Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.7 LAccepted-AOC 344 1 SB GORAI ROAD HILL VIEW PARK NORTH ASANSOL | ASANSOL | WEST BENGAL | L1 | Accepted-AOC L1 | |
| 2 | L2₹20.5 L+₹20,293 (1.00%)Rejected-Finance 138 CANNING STREET GROUND FLOOR KOLKATA | KOLKATA | WEST BENGAL | L2 | Rejected-Finance High Than L1 | |
| 3 | L3₹20.6 L+₹31,440 (1.55%)Rejected-Finance 4 ASWINI DUTTA LANE CINEMA HOUSE LANE KRISHNAGAR NADIA PIN 741101 | KRISHNAGAR | NADIA | WEST BENGAL | 741101 | L3 | Rejected-Finance Higher Than L1 | |
| 4 | L4₹20.6 L+₹35,512 (1.75%)Rejected-Finance 19 A NIRUPAMA DEVI ROAD LANE 1 BERHAMPORE MURSHIDABAD | BERHAMPORE | MURSHIDABAD | L4 | Rejected-Finance Highest Than L1 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
31 Dec 2020, 3:00 pmClosed
Executive Engineer
Office of the Executive Engineer Mechanical_Electrical Division Berhampore PH Engineering Dte Netaji Subhas Road P H E River Side Complex Berhampore Murshidabad PIN_742101
Renovation of Existing Air Blower Unit along with Other Allied Accessories for Backwash of Filter Bed of Water Treatment Plant of Central Sector (Part _II) Surface Water Based Water Supply Scheme under Mechanical_Electrical Division Berhampore PHE Dt
2020_PHED_308444_1
WBPHED/EE/MEDB/NIeT-22 of 2020-21
Open Tender
MECHANICAL
Item Rate
120 days
Central Sector Part_II, Haridas Mati_MSD
Renovation of Existing Air Blower Unit along with Other Allied Accessories for Backwash of Filter Bed of Water Treatment Plant of Central Sector (Part _II) Surface Water Based Water Supply Scheme under Mechanical_Electrical Division Berhampore PHE Dt
6 documents required · 6 mandatory
₹50,000
8 Jan 2021
11 Dec 2020
4 Jan 2021
11 Dec 2020
31 Dec 2020
11 Dec 2020
Amount
Supply, delivery at site of Twin Lobe Air Blower complete with accessories as per technical specification of NIT. i) Capacity at suction condition : 2550 M³/hr. ii) Discharge Pressure : 0.35Kg/cm² iii) Speed : 745 rpm iv) Duty : Continuous
Supply, delivery at site of mandatory spares for two years Operation of Blowers unit as per specification of NIT.
Installation of all items mentioned above (Sl no 1 ) including supply of all erection materials and coupling with the existing motor and making connection to existing delivery line all complete by engaging skilled technican and semi-skilled labours as per direction of EIC and as per technical specification of NIT.
Testing and commissioning the whole system for at least 1 hrs including adjustment, setting etc for different components as and where necessary and as per technical specification of NIT.
Add GST @12%
WEST BENGAL ENGINEERING CO.
HARA PROSAD DAS
M/S. Sajahan Chowdhury
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .