| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹26.7 LAccepted-AOC | 1 | Accepted-AOC lowest bider | |
| 2 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹30 L
EMD Value
₹50,000
Closing Date
5 Oct 2020, 12:00 pmClosed
ASSISTANT ENGINEER PLPY
ASSISTANT ENGINEER PLPY
MARIYA JUNCTION-CHUNDAKOLLY PACHIKARAMUKK BALANCE PORTION RETARRING,CULVERT AND DRAINAGE/
2020_LSGD_387646_1
AE/LSGD/PLPY/21/61/2020-21
Open Tender
Civil Works - Roads
Item Rate
90 days
AE OFFICE PLPY
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,825
Yes
online
₹50,000
Yes
5 Nov 2020
25 Sept 2020
6 Oct 2020
25 Sept 2020
5 Oct 2020
25 Sept 2020
Amount
WIDENING AND RETARRING CH 0/863 -1/790m
3.2 : Preparation of Foundation for EmbankmentScarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical MeansScarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
3.5.2 : Excavation in Soil with Dozer with lead upto 100 m <br> Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections.
3.15.2 : Compacting Original Ground<br> (ii) Compacting original ground supporting subgrade<br> Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.
4.11.2 : Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. <br>(ii) Using Gravel mix soil.
4.9 : Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead
75.5.1.1pb : Prime Coat - Low porosity - With Packed Bitumen Rates <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
75.5.2.3pb : Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.2.1pb : Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.5.B.2pb : Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
75.5.9.1.2pb : 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder - Bitumen S-65 - Packed Bitumen Rates<br> Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. <br> Case - I By Manual Means <br> (II) Bitumen (S-65)
75.5.12.A.1.2pb : Seal Coat - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates<br> Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 <br> A. By Manual Means <br> Case I : Type A <br> (II) Bitumen (S-65)
od786057/2020_2021 : Providing and fixing NAME BOARD fixed over MS sheeting, 2 mm thick supported on<br>GI pipe 50 mm dia firmly fixed to the ground by means of properly designed foundation with M-15 grade<br>cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical<br>Specification Clause 1701.600 mm x 450 mm Rectangular
cross drainage and cc side protection
11.1.1.1 : Excavation for StructuresEarthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.I.Ordinary soil(i)Upto 3 m depth
od786032/2020_2021 : Providing concrete for plain/reinforced concrete in open foundations (WITHOUT<br>FORMWORK) complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (11.4.1.1<br>Modified)P.C.C grade M 10, Nominal mix 1:3:6
11.4.2.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 II.P.C.C grade M 15(i)Nominal mix (1:2.5:5)
od786033/2020_2021 : :Providing Wearing Coat in CC Drain using plain cement concrete as per drawings and<br>direction of Engineer-in-Charge (11.4.4 Modified) Nominal Mix 1:2:4<br>
13.1.2 : Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5R.C.C M 25
13.3 : Supplying, fitting and placing TMT bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002,1010 and 1202
DR side protection
11.1.1.1 : Excavation for StructuresEarthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.I.Ordinary soil(i)Upto 3 m depth
od790874/2020_2021 : DRY RUBBLE MASONRY _ Dry rubble without concrete leveling course masonry with<br>good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of allmaterials labor charges etc. complete as per direction of Departmental officers at site.<br>
od790883/2020_2021 : Providing concrete for plain concrete in TOP Belt concrete in DR Retaining Walls<br>complete as per drawings and direction of Engineer-in-Charge.<br>P.C.C grade M 10, Nominal mix 1:3:6<br>
od790884/2020_2021 : Providing concrete for reinforced concrete in MIDDLE BELT for DR Retaining Walls<br>complete as per drawing and direction of Engineer-in-Charge.R.C.C grade M 20, nominal mix 1:2:4 (11.4.4<br>Modified)<br>
12.3 : Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
od790893/2020_2021 : DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
od790894/2020_2021 : DR with Departmental. Stone - <br>DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
12.7 : Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Bidder Name
T J Antony
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_550840.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .