipe including fittings like flanges, bends, nipples, coupling, bolts/nuts, washer, etc 25 NB | 30 | mtr | 2,800 ₹84,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹41,930
Closing Date
15 Sept 2025, 2:00 pmClosed
EXECUTIVE ENGINEER, ELECTRICAL DIVISION
EXECUTIVE ENGINEER OFFICE, ELECTRICAL DIVISION, TRAVANCORE DEVASWOM BOARD,CHENGANNUR
Sabarimala Devaswom relocating of existing devaswom mess to the annadhanamnadapom in sabarimala Shifting and reinstalling the boilers water tanks and associated equipment including the supply and installation of new steam lines water lines fuel lines
2025_TDB_782223_3
TDB/EEE/ET-61/2025-26
Open Tender
Electrical Works
Item Wise
sabarimala
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,950
₹41,930
17 Sept 2025
10 Sept 2025
17 Sept 2025
10 Sept 2025
15 Sept 2025
10 Sept 2025
Amount
Charges for Complete shifting of 500 kg/hr boiler and connected accessories installed at Devaswom mess , relocation, installation and re-commissioning the same @ new Devaswom mess in Annadhanamadapam The scope of work includes the following a. Dismantling the boiler - removing the burner, top cover, top refractory, water pump, fuel pump, control panel base frame, economiser, coil, optimiser header etc, b. Dismantling the HSD/water lines from the feed tanks c. Dismantling the flue gas duct connecting the boiler with the common chimney d. Charges for shifting of the boiler from the devaswom mess to the new mess in the annadhanamandapam e. charges for reassembling of boiler with new packings, gasket, etc f.Leading, positioning and alignment of boiler to the new foundation
Shifting and relocating the 1 KL capacity HSD day tank to the new location inside the building- the work includes dismantling the HSD lines to boiler , leading the tank to new location,
Shifting and relocating the 2KL capacity water day tank to the new location outside the building- the work includes dismantling the water lines to the boiler, leading the tank to the new location,
Supply, erection and fabrication of steam line, Fuel line. Water line, condensate, etc,with MS ‘C’ class pipe including fittings like flanges, bends, nipples, etc 50 NB
Supply, erection and fabrication of steam line, Fuel line. Water line, condensate, etc,with MS 'C' class pipe including fittings like flanges, bends, nipples, etc 40 NB
Supply, erection and fabrication of steam line, Fuel line. Water line, condensate, etc,with MS ‘C’ class pipe including fittings like flanges, bends, nipples, etc 25 NB
Supply, erection and fabrication of steam line, Fuel line. Water line, condensate, etc,with MS ‘C’ class pipe including fittings like flanges, bends, nipples, etc 20 NB
Supply, erection and fabrication of steam line, Fuel line. Water line, condensate, etc,with MS ‘C’ class pipe including fittings like flanges, bends, nipples, etc 15 NB
Supply, erection and fabrication of steam line, with SS304 ‘Sch 40 pipe including fittings like flanges, bends, nipples, coupling, bolts/nuts, washer, etc 40 NB
Supply, erection and fabrication of steam line, with SS304 ‘Sch 40 pipe including fittings like flanges, bends, nipples, coupling, bolts/nuts, washer, etc 25 NB
Supply, erection and fabrication of steam line, with SS304 ‘Sch 40 pipe including fittings like flanges, bends, nipples, coupling, bolts/nuts, washer, etc 20 NB
Supply fabrication and erection of steam distribution header 150NB SS pipe,including provision for steam inlet nozzles, outlet nozzles, pressure gauge, steam trap and drain
Supply and fixing of steam pressure reducing station comprising 1 No 25 NB PRV(Samson Make),1 No moisture separator,3 Nos 25NB steam globe valve, 1 no 25 NB Y strainer, 1 no Safety valve and 2 Nos Pressure guages, including necessaruy,flanges, bends, coupling, gasket, bolt nut etc
Supply fabrication and erection of steam trap assembly comprising 15 NB T D trap, ball valves, flanges, 15 NB MS C class Pipes, nipples and nut bolts etc
Supply fabrication and erection of steam trap assembly comprising 20 NB Float trap, flanges, nipples and nuts bolts, etc
Supply and fixing of valves, and fittings for water line, steam line, condensate line,fuel line, etc. 25 NB Steam ball Valve with SS Ball & Stem and Forged Carbon Steel Body PTFE seat S/E
Supply and fixing of valves, and fittings for water line, steam line, condensate line ,fuel line, etc, 20 NB Steam ball Valve with SS Ball & Stem and Forged Carbon Steel Body PT
Supply and fixing of valves, and fittings for water line, steam line condensate line,fuel line, etc, 15 NB Steam ball Valve with SS Ball & Stem and Forged Carbon Steel Body PTFE seat S/E
Supply and fixing of valves, and fittings for water line, steam line condensate line,fuel line etc, 40 NB SS ball valve
Supply and fixing of valves, and fittings for water line, steam line condensate line,fuel line, etc, 25 NB SS ball valve
Supply and fixing of valves, and fittings for water line, steam line condensate line,fuel line etc 40 NB SS Y strainer
Supply, fabrication and erection of structural supports for diesel tanks, water tank and steam line using, MS channel, MS angle, plate etc
Supply and fixing fuel transfer pump (gear pump) coupled to 1 HP motor
Insulation of steam pipelines and duct using mineral wool covered with chicken mesh and cladded with aluminum sheet of suitable thickness for a total insulation thickness of 50mm
Transportation charges of materials and tools
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .