Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹90,000
Closing Date
27 Mar 2023, 4:00 pmClosed
Block Development officer
Block Development officer,Thuraiyur
Providing FHTC with Pipe line at Mettu Sorathur in Sorathur Panchayat in Thuraiyur Block at Trichy District
2023_RDTN_295798_9
T3/181/2023
Open Tender
Civil Works - Water Works
Item Wise
60 days
Thuraiyur
Please refer Tender documents.
4 documents required · 4 mandatory
₹900
Block Development officer
Block Development office
28 Mar 2023
18 Mar 2023
27 Mar 2023
18 Mar 2023
27 Mar 2023
18 Mar 2023
23 Mar 2023
Amount
Providing FHTC with Pipe line at Mettu Sorathur in Sorathur Panchayat in Thuraiyur Block at Trichy District Supply,delivery, laying and jointing of 63mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by TWAD Board Officer. Engineering Director TWAD Ltr.No.F 44148 / CM / AE / 2011 Dated: 29.12.2021
63mm PVC Bend 4kcs
63mm PVC Tee
63mm PVC end Cap
PVC Adhesive (Solution)
Earth work excavation in all soil for laying jointing of PVC Pipes and specials including refilling the trenches after people laying works. (Width 0.60 m, Depth - 1.05m) Main lain
Saddle Piece (63 x 20)
15mm Brass Ferrule
20 mm UPVC Rigid Pipe1.80mm tk
20 mm UPVC Elbow
20 mm x 15 mm UPVC Reducer Coupling
15 mm Brass Screw down Tap heavy type
GI Flow control valve SS 304
Shellace
Thread Ball
Earth work excavation in all soil for laying of Pipes and specials including all labour charges for hard gravelly soil etc., (Earth work Pipe Trench width 0.60 m and Depth 1.05 m , Laying and Refilling )
Lowering and Laying of Pipes
Refilling of Pipe trenches
Precast RCC foundation post (0.15x0.15x1.20) and CC platform (0.60x0.60x0.10)
Labour charges for Ferrule fixing
25mm UPVC Pipe Cutting Charges
Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M S S CONSTRUCTION
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].