Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹62.1 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹66.0 L+₹3.9 L (6.26%)Rejected-AOC | 2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹67,700
Closing Date
24 Nov 2022, 3:00 pmClosed
Chief General Manager
171 TNMB building 2nd floor Greenways Road RA puram Chennai 600028
Shifting Dismantling and Conversion Laying of UG cable of existing 11 KV Kattupalli OH feeder fed off Athipattu Pudunagar SS and existing L T SS VII 100KVA DT and its LT OH feeder converted into UG feeder at opposite to L T Ship Building
2022_TNRDC_262574_1
TNRDC/CD/023/2022
Open Tender
Electrical Works
Item Rate
120 days
Minjur
Please refer Tender documents.
2 documents required · 2 mandatory
₹17,700
TamilNadu Road Development Company Ltd
₹67,700
28 Jun 2023
9 Nov 2022
25 Nov 2022
9 Nov 2022
24 Nov 2022
10 Nov 2022
Amount
Erection of 2 nos . 2 pole DP structure without AB switch at Loc 27 & with AB switch at Loc 31
Cost & Supply of the following new materials of ISI standard as per TANGEDCO Specifications and properly stacking at stores as directed by the Engineer-in-charge including cost, conveyance and other incidental charges etc complete
PSC 9.0 mtr pole (2 nos for stud pole) 300 KG WL
Base plate
11 KV Tapping Channel cross arm
11 KV V cross arm 4'-6"
11 KV HT TI fitting
11 KV Pin Insulator with pin
11 KV Disc with MP
Back clamp for PSC 9.0 mtr pole
MS Bolts & Nuts
Cross bracing set
11 KV structure clamp
11 KV AB switch with insulator
DPDC Channel cross arm
Jumpering materials
Structure concreting
Structure earthing
Stay Set complete with Guy Shackle
Erection of 1 Nos 2 Pole DT structure at Loc 29
Cost & Supply of the following new materials of ISI standard as per TANGEDCO Specifications and properly stacking at stores as directed by the Engineer-in-charge including cost, conveyance and other incidental charges etc complete
PSC 9.0 mtr pole 400 KG WL
Base plate
11 KV V cross arm 4'-6"
Back clamp for PSC 9.0 mtr pole
11 KV Pin Insulator with pin
11 KV HT TI fitting
11 KV Transformer structure materials with clamp
11 KV AB switch with PT insulator
11 KV HG Fuse unit
DPDC Channel cross arm
Stay Set complete with Guy Insulator
MS Bolts & Nuts
Jumpering materials
Structure concreting
Structure earthing
11 KV LAS
Laying of HT/ LT UG cable
Cost & Supply of the following new materials of ISI standard as per TANGEDCO Specifications and properly stacking at stores as directed by the Engineer-in-charge including cost, conveyance and other incidental charges etc complete
PSC 8.0 mtr pole (2nos for stud pole)
Base plate
Back clamp for PSC pole
MS Bolts & Nuts
11 KV 3x300 sqmm XLPE UG cable as per TANGEDCO specifications
11 KV 3x300 sqmm XLPE O/D kit (HS type)
11 KV 3 x 300 sqmm straight joint kit (HS type)
225 mm RCC spun pipe
11 KV V trough
4 way MS HRC pillar box
LT UG cable 4 x 120 sqmm as per TANGEDCO specifications
LT UG cable 4 x 120 sqmm straight joint kit
LT open type mini pillar box
Plinth & earthing for pillar box
LT LAS
Storage charges for storing materials as directed by the Engineer-in-charge
Labour charges for erection of new materials at new location including transport charges , loading and unloading from stores to new location etc complete as directed by the Engineer incharge
Labour charges for re-erection of dismantled old materials(11 KV 433V, 100 KVA DT -1 No) at new location including transport charges , loading and unloading from old location to new location etc complete as directed by the Engineer incharge
Bharath Enterprises
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .