Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.8 LAccepted-AOC | ₹38.8 L | L1 | Accepted-AOC L1 bidder |
| Sl No | Description | Qty | Unit | ENVIS HEIGHTS PRIVATE LIMITED L1 |
|---|---|---|---|---|
| 1.00Side covering of Indoor and Acrylic flooring works | ||||
| 1.01 | OD148395/2025-2026 : Supply of acrylic surface (8 layer) consists of a primer coat (if required) , filling of crack and leveling the surface with suitable acrylic surface and leveling compound, resurfacer / pore filler , of cushion system, premixed acrylic topping and concentrated final acrylic layer with game line markings. The rate include all taxes, duties, levies, excise duty and other charges except GST. Design, receive material, installation testing commissioning of synthetic surface for courts including, laying the synthetic surface over the base with all ancillary works, all according to methodology and drawings and specifications, including line marking etc all complete. | 626.62 | sqm | 1,742 ₹10.9 L |
| 1.02 | 14.72 : Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | 682.5 | sqm | 357 ₹2.4 L |
| 1.03 | 5.3 : Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 4.17 | cum | 13,442 ₹56,026.26 |
| 1.04 | 5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 41.68 | sqm | 762 ₹31,760.16 |
| 1.05 | 5.22A.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 458.48 | kg | 112 ₹51,349.76 |
| 1.06 | 50.10.1 : Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 3,931.57 | kg | 230 ₹9.0 L |
| 1.07 | 50.10.2 : Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 1,868.08 | kg | 187 ₹3.5 L |
| 1.08 | 10.1 : Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 241.15 | kilogr am | 116 ₹27,973.63 |
| 1.09 | OD148394/2025-2026 : Burned clay Jali work, using jaly of size: 20x20 cm square bricks of class designation 7.5 in superstructure above plinth level using Cement mortar 1:4 (1 cement : 4 coarse sand) | 136.5 | sqm | 1,427 ₹1.9 L |
Tender Value
₹38.8 L
EMD Value
₹50,000
Closing Date
10 Nov 2025, 3:00 pmClosed
The Chief Engineer, Sports Kerala Foundation
Jimmy George Indoor Stadium, Vellayambalam, Thiruvananthapuram
Side covering of Indoor and Acrylic Flooring works
2025_SKF_791777_3
162/SKF/CE/2025-26
Open Tender
Civil Works - Others
180 days
Alappuzha
Please refer tender document
6 documents required · 6 mandatory
₹2,950
₹50,000
21 Jan 2026
31 Oct 2025
12 Nov 2025
31 Oct 2025
10 Nov 2025
31 Oct 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1369577.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Tenderdoc.pdf
Tender Documents • 1.36 MB
BOQ_1369577.xls
BOQ • 0.29 MB
DWG.pdf
Other Document • 0.48 MB
Download all tender documents and submit your bid