Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 CrAccepted-AOC | ₹5.0 Cr | L1 | Accepted-AOC Tender allotted to M/s Anand Associates |
| 2 | L2₹6.3 Cr+₹1.3 Cr (26.0%)Rejected-Finance H NO 30 SECTOR 17 PANCHKULA 2022R6473 | PANCHKULA | PANCHKULA | HARYANA | 2022 | ₹6.3 Cr+₹1.3 Cr (26.0%) | L2 | Rejected-Finance High Rates so the EMD is refunded |
Tender Value
₹3.1 Cr
EMD Value
₹6.2 L
Closing Date
24 Jun 2022, 3:00 pmClosed
Executive Engineer
Public Health Engineering Division Panchkula
Up gradation and commissioing after converstion of existing 4.5 MLD capacity sewage treatment plant based on moving bed Biological Reactor technology
2022_HRY_223269_1
Amt. Rs. 308.32 Lacs 4.5 MLD STP
Open Tender
Civil Works
Works
545 days
Public Health Engineering Division Panchkula
Up gradation and commissioing after converstion of existing 4.5 MLD capacity sewage treatment plant based on moving bed Biological Reactor technology
2 documents required · 2 mandatory
₹15,000
Yes
₹6.2 L
Yes
29 Nov 2022
25 May 2022
24 Jun 2022
25 May 2022
24 Jun 2022
25 May 2022
Amount
Upgradation and commissioing after conversion of existing 4.5 MLD capacity sewage treatment plant based on moving bed biological reactor technology (Attached growth process) to combined activated sludge process in conjection with MBBR Bio film process with addition of Anoxic Tank, Individual internal Recirculation Pumps, Return activated sludge pumps, Treated effluent lifting pumps in Tertiary Treatment Plant based on DMFs followed by Chlorination in existing STP complete in all respect with PLC, data transfer through modem to website and all other works contingent thereto including Operation and Maintenance of existing STP/MPS during up-gradation period and 3 months of trial run period, 12 months defects liability period after and 5 years thereafter on the commissioing of up-graded STP i.e. completion of Tertiary treatment Plant at Kalka. (Entire Civil Works as Per DNIT and existing structures any other work contingent thereto. (As per detail attached and inclusive of O & M)
Entire mechanical works as per DNIT (Existing mechanical equipment any other works contingent thereto." (As per detail attached and inclusive of O & M)
Entire Electrical & instrumentation works as per DNIT and existing electrical and instrumentation equipment any other work contingent thereto. (As per detail attached and inclusive of O & M)
Guaranted closure period of existing (STPs (Amount to be loaded for recovery if delayed beyond guaranted closure period)
Guaranted completion period for the Up-gradation as per DNIT. (Amount to be loaded for recovery if delayed beyond guaranted completion period)
HL HANDA AND CO
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .