Loading…
Loading…
Tender Value
₹29.2 L
EMD Value
₹30,000
Closing Date
20 May 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Panchayat R. & B. Division, Palanpur
Construction of Various Structure Under TAPS/Border Village/2025-26/B.K/ Package No.3 In Ta. Amirgadh Dist.Banaskantha (4 Roads)
301389
01 (2026-27)
Open
Civil - All
Banaskantha
6 documents required · 5 mandatory · 1 optional
₹1,500
Executive Engineer, Panchayat {R. &B.} Division Palanpur
₹30,000
11 May 2026
11 May 2026
11 May 2026
20 May 2026
11 May 2026
Name of work :- Construction of Various Structure Under TAPS/Border Village/2025-26 /B.K/ Package
No.3 In Ta. Amirgadh Dist.Banaskantha
Bill Of Quantities
Memorandum showing items works to be carried out :
No Description of Item (with brief specification and reference to book of
Quantity Unit Rate In figures Amount
specifications)
Clearing and grubbing road land including uprooting trunk, vegetation, grass bushes,
shrubs, sapling and trees girth upto 300 mm removal of stumps of trees cut earlier and
disposal of unservicable materials [C] By Mechanical means in area of light jungle
Earth work for embankment with selected soil including breaking clods, dressing,
2 with all, lead and lift (excluding watering and consolidation) (A) From borrow area 288.00 Cmt 154.87
with All lead and lift & CBR not less than
Rolling of earthwork in layers with vibratory roller 80 Kn to 100 Kn static weight
3 including filling in depressions which occurs during the process. 288.00 Cmt 22.96
Provdining and laying W.B.M of B.T.M.C metal of size 45 mm to 63 mm size
including 0.12 Cu.M. Stone Screeing & 0.08 Cu.M. stone dust as filler including
4 spreading, watering & consolidation by vibratory roller 80KN to 100KN static 147.90 Cmt 1677.49
weight. 75 mm thick compected.
Providing and laying cement concrete 1:4:8 (1cement : 4 coarse sand : 8 Machine
5 Crushed stone aggregates 40 mm. nominal size) and curing complete excluding cost 104.70 Cmt 2780.37
of from work in :(a) Foundation and plinth
Providing & Laying cement concrete 1:1:5:3 (1 cement : 1:5 course sand : 3 graded
stone aggregate 20 mm nominal size) for C.C. road and curing cost of form work.
Finishing the cement concrete road by trimix process inclusive of labour charges for
trimix vacuum dewatering process on cement concrete road by using vacuum
dewatering pump, surface floater, surface vibrator including channeling & making
grooves & rough finish to surface by providing expansion joints, contraction joint &
construction joints with fillings of joints with asphalt filler as per direction by
engineer incharge & as per specsificaiton.
Providing TMT Bar FE 550D reinforcement for R.C.C. work including bending,
binding and placing in position complete upto floor two level
Excavation for foundation upto 1.5 M. depth including sorting out and stacking of
8 useful materials and disposing of excavated stuff up to 50M. lead. (a) Loose or soft 271.20 Cum 122.94
Excavation for foundation upto 1.5 M to 3.0 M depth including sorting out and
9 stacking of useful materials and disposing of excavated stuff up to 50M. lead. (a) 14.00 Cum 136.30
Loose or soft soil
Providing and casting in situ ordinary cement concrete M-150 mix and providing
10 necessary pin headers including shuttering, scaffolding, laying vibrating curing and 281.40 Cum 3765.79
finishing complete without V Grooves. (A) Height from 0.0 to 5.00 mt
Supplying and fixing reinforced concrete heavy duty non-pressure pipes with collars
for culverts carrying heavy traffic as per IS 458-1991 specifications including setting
the pipes in C.M. 1:2 watering and laying (to level or slopes) of class NP3 of
following internal daimeters.(v) 900mm dia.
No Description of Item (with brief specification and reference to book of
Quantity Unit Rate In figures Amount
specifications)
Hazard Marker Sign :-Providing and fixing sign boards made out of 3mm ACP
(Aluminum composite Panel); size 90x30 cms. rectangular as per design of IRC-67-
2012. Pre treated with phospheting process & acid etching; coated with one coat of
epoxy primer and two coats of best quality epoxy paint ; reflectorised with High
Intensity Prismatic Grade retro refiectivesheeting of Type-4 as per ASTM D-4956 and
latest MORD Specifications; 1.8mtr long stand post of Iron Angle 75 x 75 x 6mm as
12 required and frame fabricated from suitable size iron angle of 35 x 35 x 3mm; painted 6.00 No 3518.69
with bestquality epoxy coatings in black and white bends. The details of symbol for
each board shall be as per the instruction of engineer in charge. The fixing at site shall
be in 1:2:4 CC blockof size 45 x 45 x 60 Cms. for each leg including excavation,
curing etc.complete under the supervision of engineer in charge. A warranty for
years for the Retro reflective sheeting from original manufacturer shall be submitted
by contractor. (A) Class-B High Intensity Grade Retro Reflective sheeting
Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and
13 stacking of useful materials and disposing off the excavated stuff upto 50 Meter 21.60 Cum 170.50
lead.(B) Dense or Hard soil
Providing and laying in position FE 550D bar reinforcement including cutting,
14 bending, hooking and tying complete as per detailed drawings for the following.(A) 1.05 MT 73858.69
Piers (B) Abutments (C) R.C.C. Returns
Providing hard side shoulder of 100 mm thick for embankment using quarry spall
with all lead and lift and including watering and rolling and consolidation of sub
grade in layers at OMC to required dry density including filling depression which
occur during the process using vibratory roller of 80 KN to 100 KN (selected quarry
spall having CBR value not less than 30.0)
Providing and fixing hectometer as per I.R.C. type design including painting, lettering
etc. com plate.
Supplying and fixing reinforced concrete heavy duty non-pressure pipes with collars
for culverts carrying heavy traffic as per IS 458-1991 specifications including setting
the pipes in C.M. 1:2 watering and laying (to level or slopes) of class NP3 of
following internal daimeters.(v) 300mm dia.
Total Tender amount
Rupees Twenty Nine Lakh(s) Twenty Thousand Two Hundred Eighty Seven And Paise Fifty Two Only
I/am we/are willing to carry out the work at _____% above /below _____________ percent (should be written in figures and words) of the estimated rates
mentioned above. Amount of my/our tender works out as under.
* Estimated amount put to tender
No Description of Item (with brief specification and reference to book of
Quantity Unit Rate In figures Amount
specifications)
1. The Contractor Shall Exhibit a board with deatiled specification and details of work as directed by the Engineer-In-Charge for which no Extra
Payment shall be made.
2. The labour crss will be deducted as per prevaling Rules i.e 1% of the work done.
3. GST and Income tax TDS will be deducted at a Source while making Payments of bills.
4. In all RCC items in Rate Analysis Standard cement Consuption has been taken as per Govt.G.R: PRC -10/2017 cement consumption/16/c,
Date: 11/05/2017 as stated i. S.O.R therefore in RCC Items where there is a changed as per actual mix design the cost of diffrence of cement
consumption have been deduvted from the rate of orignal item at the rate of input rate mentioned in all the tender.
Above all items of " Schedule-B" with iem Description,Unit,Rate & Amount Have verified by me and found Order.
Deputy Executive Engineer Executive Engineer
Panchayat R & B Sub Division Panchayat R & B Division
Palanpur Palanpur
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
001.Tender Form SBD-Pkg-03.pdf
002.SBD GR All Pdf.pdf
003.BOQ-pkg-03.pdf
005.specification pkg-03.pdf
006.Testing Shedule-pkg-03.pdf
Download all tender documents and submit your bid