Loading…
Loading…
Tender Value
₹4.2 L
EMD Value
₹10,391
Closing Date
29 Aug 2026, 6:00 pmDue tomorrow
The Managing Director
Kerala SIDCO Limited Housing Board Building, 6th floor Santhi Nagar, Thiruvananthapuram - 695 001
etender for the Construction of Bitumen and Wax Storage Room in Pappanamcode -GIW-General Civil Work
2026_SIDCO_866043_1
SIDCO/PROC/CONS/GIWSD/26-27
Open Tender
Civil Works - Others
Item Rate
120 days
Thiruvananthapuram
Please refer Tender documents.
10 documents required · 10 mandatory
₹981
₹10,391
19 Aug 2026
19 Aug 2026
31 Aug 2026
19 Aug 2026
29 Aug 2026
19 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Wax Storage Room | |||||
| 1.01 | 15.7.4
Demolishing brick work manually / by mechanical means including stacking of
serviceable material and disposal of unserviceable material within 50 metres lead as
per direction of Engineer-in-Charge.In cement mortar | - | cum | - | - |
| 1.02 | 15.3
Demolishing R.C.C. work manually / by mechanical means including stacking of
steel bars and disposal of unserviceable material with in 50 metres lead as per
direction of Engineer -in-Charge | - | cum | - | - |
| 1.03 | 2.25
Filling available excavated earth (excluding rock) in trenches, plinth, sides of
foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited
layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 1 | cum | - | - |
| 1.04 | 15.12.1
Dismantling doors, windows and clerestory windows (steel or wood ) shutter
including chowkhats, architrave, holdfasts etc. complete and stacking within 50
metres lead:Of area 3 sq. metres and below | - | each | - | - |
| 1.05 | 2.32
Clearing grass and removal of the rubbish up to a distance of 50 m outside the
periphery of the area cleared. | - | sqm | - | - |
| 1.06 | OD95333/2026-2027
Labour for shifting and clearing of materials | - | each | - | - |
| 1.07 | 2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5
m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.08 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means
in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),
including dressing of sides and ramming of bottoms, lift up to 1.5 m, including
getting out the excavated soil and disposal of surplus excavated soil as directed,
within a lead of 50 m.All kinds of soil | - | cum | - | - |
| 1.09 | 4.1.8
Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4
coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm
nominal size derived from natural sources) | - | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
bshed1.pdf
Tender Documents • 0.90 MB
BOQ_1465764.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].