Tender Value
₹31.2 L
EMD Value
₹32,000
Closing Date
18 Jun 2026, 4:30 pm
SRI GOWRESWARA SWAMY TEMPLE
GOWRAVARAM VILLAGE KAVALI MANDAL SPR NELLORE DISTRICT
Construction of Arch Gate and Providing Cut Stone Flooring to Sri Gowreswara Swamy Temple, Gowravaram (V), Kavali (M), SPSR Nellore District (AP), Est.Cost Rs.40.00 Lakhs
942509
01/GOWRAVARAM/2026-27, Dt 02.06.2026 of Person-in-Management, Sri Gowreswara Swamy Temple, Gowravaram VIllage, Kavali Mandal, SPSR Nellore District (AP)
OPEN - NCB
Civil Engineering Works
SRI POTTI SRI RAMULU NELLORE
10 documents required · 10 mandatory
₹1,105
₹32,000
3 Jun 2026
3 Jun 2026
3 Jun 2026
Earth work excavation and depositing on bank with intial lead and lift in BC Soils for Foundations as per SS No. 301 For Foundation - For Arch Gate Pillars
Filling of Foundation and basement with best river sand in layers of not more than 15 cms thick each well watered to saturation and consolidated including cost and conveyance of all materials incidental charges etc., complete For Arch Gate Pillars alround Temple under Flooring
C.C(1:4:8) using 40mm HBG metal including cost and conveyance of all materials, labour for mixing curing, ramming, watering etc.,complete For Arch Gate Pillars
Ornamental Brick with CM (1:5) 2nd class brick including cost and conveyance of Cement and all other materials to work spot labour charges etc., complete for Salaharam over Arch
VRCC (1: 1 1/2 : 3) using 20mm HBG Metal including cost and conveyance of cement and all other materials to work spot labour charges curing etc., complete but excluding cost and conveyance of steel and its fabrication charges etc., A) For Footings
C) For Plimth Beaam
E) For Roof Beam
F) For Sunshade 3.0 vide at the height above 3.66 M for Arch Gate
Supply and fixing of Tar Steel including cost and conveyance of cutting cracking bending and tying Grills and placing in possition as directed including cost of binding wire fabrication charges etc. complete
Ornamental Plastering with CM (1:3) and CM (1:2) with 1" to 1 1/4" thick with required ormentation rendering work spot labour charges curing etc., complete 1st Class - A) Above Roof Level
B) For Chitrakuntam Pillars
C) For Chitrakantam Pillars
D) Providing Pushpa Pothicas
Plastering with CM (1:3) 12mm thick including cost and conveyance of cement and all other materials to work spot labour charges etc., complete 1st story
Providing Cement Vigrahams using Cement, Fine Sand Iron bars, mesh brick bats, flat tiles pieces etc., including cost and conveyance of materials labour charges curing etc., complete
Painting with best emulsion paint two coats over primary coat including cost conveyance of cement and all other materials to work spot labour charges curing etc., complete
Providing Scaffolding Charges during execution of work Upto 20' 0" ht for Alround Arch Gate
Supply and fixing of Cut Stone Flooring from Kuppam with 3 line dressing including cost conveyance of all materials to work spot labour charges etc., complete A) Cost of Stone - Alround temple Flooring
B) 3 Line Palamana Dressing
C) Labour Charges for Jointing
Total No. of Items 22 Nos ( Twenty two Items Only)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
3 GOWRAVARAM- SCHEDULE-1.xls
TENDER_DOCUMENT • 0.04 MB
3 GOWRAVARAM-SBD.doc
TENDER_DOCUMENT • 0.41 MB
Download all tender documents and submit your bid