Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.4 LAdmitted-Fee/PreQual/Technical/Finance | -33.37% | ₹6.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.4 L+₹3,632.47 (0.57%)Admitted-Fee/PreQual/Technical/Finance | -32.99% | ₹6.4 L+₹3,632.47 (0.57%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.8 L+₹46,552.97 (7.31%)Admitted-Fee/PreQual/Technical/Finance | -28.50% | ₹6.8 L+₹46,552.97 (7.31%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹7.0 L+₹63,090.27 (9.91%)Admitted-Fee/PreQual/Technical/Finance | -26.77% | ₹7.0 L+₹63,090.27 (9.91%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹7.0 L+₹64,141.77 (10.1%)Admitted-Fee/PreQual/Technical/Finance | -26.66% | ₹7.0 L+₹64,141.77 (10.1%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹9.6 L
EMD Value
₹19,200
Closing Date
5 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW GANDERBAL
EXECUTIVE ENGINEER REW GANDERBAL
Development of public park at Bonpora Haripora Block Lar DDC 70
2026_RDPR_318379_5
E NIT No. 71/2026-27 of REW Ganderbal
Open Tender
Civil Works
Percentage
40 days
RDD AND PR
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹19,200
14 Aug 2026
29 Jul 2026
6 Aug 2026
29 Jul 2026
5 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Structural steel work welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works inluding primer and painting steel 2 coats ornamental grills as directed by EIC | 1,696 | KG | 145 | ₹2,45,920 |
| 2 | Dismantelling of old damaged gi fencing complete job | 79.89 | sqm | 250 | ₹19,972.5 |
| 3 | Provinding and laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work upto plinth level in 1:3:6 mix (1cement: 3coarse sand: 6 graded stone aggregate with 20mm nominal size) with all carriages, loading, unloading and stacking etc complete job | 10 | cum | 5,733.6 | ₹57,336 |
| 3.1 | 20% plums | 4.3 | cum | 1,000 | ₹4,300 |
| 4 | Centring and shuttering including propping, strutting and removal of form work for foundations, footings, bases of columns for mass concrete | 62.73 | sqm | 286.35 | ₹17,962.74 |
| 5 | 12mm thick cement sand plaster in 1:6 mix | 100.37 | sqm | 266.2 | ₹26,718.49 |
| 6 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 3.35 | cum | 7,571.55 | ₹25,364.69 |
| 7 | Stone tile work for wall lining upto 10m height with special adhesive like araldite or equivalent over 12mm thick bed of cement mortar 1: 3 (1 cement
: 3 coarse sand) including pointing in white cement with an admixture of pigment to match the stone shade.Granite stone of any colour and shade | 196.6 | sqm | 2,774.3 | ₹5,45,427.38 |
| 8 | Carriage of materials aggregate/sand by means of mechanial transport for an average lead of 15km | 13.66 | cum | 344.9 | ₹4,711.33 |
| 8.1 | bricks for an avg lead of 60km | 1,600 | no | 2 | ₹3,200 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.60 MB
BOQ_1048619.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .