SE/C-II/RB/KMDA
OFFICE OF THE SUPERINTENDING ENGINEER CIRCLE-II, R and B SECTOR, K.M.D.A. UNNAYAN BHAVAN, BLOCK -A, (7TH FLOOR) BIDHAN NAGAR, KOLKATA -700 091
Renovation of road from Gayeshpur Jhilpar more to Bedi bhawan Bazaar More at ward No 15 in Gayeshpur Municipal Area.
2026_KMDA_1039599_3
04/SE/C-II/RB/KMDA/ W-28 (Part-VIII) of 2026-2027 DATE 27/08/2026
Open Tender
CIVIL WORKS
Percentage
60 days
UNNAYAN BHAWAN
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹2.6 L
3 Oct 2026
3 Sept 2026
5 Oct 2026
3 Sept 2026
3 Oct 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Flexible Pavements
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately (Reference to MoRT&H's specification clause 202)
By Mechanical Means
Bituminous course | - | Cum | 1 | - |
| 2 | Excavation in Soil by Manual Means Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and
lead upto 1000 metres (Reference to MoRT&H's specification clause 301). | 162 | Cum | 1 | ₹161.84 |
| 3 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | - | Sqm | - | - |
| 4 | Plain/Reinforced cement concrete in open foundation complete all including Cost of formwork, shuttering,vibrating and compacting,
finishing, curing, sampling, testing etc. as per drawing and Technical Specifications (Reference to MORT&H's specifications 1500, 1700 & 2200). A)PCC Grade M15 I) With using concrete mixer | 1 | Cum | 1 | ₹1 |
| 5 | Supplying, binding, fixing etc. including initial straightening, cutting to requisite length, hooking and bending to correct shape, placing in proper position of uncoated HYSD reinforcement bar in sub-structure complete as per drawing and Technical Specifications (Reference to MORT&H's specifications 1600 & 2200). | 1 | MT | - | - |
| 6 | Plain/Reinforced cement concrete in open foundation complete all including Cost of formwork and compacting, finishing, curing, sampling, testing etc. as per drawing and Technical Specifications (Reference to MORT&H's specifications 1500, 1700 & 2200). E)RCC Grade M25 I) With using concrete mixer | - | Cum | 1 | - |
| 7 | Wet Mix Macadam
Providing, laying, spreading and compacting graded stone aggregate conforming to the grading of table 400- 13 revised vide table 2 of IRC : 109 (2015) to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density .The thickness of a single compacted layer shall not be less than 75 mm.(Reference to MoRT&H's specification 406. | - | Cum | - | - |
| 8 | Concrete Block Pavement
Supplying and Laying in the particular pattern of cement concrete block pavements with BIS certification and spacer nib of size and shape with aspect ratio as per IS 15658 with cement concrete grade not less than M40 on the prepared base course of specified CBR as
mentioned in design and drawing with a cushion of bedding sand of 30 to 50 mm thick (grading of the bedding sand as per clause 6.5.1 of IRC SP-63) and filling up the gaps between two paver block with joint filling sand (the grading of the joint filling sand will be as per clause 6.5.2) complete as per IRC SP - 63 with proper confinement of bedding and joint filling sand, compaction,levelling and filling up of the edge gaps with mortar. Type I, II,III, IV should be as per design requeirment or instruction of E-I-C.
a) Type - I (100 mm thickness) inter locking system | - | Sqm | 1 | - |
| 9 | Brick masonry work with 1st class full size bricks except when necessary to complete the bond in cement morter 1:3 in sub-structure complete, including thoroughly soaking the bricks in a tank filled with water for a minimum period of one hour prior to being laid, protecting the green structure from rain by suitable covering and with a minimum Seven days curing etc., but excluding pointing and plastering, as per drawing and Technical.
Specifications.(Reference to MORT&H's specifications 1300 & 2200). | - | Cum | - | - |
| 10 | Sand Filling in Foundation Trenches with good local sand free from earth not exceeding 150 mm compacted thickness including inundating each layer by profuse water and porking and rammimg layer by layer. Quality of sand is to be approved by the Engineer-in charge.(Reference to MORT&H's specification 304).a) By Fine Sand | - | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.58 MB
BOQ_2554540.xls
BOQ • 0.32 MB
Date-Extension-1.pdf
PDF • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .