Loading…
Loading…
Tender Value
₹3.8 Cr
EMD Value
₹2.5 L
Closing Date
29 May 2026, 4:00 pmClosed
Additional Chief Engineer (P&C)
Supply, Erection ,Testing & Commissioning of 132KV LILO to 132KV Padavala substation from existing 132KV Vikram Gondal line on 220KV N.B M/C and D/C Tower with ACSR Panther conductor having line length 1.02Rkm under Gondal circle
301961
ACE(P&C)/Contract/E-430/TL/132kV/S&E
Open
Electrical Works
Works
Vadodara
29 documents required · 22 mandatory · 7 optional
₹8,850
Gujarat Energy Transmission Corporation Limited
₹2.5 L
6 May 2026
6 May 2026
6 May 2026
29 May 2026
6 May 2026
Sr. No. Description of Works - SAC Code 9954 Amount in Rs.
PART -A Supply of Materials
Erection of Line
TOTAL F.O.R. COST WITHOUT GST
Service of "Works Contracts" GST @ 18% (SAC 9954)
TOTAL END COST WITH GST
I am / we are willing to carry out this service package of works contract stated above at GST 18% (in figure) ______
% (in words _____ %) below / above the estimated TOTAL END COST for all the items stated there in.
The amount of tender works out with above % (in figure) for TOTAL END COST Rs. _____________ (in words Rs.
I / we confirm that our above quoted rates are ON firm price basis; except supply of tower materials (including nut-
bolts) for which Price variation will be applicable.
1) Separation of the Contract into Supply of Goods, Services and Civil Work, is only for convenience and better economical
management and for the ease of Accountancy but the entire Contract, is to be assessed under GST Law, as the Works
Contract Service, which is, as per the provisions of Section 2(30), read with, Section 2(119), further read with, Paragraph 6(a)
of the Schedule II to the CGST Act, 2017 or SGST Act, 2017 and similar provisions, applicable under the UTGST Act,
2017and the IGST Act, 2017 and the entire activity, would be subjected to levy of Tax, at the rate of 9% CGST + 9% SGST or
18% IGST, under the GST Law. However, Classification Codes for different segments or portions of the Works Contract, may
be specified separately, in the Supplies, with a final common Classification Code of Works Contract Service.
2) The Bidder is hereby conveyed that only SAC Code and Tax rate for supply of Service Works Contract i.e. 18% is relavant
for the purpose of contract since the contract is works contract and any separation in the works is for better management and
convenience purpose.
It is to state that bidders are however requested to fill the HSN code item by item for the knowledge and transparency purpose
which shall have no bearing on price or taxation payment.
Signature of Authorized Representative of Company / Agency
SEAL & SIGNATURE Status _________________
OF BIDDER Name of bidder Company
Estimated Cost - SUPPLY (For reference only)
Supply, Erection, Testing & Commissioning of 132kV LILO to 132kV Padavala substation from Existing 132kV Vikram - Gondal line on 220kV N.B. M/C+D/C Tower with ACSR Panther
Conductor having line length 1.02Rkm under Gondal Circle.
Sr. No. Description of Supply with Detail Specification of HSN / SAC Unit Quantity Unit Rate Unit Freight, Unit FOR Unit Rate FOR Total Cost (Excl. GST)
Service Package - Works Contract (SAC Code 9954) code for Packing & Insurance in Rs. in Rs.
identification Forwarding Charges in
only charges Rs.
