| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAccepted-AOC | ₹4.3 L | L1 | Accepted-AOC L1 Accepted |
| 2 | l2₹4.8 LRejected-AOC | ₹4.8 L | l2 | Rejected-AOC L2 |
| 3 | L3₹5.9 LRejected-AOC | ₹5.9 L | L3 | Rejected-AOC L1 |
| Sl No | Description | Qty | Unit | SUDEEP S L2 | ASHARUF K K L1 | Vishnu R Krishnan L3 |
|---|---|---|---|---|---|---|
| 1.00Protection work DR | ||||||
| 1.00 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 48.62 | cum | 832.7 ₹40,490.04 | 734.79 ₹35,729.16 | 1,500 ₹72,937.50 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 33.98 | cum | 283.39 ₹9,628.18 | 249.9 ₹8,490.35 | 300 ₹10,192.50 |
| 1.00 | 60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 38.9 | cum | 1,887.38 ₹73,419.08 | 1,664.4 ₹64,745.16 | 1,500 ₹58,350 |
| 1.00 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 76.86 | cum | 4,392.3 ₹3.4 L | 3,873.66 ₹3.0 L | 5,500 ₹4.2 L |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 3.94 | sqm | 424.77 ₹1,673.17 | 374.58 ₹1,475.47 | 500 ₹1,969.50 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.93 | cum | 10,159.56 ₹19,618.11 | 8,958.89 ₹17,299.62 | 9,999 ₹19,308.07 |
Tender Value
₹4.4 L
EMD Value
₹10,965
Closing Date
2 Mar 2026, 6:00 pmClosed
Asst. Exe Engineer
Asst. Exe Engineer, MI Sub Division Kottayam
DR retainingwall is Propoded in the banks Nedumanny thodu at thonippara bhagam in ward no 7of Nedumkunnam Panchayath
2026_Irrig_839081_1
IRR/IA/TR/9102/2022_5_1_1/1
Open Tender
Civil Works - Others
270 days
Nedumkunnam
Please refer Tender documents.
9 documents required · 9 mandatory
₹970
Yes
₹10,965
Yes
17 Mar 2026
21 Feb 2026
3 Mar 2026
21 Feb 2026
2 Mar 2026
21 Feb 2026
Protection work DR
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1413665.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
NIT30.pdf
Tender Documents • 0.02 MB
SBD30.pdf
Tender Documents • 2.29 MB
BOQ_1413665.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid