| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 CrAccepted-AOC AHROLA NAWAGI JUNAWAI GUNNAUR DISTT SAMBHAL | GUNNAUR | SAMBHAL | ₹3.8 Cr | L1 | Accepted-AOC AOC |
| 2 | Rejected-Technical NAHAR KHAN SARAI BADAUN | BADAUN | BUDAUN | UTTAR PRADESH | - | - | Rejected-Technical NON RESPONSIVE |
| 3 | Rejected-Technical GONDA | UTTAR PRADESH | 271001 | - | - | Rejected-Technical NON RESPONSIVE |
| Sl No | Description | Qty | Unit | PRADEEP KUMAR CONTRACTOR L1 |
|---|---|---|---|---|
| 1.00 | BRIDGE WORK | 1 | cum | - |
| 1.01 | Earth work in excavation for foundation of structure by mechanical means as per drawings and clause 304 of MORT&H specifications (2001)(placing for well curb) including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. | 333 | cum | 147 ₹48,951 |
| 1.02 | Providing and laying of cutting edge of mild steel weighing 150 kg per meter of well foundation as per drawings and clause 1200 & 1900 of MORT&H Specifications (2001) including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. | 2.96 | MT | 1,24,500 ₹3.7 L |
| 1.03 | Providing and constructing temporary iceland 34 m diameter for Construction of well foundtation for 8 m dia well including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. | 2 | No. | 4,92,965 ₹9.9 L |
| 1.04 | RCC work in M-30 in well curb with cement, aproved coarse sand & 2cm. Gauge well graded grit including nece-sarry shuttring, placing and fixing of reinforcement including its binding with wire but excluding cost of reinforcement and also including supply of all materials, labours T&P etc. required for proper completion of the work. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. | 61 | cum | 8,555 ₹5.2 L |
| 1.05 | RCC work in M-30 in well steining with cement aproved coarse sand & 2cm. Gauge well graded grit including nece-sarry shuttring, placing and fixing of reinforcement including its binding with wire but excluding cost of reinforcement and also including supply of all materials, labours T&P etc. required for proper completion of the work. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. | 496 | cum | 8,732 ₹43.3 L |
| 1.06 | Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types of strata namely sandy soil,clayey soil and rock as shown against each case ,cpmplete as per drawings and clause 1200 of MORT&H specification (2001).Depth of sinking reckoned from bed level, including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. | 1 | cum | - |
| 1.07 | depth below bed level up to 3.0M including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. | 12 | RM | 13,231 ₹1.6 L |
| 1.08 | depth below 3.00 to 10 M including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. | 28 | RM | 20,451 ₹5.7 L |
| 1.09 | Beyond 10.00 M including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. | 32 | RM | 43,742 ₹14.0 L |
Tender Value
₹4.3 Cr
EMD Value
₹23.8 L
Closing Date
20 Dec 2025, 12:00 pmClosed
SE, MORADABAD CIRCLE PWD MORADABAD
SE, MORADABAD CIRCLE PWD MORADABAD
Construction of minor bridge (3x18 m), Approach road, Additional Approach road and Protection work on Wah River between Papsari Khadar to Paharpur Kashyap road (VR) in District Amroha
2025_CEMBD_1098305_2
7230/Nivida-Moradabad/25-26 Dated 18-11-2025
Open Tender
Civil Works - Bridges
120 days
EXECUTIVE ENGINEER PD PWD AMROHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹23.8 L
Yes
SE, MORADABAD CIRCLE PWD MORADABAD
4 Apr 2026
11 Dec 2025
20 Dec 2025
11 Dec 2025
20 Dec 2025
11 Dec 2025
15 Dec 2025
Earth work in excavation for foundation of structure by mechanical means as per drawings and clause 304 of MORT&H specifications (2001)(placing for well curb) including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Providing and laying of cutting edge of mild steel weighing 150 kg per meter of well foundation as per drawings and clause 1200 & 1900 of MORT&H Specifications (2001) including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Providing and constructing temporary iceland 34 m diameter for Construction of well foundtation for 8 m dia well including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
RCC work in M-30 in well curb with cement, aproved coarse sand & 2cm. Gauge well graded grit including nece-sarry shuttring, placing and fixing of reinforcement including its binding with wire but excluding cost of reinforcement and also including supply of all materials, labours T&P etc. required for proper completion of the work. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
RCC work in M-30 in well steining with cement aproved coarse sand & 2cm. Gauge well graded grit including nece-sarry shuttring, placing and fixing of reinforcement including its binding with wire but excluding cost of reinforcement and also including supply of all materials, labours T&P etc. required for proper completion of the work. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types of strata namely sandy soil,clayey soil and rock as shown against each case ,cpmplete as per drawings and clause 1200 of MORT&H specification (2001).Depth of sinking reckoned from bed level, including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
depth below bed level up to 3.0M including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
depth below 3.00 to 10 M including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Beyond 10.00 M including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
M 25 grade plain cement concrete with 10 per cent extra cement in well foundation as per drawings and clause 1200,1500 & 1700 of MORT&H Specifications (2001) in bottom plug. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
M 25 grade plain cement concrete in well foundation as per drawings and clause 1200,1500 & 1700 of MORT&H Specifications (2001) in intermediate plug. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Sand filling in wells complete as per drawing and clause 1207 of MORT&H Specifications (2001) including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
M30 grade Reinforced cement concrete in well foundation as per drawings and clause 1200,1500 & 1700 of MORT&H Specifications (2001) in well cap. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
M 30 grade Reinforced cement concrete in substructure as per drawing as clause 1200 ,1500 & 1700 of MORTH Specifications (2001) in piers including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
M 30 grade Reinforced cement concrete in substructure as per drawing and clause 1200 ,1500 & 1700 of MORTH Specifications (2001) in piers caps, abutment columns, abutment top beams, un back walls and wing walls including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
RCC M-35 in superstructure with cement approved coarse sand & 2cm gauge well graded grit including nece-sary shuttring placing and fixing of reinforcement including its binding with wire but excluding cost of reinforcement and also including supply of all material labours T&P etc required for porper completion of wortk. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Providing and laying concrete wearing coat M-30 Grade including reinforcement complete as per drawing and technical specification including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
HYSD steel or iron work in well steining well cats, abutment and their caps, slabs, curvs etc, brought to required shape including cutting, bending & also including cost of cecessary reinfocement for proper completion of the work. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
M 30 grade renforced cement concrete approach slab excluding reinforcement as per drawings and clause 1200,1500 & 1700 of MORT&H Specifications (2001) including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
M 15 ordinary grade plain cement concrete leveling course below approach slabs per drawings and clause 1500, 1600, 1700 & 2700 and MORT&H Specifications (2001) including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
uPVC pipes (working pressure 4 kg / cm 2 ) Single socketed pipe 110 mm dia including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Back filling behind abutment, wing wall and return wall with 40mm Stone ballast. complete as per drawing and technical specifications including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Supply, fitting and fixing in positions true to line and level sixe elastomeric bearing comforming to IRC 83 (part II) section ix compelete with all accessories including all labour material T & P and testing charges required for the porper compeletion of the work as per drawing and Morth specifications (2001) including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Providing and laying of a strip seal expansions joint catering to maximum horizontal movement up to 70mm compelete as per approved drawing and standard specification to be installed by the manufacturer/s supplier or their aurthorized representative ensuring compliance to the manufacturer,s instructions for installation including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Drainage Spouts complete as per drawing and Technical specification including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). Lucknow SOR 2022 including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Construction of embankment with apporved material obtained from borrow pits with attl ifts upto 1.5m transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300.1 and 300.2 with a lead upto 1000m as per Tecnical Specification Clause 301.5 including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Providing and laying filter material undermeath pitching in slopes complete as per drawing and technical specification. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Providing and laying pitching on slopes laid over prepared filter media including boulder pron laid dry in front of toe of embankment complete as per drawing and technical specification including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. as per MORT&H specification No 12.1& 304 including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Plastering with cement mortar (1:3) , 15 mm thick on brick work in super structure as per Technical specification clause 613.4 & 1204. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Plain/Reinforced Cement Concrete M-20 in Open Foundation complete as per Drawing and Technical Specifications. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader/ tractor mounted appropriate equipment on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth MORD Specific - ations 401 including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Providing, laying, spreading and compacting stone aggregate of specific size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to required density Grading 2 as per Technical Specification Clause 405. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Providing, laying, spreading and compacting stone aggregate of specific size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to required density Grading 3 as per Technical Specification Clause 405. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Brick edging on both sides of the road of first class bricks 8 cm (3") wide and 12 cm. 4½"deep laid with mud mortar including labour and supply of. bricks finished to required template and proper alignment and also including dressing and ramming the excavated earth as directed by Engineer-in-Charge. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Providing and applying primer coat of Low Porosity with Bitumen emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at rate of 0.70 Kg/Sqm using mechanical means as per Technical Specification Clause 502. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Providing and applying tack coat with Bitumin VG-10 using emulsion pressure distributer at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clauses 503. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Providing, laying and rolling of open graded premix carpet of 20mm thickness composed of 13.2mm to 5.6mm aggregates using 80/100 Grade bitumen bitumen to required line grade and level to serve as wearing course on a previously prepared base by manual means, including mixing in a suitable plants, laying and rolling with a three wheel 80-100kN static roller capacity, finished to required level and grades to be followed by seal coat as per Technical Specification Clause 508 including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Providing and laying seal coat by manual means with VG-10 Bitumen sealing the voids in a bitumenous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specifications Clause 510 including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader/tractor mounted appropriate equipment on prepared surface , mixing by mix in place method with rot
Providing, laying, spreading and compacting stone aggregate of specific size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to required density Grading 2 as per Technical Specification Clause 405. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Providing, laying, spreading and compacting stone aggregate of specific size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to required density Grading 3 as per Technical Specification Clause 405. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
avator at OMC and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specifications Clause 401 including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Brick edging on both sides of the road of first class bricks 8 cm (3") wide and 12 cm. 4½"deep laid with mud mortar including labour and supply of. bricks finished to required template and proper alignment and also including dressing and ramming the excavated earth as directed by Engineer-in-Charge. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Providing and applying tack coat with Bitumin VG-10 using emulsion pressure distributer at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clauses 503. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Providing, laying and rolling of open graded premix carpet of 20mm thickness composed of 13.2mm to 5.6mm aggregates using 80/100 Grade bitumen bitumen to required line grade and level to serve as wearing course on a previously prepared base by manual means, including mixing in a suitable plants, laying and rolling with a three wheel 80-100kN static roller capacity, finished to required level and grades to be followed by seal coat as per Technical Specification Clause 508 including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Providing and laying seal coat by manual means with VG-10 Bitumen sealing the voids in a bitumenous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specifications Clause 510 including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Providing and applying primer coat of Low Porosity with Bitumen emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at rate of 0.70 Kg/Sqm using mechanical means as per Technical Specification Clause 502. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Plain/Reinforced cement concrete (PCC Grade M15) in sub-structure complete as per drawing and Technical Specifications including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Laying and compacting dry O.B.B. 40mm. Gauge in foundation in layers of not more than 15cm, thickness including local sand, in ratio 2:1 as per direction of the Engineer-in-Charge including cost of all materials, labour T&P etc. required and including watering & ramming for proper completion of work including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Pointing with cement mortar (1:3 ) on brick work in super-structure as per Technical Specifications including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.57 MB
BOQ_2022970.xls
BOQ • 0.32 MB
SBDPAHARPURKASHYAP.pdf
Tender Documents • 8.67 MB
Download all tender documents and submit your bid