| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.3 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹11.0 L+₹62,544.25 (6.05%)Rejected-AOC | L2 | Rejected-AOC Second Lowest | |
| 3 | L3₹11.6 L+₹1.2 L (11.9%)Rejected-Finance | L3 | Rejected-Finance Higer Amount quated | |
| 4 | L4₹11.7 L+₹1.4 L (13.1%)Rejected-Finance | L4 | Rejected-Finance Higer Amount quated |
Tender Value
₹12.1 L
EMD Value
₹30,250
Closing Date
28 Oct 2024, 6:00 pmClosed
Assistant Director of Soil Conservation
Office of the Assistant Director of Soil Conservation ,Idukki Project, Parakadavu, Kattappana.
CEMENT CONCRETE RETAINING WALL AND DR RETAINING WALL
2024_DSSC_697523_1
IS(4)315/2023
Open Tender
Civil Works - Others
Item Rate
30 days
KATTAPPANA
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,500
₹30,250
9 Jan 2025
18 Oct 2024
30 Oct 2024
18 Oct 2024
28 Oct 2024
18 Oct 2024
18 Oct 2024 - 28 Oct 2024
Amount
C.C. Retaining wall 1.0m height with 63mm weep hole - 62m
Earth work in excavation by mechanically means (Hydrolic Excavator)/ manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm. On plan) including disposal of excavated earth, lead up to 50m and lift up to 1.5m disposed earth to be levelled and neatly dressed. All kinds of soil as per code number 2.6.1
Rock anchoring - providing dowel bar of 12mm dia. Bars of 100cm long hooked at one end in 15 cm deep holes fixed with it cement grouting including cost and conveyance of steel, labour charges etc. complete as per code number OD52/2024-2025
Centering and shuttering including strutting, propping etc. and removal of form work for foundation, footings bases of columns as per code number 4.3.1
Centering and shuttering including strutting, propping etc. and removal of form work for retaining walls, return wall, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets,kerbs and steps etc. as per code number 4.3.2
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all works up to plinth level 1:2:4 as per code number 4.1.3
D R Retaining wall 1m height - 130M
Earth work in excavation by mechanically means (Hydrolic Excavator)/ manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm. On plan) including disposal of excavated earth, lead up to 50m and lift up to 1.5m disposed earth to be levelled and neatly dressed. All kinds of soil as per code number 2.6.1
Rock anchoring - providing dowel bar of 12mm dia. Bars of 100cm long hooked at one end in 15 cm deep holes fixed with it cement grouting including cost and conveyance of steel, labour charges etc. complete as per code number OD55/2024-2025
Centering and shuttering including strutting, propping etc. and removal of form work for foundation, footings bases of columns as per code number 4.3.1
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all works up to plinth level 1:2:4 as per code number 4.1.3
Dry Rubble without Concrete levelling courses masonry with good quality blased rubble including packing to compactness to lines and levells cost and conveyane of all materials labour chargse etc. complete as per the direction of departmental officers at site as per code number OD59/2024-2025
Centering and shuttering including strutting, etc. and removal of form work for foundation, footings bases of columns etc. for mass concrete as per code number 5.9.1
Steel reinforcement for r.c.c. work including straitining, cutting, bending, placing in position and binding all complete up to plinth level Termo - Mechanically treated bars of grade Fe-500D or more as per code number 5.22.6
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishind and reinforcement - all works up to plinth level 1:1.5:3 as per code number 5.1.2
JACOB VADAKKAN
THOMAS K JOSEPH
Antony Varkey
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .