Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹55.0 LAdmitted-Finance | -30.11% | ₹55.0 L | L1 | Admitted-Finance |
| 2 | L2₹57.1 LAdmitted-Finance 224 KAILASH NAGAR SHOBHAPUR COLONY DISTRICT BETUL MADHYA PRADESH PIN 460449 | BETUL | MADHYA PRADESH | 460449 | -27.40% | ₹57.1 L | L2 | Admitted-Finance |
| 3 | L3₹60.7 LAdmitted-Finance | -22.77% | ₹60.7 L | L3 | Admitted-Finance |
Tender Value
₹78.6 L
EMD Value
₹1.6 L
Closing Date
26 Apr 2026, 6:00 pmClosed
SE CUM PM WDSC ZP BUNDI
SE CUM PM WDSC ZP BUNDI
Construction of Anicut, Pakka Checkdam, under MJSA2.0 (PHASE-II) in Project Area Panchayat Samiti Bundi
2026_WDSC_552042_1
WDSC BUNDI NIT - 02/2026-27
Open Tender
Civil Works
BUNDI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
AS PER NIT
₹1.6 L
Yes
29 Apr 2026
16 Apr 2026
27 Apr 2026
16 Apr 2026
26 Apr 2026
16 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect | |||||
| 1.01 | Hard / dense soil (40%) (Item No. 1 b) | 1 | Cum | - | - |
| 1.02 | Hard soil mixed with Kankar / boulders, Morrum (60%) (Item No. 1 c) | - | Cum | - | - |
| 1.03 | Drilling holes of 35mm daimeter for anchor rods (BSR WRD-2023, Dist Bundi, chap XI item no 1a) | - | RM | - | - |
| 1.04 | Labour charges for Fixing of anchor bars in neat cement grout including cost of cement and curing etc. complete (BSR WRD-2023, Dist Bundi, chap XI item no 1b) | - | Each | - | - |
| 1.05 | सीमेंट कंक्रीट 1 सीमेंट : 4 बजरी तथा 8 गिट्टी / 1 सीमेंट, 3 बजरी तथा 6 गिट्टी पत्थर की 20 मिमी नामीय माप की नींव में डालना,कूटना तथा तराई आदि सहित एनीकट के लिए। FOUNDATION ITEM 170 B GKN 2025-26 Bundi( 1:3:6 ( In Foundation)) | 1 | Cum | - | - |
| 1.06 | Providing and Laying in position of Cement concrete Nominal mix(1:2:4) including leads of all construction materials, curing,compaction and finishing with rendering in cement sand mortar 1:3 (1cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm In Superstructure (BSR WRD-2023, Dist Bundi CHAPTER IX Item No. 7d) | - | Cum | - | - |
| 1.07 | सेन्टरिंग' शटरिंग (तख्ता एवम ढुलाबंदी) का आर.सी.सी. छत, स्लेब, छज्जे, लिन्टल आदि डालने के लिए लगाना 4.5 मीटर ऊचाई तक के लिए तथा हटाना आदि विशेष विवरण के अनुसार। | - | Sqm | - | - |
| 1.08 | आर.सी.सी. काम के लिए लोहे को काटना, मोड़ना तथा स्थान पर लगाना तथा बांधने का कार्य मय आपूर्ति के । | 1 | Kg | - | - |
| 1.09 | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. (मशीनरी कार्य सख्त मिट्टी (in Hard Soil) ) (xzkeh.k dk;Z funsZf'kdk 2025-26 dh CykWd Lrjh; nj vuqlwph iapk;r lfefr cwUnh ds vuqlkj dz-la-196 Ck) | - | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.66 MB
BOQ_983867.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid