Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹14.9 L
EMD Value
₹29,720
Closing Date
9 Oct 2026, 6:00 pmDue today
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer
XEN
As BOQ
2026_RDPR_326294_16
136REW Samba of 2026-27Dated -28-09-2026
Open Tender
Civil Works
Percentage
60 days
Rajpura
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executve Engineer Rew Samba
₹29,720
28 Sept 2026
28 Sept 2026
10 Oct 2026
28 Sept 2026
9 Oct 2026
28 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m
in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed for a lead upto 1 meter from cutting edge. All kinds of soil | 44.28 | cum | 479.3 | ₹21,223.4 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 6 | cum | 4,826.5 | ₹28,959 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 17.12 | cum | 5,733.6 | ₹98,159.23 |
| 4 | Supply of stone boulders for plum concrete | 4.28 | cum | 700 | ₹2,996 |
| 5 | P/laying in position r.c.c of specified grade excluding cost of centering and shuttering in M20 upto plinth level | 12.69 | cum | 7,788.5 | ₹98,836.07 |
| 6 | P/laying in position r.c.c of specified grade excluding cost of centering and shuttering in M20 upto plinth level. Slab | 35.15 | cum | 9,821.85 | ₹3,45,238.03 |
| 7 | Providing tar steel inc. bending binding etc. | 4,784.12 | kg | 123.2 | ₹5,89,403.58 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of formwork column foundations | 76.92 | sqm | 286.35 | ₹22,026.04 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of formwork column upto roof level | 70.23 | sqm | 742.25 | ₹52,128.22 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of formwork soffit of slab | 100.33 | sqm | 718.2 | ₹72,057.01 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.97 MB
BOQ_1103541.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .