| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-AOC VILL ANGNARA P O SIMULIA KALIBARI P S HASNABAD NORTH 24 PARGANAS PIN 743426 | NORTH 24 PARGANAS | WEST BENGAL | 743426 | ₹5.4 L | L1 | Accepted-AOC 1st Lowest |
| 2 | L2₹5.4 L+₹272 (0.05%)Rejected-AOC | ₹5.4 L+₹272 (0.05%) | L2 | Rejected-AOC 2nd Lowest |
| 3 | L3₹5.4 L+₹545 (0.10%)Rejected-AOC MAKARDAH ROAD DASNAGAR OPP UNITED CLUB HOWRAH 711105 | HOWRAH | HOWRAH | WEST BENGAL | 711105 | ₹5.4 L+₹545 (0.10%) | L3 | Rejected-AOC 3rd Lowest |
Tender Value
₹5.4 L
EMD Value
₹10,893
Closing Date
19 Aug 2026, 5:00 pmClosed
EE/BID
Office of the Executive Engineer Basirhat Irrigation Division Postal address Dhaltitha with Telephone No. Fax No. 03217 265258
Emergent restoration of Sundarban Embankment damaged on dated on 16.07.26 along right bank of river Kalindi for a length of 170M near H/O Probash Bain at Mouza- Samsernagar, Block-Hingalganj under Basirhat Irrigation Division in the District of North
2026_IWD_1038256_2
e SNIT No. -WBIW/EE/BID/e-SNIT- 09 of 2026-27
Open Tender
CIVIL WORKS
Percentage
14 days
Mouza- Samsernagar
Please refer Tender documents.
5 documents required · 5 mandatory
₹10,893
2 Sept 2026
17 Aug 2026
21 Aug 2026
17 Aug 2026
19 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter.(Dia. to be measured at mid length). | - | Metre | 41.47 | - |
| 2 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances. (a) Where boats are not necessary. | - | Metre | 13.11 | - |
| 3 | Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.) | - | Metre | 31.46 | - |
| 4 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). | - | Each Bag | 8.59 | - |
| 5 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates (stone / brick) and sewing as done in case of cement bags ,(tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge(cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag. | - | Each Bag | 8.34 | - |
| 6 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. | - | Each Bag | 3.58 | - |
| 7 | Earth work from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile. | - | Cum | 96.54 | - |
| 8 | Extra rate over Item Nos.7 for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres.
(i) 2(Two) nos .extra lead. | - | Cum | 28.6 | - |
| 9 | Extra rate over Item Nos.7 for all kinds of soil for every additional lift of 1.50 metre or part thereof beyond the initial lift of 1.50 metre.
(i) One extra lift | - | Cum | 14.3 | - |
| 10 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge [The rate is inclusive of Royalty & Cesses Charges and Compensation for earth for land owned/arranged by the contractor. Royalty payment certificate in original from competent authority are to be produced along with the bill, otherwise amount due towards Royalties @ Rs. 29.00/Cum & Cesses Charges @ Rs. 5.30/Cum will be deducted from the bills of works] Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. (a) within a lead of (I) Beyond 500 metre and upto 1.0 km. | - | Cum | 330.48 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
2911.pdf
Tender Documents • 0.50 MB
BOQ_2550772.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .