Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.7 LAdmitted-Fee/PreQual/Technical/Finance | -3.00% | ₹3.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.1 L+₹30,758.93 (8.21%)Admitted-Fee/PreQual/Technical/Finance VILL KAZIYAPUR POST SURATGANJ TAHSHEEL RAMNAGAR KAZIYAPUR NEAR JHEEL LUCKNOW UTTAR PRADESH 227115 UDYAM UP 14 0003184 | 227115 | -11.05% | ₹4.1 L+₹30,758.93 (8.21%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹5.1 L+₹1.3 L (35.0%)Admitted-Fee/PreQual/Technical/Finance | +11.00% | ₹5.1 L+₹1.3 L (35.0%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹5.2 L+₹1.4 L (38.7%)Admitted-Fee/PreQual/Technical/Finance | +14.00% | ₹5.2 L+₹1.4 L (38.7%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.6 L
EMD Value
₹6,000
Closing Date
12 Aug 2026, 5:00 pmClosed
ACE Govindpur area
GM office, Bilbera , sonardih
Improving Drainage system of WB at Hired patch H under Govindpur Area
2026_BCCL_362798_1
BCCL/AR III/GM/ACE/E-NIT/26-27/ 47/2148-2173
Open Tender
Civil Works - Others
Percentage
28 days
Govindpur ARea
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
14 Aug 2026
3 Aug 2026
14 Aug 2026
3 Aug 2026
12 Aug 2026
3 Aug 2026
3 Aug 2026 - 12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Civil work | - | - | - | - |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in
foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including
dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the
excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 71.1 | m3 | - | - |
| 4 | Dry Fly ash brick flat soiling | 259 | m2 | - | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of
centering and shuttering - All work up to plinth level1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone
aggregate 20 mm nominal size derived from natural sources). | 25.9 | m3 | 1 | ₹25.87 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding
the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level :
1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone
aggregate 20 mm nominal size derived from natural sources) | 0.9 | m3 | - | - |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth levelThermo-Mechanically Treated bars of grade Fe-500D or more | 72 | kgs | - | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for
5.9.1 Foundations, footings, bases of columns, etc. for mass concrete | 4.5 | m2 | 1 | ₹4.5 |
| 9 | Brick work with clay ash FPS non modular brick of class designation 7.5 in foundation | 11.04 | m3 | - | - |
| 10 | 20 mm cement plaster of mix1:4(1cement:4 fine sand) | 61.8 | m2 | - | - |
| 11 | Surface dressing of the ground including removing vegetation and in-equalities not
exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil | 220 | m2 | 1 | ₹219.78 |
stage.html
html • 0.02 MB
finance_375701.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.62 MB
BOQ_375701.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .