Loading…
Loading…
Tender Value
₹5.1 L
EMD Value
₹5,089
Closing Date
29 Aug 2026, 5:00 pm6d left
Divisional Officer
RURAL WORKS DIVISION, SUNDARGARH
Repair to Bridge over Balikissan Nallah on Musabira To Futakani road_Road_ maintenance and colouring of parapet, guard post and Repairing of Approach, Flexible appron._At 1.000 Km
2026_CERWI_139131_1
Online-SESNG-08 of 2026-27
National Competitive Bid
Civil Works - Roads
Percentage
30 days
Sundergarh
2 documents required · 2 mandatory
₹4,000
₹5,089
Yes
19 Aug 2026
19 Aug 2026
29 Aug 2026
19 Aug 2026
29 Aug 2026
19 Aug 2026
19 Aug 2026 - 28 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Trimming of grass and weeds from the shoulder / berms and disposal the same to the suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge | 3,000 | sqm | 3.82 | ₹11,460 |
| 2 | Earth work in excavation of foundation in hard soil or gavelly soil including dressing and levelling the bed within initial leads and lifts as perdirection of Engineer-in-charge . | 28.8 | cum | 282.87 | ₹8,146.66 |
| 3 | Collecting ,conveyance ,supplying clean dry sand of approved quality from approved quarry at work site ,conveying the same and filling in foundation and plinth in 9" thick layer well water and rammed including cost ,conveyance ,royalities and taxes of all materials ,cost of labour & T &P etc complete as per thr direction of Engineer-in-charge | 4.8 | cum | 1,066.27 | ₹5,118.1 |
| 4 | Cement ,concrete (1:3:6 ) using 40 mm size hard granite metal including hoisting laying using concrete mixture and vibrators including cost of all materials ,labour ,T & P etc complete as directed by Engineer-in-charge . | 7.2 | cum | 6,397.26 | ₹46,060.27 |
| 5 | M-15 with 20 mm and down grade C.B chips including hoisting ,laying ,,hire charges of concrete mixture ,vibrator ,watering ,curing and cost of all materials and labour ,T & P centering shuttering etc complete but excluding cost of reinforcement complete . | 39 | cum | 5,801 | ₹2,26,239 |
| 6 | Rough stone dry packing in aprons and revetments with hard granite stone 30 cm and above including cost of all materials etc complete as per the direction of EIC . | 34.92 | cum | 2,903.09 | ₹1,01,375.9 |
| 7 | Wall painting 2 coats with plastic emulsion paint of approved shade on new work to give an even shade excluding cost of paint | 553.69 | sqm | 199.49 | ₹1,10,455.62 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 8.93 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_606645.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].