Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-Finance | ₹1.7 L | L1 | Accepted-Finance L1 |
| 2 | L2₹1.7 L+₹313.12 (0.18%)Accepted-Finance | ₹1.7 L+₹313.12 (0.18%) | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | shibu abraham L2 | mani kuruvilla L1 |
|---|---|---|---|---|---|
| 1.00Hand rail work | |||||
| 1.00 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 619.55 | kg | 178.42 ₹1,10,540.82 | 178 ₹1,10,280.61 Lowest |
| 1.00 | 4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded
stone aggregate 40 mm nominal size derived from natural sources) | 4.53 | cum | 9,062.58 ₹41,071.61 | 9,060 ₹41,059.92 Lowest |
| 1.00 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 40.56 | sqm | 164.86 ₹6,686.72 | 164 ₹6,651.84 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 39.63 | sqm | 386.16 ₹15,303.52 | 386 ₹15,297.18 Lowest |
Tender Value
₹1.7 L
EMD Value
₹4,340
Closing Date
26 Feb 2026, 5:00 pmClosed
BDO
pallom block panchayat vadavathoor p o
HAND RAIL
2026_CRD_837679_3
D-2713922/25
Open Tender
Civil Works - Roads
Item Wise
PALLOM BLOCK PANCHAYAT
Please refer Tender documents.
11 documents required · 11 mandatory
₹555
Yes
₹4,340
Yes
12 May 2026
19 Feb 2026
28 Feb 2026
19 Feb 2026
26 Feb 2026
19 Feb 2026
Hand rail work
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources)
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1411805.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
BOQ_1411805.xls
BOQ • 0.30 MB
sbd.pdf
Tender Documents • 0.95 MB
preliminaryagreement.pdf
Additional Documents • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .