Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.0 L+₹781.51 (0.40%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.9 L
EMD Value
₹3,900
Closing Date
20 Jul 2026, 6:00 pmClosed
Executive Engineer Rew Baramulla
REW BARAMULLA
Construction of Link Road From H / O Wali MOHAMMAD Bhat To Habibulla Bhat at Dangerpora Block Baramulla Block Pattan
2026_RDPR_313930_3
e- NIT No. 67/Xen/Rew/Bla/2026-27 Dated 29-06-2026
Open Tender
Civil Works
Percentage
45 days
Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Baramulla
₹3,900
21 Jul 2026
29 Jun 2026
21 Jul 2026
29 Jun 2026
20 Jul 2026
29 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | surface Dressing of the ground i/c removing of vegetation and in - equalities not exceeding 15 cm deep and disposal of rubbish lead upto 50mtr and lift upto 1.50 mtr . All kinds of soil | 141.26 | Cum | - | - |
| 2 | P/L dry stone solling hand packed including all carriages/ HL and including 20% plums. | 8.95 | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 11.85 | cum | - | - |
| 4 | P/fixing of Interlocking Tiles 60 mm thick on Sand Cushion 60 mm thick i/c all carriges and cost of materials involved | 114 | sqm | 1 | ₹113.89 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc | 8.64 | sqm | - | - |
| 6 | carriage by MT and H/L of sand Aggregates by machanical means for avg 30 kmtr . | 16 | cum | - | - |
| 7 | Form work of ordinary timber planks for in situ concrete work. | 25.27 | sqm | - | - |
| 8 | photograph /signboard charges CIB and unforseen items | 1 | job | - | - |
stage.html
html • 0.02 MB
finance_1016210.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BOQ_1016210.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .