Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.8 LAccepted-Finance | L1 | Accepted-Finance Due to L1 | |
| 2 | L2₹49.8 L+₹2.1 L (4.38%)Rejected-Finance NEAR HAIDAKHAN MANDIR VILL PO CHILIYANAULA RANIKHET DISTT ALMORA UTTARAKHAND 263645 | ALMORA | UTTARAKHAND | 263645 | L2 | Rejected-Finance Due to L2 |
Tender Value
₹46.5 L
EMD Value
₹77,400
Closing Date
21 Mar 2022, 11:00 amClosed
EE Bilaspur Division No. 2 HPPWD Bilaspur
EE Bilaspur Division No. 2 HPPWD Bilaspur
Annual Maintenance Plan for the year 2022-2023 (Major District Roads) On S.N.B Road Km 34/00 to 37/300(MDR-031)(SH- Providing and laying 30mm thick bituminous concrete)
2022_PWD_57968_4
PW-NBT/CB/Tender/2020/17156-57 dated 05.03.2022
Open Tender
Civil Works
Item Rate
75 days
Bilaspur
Refer in SBD
8 documents required · 8 mandatory
₹2,000
₹77,400
22 Mar 2022
14 Mar 2022
21 Mar 2022
14 Mar 2022
21 Mar 2022
14 Mar 2022
Amount
Providing and applying tack coat using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface &cleaning with mechanical broom.With rapid setting bitumen emulsion On bituminous surface @ 0.25kg/sqm. including carriage of materials, within all leads lifts and other incidentals as per direction of Engineer-in-charge.The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
)Providing and laying Bituminous concrete using crushed stone aggregates ofspecified grading, premixed with bituminous binder and filler, transportingthe hot mix to work site by tippers, laying with paver finisher equiped withelectronic sensor to the required grade, level and alignment and rolling withsmooth wheeled, vibratory and tandem rollers to achieve the desiredcompaction and density as per specification, complete and as per directionsof Engineer-in-Charge.40/50 mm compacted thickness with bitumen of grade VG-30 @ 5.5%(percentage by weight of total mix) and lime filler @ 3% (percentage byweight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPHcapacity.. including carriage of materials, within all leads , lifts and other incidentals as per direction of Engineer-in-Charge.The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 KN static roller to achieve the desired degree of compaction as per Technical Specification,2004Clause 506, 50mm(Fifty milimetre ) thick with bitumen V.G-10)(Viscosity grade ten).including carriage of materials, within all leads , lifts and other incidentals as per direction of Engineer-in-charge.The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and laying of hot applied Thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms. Per Sqm. Area , thickness of 2.5mm is exclusive of surface applied glass beads as per IRC-35 .The finished surface to be level uniform and free from streaks and holes as per MORTH Specifications ncluding carriage of material with in all leads and lifts and other incidentals as per direction of Engineer-in-Charge..The rates includes octroi, ,Malkana toll tax ,goods and serivice tax ,building and other construction workers, welfare cess royality of any other tax, levy or cess in respect of input for or output by this contract shall be payable by the Contractor and Government shall not entertain any claim whatsoever in this respect of the same.
SS CONSTRUCTION COMPANY
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .