Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAdmitted-Finance | ₹3.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.1 Cr+₹14.9 L (4.97%)Admitted-Finance | ₹3.1 Cr+₹14.9 L (4.97%) | L2 | Admitted-Finance |
| 3 | L3₹3.2 Cr+₹19.7 L (6.58%)Admitted-Finance A 1 BLOCK A ASTHA APRTMENT BHOJUBEER NEAR CIRCUIT HOUSE VARANASI UTTAR PRADESH 221002 UDYAM UP 75 0008931 | VARANASI | UTTAR PRADESH | 221002 | ₹3.2 Cr+₹19.7 L (6.58%) | L3 | Admitted-Finance |
| 4 | L4₹3.5 Cr+₹49.5 L (16.5%)Admitted-Finance | ₹3.5 Cr+₹49.5 L (16.5%) | L4 | Admitted-Finance |
| 5 | L5₹3.6 Cr+₹56.2 L (18.7%)Admitted-Finance | ₹3.6 Cr+₹56.2 L (18.7%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | INDIA SUPPY CORPORATION L1 | M/s Sharada Electricals L2 | M/S Grid Power Systems L3 | M/S SHUKLA ENTERPRISES L4 | M/S GANGA CONSTRUCTION L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Supply of Materials (A) | ||||||||
| 1.01 | 11 Mtr. Long STP | 439 | No. | - | - | - | - | - |
| 1.02 | 33 KV Top Channel | 22 | No. | - | - | - | - | - |
| 1.03 | MS Angle Iron for Bracing with Clamps | 404 | No. | - | - | - | - | - |
| 1.04 | 33 KV Disc Insulator with Fitting | 30 | No. | - | - | - | - | - |
| 1.05 | 33 KV Pin Insulator with Pin | 42 | No. | - | - | - | - | - |
| 1.06 | 33 KV X-Arms | 12 | No. | - | - | - | - | - |
| 1.07 | 33 KV X-Arm Holding Clamp | 12 | No. | - | - | - | - | - |
| 1.08 | E-Bracket Complete for 33 KV | 12 | No. | - | - | - | - | - |
| 1.09 | 33 KV PG Clamp for DOG Conductor | 12 | No. | - | - | - | - | - |
Tender Value
₹4.0 Cr
EMD Value
₹4 L
Closing Date
8 Jun 2020, 3:00 pmClosed
SE, EDC-II, Azamgarh
SE, EDC-II, Rahul Nagar Madya, Azamgarh
Shifting of 33 KV, 11 KV and LT Line in R.O.W. of Gorakhpur Link Expressway on Turnkey Basis Under Electricity Distribution Division-VI, Azamgarh (UP)
2020_PVVNV_470147_1
14/EDC-II(A)/2020-21
Open Tender
Electrical Works
Turn-key
240 days
Under of EDD-VI
See Tender Notice
5 documents required · 5 mandatory
₹5,900
EE ETD-II
₹4 L
18 Jun 2020
14 May 2020
10 Jun 2020
15 May 2020
8 Jun 2020
15 May 2020
15 May 2020 - 8 Jun 2020
Amount
Supply of Materials (A)
11 Mtr. Long STP
33 KV Top Channel
MS Angle Iron for Bracing with Clamps
33 KV Disc Insulator with Fitting
33 KV Pin Insulator with Pin
33 KV X-Arms
33 KV X-Arm Holding Clamp
E-Bracket Complete for 33 KV
33 KV PG Clamp for DOG Conductor
11 KV Pin Insulator with Pin
11 KV Disc Insulator with fitting
11 KV Top Channel
Dropper Angle Channel
T/F Base Angle
Stay-Set Complete
A.C.S.R. Weasel Conductor
A.C.S.R. Dog Conductor
Cable AL 3X300 sq mm XLPE 33 KV
Cable AL 3X185 sq mm XLPE 11 KV
11/0.4 KV, 25 KVA Transformer
33 KV XLPE Cable Termination Kit O/D 300 sq mm
11 KV XLPE Cable Termination Kit O/D 185 sq mm
Stone Pad
G.I. Pipe 6" Dia
G.I. Barbed wire
HDPE Pipe 6" Dia for underground cable
LT XLPE Cable AL 3.5X240 sq mm
Earthing Set Complete
11 KV X-Arm
11 KV X-Arm Holding Clamp
11 KV E-Bracket Complete
MS Nut & Volt of Proper Size
Clamp For Top & Dropper Channel
Aluminium binding wire
Danger board
Alluminium Paint
Red Oxide Paint
LT Clamp with nuts & Volts
PVC Cable 3.5X70/35 sq mm
LT lugs 70 sq mm
LT Shackle Insulator
Works (B)
Concreting of support/pole (0.268 Cu. m. per support/pole) including carriage & handling of all materials.
Erection of 33 kv line on 11 mtr. ST Pole including all works of excavation of pit, pole erection, back filling of earth, proper ramming & fitting of all accessories (cross arm, clamps with bolt and nut, 'E' bracket, insulator, danger board with clamp, earthing, making of plinth around ST Pole etc. and Laying, spreading, lifting and final sagging of 3 phases of ACSR Dog conductor in accordance with profile, sagging including binding, Jumpering and fixing of P.G. Clamp as per requirement in 03 Nos. conductor in parallel etc. complete) The work includes carriage & handling of all materials.(All works must be as per RESSPO Norms)
Erection of 11 kv line on 11 mtr. ST Pole including all works of excavation of pit, pole erection, back filling of earth, proper ramming & fitting of all accessories (cross arm, clamps with bolt and nut, 'E' bracket, insulator, danger board with clamp, earthing, making of plinth around ST Pole etc. and Laying, spreading, lifting and final sagging of 3 phases of ACSR Weasel conductor in accordance with profile, sagging including binding, Jumpering and fixing of P.G. Clamp as per requirement in 03 Nos. conductor in parallel etc. complete) The work includes carriage & handling of all materials.(All works must be as per RESSPO Norms)
Erection of LT line on 11 mtr. ST Pole including all works of excavation of pit, pole erection, back filling of earth, proper ramming & fitting of all accessories (cross arm, clamps with bolt and nut, Shackle insulator, making of plinth around ST Pole etc. and Laying, spreading, lifting and final sagging of 3 phases of ACSR Weasel conductor in accordance with profile, sagging including binding, Jumpering as per requirement in 04 Nos. conductor in parallel etc. complete). The work includes carriage & handling of all materials.(All works must be as per RESSPO Norms)
Erection of Four pole structure with all fitting such as Top Channel, MS Angle Iron for Bracing with Clamps volt and nut, composite polymar pin, insulator, danger board with clamp, earthing, making of plinth around ST Pole etc. (All works must be as per RESSPO Norms)
Erection of Triple pole structure with all fitting such as Top Channel, MS Angle Iron for Bracing with Clamps volt and nut, composite polymar pin, insulator, danger board with clamp, earthing, making of plinth around ST Pole etc. (All works must be as per RESSPO Norms)
Erection of Double pole structure with all fitting such as Top Channel, MS Angle Iron for Bracing with Clamps volt and nut, insulator, danger board with clamp, earthing, making of plinth around ST Pole etc. (All works must be as per RESSPO Norms)
Erection of GI pipe at Four pole, Triple pole, Double pole for laying cables from ground.
Digging of trench of 1.2 m depth for laying HDPE pipe and XLPE 33 KV, 11 KV and LT Cable.
Laying of HDPE pipes 6" dia, Laying of underground 33 KV, 11 KV and LT XLPE cable inside HDPE pipe with proper termination thourgh GI Pipe and Cable jointing kit complete.
Erection Of Double Pole with pole mounted LT S/S 11/0.4 KV 25 KVA Transformer as per RESSPO Norms along with earthing etc. complete.
Erection of stay set complete for 33 KV, 11 KV, LT Line as per RESSPO Norms.
Aluminium Painting of ST Poles with primer along with Numbering of poles with paints.
Dismantling & Carriage of old conductor and materials from work site to store site along with loading & Unloading with proper stacking.
M/s Sharada Electricals
M/S Grid Power Systems
M/S SHUKLA ENTERPRISES
M/S GANGA CONSTRUCTION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .