Loading…
Loading…
Tender Value
₹10.0 L
EMD Value
₹9,997
Closing Date
16 Jun 2026, 6:00 pm5d left
DY.CITY ENGINEER (SOUTH ZONE)
A.R.C. Work for Providing Services for Collection, Loading, Transportation and Disposal of Silt Generated from Drainage Line Desilting Works at Various Locations in Maninagar Ward, South Zone, to Authorized Dumping Sites Specified by the Health Department, Including Supply of Small Goods Vehicle Chhota Hathi Driver and Labourers for Drainage Maintenance Operations.
312592
Tender Notice No 2 Tender No 110
Open
Miscellaneous Works
Ahmedabad
5 documents required · 5 mandatory
₹900
municipal commissioner
₹9,997
8 Jun 2026
8 Jun 2026
8 Jun 2026
16 Jun 2026
8 Jun 2026
Name Of work :- A.R.C. Work for Providing Services for Collection, Loading, Transportation
and Disposal of Silt Generated from Drainage Line Desilting Works at Various Locations in
Maninagar Ward, South Zone, to Authorized Dumping Sites Specified by the Health Department,
Including Supply of Small Goods Vehicle (Chhota Hathi), Driver and Labourers for Drainage
Maintenance Operations. દ ણઝોન મણીનગર વોડમાં નેજ ખાતા તરફથી ુ દા ુ દા િવ તારમાં નેજ લાઇન
Q'ty Item Rate Per Amount
Rent for Providing Chota Hathi (Light weight vehicle)
with Driver at shown site incl. necessary oil/diesel/petrol
1 448 1000 Shift
for vehical and all other charges.Work Done as per
Instruction of incharge etc. Complete as Directed.
Supplying, labour for excavation of all types of soil at any
depth including excavation of asphalt pavement of any
2 thickness,demolit ion of brick work in CM of any
proportion including stacking of serviceable materials and
disposal of unserviceable material etc. comp. as directed.
(a) 800 Mazdoor at day /night 452 No
(b) 401 Makadam/ supervision/Fitter at day / Night 474 No
The Rates are Exclusive of GST. Prevailing GST will be paid separately.
AHMEDABAD MUNICIPAL CORPORATION
"South Zone Office", Opp. Fire Station, Rambaug, Maninagar, Ahmedabad - 380
Municipal Commissioner invites online Percentage Rate sealed tenders from interested contractors for the
work mentioned below.
1 Name of work A.R.C. Work for Providing Services for Collection, Loading,
Transportation and Disposal of Silt Generated from Drainage Line
Desilting Works at Various Locations in Maninagar Ward, South Zone, to
Authorized Dumping Sites Specified by the Health Department, Including
Supply of Small Goods Vehicle (Chhota Hathi), Driver and Labourers for
Drainage Maintenance Operations.
2 Time Limit 12Months
3 Tender Validity Period 120 days from the date of submission of the tender
4 Eligibility Criteria Register “E2” class in PWD in Govt. R&B/CPWD/AMC orequivalent
registration with any other state Govt. or institutions.
5 Estimated Cost put to Rs.
6 Earnest Money Deposit Rs.9,997/-Demand Draft Or Bank Guarantee in favour of Municipal
Commissioner, Ahmedabad to be submitted as prescribed in tender.
7 Security Deposit 5 % of the Tender Amount in form of Bank Guarantee / Demand Draft in
favour of Municipal Commissioner, Ahmedabad to be submitted as
prescribed in tender.
8 Tender fees Rs.900/-Demand Draft in favour of Municipal Commissioner,
(Non refundable) Ahmedabad)
9 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along with
Tender Fees Tender as described in the invitation of tender and submitted to Assistant
Manager(South zone), South zone office, Rambaug, Maninagar
10 Tenders issue date Tenders from the amc.nprocure.com website shall be downloaded from
AS PER TENDER NOTICE INVITED
11 Last date of receiving As per Notice inviting Tender / Addendum / Corrigendum.The tenders
Tenders. received after latest schedule date and time will not be entertained under
any circumstances.
12 Date of Opening As per Notice inviting Tender / Addendum / Corrigendum to Assistant
Manager / Add.C.E.(S/Z) office, 2nd Floor, South Zone Office, Opp. Fire
Station, Maninagar, Ahmedabad-380008
13 Mode of sending the Document shall be submitted in sealed envelope systems By RPAD/Speed
Tender Documents post/ Hand Delivery in sealed covers in Duplicate ( One Original & One
Duplicate) duly sign & seal by contractor .
14 Terms, Condition, & All general condition of contract mentioned in tender shall be applicable.
15 Defect &Liability Period The contractor shall be responsible to make good and remedy at this own
exppence any defect which may developed or may be noticed before the
period mentioned here under from the certified date of complition, The
within 15 days of recipts of the notice. In the case of failure on the part of
the contractor, the Engineer incharge may rectfy or remove or reexecute
the work at the risk & cost of the contractore. The Engineer incharge shall
be entitled to appropriate the whole or any part of the amount of cicurity
deposit towrdes they expences, If any, incurred by him in rectification,
removal or re- execution. The defect liability period shall be as under (a)
for all works costing up to Rs. 50,000 (amount put to tender), the period
shall be three months from the cirtified date of complition. (b) for all
workscosting more than Rs. 50,000 and upto Rs. 1 crore (Amount put to
tender) ,the period shall be six (6) month from the cirtified date of
compition or one monsoon , which ever letter.(c) the major project costing
more than Rs. 1 crore , the period shall be 12 months from the cirtified
date of complition which should include one monsoon.(d) For building
works , the period specified in (a) ,(b) & (c) above or elapse of monsoon
period following cirtifide date of complition.,whichever is letter . For the
purpose of deciding the monsoon period, the 30 september may be treated
as the last date.
16 Compansation for Delay 0.1% per day delay of remaining work after the completion date but not
more than 10% of cost of remaining works.
17 Deduction of Retention Retention @ 2% of the value of work done will be deducted from each
Money from each RA RA bill. It will be released along with release of payment of Final Bill.
18 Addendum/Corrigendum Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To the
Final Submission Time And Date. The Same Shall From a part Of Tender
And The Same As to be Attached Along With The Tender Document.
19 For ESIC & EPFO Act. As per Account department circular no.37, date-09/08/2018 & Circular
20 GST As per AMC Finance Department Circular No. 38 dated 21-11-2022. The
Rates are Exclusive of GST. Prevailing GST will be paid separately.
Conditional tenders will not be accepted. Municipal Commissioner reserves the rights to reject any or all
the tenders without assigning any reasons thereof.
Seal and Signature of the Bidder Add. City Engineer
AHMEDABAD MUNICIPAL CORPORATION ENGINEER DEPARTMENT
TECHNICAL SPECIFICATION
Name of Work : A.R.C. Work for Providing Services for Collection, Loading, Transportation
and Disposal of Silt Generated from Drainage Line Desilting Works at Various
Locations in Maninagar Ward, South Zone, to Authorized Dumping Sites
Specified by the Health Department, Including Supply of Small Goods Vehicle
(Chhota Hathi), Driver and Labourers for Drainage Maintenance Operations.
Providing & Supplying JCB Machine on rental basis in case of emergency situation and break
down type work & also during unavoidable condition as per instruction of engg.incharge , rate
includes all nece. shifting, fuel and operating charges and stacking of useful & non-useful
materials separately up to store. (No payment should be allowed for non working condition of
machinery and for pipe line excavation and laying work)
Item includes Providing & Supplying JCB machine for RCC/ Asphalt cutting and heavy
excavation in Case of heavy traffic Main road, rate includes all necessary shifting, fuel and operating
charges and stacking of usefull & unusefull materials separatly up to store Measurement shall be paid
Rent for Providing Chota Hathi (Light weight vehicle) with Driver at shown site incl. necessary
oil/diesel/petrol for vehical and all other charges. Work Done as per Instruction of incharge etc.
Complete as Directed.
The M/s shall be on Shift basis.
(a) Supply for UnSkllied Labuour For Monsoon During etc,to carryout different works during
monsoon for 8 Hrs. Shift. Work shall be carried out as per the instrucitons of Engineer In-
(b) Supply for Makadam/ supervision For Monsoon During etc,to carryout different works
during monsoon for 8 Hrs. Shift. Work shall be carried out as per the instrucitons of Engineer
The M/s shall be on No basis.
Contractor’s Signature Add. City
Engineer (South Zone)
કો ાકટર ારા ESIC અને EPFO ર શન ગેના અ. .ુ કોપ . નાણાં ખાતા સર લ
લ ુ બ ESIC અને EPFO
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (œrûtK Ítul)
APPLICABILITY OF PROVIDEND FUND AND MISCELLANEOUS PROVISIONS ACT
Successful bidder i.e. the agency whose tender is accepted by the AMC shall have to comply the
necessary formalities under the employees provided fund and Miscellaneous Provisions Act,
as Contributory Provident Fund Scheme is applicable to laborers engaged in construction
activity and shall have to submit proofs regarding deduction of provident fund and other dues
and depositing the same with government department under the act and the scheme regularly on
monthly basis failing which no running / final bill payment will be made by the AMC to the
contractor in any circumstances.
A certificate to the above effect has to be given by the contractor as under.
Declaration of Depositing Provident Fund contribution
This to certify that we have deducted the employees’ P.F. and deposited the same along with
employer’s contribution towards provident fund on labour charges / wages paid by us to the
laborers engaged for the work of
Authority under our Provident Fund Code No.___________
We produce herewith the copies of the challans for the provident fund deduction and
contribution deposited as mentioned above.
(Signed by an Authorized Representative of the Firm)
Name of the Representative
To be notarized by Notary
For BANK GUARANTEE
Seal and Signature of the Bidder Addl City Engineer (South Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
General terms & conditions
1. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water Resources
Department with the latest correction slips may be referred for quality of construction &
standard of Procedure (SOP). (only English version)
2. In the specification “as directed" / "approved" shall be taken to mean "as directed / "approved"
by the Engineering in charge.
3. Wherever a reference to any Indian standard appears in the specifications, it shall be taken to
mean as reference to the latest edition of the same of force on the date of agreement.
4. In "Mode of measurement" in the specifications wherever a dispute arises in the absence of
specific mention for a particulars point / aspect, the same in the relevant Indian Standards shall
be referred to.
5. All measurement and computations, unless otherwise specified shall be carried out nearest to
the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or thickness
shall be followed.
6. Definite particulars covered in the items of work, though not mentioned or elucidate in its
specifications shall be deemed to be included therein.
7. Approval of the samples of various materials given by the Engineer in charge or AMC's
Consultant shall not absolve the contractor from the responsibility of replacing defective
materials brought on site or materials used in the work found defective at a later date. The
contractor shall have no claim to any payment or compensation whatsoever on account of any
such materials being rejected by the Engineer in charge.
8. The contractor’s rate for the item of work shall be for the work completed in all respect.
9. All materials including those of electrical shall be got approved by the Engineer in charge/
Architect before using them in the work.
10. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be
removed from the site of work within 24 hours.
11. All work shall be carried out in a manner applying the best technique.
12. All tools, templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the works & all precautionary measures during execution
shall have to be kept in sufficient numbers and in good working condition at the site of the
13. Special modes of the construction not adopted in general Engineering practice, if proposed to
be adopted by the contractor shall be considered only if the contractor provided satisfactory
evidence that such special mode of construction and completion of work to the required
strength and quality. Acceptance of the same by the Engineer in charge shall not however,
absolve the contractor from the responsibility of any adverse effect and concordance of
adopting the same in the course of exaction or completion of the work.
14. The contractor shall be responsible for observing the rules and regulation imposed under the
"Minor Mineral Act", and such other laws and rules prescribed by the Government from time
15. All necessary safety measures and precautions (incl. those laid down in the various relevant
Indian Standard) shall be taken to engrave the safety of men, materials and machinery on the
work and also of the work itself.
16. Quantity measured in the tender is approximate. It may increase or decrease looking to the
quantum of actual work for which no any claim shall be entertained by A.M.C.
17. Contractor shall have to execute extra item if required only after necessary permission from
18. The work in general shall be carried out as per standard specifications of the relevant items to
be executed & as per the instruction of Engineer in charge & as per the guidance of AMC's
Consultant for this project.
19. The general terms & conditions of the contract shall be applicable & shall be binding on the
contractor. The contract agreement shall have to be executed between AMC & the agency to
which work is awarded for execution.
20. The time limit shall be reckoned after next day from the date of issue of the written work order
to the contractor after fullfillng the formality life SD & Agreement. No time extension will be
granted under any circumstances.
21. In case of any ambiguity in specifications mentioned in this tender, the interpretation given by
Additional City Engineer /Dy.M.C of A.M.C. will be final and binding to the Contractor.
22. The contractor shall take no advantage of any apparent error or omission in drawing or
specification and the Engineer -in-charge shall make such corrections and interpretations as
necessary to fulfill the intent of the plants and specifications.
23. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
24. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal
Corporation. will be payable by the contractor.
25. No any kind of price rise / price escalation / price variation for cement , steel or labour shall be
26. Contractor is requested to see the site physically before tendering. He is also requested to quote
the rates keeping in view of all the points mentioned in relevant pages of tender documents.
27. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped water
for the construction of the works and provide a satisfactory supply of potable water for
drinking, washing, sanitation and cleaning down. The contractor will be responsible for all the
costs where applicable of connection, meter installation, water consumed, water required for
testing purposes, disconnection and the laying, maintenances and ultimate removal of any
distribution system around the site.
28. Electricity: Electric supply will be made available at the site by the Contractor and the
contractor must make his own arrangements with the Corporation and Electricity Supply
Authorities and with other contractors to connect and to take a supply from such services,
paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site for
purpose of the work and shall pay such charges as is fixed by the appropriate supply
In case there is any delay in supply of power site of any interruption or fault in the power
during the work. No compensation shall be paid for idle labor staff, machineries and for use of
diesel operating sets etc. as the case may be.
29. Tenders shall submit all the valid/certified documents in support of their initial/eligibility
criteria mentioned above along with the bid. They shall have also to submit the income tax
clearance certificate and solvency certificate.
30. No advance such as secured advance machinery advance, mobilization advance or materials
advance will be given.
31. The contractor shall get the electrical works executed through the authorized Government
approved licensed electrical person or firm in appropriate category in accordance to contractual
32. The electrical works shall be carried out strictly in accordance with the directives issued by
Engineer in charge.
33. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes &
thereby total amount of work increases/ decreases.
thereby total amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision what so
34. In case of any dispute, decision of Municipal Commissioner shall be final and binding on the
35. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any respect
will be rejected. Municipal Commissioner reserves the right to increase/decrease the scope of
work. No any claim to that effect shall be entertained. The Municipal Commissioner also
reserves the right to reject any or all the tenders without assigning any reason thereof.
36. The contractors are requested to quote their rates considering above tender conditions.
37. The contractor shall have to paid balance Security Deposit within 15 days from the date if issue
of Letter of Interest (LOI). And after paying the balance S.D. the time limit will be started &
Execution of Agreement to be done than after.
In case of delay in paying balance S.D. by more than 15 days penalty at the rate of
0.01% of sanction tender amount per day will be deducted from the Bill.
Eventhough in special case, If work is not started because of monsoon or any other
special reason (like site is not available), after evaluation of situation the actual date of starting
of work will be consider after approval of Dy.M.C. (South zone)
38. The Contractor shall not claim for increase or decrease in the quantity of the item or the scope
39. The payment shall be made as per the A.M.C policy for the work done by the contractor.
40. Conditional tenderes will not be accepted.
41. The Contractor must be followed the rules and regulations for COVID-19 as per guidelines
published by WHO/ Center government/State government /Ahmadabad municipal
Signature of contractor with seal Additional City Engineer (S.Z)
Date Ahmedabad Municipal Corporation
FORM OF BANK GUARANTEE
(hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance with
the terms and conditions of tender for the work of
1 .Therefore. We hereby affirm that -we are guarantors on behalf of the Tenderer up to
(in figures) and we undertake to pay to Municipal Commissioner, Ahmedabad Municipal Corporation,
A'bad specified up to his first written demand, without demur without delay and without the necessity of a
previous of judicial or administrative procedures and without the necessity to prove to the Bank the
defects or short comings or debits of the contractor any sum within the limit of
2. We further agree that the Guarantee herein contemned shall remain in full force and effect during the
period that would be taken for the acceptance of tender.
However unless a demand of claim under this guarantee is made on its in writing on or before the
(Date to be specified will not he less than 180 days from the stipulated date of receiving the tender) we
shall be discharge form all liabilities under the guarantee thereafter.
3. We undertake not to revoke the guarantee during it currency except with the previous consent of the
Municipal Commissioner, Ahmedabad Municipal Corporation, A'bad in writing.
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the Tenderer or of the
Date: Signature & Seal of Guarantor...........................
5. The contractors shall have to furnish income tax clearance certificate before his tender is accepted and
intimate assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
Signature of Contractor Add.C.E (S.Z) Dy. Municipal Commissioner (S.Z)
Date Ahmedabad Municipal Corporation
TENDER DECLARATION FORM
The Deputy Municipal Commissioner,
South Zone, Ahemedabad
Name of Works: - A.R.C. Work for Providing Services for Collection, Loading, Transportation and
Disposal of Silt Generated from Drainage Line Desilting Works at Various
Locations in Maninagar Ward, South Zone, to Authorized Dumping Sites
Specified by the Health Department, Including Supply of Small Goods Vehicle
(Chhota Hathi), Driver and Labourers for Drainage Maintenance Operations.
I/We the undersigned have carefully gone through and clearly understood the Tender documents
for the above work. I/We have satisfied myself/ourselves as to the location of site, examined drawings.
I/We have visited site & fully acquainted with local situations regarding materials, labours & others
factors pertaining to work before submitting tenders.
I/We do hereby offer to execute and complete the whole of the work within the time specified all
in accordance with the specification, designs, drawing and instruction in writing referred to in the said
document and with such materials as are provided for, at the respective rates which I/we have quoted in
the schedule-B or at such other rates as maybe fixed under the provisions of these conditions.In the event
of this tender being accepted I/We agree to enter into an agreement and when required andexecute the
contract, according to your fom1 of agreement as or in default where of I/we bind myself/ ourselves to
forfeit the "Earnest Money Deposit."
I/We understand that if I/WE shall not enter in agreement within ten days or decided by AMC
from the date of receipt of letter of acceptance, you will forfeit the earnest money paid by me/us and take
necessary action as deemed fit.
I/We have enclosed a DEMAND DRAFT or PAY ORDER as an “Earnest Money Deposit", for the
sum as mentioned in tender notice, the full value of which is to be absolutely forfeited to the Employer If
I/We fail to commence the work specified. Otherwise the said sum shall be retained, by the Employer as
on account of such. Security)' Deposit'.' as provided for in the aforesaid documents.
I/We agree not to employ sub-contractors other then those that may be approved in accordance
with Conditions in the aforesaid documents.
I/We understand that you are not bound to accept the lowest or any tender which you may receive.
I/We am/are bound to execute the job if the work order is issued within 120 days from the date of
opening of the tender.
I/We agree to pay the Government income-Tax, Sales-Tax (Central and State) ,Sales Tax on work,
octroi duties and other prevailing Government taxes/charges on such items on which the same are leviable
and therates quoted by me/us are inclusive of the same.
Yours faithfully
Signature of the contractor
ybœtJtœ BGþrlrmvj ftuvotuhuNl
ÆÂûtKÍtul - Esluh Ftðþ
1. mbgbgto>t ykdu yuj.ytu.ytR. ytÃgt ctœ 10 rœJm mw^ebtk sÁhe me¾gtuhexe rzvtuÍex Che ðgth ctœ&e dKJtbtkk ytJNu. <ubs
ðgth ctœ Jfo ytuzoh R~gw &gu&e mbtg bgtoœt NY &guje dKtNu. <&t <u mt&u fhthvºt fhJtltu hnuNu. ylu <u bwsc ftb NÁ fhJtle
<theF dKJtbtk ytJNu. yuj.ytu.ytR. ytÃgt ctœ me¾gtuhexe rzvtuÍex ChJtbtkk rœl -15 fh<tk J^w rJjkc ltk rfMmt btk <ubs Jfo
ytuzoh ytvu&e ftb NY fhJtbtkk rJjkc &gu&e «r<rœl bkswh xuLzh hfbltk 0.01 % juFu vulÕxe cej btk&e ftvJtbtk ytJNu. <ub A<tk
rJrNÐ rfMmt btk atubtmt ltk fthKu y&Jt yrlJtgo fthKtumh ftb NÁ &R Nfu <ub l ntug <u rfMmt btk gtuøg<t aftme zu.Bgw.frb©h
(œ.Ítul) le bkswhe bu¤Je ftb NÁ fhJtle <theF dKJtbtk ytJNu.
2. xuLzh Jujezexe 120 r>Jm Mþ^ele hnuNu.
3. xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
4. S.yum.xe. «J<obtl œh «btKu yjd&e awfJJtbtk ytJNu. xuût fu yLg ftuE vK mhfthe fhJuht ChJtle sJtc>the ftuLx[tfxhle
5. htsg / fuL÷ mhfth©elt JF<tuJF<lt ftg>t Bþsc su ftuE hfble fvt< fhJtle &Nu <u bwsc ftuLx[tfxlt cejbtk&e fvt< fhJtbtk
6. juch JuÕVuh Vkz btxu ntjbtk htsg mhfth©eyu fhuj nwfb Bþsc 1% (yuf xft) hfb cejbtk&e ftve juJtbtk ytJNu.
7. bxehegj xuMxekdltu xuMxekdltu FhuFh &guj Fao ftuLx[tfxh©e vtmu &e Jmwj fhJtbtk ytJNu.
8. ftb ytv<e JF<u su <u ftuLx[tfxhLþk hSMx[uNl ægtlbtk htFelu <ule bgto>tbtk ftb ytvJtbtk ytJNu.
9. yt xuLzh su <u Jdolt btLg gtœe lt ftuLx[tfxhtu Che NfNu. dJobuLxlt btLg ftuLx[tfxhu y.BGþ.ftuvotu.btk btLg ftuLx[tfxhtu le gtœebtk
hSMxuNl fhtJJtLþk hnuNu.
10. yt Wvhtk< y.BGþ.ftuvotu. lt slhj ftuLx[ufx fLzeNl ylu xuLzhle Nh<tu ck^lf<ot hnuNu. su BGþrl.ftuvtuohuNl Juc mtEx
www.ahmedabadcity.gov.in Wvh Bþfuj Au.
11. ftuLx[tfxh lu vubuLx - hl´dcej BGþrl.ftuvotu.lt su <u atÕþ mbglt mhfGþjh Bþsc fhJtbtk ytJNu.
12. Nh<e xuLzh MJefthJtbtk ytJNu lrn.
13. xuLzh MJefthÔþ, h> fhÔþ, ftulu ytvÔþ ylu fgt CtJ&e ytvÔþ <u ykdu zu.BGþrl.frbNlh©eltu rlKog ytFhe hnuNu.
14. œhuf ytExbltk MvuNeVefuNl ftuvtuohuNlltk bkswh &guj MvuNeVefuNl Bþsc <&t RLzegl MxtLzzo ftuz ytuV «ufxem ltkk btLg ^tht ^tuhKtu
Bþsc hnuNu ylu zu.mexe yuLSlegh©eltu rlKog ytFhe hnuNu. Jtuxh´d fhJtbtk lrn ytJu fu >hhtus J^thtltu zucheÍ WvtzJtbtk lrn
ytJu <tu ftuLx[tfxhltk Fauo ylu òuFbu Jdh ltuxemu Jtuxh´d fhtJJtbtk <&t zucheÍ WvtzJtbtk ytJNu ylu cejbtk&e hfb ftve juJtbtk
15. yufe JF<u yuf fh<tk Jæþ søgtytuyu ftbNY fhJtltu Jfoytuzoh b¤u <tu ftb yuf mt&u s yuf s c<tJuj søgtyu fhJwk vzNu. yuf ftb
ÃþÁ &tg vAe cesw ftb NY fheyu <uÔþk atjNu lrn.
16. atÕþ ftbu ftuEvK mrJom jtEllu LþfNtl l &tg <u he<u ftb fhÔþk vzNu, òu ftuE mrJom jtEl lu LþfNtl &Nu <tu <ule mkÃËKo sJtcœthe
(òlbtjle) ftuLx[tfxhle vtu<tle hnuNu. mtEx vh ftb œhBgtl bswh fu sl<t lt ftuE btKmlt òlbtjlu lwfNtl &tg <ule
sJtcœthe ftuLx[tfxhle hnuNu. vtujem Vhegt> &tg <tu <ule sJtc>the vK ftuLx[tfxhle hnuNu. CuFz ^me l vzu <ule sJtc>the vK
vtujem Vhegt>btk ftuLx[tfxhle hnuNu. CuFz ^me l vzu <u btxu mjtb<elt vdjtk (suJt fu >tuhzwk ctk^e bsqh Ftztbtk W<thJt, mtuh´d
ylu Mx[x´d fhJt rJduhu) je^t Jdh bsqhlu Ftztbtk W<thNu <tu ftuLx[tfxh s vtujem Vhegt>btk sJtct>h hnuNu ylu BGþrl.ftuvtuohuNlltu
ftuEvK MxtV ytlt btxu sJtc>th hnuNu lrn. ytxÕþk mbSlu s xuLzh ChÔþk. Btswhtultu rJbtu vK W<thtJJtu.
17. juch yufx «btKu <ubs Bgw. frb§h©eltkk vrhvºt lkch 81 <t.26.02.2015 bwsc <btb juch / bsqhtulwk dwsht< rcÕzekd yuLz
y^h fLMx[[fNl Jfombtkk VhSgt< hSMx[uNl fhtJJt ykdu ybj fhJtltu hnuNu <&t fuxjt juch jtJNtu <u vK sKtJJtLþk hnuNu. juch
yufx «btKu ftgoJtne lrn &E ntug <tu <u btxu ftuLx[tfxh mkÃËKovKu sJtc>th hnuNu. ylu <ulu vubuLx ytvJtbtk ytJNu lrn <ubs ct¤
bswhtulu ftb Wvh htFe NftNu lrn. <ubs JF<tu JF< Bgw. frBNlh©e îtht fhJtbtkk ytJuj mh¾gwjhtule Nh<tu ftuLx[[tfxhlu ckk^l f<to
18. ftuEvK ftgœtfeg jexeduNl ybœtJtœ Nnuhle ftuxobtk hnuNu.
19. ftuE fthKmh òu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykdu ftuLx[tfxh ftuEvK «fthltu LþfNtle- J¤<hltu n¬ >tJtu fhe NfNu lrn fu
ftg>tfeg ftgoJtne yt ykdu &E NfNu lrn. xuLzh bkswh >ltu y&o ftb ytve s >uJtLþk Au <uJtu &E NfNu lrn.
20. ytuVh y&Jt xuLzhbtk œNtoJuj ytRxbltu sÚ&tu mkCrJ< sÚ&tu Au subt atjw ftb œhBgtl VuhVth &Jtle N¾g<t hnuje Au.
21. M&¤ vrhÂM&r< / sYhegt< Bþsc ftb fhtJ<t xuLzhbtk sKtJuj fJtuLxexebtk J^ Dx &Nu <tu <u ykdu ftuLx[tfxh îtht ftuEvK «fthle
J^thtle ltKtkfeg btkdKe fhe NfNu lrn. ylu ftb ytuAw &tg <tu ftuLx[tfxhle J¤<hle btkdKe MJefthJtbtk ytJNu lrn.
22. mtEx vh jtJJtbtk ytJuj btjmtbtl hesufx fhJtbtk ytJu <tu ðþhk< r>l-1btk vh< jE sJtltu hnuNu. yLg&t ftuvtuohuNl îtht <u
hesufx btjltu rlftj fhe >uJtbtk ytJNu ylu <ule LþfNtlele sJtc>the ftuLx[tfxhle hnuNu.
23. su ftuLx[tfxh vtmu bswhtultu rJbtu, ydtW&e W<htÔgtu ntug <ublu «t^tLg ytve ftb ytve NfNu.
24. bsqhtu fu htn>theytulu ftuEvK «fthltu yfMbt< &tg <tu <ule vtujem ftgoJtnele fu juch yufx bwscle ftgoJtnele sJtc>the
yb.BGþrl.ftuvtuo.lt fboatheytule ftuEvK he<u hnuNu lrn.btºt ftuLx[tfxh s yt btxu sJtc>th hnuNu. bswhtulu dbçËx, nuÕbux nt<k
btuò rJduhu ftuLx[tfxhu VhSgt< ytvJtltk hnuNu. bswhtu <&t MþvhJtEÍ fu Bþft>bltu rJbtu vK W<thJtltu VhSgt< hnuNu. juch yufx
Bþsc ltuk^Ke fhtJe <ult rlgbtuLþk vtjl fhJt ftuLx[tfxh ck^tguj hnNu. ct¤ bswhtu htFe NftNu lrn.
25. bsqhtu fu htn>theytulu ftuEvK «fthltu yfMbt< &tg <tu <ule vtujem ftgoJtnele fu juch yufx bwscle ftgoJtnele sJtc>the
yb.BGþrl.ftuvtuo.lt fboatheytule ftuEvK he<u hnuNu lrn.btºt ftuLx[tfxh s yt btxu sJtc>th hnuNu. bswhtulu dbçËx, nuÕbux nt<k
btuò rJduhu ftuLx[tfxhu VhSgt< ytvJtltk hnuNu. bswhtu <&t MþvhJtEÍ fu Bþft>bltu rJbtu vK W<thJtltu VhSgt< hnuNu. juch yufx
Bþsc ltuk^Ke fhtJe <ult rlgbtuLþk vtjl fhJt ftuLx[tfxh ck^tguj hnNu. ct¤ bswhtu htFe NftNu lrn.
26. rcÕz´d ftble ytExbtu btxu - slhj xuflefj MvuNeVefuNl ytuV rcÕz´d Jfomle çþf Bþsc yLþmhJtltk hnuNu. Mt>h ÃþM<eft
øþsht< çþf Mxtumo 20-ce, zeMx[ef Ntuv´d, mufxh-21, dtk^eldh&e b¤e hnuNu. su Juc mtEx www.ahmedabadcity.gov.in
27. bxehegj fu ceò xuMx´d hevtuxo ftuLxtfxhu vtu<tlt Fauo ftuvotuhuNl sKtJu <u søgtyu fhtJJtlt hnuNu. yt ykdultu mkÃËKo Fao <&t
Bgwrl.MxtVlu juctuhuxhe Mþ^e <&t buLGþVufah´d søgt Mþ^e jtJJt -jE sJtltu Fao vK ftuLx[tfxhu CtudJJtltu hnuNu.
28. btj su <u Mxtumo Wvh y&Jt mtEx Wvh jtuftulu lz<h l &tg <u he<u MËalt Bþsc W<thJtltu <ubs dtuXJJtltu hnuNu.
29. òu BGþ.yuLSlegh´d MxtV sKtJu <tu ftuLx[tfxhu atÕþ ftbu mtEx Wvh zeÍexj fubuht&e ftb atÕþ > vnujt, atÕþ ftbu <&t ftb ÃËKo
>ltk Vtuxtud{tVm BGþrl.yturVmbtk ytvJtltk hnuNu <u rmJtg ftbLþk vubuLx fhJtbtk ytJNu lrn òu MxtV MËalt ytvu <tu fubuhtbtk&e
ftuBÃGþxhbtk Vtuxt x[tLmVh fhe ytvJtlt hnuNu. yt ykdu ftuE vK J^thtltu Fao ytvJtbtk ytJNu lrn.
30. ftuEvK fthKmh xuLzh h> fhJtbtk ytJu <tu ftuLx[tfxh <u ykdu ftuEvK «fthltu n¬ >tJtu fu J¤<hle btkdKe fhe NfNu lrn. yt Nh<
MJeftgo ntug <ubKu s xuLzh ChÔþk.
31. bxehegÕm suJt fu hu<e, #xtu, mebuLx, vtEv, rJduhu MxtLzzo bxehegÕm MvuNeVefuNl «btKult jtJJtlt hnuNu. sgtk ftuE atuFJx l
&E ntug ðgtk ytE.yum.ftuz «btKu bxehegÕm jtJJtLþk <&t xuMx´d fhtJJtLþk hnuNu. <ubs ftuLx[tfxhu muBvj yu«wÔz fhtÔgt ct> ftb
NY fhtJJtLþk hnuNu.
32. yt xuLzhbtk òu ftuE ytExb hne dE ntug <tu <u atÕþ yum.ytu.yth.btk&e juJtbtk ytJNu ylu òu yum.ytu.yth.btk ytExb l ntug <tu
btfuox huEx&e huEx yultjemem fhe su CtJ Ft<t <hV&e ytvu <u ftuLx[tfxhu juJtltu hnuNu. yt mbSlu s xuLzh ChJtLþk hnuNu. J^tht
le ytRxb btk ftuLx[tfxhle btkdKe Bþsc CtJ b¤Nu lrn.
33. atÕþ ftb >hBgtl «tuxufNlle mkÃËKo sJtc>the ftuLx[tfxhle hnuNu subtk vevzt, >tuhzt, CgMËaf ctuzo, jtj xul , cuhefuxekd xuv,
ÃjtMxef vèe, rJ. ftuLx[tfxhu jtJJtLþk ylu mtaJJtLþk hnuNu. ylu ftuEvK yfMbt< &Nu <tu <ule mkÃËKo sJtc>the ftuLx[tfxhle hnuNu.
34. MxtV MËalt ytvu <tu mtEx Wvh zuEje «tud{um hSMxh ftuLx[tfxhu htFJtLþk hnuNu. >hhtus ytme.mexe yuLSlegh©ele <ubtk mne juJtle
hnuNu, <ubtk >hhtus ftb fh<t bswhtule mkÏgt, fhuj ftbdehe <&t yr^ftheytuyu ftb Mþ^thJt fu «tud{um J^thJt ltuk^ fhuj ntug <tu <uLþk
ftuBÃjtgLm ytvJtLþk hnuNu ytJe ltuk^ltk sJtc l &gu fu <u «btKu M&¤ Wvh ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle m•tt yuze.mexe
yuLSlegh©elu hnuNu <u ykdu ftuLx[tfxh ftuE Jtk^tu jE NfNu lrn.
35. rlg< mbgbgto>tbtk ftb ÃþY l &gu&e xuLzh ¾jtuÍ bwsc ctfe ftbltkk 10.00% juFu vulÕxe BGþrl.ftuvtuohuNllu åþfJJtle hnuNu.
36. xuLzh le yt Nh<tu ce - 1 Vtubobtk sKtJuj Nh<tulu ytuJhYj fhNu.
Wvhtuf< <btb Nh<tu <&t rlgbtu buk ft¤SÃËJof Jtkauj Au ylu blu fçËj bksqh Au.
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (œrûtK Ítul)
yufhthlwk Vtubo
(1) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tk vnujtk buk/ybu M&¤le bwjtft< je^e Au ylu
ftblu jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e M&trlf vrhrM&r<le ò<-btne<e bu¤Je Au.
(2) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu jd<t >M<tJustu
ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt mkb< Awk/Aeyu.
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (œrûtK Ítul)
" ybœtJtœ BGþrlrmrvj ftuvtuohuNl”
œrûtK Ítul- Esluh Ftðþ
vtKe, z[ulus, vuJ´d, heEMxuxbuLxlt ftuLx[tfxhu Ftm JtkaJt ylu ægtlbtk htFJtle ctc< leau Bþsc Au.
" yt ftblt œhuf ytExblt sÚ&tbtk ~ËLg &e cMmtu xftle JD^x &Jt mkCJ Au. ftuE ytExbltu CtJ J^thtu
ytvJtbtk ytJNu lrn. yBþf søgtyu swlt vÚ&h s VheJth heEMxux fhJtlt &Nu. <uJe œhuf ytExbbtk J^^x &tg fu
ytExb yufÍefGþx l &tg <uÔþk vK clNu. ytlt btxu ftuEvK «fthle J¤<hle btkdKe fhJtle hnuNu lrn fu CtJ
J^thtu, vK ytvJtltu &Nu lrn. <ult btxu Ãþh<tk mt^ltu ylu bsqhtu ntug, yuf mt&u yluf søgtytuyu ftb fhJtle ûtb<t
ntug <ubKu s rJathelu xuLzh ChÔþk. bsqhtu l&e fu dtbzu s<t hÌtt Au fu ntu¤e, lJhtºte, rœJt¤e, jøl meÍl fu yLg
<nuJthtubkt fu «mkdtubtk bsqhtu ytJ<t l&e <uJt fu ceò ftuEvK cntlt nuX¤ ftb ck^ htFe NftNu lrn yLg&t htuslt
Yt.250.00le J^thtle vulÕxe ftb ck^ hnu fu MËalt fh<t ytuAt bsqhtu ytJu <ulu je^u fhJtbtk ytJNu.”
ftuLx[tfxhle mne yuze.mexe.yuLS.
rm¬t ylu btuctEj lkch (œrûtK Ítul)
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be as per tender notice after the order to start the works. Progress of
work should be in proportion to time limit. The details of reinforcement of R.C.C. work shall be as per
design and instructions of Add. City Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may be
brought by him on site. This account shall be regularly maintained and kept open for inspection by
Municipal Staff. Watering of all the items shall be as per instructions otherwise no payment shall be made
to contractors. Mixing of concrete shall be done by concrete mixer machine. Arrangements of binding
vibrator for R.C.C. works if required shall have to be made by the contractor.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The
contractor shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic. He
shall be responsible for any damage to public. If any incident happen, during the execution of work. In
case of dispute for unseen or overlooked items the decision of the Dy. City Engineer shall be final. The
contractor shall have to give site clean of all rubbish during the work and at the time of completion of
work and hand over the site with final finishing of the work as directed. All the rejected materials shall be
removed from site within 24 hours by contractor at this risk and cost. Debris shall have to cart daily from
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall have
to prepare through of bigger size and mix the mortar in the required proportion. In on case he shall be
allowed to mix the mortar either on floor or any finished surfaces. The contractor shall have to make his
own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the
contractor and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or
if item is not available in SOR than based on current market rates. In case of extra item decision of Add.
City Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the
propose work the contractor shall carry out the same at his quoted rates without charges any extra and the
contractor will have to carry out the works and he will be paid at the rate quoted by him. No claim for
extra rate for subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall
have to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will
be fully responsible for compliance of the various provisions under contract Act. 1970 and the Rules
framed the to under.
The tender for the work shall remain open for a period (120) days from the date of opening of the
tenders for this work and that the tenderer shall not be allowed to withdraw on modify the offer on his
own during the period. If any tenderer withdraw or makes any modifications or addition in the terms and
conditions of his tender not acceptable to the Municipal Corporation the Municipal Corporation shall
without prejudice to any right or remedy be at liberty to forfeit in full the said earnest money and black list
the contractor.
If work is not started within specified time limit i.e. within ten days from the date of order to start
the work the penalty of the 0.01% tender Amount per day of delay of start shall be recovered separately
from the immediate bills payable to the contractor. Contractor has to make his own arrangement for
procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of
iv) Condition of Form - B1 only Standard Specification of material & code of practice will be
applicable. Form B1 can be is available in website. Specification shall be as per ' R & B Dept. -
Govt. of Gujarat booklets of Building Works & and Road Works Specifications published by
Gujarat Book Depot, Sector-21. Gandhinagar. Other techinical condition will be applicable as per
tender condition only.
CONTRACTOR'SSIGNATURE & STAMP ADD. CITY ENGINEER
Mobile No.:- (South Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice No 02 2026 27 Tn No 110 Chhota Hathi.pdf
Download all tender documents and submit your bid