A Supply of Materials
A.1 Tower Materials
A-2 ACSR Panther conductor kM 0.000 234904.00 2867.00 1229.00 239000.00 -
A.3 Silicone Rubber insulators - 132kV -
A.4 Insulator hardware for ACSR Panther conductor -
A.4.1 Single suspension Nos. 21 1564.00 17.00 7.00 1588.00
A.4.2 Double suspension Nos. 0 4413.00 34.00 15.00 4462.00 -
A.4.6 Mid span joint Nos. 5 695.00 6.00 3.00 704.00
A.4.7 Vibration damper Nos. 192 572.00 11.00 5.00 588.00
A.4.8 Repair sleeve Nos. 1 252.00 6.00 3.00 261.00
A.6 Hardware for Earth wire (7/3.15mm) -
A.4.1 Suspension Clamp Nos. 0 440.00 12.00 5.00 457.00 -
A.4.2 Tension Clamp Nos. 4 433.00 9.00 4.00 446.00
A.4.3 Mid span Joint Nos. 1 115.00 1.00 1.00 117.00
A.4.5 copper earth bond Nos. 4 558.00 13.00 6.00 577.00
A.7 OPGW - 24 Fibre (220kV) -
A.6.1 24 Fibre (DWSM) OPGW fibre Optic cable kM 0.000 145356.00 1999.00 857.00 148212.00 -
A.6.2 Installation Hardware set * & accessories for above OPGW Km 0.000 45351.00 502.00 215.00 46068.00 -
i.e. all cable fittings & accessories like suspension clamps,
tension clamps, vibration dampers, earthing clamps, down
lead clamps, in-line splice enclosures etc. including; Pigtails
a) Fibre Optic Approach Cable -
400 Mtrs - For 220KV S/S &
500 Mtrs - For 400KV S/S
(with installation hardware like ties/ clips / cleats, conduits,
ducts, supports, fittings, accessories etc).
(Any variation in quantities shall be absorbed by contractor)
A.8 OPGW - 48 Fibre (220kV) -
A.7.1 48 Fibre (DWSM) OPGW fibre Optic cable Km 1.000 195533.00 2385.00 1022.00 198940.00
A.7.2 Installation Hardware set * & accessories for above OPGW Km 1.000 48279.00 644.00 276.00 49199.00
i.e. all cable fittings & accessories like suspension clamps,
tension clamps, vibration dampers, earthing clamps, down
lead clamps, in-line splice enclosures etc. including; Pigtails
a) Fibre Optic Approach Cable -
400 Mtrs - For 220KV S/S &
500 Mtrs - For 400KV S/S
(with installation hardware like ties/ clips / cleats, conduits,
ducts, supports, fittings, accessories etc).
(Any variation in quantities shall be absorbed by contractor)
TOTAL COST FOR MATERIALS
Service of "Works Contracts" GST @ 18% (SAC 9954)
1) Separation of the Contract into Supply of Goods, Services and Civil Work, is only for convenience and better economical management and for the ease of Accountancy but the entire
Contract, is to be assessed under GST Law, as the Works Contract Service, which is, as per the provisions of Section 2(30), read with, Section 2(119), further read with, Paragraph 6(a) of the
Schedule II to the CGST Act, 2017 or SGST Act, 2017 and similar provisions, applicable under the UTGST Act, 2017and the IGST Act, 2017 and the entire activity, would be subjected to levy
of Tax, at the rate of 9% CGST + 9% SGST or 18% IGST, under the GST Law. However, Classification Codes for different segments or portions of the Works Contract, may be specified
separately, in the Supplies, with a final common Classification Code of Works Contract Service.
2) The Bidder is hereby conveyed that only only SAC Code and Tax rate for supply of Service Works Contract i.e. 18% is relavant for the purpose of contract since the contract is works contract
and any separation in the works is for better management and convenience purpose.
It is to state that bidders are however requested to fill the HSN code item by item for the knowledge and transparency purpose which shall have no bearing on price or taxation payment.
Signature of Authorized Representative
of Company / Agency
SEAL & SIGNATURE Status _________________
OF BIDDER Name of bidder Company
ERECTION PORTION
FOR REFERENCE ONLY
Supply, Erection, Testing & Commissioning of 132kV LILO to 132kV Padavala substation from Existing 132kV Vikram - Gondal line on 220kV N.B.
M/C+D/C Tower with ACSR Panther Conductor having line length 1.02Rkm under Gondal Circle.
Description of Supply with Detail Specification of Service Package - code for
SN Unit Quantity Unit Rate (Excl. GST)
Works Contract (SAC Code 9954) identificatio
B ERECTION OF LINE
B-1 Schedule-1 (Tower line)
The work of detail survey, preparation and submission of profiles in 6 copies
(PLSCAD as well as hardcopy),
Detail scope of Work :-
(a) Fixing of tower as per actual requirement, site condition and plotting of line
on profile having standard details i.e. span length, lat-long (co-ordinate),
chainage, weight and wind span, all dimensions, scale, legends, tower spotting
data etc. as per requirement and along with all require details.
(c) Preparation and submission of tower schedule as per standard require
details with all the Major - Minor crossing details in profile drawing and tower
schedule, along with due care of clearance as per prevailing standards i.e., for
1 all electric line with pole, all type of track, river, pond, nala, road, canal etc. kM 1.100 10222
(d) Details of Right of Way in profile drawing. i.e. Building, Temple, Well etc.
(g) Plotting line on TIKKA-MAP (Revenue Land map) - Required TIKKA-MAP
will be provided by GETCO.
Importantly, any work other than mentioned will align with the specific
requirements outlined by the Engineer-in-Charge.
Note : The survey report will be submit with sign and stamp of the surveyor
agency and engineer in charge.
Check Survey along with plotting of line route on village (tika) map with
2 Coordinates including detailed survey, preparation of profiles and revision in kM 1.100 9277
original route alignment, if any and as per instruction of EIC.
Excavation excluding back filling, but including shoring, shuttering,
dewatering, tree cutting for tower footings etc. for:-
a) Normal soil either dry or wet / Sandy soil. CMT 0.00 307.00 -
b) Black Cotton Soil either dry or wet. CMT 0.00 614.00 -
c) Normal submerged / marine soil where dewatering is necessary.
d) Black cotton submerged / marine soil where dewatering is necessary.
e) Soft Rock CMT 0.00 1066.00 -
f) Hard Rock CMT 1654.43 2212.00
Installation of steel reinforcement in concrete foundation including supply of
GETCO Approved M.S. bars, binding wire. Work also includes their cutting,
bending, shaping and binding with binding wire and fixing in position of TMT
bars as per drawing before the concrete work and as per instruction of the EIC
Stub-setting with prop or template including back-filling, during back filling
dispose of excess soil and levelling of site is to be done as per instructions of
5 EIC but excluding excavation and concreting etc. for all types of MT 12.898 8206
towers/extensions except special towers. (Weight of stub, cleat & template
with Bolt & Nuts of stub & template shall be counted)) up to 6 mtr extension.
6 ---- Do ---- up to 9 to 25 mtr extension MT 0.000 9918 -
Concreting of foundation by M20/M15/M25 mixture including shoring,
shuttering, compaction, dewatering etc. for normal tower / tower with extension
After completion of concrete work, curring (watering to concerte) is to be done
as per instruction of EIC.
(Rates are inclusive of supply of GETCO approved Cement only.)
Grounding of towers with pipe type earthing including excavation and back
filling, with supply of all materials like 32mm dia heavy duty 3 mtr. long G.I.
Pipe, 50 x 6 mm G.I. flat, GI bolt-nuts, with GI spring washer, salt, charcoal etc.
as per drawing and as per instruction of EIC.
Grounding of towers with COUNTER POISE TYPE including excavation and
9 back-filling and supply of all materials like GSS wire, lugs, bolt-nuts, salt, Set. 6 15756
coke/charcoal as per drawing.
Erection of super structure upto 6 meter extension including tree cutting,
fixing of tower accessories, attachments except ACD /DP /NP /CIP /PP and
excluding tack welding of bolts as per instruction of EIC. This includes taking
10 delivery of tower materials and bolt-nuts from GETCO’s stores etc. for normal, MT 97.969 10076
extension & special towers at destination and keeping them in safe custody
and transporting the same to erection site.
Same as above but erection of 9/12/15/18/21/25 mtr. Extention with Tower.
Fixing of Anti-climbing devices including supply of barbed wire as per
drawing and as per instruction of EIC.
c) 220kV Loc. 6 3589
Fixing of DP / NP / PP / CIP including supply of plates and supply of G.I. bolts-
13 nuts & tack welding as per drawings and as per instruction of EIC. Loc. 0 1690 -
13(a) (II) For D/C Loc. 5 3379
13(b) (II) For M/C Loc. 2 6758
Tack welding of nuts upto approx. 10 mtrs. height OR two bottom-most panel
from ground level at three places on the nuts diametrically and applying zinc
14 rich paint immediately after tack welding and as per instruction of EIC. Per Bolt 8100 15.00
Complete Installation of OPGW cable (24/48 fibres) including laying, providing
required hardwares, in line splices to be encased in Fibre Optic Splice
Enclosures, Laying and termination of a fibre optic approach cable required to
15 connect Overhead Fiber Optic Cable (OPGW) between the final iin line splice RKM 1.000 97193
enclosure on the gantry/tower and the Fibre Optec Distribution panel (FODP)
to be installed within the building at both the substation ends as per technical
16 Link up of OPGW Cable including all related activities as per inst. Of EIC. RKM 1.000 8850
Stringing of ACSR/ AAAC 6 (Six) conductors for double circuit including laying,
jointing, tensioning, clamping with armour rods, hoisting of insulator string
17 fixing of jumpers, dampers etc. & with required tree cutting on entire length for RKM 4.240 112928
adequate clearances / safe charging of line, as per instruction of EIC.
-do- but for Stringing of ACSR/ AAAC 12 (Twelve) conductors for Multi circuit.
Stringing of ACSR/ AAAC 3 (Three) conductors for single circuit including
laying, jointing, tensioning, clamping with armour rods, hoisting of insulator
18 string fixing of jumpers, dampers etc. & with required tree cutting on entire RKM 0.000 56464 -
length for adequate clearances / safe charging of line, as per instruction of
Work of Painting of Line name, Location No., two coat Painting Color code
of desired length and telephone no. on Tower Leg with letter of Gujarati
19 language using ISI marked Paint as per instruction of EIC including Supply of per loc 0 216.00 -
paints and other require materials.
a)Two legs - For 1 Nos. of Line (S/C)
b) All four legs - For 2 Nos. of Line (D/C) per loc 5 431.00
c) All four legs - For 4 Nos. of Line (M/C) per loc 2 862.00
Work of Painting of Two coat painting of color code Strip (Patta) only of 2 feet
length near cross arm using ISI marked paint as per instruction of EIC,
20 including supply of paints and other require materials. -
- 220kV Tower Line
- HOT LINE CONDITION
8 Nos of Color Code Strip (Patta) - For 4 Nos. of Line (M/C) per loc 2 1154
4 Nos of Color Code Strip (Patta) - For 2 Nos. of Line (D/C) per loc 5 577
Termination and connection for making LOOP-IN-LOOP-OUT arrangement with
existing line during specified outage including restringing of existing
conductors OR dismantalling / new stringing for making LILO arrangements
21 with existing line or for change over line as per approved LILO arrangement in Job Work 2 117351
profile as per instruction of EIC in COLD CONDITION and dismentalled
materials to be credited to near by GETCO's store or sub station as per inst.
Stringing of ONE ground wire including laying, jointing, tensioning, clamping
22 with accessories, jumpering, & sister wire, vibration damper earth bond etc.& Rkm 0.15 16843
including tree cutting as per instruction of EIC.
Schedule-2 Work involved in existing Line ( Old line dismentalling)
Description of Supply with Detail Specification of Service Package - code for
B-2 Unit Quantity Unit Rate (Excl. GST)
Works Contract (SAC Code 9954) identificatio
Dismantling of any type of tower including transportation & crediting to nearest
GETCO’s store or substation as per instruction of EIC.
Cutting of stubs of old tower to be dismantled including breaking of
chimney/cutting of RCC upto 450mm below ground level & crediting stubs &
2 Per tower 3 12618.00
steel bars to GETCO's store or substation including back‑filling & leveling of
site as per inst. of EIC.
Dismantling of conductors and line materials of existing line including
3 transportation & creaditing to nearest GETCO's store or substation as per -
instruction of EIC.: SOR B-13
(A) COLD CONDITION -
6 Conductors (D/C) Route Km. 4.30 67012
- 1 Earthwire Route Km. 0.00 9985 -
Dismantling of ‘A’ & ‘B’ type ‘H’ frame structure by breaking of muffing upto
450 mm depth from ground level and cutting the girders from 450 mm depth
from ground level by gas cutting & crediting the material to GETCO Store or
Substation including transportation as instructed by Engineer in‑charge.
5 - do – but for ‘C’ type structure. Loc. 0 11055 -
Dismantling of all three conductors and line materials such as insulators,
hardwares etc. and crediting to the GETCO’s Store or Substation including
transporation as per instruction of Engineer in‑charge with submission of pole
wise inventory for preparing C.R.note.
Dismantling of OPGW cable with require accessories and creadit to GETCO's
store OR Sub station as per instruction of EIC.
TOTAL COST PART - B, SCHEDULE - 02 WITHOUT GST
TOTAL COST PART - B, SCHEDULE - 01+02 WITHOUT GST
Service of "Works Contracts" GST @ 18% (SAC 9954)
TOTAL COST PART - B, SCHEDULE - 01+02 WITH GST
1) While calculating the weight of stub-setting, the weight of stub, cleat & templetes shall also be added in stub weight.
2) Red oxide & zinc rich paint shall be applied after tack welding of nuts.
3) The above rates are with supply of cement by the contractor.
4) The rate indicated above includes taking delivery of all stringing materials from Board / Contractor store at destination keeping them in safe custody and
transporting the same to erection site.
1) Separation of the Contract into Supply of Goods, Services and Civil Work, is only for convenience and better economical management and for the ease of
Accountancy but the entire Contract, is to be assessed under GST Law, as the Works Contract Service, which is, as per the provisions of Section 2(30),
read with, Section 2(119), further read with, Paragraph 6(a) of the Schedule II to the CGST Act, 2017 or SGST Act, 2017 and similar provisions, applicable
under the UTGST Act, 2017and the IGST Act, 2017 and the entire activity, would be subjected to levy of Tax, at the rate of 9% CGST + 9% SGST or 18%
IGST, under the GST Law. However, Classification Codes for different segments or portions of the Works Contract, may be specified separately, in the
Supplies, with a final common Classification Code of Works Contract Service.
2) The Bidder is hereby conveyed that only only SAC Code and Tax rate for supply of Service Works Contract i.e. 18% is relavant for the purpose of contract
since the contract is works contract and any separation in the works is for better management and convenience purpose.
It is to state that bidders are however requested to fill the HSN code item by item for the knowledge and transparency purpose which shall have no bearing
on price or taxation payment.
Signature of Authorized Representative
of Company / Agency
SEAL & SIGNATURE Status _________________
OF BIDDER Name of bidder Company
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. MS HT steel - Addendum for Tower material.pdf
2.Amendment- Structure weight.pdf
3.EARTH WIRE - R5 - Print copy.pdf
4.EARTH WIRE ACCESSORIES 7-3.15 PRINT COPY.PDF
5.HW and ACCS PANTHER CONDUCTOR.pdf
6.ON - Ammendment for ROW clause Tender Copy.pdf
7.OPGW (48F) specs final-R2-11.09.2023 final.pdf
8.R5 May 24- Silicon Rubber - Print Copy.pdf
9.Standard MQP GI Tower material for issuence to SUPPLIER COPY.PDF
10.SUPPLY ERECTION OF 132KV LINES.pdf
11.TOWER MATERIAL-220KV LINE-ZEBRA.pdf
12. MAAT LA Networth Form.pdf
13.L2 Schedule 132kV LILO Padvla.pdf
14.Amendment- Structure weight.pdf
15.ON - Ammendment for ROW clause Tender Copy.pdf
16.Form of LD undertaking 1A.pdf
17.Form of LD undertaking 1B.pdf
18.ONLINE SCHEDULE TECH - E-430.pdf
19.Online Schedule-QR-E-430.pdf
20.Public Procurement Circular of GOI.pdf
21.SD cum PBG Format.pdf
22.Letter for CBuD.pdf
23. ERECTION Circular-1.pdf
24. STD FQP TR LINE JUNE-2014.pdf
25.Safety regulation for transmission line.pdf
26.TTR Validity ammentment -2.pdf
27. ERECTION Circular-2.pdf
28. EMD BG Format.pdf
29.Joint venture agreement-Format.pdf
30.220KV Tower weight-DCNB-E-430.pdf
31.220KV Tower weight-MCNB-E-430.pdf
32.Foundation volumeE-430.pdf
33.POA Of JV Agreement-Format.pdf
34.LAt-Long-E-430.pdf
35.RoW policy 2021.pdf
36.Part-1 Tender Speci-132KV Vikram Gondal LILO Padwala-E-430.pdf
37.TL amend-1 Part-1-132KV Vikram Gondal LILO Padwala-E-430.pdf
38.Tender Notice-132KV Vikram Gondal LILO Padwala-E-430.pdf
39.L2 Schedule 132kV LILO Padvla.pdf
40.Price Bid-E-430.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .