Tender Value
₹1.7 L
EMD Value
₹4,234
Closing Date
8 Nov 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
THE ASSISTANT ENGINEER,CHEMPU G.P
O/o THE ASSISTANT ENGINEER,CHEMPU G.P
Refer the schedule
2023_LSGD_617734_1
LSGD/CELSGD/54218/2023-2024
Open Tender
Civil Works - Buildings
Item Rate
270 days
Brahmamangalam
Please refer Tender documents.
6 documents required · 6 mandatory
₹555
₹4,234
16 Feb 2024
31 Oct 2023
13 Nov 2023
31 Oct 2023
8 Nov 2023
31 Oct 2023
Amount
BUILDING MAINTENANCE
13.9.1:Cement plaster 1:3 ( 1 cement : 3 coarse sand) finished with a floating coat of neat cement.12 mm cement plaster
14.43:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
14.53.1:Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:One or more coats on old work
14.47.1:Painting on G.S. Sheet with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade:Old work( one or more coats)
2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
14.17: Raking out joints in lime or cement mortar and preparing the surface for repointing or replastering, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge
13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
10.25.1:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In stringers, treads,landings etc. of stair cases, including use of chequered plate wherever required, all complete
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
JOYAN CONSTRUCTIONS
Bidder Name
JOYAN CONSTRUCTIONS
Kadavil Constructions
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_926729.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .