Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-AOC | ₹2.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.1 LRejected-AOC | ₹2.1 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SHEJI KT L2 | KUNJUMOITHEEN P M L1 |
|---|---|---|---|---|---|
| 1.00side protection works | |||||
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 8 | hour | 345.54 ₹2,764.32 | 345.44 ₹2,763.52 |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.55 | cum | 9,963.93 ₹55,299.81 | 9,960.94 ₹55,283.22 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 15 | sqm | 762.88 ₹11,443.20 | 762.65 ₹11,439.75 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 360.75 | kilogram | 112.4 ₹40,548.30 | 112.4 ₹40,548.30 |
| 1.00 | OD450451/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 21 | cum | 3,993.46 ₹83,862.66 | 3,992.26 ₹83,837.46 |
| 1.01 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 21.6 | cum | 729.39 ₹15,754.82 | 729.17 ₹15,750.07 |
| 1.01 | OD450454/2025-2026:Supplying and fixing MS Name board with 1.2m length post from ground level,
having board dimension 80 x 45 c.m, lettering done with black enamel Paint on yellow
back ground, including the cost of all materials , labour and conveyance charges etc
complete. | 1 | 1 nos | 2,000.1 ₹2,000.10 | 1,999.5 ₹1,999.50 |
Tender Value
₹2.1 L
EMD Value
₹5,292
Closing Date
19 Mar 2026, 6:00 pmClosed
Assistant Engineer,LSGD SEction varandarappilly Gp
O/O Assistant Engineer ,LSGD Section varandarappilly GP Thrissur (dist), 680303
Annual Plan-2025 26 VPLY Prno 499/26 Side protection Work of Echippara Thodu Second Phase-in ward 9-General Civil Work
2026_LSGD_845414_1
TN11-01/2025-26/AELSGD/VPLY
Open Tender
Civil Works - Others
180 days
Varandarappilly Gp
Please refer Tender documents.
9 documents required · 9 mandatory
₹555
Yes
₹5,292
Yes
27 Jun 2026
9 Mar 2026
23 Mar 2026
9 Mar 2026
19 Mar 2026
9 Mar 2026
side protection works
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD450451/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
OD450454/2025-2026:Supplying and fixing MS Name board with 1.2m length post from ground level, having board dimension 80 x 45 c.m, lettering done with black enamel Paint on yellow back ground, including the cost of all materials , labour and conveyance charges etc complete.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1427919.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1427919.xls
BOQ • 0.30 MB
sbd.pdf
Tender Documents • 1.73 MB
Download all tender documents and submit your bid