Executive Engineer, P. H. Works Division, GWSSB, AHMEDABAD
Shifting of 450 mm HDPE pipeline near Vataman Village Due to Construction of new bridge on andhari river for Vataman - Dholka Highway, Vataman, Ta. Dholka, Dist. Ahmedabad under Deposit Work”
313443
01 Of 2026-27 (2nd attempt)
Open
Civil Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹900
Executive Engineer, Public Health Works Division, GWSSB Ahmedabad
₹19,510
11 Jun 2026
11 Jun 2026
11 Jun 2026
18 Jun 2026
11 Jun 2026
Estimated Cost :Rs.
Gujarat Water Supply & Sewerage Board
Zone-2,AHMEDABAD
Volume-III, PRICE BID
Bid Documents for Design, Build & Operate Contract for
BREAK UP FOR INTERIM PAYMENTS .................................................
Volume-III, PRICE BID
(1) Name of Work: “Providing,Lowering, Laying, Jointing and commissoing of pvc
pipeline for Saragvala village-Seven RWSS.” The bidder shall quote his firm and
fixed price for the entire work under this Contract, defined in more details in
various sections of this bid document.
(2) The rates and prices shall be submitted in the electronic formats given by n-
procure which is called Schedule-B. Rates and prices received in any other formats
will be rejected and the Bids will be disqualified.
(3) It will be entirely at the discretion of the Employer to accept or reject the
bidder’s proposal, without giving any reasons whatsoever and the bidder shall not
be permitted to withdraw his bid on this account.
free supplied by client.
(5) In Schedule-B the Bidder shall quote prices for the items on lump sum / unit rate
as called for against the BOQ item.
Schedule-B only will be considered for price evaluation & shall form a part of the
Contract Agreement.
Schedule-B and shall be carried forward to Schedule-B for comparison and
(8) The Bidder shall quote his prices for Operation & Maintenance in Schedule-C. The
total shall be in line to the price quoted in Schedule-C. The total shall be carried
forward to Schedule-B for comparison and evaluation.
(9) Wherever for a particular item the quantities have been specified payment shall
be on unit rate basis and unit variation in quantity will be paid with pro rata basis.
(10) Each item is to be individually priced online and the amounts shall be added
prices shall be left blank except where the item description requires the item to
be priced on "as applicable” basis. The item shall not be priced if it is “not
applicable” to the bidder’s design, in which case the bidder shall add the words
“NOT APPLICABLE”. The wording in the item description is for subject matter
guidance only; clause references are indicative only and all other relevant clauses
shall also be referred to. The prices shall allow for all the works covered under the
bid and all liabilities and contractual obligations whether separately specified or
not. Items against which no prices are quoted shall not be separately paid for and
the bidder shall be deemed to have covered the cost of execution of such items
(according to the requirements of the bid document) in the prices quoted for
satisfactory working/safety of the system as specified, will not be separately
paid for by the Employer when executed and shall be deemed to be already
covered by other items and rates listed in the price sheets No extra payment
Volume-III, PRICE BID
shall be given for any item which is required to complete and perform the
during the pendency of the Contract. In case of any discrepancy noted in the
and arithmetic corrections if any will be considered for financial evaluation of
(13) Schedule ‘D gives the basis of interim payment for construction of works.
(14) The bidder shall be deemed to have allowed in his price for provision,
maintenance and final removal of all temporary works of whatsoever nature
required for construction including temporary bunds, diverting water, pumping,
de-watering etc. for the proper execution of works. The rates shall also be
deemed to include any works and setting out that may be required to be carried
out for laying out of all the works involved.
(15) Prices shall be filled online only.
the Specifications and other sections of these bid documents and these
documents are to be taken as mutually explanatory of one another.
(17) The bidder shall interpret the data furnished and carry out any additional survey
work, or investigation work required at his own cost.
(18) The prices quoted shall also include the cost of materials utilized for testing.
(19) The bidder should acquaint himself with the site conditions including the access to
Work site. The successful bidder shall have to make suitable access to work sites
at his own cost. These accesses will be used by the other contractors working for
the prices shall include all the equipments / materials / accessories and services
(21) The amount to be quoted for O & M shall be as per Volume-IB, General Conditions
of Contract, Clause No. 1, Security Deposit.
(22) 1% of the value of work will be deducted from the Running bill against labour cess
which is non refundable.
(23) Third Party Inspection / CSC agency will be deployed by GWSSB and charges of the
same will be borne by GWSSB.
(24) Any expenditure incurred by inspection/ CSC agency for the work misinformed by
the contractor and charges of inspection/ CSC agency without any work due to
misinformation shall be recovered from the contractor.
(25) The prices shall be quoted inclusive of all taxes, royalties and duties prevailing at
the time of submission of the bids. Statutory variation if any during the currency
of contract shall have to borne by the agency which shall be not reimbursed by
Volume-III, PRICE BID
(26) The rates should be quoted inclusive of GST and all other taxes as per Volume-I
(B), General Conditions of Contract, Clause No. 47. & Special Caluse of GST.
(27) The rates quoted shall be inclusive of all taxes, duties and GST, which shall not be
paid extra. The TDS shall be deducted at source as per provision of IT rules and
(28) The Bidders shall have to quote the rates in this tender keeping in view of the
GST. The Complete responsibility of taxes, duties, levies rests with the
Contractor/Agency only.
(29) The process requires that the bidder shall quote his price for the work components
firm and fix during the entire period of performance of the contract except price
variation allowed for supply of MS/DI/PVC/GI pipe as per Volume-IB Clause No.
59, General Conditions of Contract.
(30) Payment shall be made for the components for which lump sump prices are
quoted, as per the schedule of payment. Total cost will be worked out on the
basis of work done of individual items and rates quoted against those particular
(31) Royalties: The contractor shall be liable to pay the royalty of the quarried
materials/ minerals used in the construction of works at the rates specified in
the Narmada Water Resources, Water Supply & Kalpsar Dept. Resolution No.
GEN-2010-595- (6)- M.I.Cell ( K-1) Dt. 29-4-2011 ( Gujarati Version Copy
enclosed) and shall be recovered from the running bills of the work from time to
time and remaining amount if any shall be recovered from the final bill before
releasing the security deposit of the work. The contractor shall furnish the
statement showing the quantity of quarried materials / minerals from whom
purchased ( with full address of the seller) and copies of the bills for purchase to
the Executive Engineer of the in charge of the work. The contractor shall also
furnish such additional information as regards royalty payment to the competent
(32) Agency shall have to take Insurance policy and intimate to GWSSB along with the
evidence within time limit. In case of non compliance entire responsibility shall
be rest with the agency and required amount shall be recovered from any due
amount of the agency.
(33) GWSSB can recover penalty amount from the agency for not taking the insurance.
Though the penalty amount is recovered, responsibility of the agency for taking
insurance shall be continued and will not be escaped from the responsibility.
Signature of contractor Executive Engineer
P. H. Works Dn., G.W.S.S.B,
Volume-III, PRICE BID
Bidders are required to fill up all the blank spaces in this Bid Form.
THE EXECUTIVE ENGINEER,
PUBLIC HEALTH WORKS DIVISION,
SUB: “Bid documents for Providing,Lowering, Laying, Jointing and commissoing of
pvc pipeline for Saragvala village-Seven RWSS. The bidder shall quote his firm and
fixed price for the entire work under this Contract, defined in more details in various
sections of this bid document.
1. Having visited the site and examined the Bid Documents, Drawings, Conditions of
Schedules etc. including Addenda/Amendments to the above, for the execution of
the above Contract, we the undersigned offer to design, Engineer, procure,
construct, complete, commission, operate and maintain the whole of the said works
for 3 years from the date of commissioning including defects liability period as given
in Conditions of Contract and in conformity with the drawings, conditions of
Documents, including Addenda Nos.__________ (insert numbers) for Lump sum fixed
price of Rs._________________.
Rupees_____________________________________________) for Construction
including free trial run for three months or such other sum as may be ascertained in
accordance with the conditions.
2. I/We agree that
a) if we fail to provide required facilities to the Employer’s representative or any
other person/Agency by the Employer to perform on his behalf for carrying out the
inspection and testing of materials and workmanship.
b) if we incorporate into the Works, materials before they are tested and approved
by the Engineer’s representative.
c) if we fail to deliver pure water of required quantity according to the
conditions/stipulations of the Contract, the Engineer will be at liberty to take any
action including termination of Contract and impose at his absolute discretion any
penalties, and/or reject the work.
3. We undertake, if our Bid is accepted, to complete and deliver the works in
accordance with the Contract within _________ months, inclusive of monsoons,
from the date or receipt of Letter of Acceptance issued to us by you.
Volume-III, PRICE BID
4. We agree to abide by this Bid for a period of 180 days from the Last date of
submission of the bill and it shall remain binding upon us and may be accepted at
any time before the expiry of that period.
5. In the event of our Bid being accepted, we agree to enter into a formal Contract
Agreement with you incorporating the conditions of Contract there to annex but
until such agreement is prepared this Bid together with your written acceptance
thereof shall constitute a binding Contract between us.
6. We agree, if our Bid is accepted, to furnish performance /Security in the forms and
of value specified in the Clause 1 of Volume-IB, “General Conditions of Contract”.
7. We have independently considered the amounts of liquidated damages shown in
Appendix to Bid and agree that they represent a fair estimate of the damages likely
to be suffered by you in the event of the work not being completed by us in time.
8. We understand that you are not bound to accept the lowest or any Bid you may
(Name of the Person)
Company Seal _____________________
Duly authorized to sign Bid for and on behalf of (fill in block capitals)
Witness Signature ___________________________
Volume-III, PRICE BID
Name of Work:- “Providing,Lowering, Laying, Jointing and commissoing of pvc
pipeline for Saragvala village-Seven RWSS.”
Schedule showing the approximately the materials to be supplied to the contractor
from government stores for the work to be executed and the rate at which they are to
Rate at which the
Sr. material will be charged Place of
Particular Qty.
No. to the contractor Delivery
1. The contractor submitting the Tender shall see that the rate in Schedule-A are filled
in by the Engineer in Charge at the time of issue tender.
2. The contractor while submitting the tender shall provide his own arrangement at his
own cost for loading, unloading, and transporting safety to the site of work the
cement stipulated in Schedule-A
3. Binding wire of 15 gauge of thinner gauge required for placing the reinforcement in
position shall be provided at his own cost.
4. All the materials required for the items other than labour in Schedule-A but
available with the dept. will be issued on request to the contractor. (for use in this
contract only) at prevailing market rates or departmental issue rates whichever is
5. All the surplus materials supplied by the deptt. As mentioned in schedule-A should
be handed over to the Department by the contractor at the Govt. stores as directed.
6. The materials mentioned in schedule-A shall have to be checked for their
correctness and soundness by the contractor before taking the delivery of the
materials from the Government.
7. Necessary cement will be purchased by the agency at their own cost from open
8. The persons of firm submitting the Tender should see that rates in the above
schedule are filled up by the Executive Engineer, on the issue of form prior to the
submission of the Tender.
9. Carting of above materials should be done by contractor at his own cost.
10. Contractor should return the balance materials in good and acceptable condition,
otherwise recovery at the double rates will be affected in view of Clause 12.4.
Signature of contractor Executive Engineer
P. H. Works Dn., G.W.S.S.B
Volume-III, PRICE BID
SUMMARY (SCHEDULE-B)
Name of Work:- Bid documents for Providing,Lowering, Laying, Jointing and commissoing of
pvc pipeline for Saragvala village-Seven RWSS
Sr. No. Name of Work Amount Rs.
1 SCHEDULE - B1
SCHEDULE - B Total Amount B
SCHEDULE - B Total Amount B
3 Net Considering Rebate (1-2)
Signature of contractor Executive Engineer
P. H. Works Dn., G.W.S.S.B,
Description Unit Qty Rate Amount
providing and supplying ISI mark high density
polyethylene H.D.P.E. pipes suiteble for
potable water as per IS specification no
4984/1995 including all local and central
1 taxes,transporatation frieght charges ,octroi Rmt. 378 4162.00
inspection charges,loading,unloading
conveyence to the departmental stores ec.
450 mm dia HDPE Pipe
Excavation for pipe line trenches incl. all safety
provisions using site rails and stacking excavated
2 stuff up to a lead of 90 mts. cleaning the site
etc. complete for lifts and strata as specified.
1) 0.00 to 1.50 mt depth
2) 1.5 mtr to 3.0 mtr depth
I) In all sorts soil & soft murrum
Dewatering by pumping set of required capacity
including temporary platform carting pumping at HP/h
site and fixing the same in position including all r.
accessories, and fuel and labour etc. complete
Lowering ,laying and jointing HDPE pipes and
specials of following class and diameter ( By
butt fusion welding method ) including cost of
conveyence from stores to site of works
including cost of labour,material,giving
satisfactory hydraulic testing ..
Providing C.C. M:100 for encasing pipes using
trap metal size 12 mm to 50 mm incl. form work
curing consolidation etc. complete for various
location on pipeline
Refilling the pipeline trenches incl. ramming
6 ,watering,consolidating desposal of surplus stuff Cmt 556 22.00
as directed within a radius of 3 KM.
Total amount of Schedule B1=
Total amount of Schedule B1=
Volume-III, PRICE BID
1. The Schedule specifies the procedure for all such assessment of the items specified
2. Each item of Schedule-B has been divided into broad components. The Employer's
Representative shall assess the value of each component as indicated in paragraph
3. Percentages are indicated against each component of each items specified in
Schedule B, based on the Employer's best appreciation of the value of the
component as related to the total costs of the concerned item as whole. A head
titled (any other item(s)) is included in each breakdown of schedule and the
tenderer shall at the time of tendering indicate any additional items which he
considers necessary but cannot be covered by any of the heads indicated in the
4. The percentage breakup as indicated in the Schedule may differ from that
corresponding to the tenderer’s scheme and design and he should take this into
account while quoting his lump sum prices for the items specified in Schedule-B.
5. The contractor shall, after approval of his detailed designs and drawings furnish to
the Employer's Representative an initial bill of quantities to all major items, to be
reviewed and updated periodically with the Employer's Representative. This bill of
quantities will be used for assessment of percentage progress of the component at
any stage. By measurement jointly taken by the Employer's Representative and the
Contractor, mutually agreed and entered in the measurement books in the form and
by the method approved by the Employer's Representative, and signed jointly by
both the parties.
Signature of contractor Executive Engineer
P. H. Works Dn., G.W.S.S.B,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.GST GR.pdf
2 Ann 7 shramyogi GR compressed.pdf
3 Royalty rate gezzatte.pdf
4 Purchase Policy GR.pdf
5 Royalti circular DOC-18.06.2016.pdf
6 vigilance GR.pdf
7 Form No 9 and Form 18 H (2).pdf
DMO_2941_01-Apr-2026_744 (EMD GR 26-27).pdf
VOL 1 A Technical Bid HDPE.pdf
VOL 1 B Gcc HDPE.pdf
VOL 2A Extent of worK HDPE.pdf
VOL 2B Tech Spec Civil HDPE.pdf
VOL 3 Price Bid HDPE.pdf
Download all tender documents and submit your bid