Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹97.9 L
EMD Value
₹98,000
Closing Date
18 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Sauni Yojana Division, Rajkot
DRAFT TENDER PAPER FOR THE WORK OF THIRD-PARTY INSPECTION/PROJECT MANAGEMENT AGENCY FOR THE SERVICES OF PROJECT MANAGEMENT, CONSTRUCTION, SUPERVISION AND DESIGN REVIEW INSITE/OFFSITE INSPECTION & TESTING OF MATERIALS, MACHINERY, EQUIPMENTS, REVIEW OF QAP FOR SAUNI YOJANA ADDITIONAL LINK – 2 & 4 CONSTRUCTION OF PUMPING STATION AT WADHWAN BHOGAVO-II RESERVOIR AND SUPPLYING AND LAYING OF TWIN MS PIPELINE OF 3200 MM DIA (ID) AND PLATE THICKNESS OF 18.5 MM FROM PUMPING STATION TO LINK-4 PACKAGE-1 APPROACH CHANNEL (22.074 KM LENGTH) WITH ALL ALLIED WORKS ETC.
357851
10 of 2026
Open
Miscellaneous Works
Works
Rajkot
18 documents required · 18 mandatory
₹2,400
Executive Engineer, Sauni Yojana Division, Rajkot
₹98,000
18 Nov 2026
22 Oct 2026
19 Nov 2026
22 Oct 2026
5 Nov 2026
22 Oct 2026
120 days
Addenda/Amendments to the above, for the INSPECTION SERVICES OF THE ABOVE
WORK, we the undersigned offer our inspection services from the date of commissioning
including defects liability period as given in Conditions of Contract and in conformity
(insert numbers) for Lump Sum fixed price mention in the summary cost. Our financial
proposal shall be fixed and firm binding upon us subject to the modifications resulting
from contract negotiations up to expiration of the validity period of the proposal. The
amount of consultancy services is inclusive of all taxes, duties, service charges etc.
2. We undertake, if our Bid is accepted, to complete and deliver the Works in accordance
with the Contract within 18 months or till the Project Implementation period, inclusive
of monsoons, from the date of receipt of work order to us by you. We will observe the
laws applicable to perform the services.
3. We agree to abide by this Bid for a period of 120 days from of opening of online Bid the
date fixed for receiving the same and it shall remain binding upon us and may be
accepted at any time before the expiry of that Period.
4. In the event of our Bid being accepted, we agree to enter into a formal Contract
Agreement with you incorporating the conditions of Contract there to annexed and
conditions of form “C” but until such agreement is prepared this Bid together with your
written acceptance thereof shall constitute a binding Contract between us.
5. We agree, if our Bid accepted, to furnish Performance Bond / Security in the forms and of
value specified in the Conditions of Contract of a sum equivalent to Rs. 20.35 Lakh for
due performance of the Contract.
6. We understand that you are not bound to accept the lowest or any Bid you may receive.
(Name of the person)
(In the capacity of)
Duly authorized to sign Bid for and on behalf of
(Fill in block capitals)
The bid is lump sum bid for DRAFT TENDER PAPER FOR THE WORK OF THIRD-PARTY
INSPECTION/PROJECT MANAGEMENT AGENCY FOR THE SERVICES OF PROJECT MANAGEMENT,
CONSTRUCTION, SUPERVISION AND DESIGN REVIEW INSITE/OFFSITE INSPECTION & TESTING
OF MATERIALS, MACHINERY, EQUIPMENTS, REVIEW OF QAP FOR SAUNI YOJANA ADDITIONAL
LINK – 2 & 4 CONSTRUCTION OF PUMPING STATION AT WADHWAN BHOGAVO-II RESERVOIR
AND SUPPLYING AND LAYING OF TWIN MS PIPELINE OF 3200 MM DIA (ID) AND PLATE
THICKNESS OF 18.5 MM FROM PUMPING STATION TO LINK-4 PACKAGE-1 APPROACH CHANNEL
(22.074 KM LENGTH) WITH ALL ALLIED WORKS ETC.
The bidder shall quote his firm and fixed lump sum price for the entire work under this
Contract, defined in more details in various sections of this bid document & form “C” of Lump
1. The rates and prices shall be submitted in the formats given in the enclosed Price
Schedules. Rates and prices received in any other formats will be rejected and the Bids
will be disqualified.
2. It will be entirely at the discretion of the NWRWS & KD to accept or reject the bidder’s
proposal, without giving any reasons whatsoever and the bidder shall not be permitted
to withdraw his bid on this account.
in Schedule only will be considered for price evaluation & shall form a part of the
Contract Agreement.
4. Each item is to be individually priced and the amounts shall be added up to arrive at
blank except where the item description requires the item to be priced on "as
applicable" basis. The item shall not be priced if it is "not applicable" to the bidder's
design, in which case the bidder shall add the words "NOT APPLICABLE". The wording
in the item description is for subject matter guidance only: clause references are
indicative only and all other relevant clauses shall also be referred to. The prices shall
allow for all the works covered under the bid and all liabilities and contractual
obligations whether separately specified or not. Items against which no prices are
quoted shall not be separately paid for and the bidder shall be deemed to have covered
The cost for execution of such items (according to the requirements of the bid
document) in the prices quoted for the other items.
satisfactory working of the system as specified, will not be separately paid for by the
NWRWS & KD when executed and shall be deemed to be already covered by other
items and rates listed in the price sheets and Lump sum prices quoted in Schedule.
6. Interim payment will be made as per break up given in the Price document.
Schedules shall be the basis to work out a schedule of Interim payments during
construction with the successful bidder.
8. The Consultant shall be deemed to have allowed in his price for provision,
maintenance and final removal of all temporary works of whatsoever nature required
for the inspection services for the proper execution of works. The rates shall be
deemed to include any works and setting out that may be required to be carried out for
laying out of all the works involved.
9. Prices shall be entered online and shall be entered in figures and in words. Where
there is a discrepancy between the unit rates and the amount entered, the latter shall
Specifications and the other sections of these bid documents and these documents are
to be taken as mutually explanatory of one another.
11. Prices quoted by the Consultant shall be firm for the entire consultancy work of
Contract without any escalation or extra payment than tendered cost. The Quoted
price should be match with Annexure E and COST SUMMARY SCHEDULE.
12. The Consultant shall interpret the data furnished if any additional survey work or
investigation required shall be carried out by EPC Contractor.
13. The Consultant should acquaint himself with the site conditions including the access to
Work site. The successful bidder shall have to make suitable access to work sites at his
own cost. These accessed will be used by the other contractors working for NWRWS &
KD/ Government.
COST SUMMARY SCHEDULE
FORM OF FINANCIAL PROPOSAL
4.0 Summary of costs (Lump - sum fix price)
Description of Services Amount in Rs. Lacs
In Figure In words
DRAFT TENDER PAPER FOR THE WORK OF
THIRD-PARTY INSPECTION/PROJECT
MANAGEMENT AGENCY FOR THE SERVICES OF
PROJECT MANAGEMENT, CONSTRUCTION,
SUPERVISION AND DESIGN REVIEW
INSITE/OFFSITE INSPECTION & TESTING OF
MATERIALS, MACHINERY, EQUIPMENTS, REVIEW
OF QAP FOR SAUNI YOJANA ADDITIONAL LINK –
& 4 CONSTRUCTION OF PUMPING STATION AT
WADHWAN BHOGAVO-II RESERVOIR AND
SUPPLYING AND LAYING OF TWIN MS PIPELINE
OF 3200 MM DIA (ID) AND PLATE THICKNESS OF
18.5 MM FROM PUMPING STATION TO LINK-4
PACKAGE-1 APPROACH CHANNEL (22.074 KM
LENGTH) WITH ALL ALLIED WORKS ETC.
General Manager “Authorized person of Inspecting Firm.”
Deputy executive engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Division,
Surendranagar Rajkot.
Construction Inspection of materials Post Construction
Pre-Construction Design Review & Supervision & allied machineries and Activities & Defect
Activity Approval Total
activities equipment Correction Period
Minimum experience required Requirem
ents in Duration Remunerati Duration Remunerat Duration Remunerat Duration Remunerat Duration Remunerati Remunerat
Project engageme on per engagement( ion per engageme ion per engageme ion per engageme on per Months ion per Total
nt(Days) month,(all Days) month,(all nt(Days) month,(all nt(Days) month,(all nt(Days) month,(all month,(all
inclusive) inclusive) inclusive) inclusive) inclusive) inclusive)
Part-A (Personals)
Graduate In Civil / Mechanical engineering with over 15 years’
1 Team Leader experience in M.S. / Steel pipeline project monitoring of water supply
projects, preferably having design/office experience and having
handled projects of similar nature.
Senior Structural Master's degree in Structural Engineering with 10 years of
Engineer Experience
Senior Mechanical Graduate Mechanical engineer with over 10 years’ experience in design
Engineer & inspection of pipe manufacturing, valve and instrument etc.
Water Supply & Pipeline Graduate in Hydraulics/Civil/ Mechanical Engineering with over
Engineer years of experience of similar nature.
Senior Electrical Graduate Electrical engineer with over 10 years’ experience in
Engineer electrification of pumping station and 11 KV sub station etc.
Instrumentation Graduate in Instrumentation engineer with over 3 years’ experience in
Engineer design and Inspection of pumping machinery etc.
Graduate Civil / Mechanical engineer /B.Sc with over 10 years’
7 Safety Engineer
experience as Safety Engineer.
Graduate with over 2 years of experience or diploma with over 5 years’
8 Site Supervision Staff
experience of site pipeline work of similar nature.
(i) Civil Civil
(ii) Mechanical Mechanical (Mini. Two Engineer should have ASNT level-II in
UT(PAUT) as per SNT-TC-1A OR ASNT Level III in UT
(iii) Electrical Electrical
LLB in general pr associated member of company secretary and
9 Legal Advisor years’ experience in techno legal arbitration/ litigation and company
secretarial service.
MBA in finance or CA/ ICW or equivalent with minimum 15 years of
10 Financial Analyst
experience in Infrastructure Project
11 Additional Staff
Computer Operator B.C.A. with 1 year experience
Diploma Civil with minimum of 2 years’ Experience of experience or
ITI Surveyor having 2 years of experience
Office Assistant B.A. / B.Com
ROU Supervisor Experience in ROU or similar nature of work
Total of Part-A
Part-B (Other Expanses)
1 TRANSPORTATION (I) Two wheeler
TRANSPORTATION (ii) Four wheeler
2 COMMUNICATION
3 OFFICE EXPANCES INCLUDIN GRENT AND OTHER OVERHEADS
4 STATIONERY EXPANCES INCLUDING ALL CONSUMABLES
5 Any other expenses if any
Total of Part-B
GST , other prevailing
Schedule of Payment
The breakup of consultancy services shall be as under:
Name of activity L.S. quoted price Amount in Rs.
in summary cost
Pre Construction
Review/Approval
C Supervision & allied 50 %
Inspection of the
D material, machineries 28 %
Post construction &
E defect correction 10 %
Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Division
Surendranagr Rajkot
Schedule of Payment
A. Pre Construction Activity : 2 % of quoted price
Percentage to be
Particulars released of total amount
Particulars released of total amount
On submission of review report on
On submission of methodology &
work plan with pert chart &
required formats of various
progress report
On setting out for project with
3 required facility at site with 60%
deployment of staff
On review of working survey &
setting out the lineout of the work
5 Any other matter require to perform 10%
Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Division
Surendranagr Rajkot
Schedule of Payment
B. Design Review/Approval : 10 % of quoted price
Percentage to be
Particulars released of total
1 On approval of G.A. 20 %
On approval of structural drawing of End 10%
structure & Road crossing, etc.
Design of pipe line, Thrust block,
3 Supporting structure, Valve chambers,
Surge devices if any, etc.
Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Division
Surendranagr Rajkot
C. Construction & Supervision, Scrutiny of
50% of quoted price
Design & allied activity of work:
Further Break up of Activities for pipeline
Percentage to be
Sr. No Particulars released
of total amount
of total amount
C-1 MS Pipeline work 50 %
C-2 Mechanical work 25 %
C-3 Electrical work 5%
C-4 RCC Work 5%
C-5 Instrumentation work 5%
C-6 After Finalization of ROU 10 %
Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Division
Surendranagr Rajkot
Further Breakup of above activity C
C-1 Pipeline work : 50 % of C
Particulars to be Amount in Rs
Transportation and inside & outside
coating of pipe
Excavation, bedding, lowering,
laying &jointing by welding of
pipeline including manifold and
joint with trunk main
3 Ultrasonic Test 10 %
4 Inside & outside joint coating 10 %
5 Hydro Test 10 %
6 Refilling & other items 15 %
1. The amount is to be paid on running meter basis. Per meter rate is to be arrived
by dividing the total length of transmission main. Payment is to be made as per
progress of work done. The hydro test payment is to be made after carrying out of
2. The Contractor shall submit the copy of attendance sheet for the period of Signed
by competent authority of department.
Note: The Contractor shall submit the copy of attendance sheet for the period of Signed
by competent authority of department.
Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Division
Surendranagr Rajkot
C-2 Mechanical Items : 25 % of C
Sr. No Particulars Amount in Rs
1 On Erection of Pumps 30%
2 On Erection of B.F. valves 15%
3 On Erection of Air valves 20%
On Erection of Scour &
miscellaneous devices.
commissioning of Pipeline
C-4 RCC work : 5 % of C
Sr. Percentage to be
Particulars Amount in Rs.
1 Setting Out 15 %
2 Work up to ground level 30 %
3 Work up to plinth level 30 %
4 On completion of work 25 %
Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Division
Surendranagr Rajkot
D. Inspection of material, machineries and equipment : 28 %quoted
Sr. No Particulars Percentage to be Amount in Rs.
D-1 Inspection of MS Pipeline 40 %
D-2 Inspection of pump & Motor 20 %
Inspection of valves water
D-3 control hammer devices 5%
related to Pipeline
Inspection of other
Mechanical equipment.
Electrical equipment &
D-6 Instrumentation & Material 10%
Note: The Consultant shall submit the copy of inspection report.
Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Division
Surendranagr Rajkot
D-4 Inspection of Mechanical Equipments :15 % of D
(Mechanical & Instrumentation of Percentage of Quoted Amount
Pipeline) related to D-4
1. Butterfly valve (P.H. valves) 20 %
2. Sluice valves 20%
3. Air Valves 40 %
4. Remaining Miscellaneous Items
(Surge Equipment, Expansion 20 %
Bellow & Manifold, etc.)
Total Total 100 %
Note: The amount is to be paid on basis of quantities of mechanical and
instrumentation items.
Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Division
Surendranagr Rajkot
E. Post Construction Activity & Defect Correction Activity : 10 % of quoted Price
Schedule of Payment
(a) Post Correction Activity : 25 % of E
Percentage to be Amount in
Sr. No Particulars
1 After Completion of testing during 95 %
commissioning Stage
2 After clearing and tiding of sites by the 5%
contractor to complete & carry out all
works required to finalize the
construction contract administratively
(b) Defect Correction Activity : 25 % of E
Percentage to be Amount
Sr. No Particulars
released in Rs.
1 On completion of outstanding work at 25 %
time of taking over
2 After rectification of any defect 25 %
observed during the running of
3 Proportionate payment to be made 25 %
during defect liability period
4 After end of defect liability Period 25 %
(c) ROU Activity : 50 % of E Amount: ___________
Sr. No Particulars Percentage to be Amount in
1 On completion of ROU Payment as per 100 %
all Govt. Section
Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Division
Surendranagr Rajkot
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
3. Vol-2 Financial Bid.pdf
2. Vol-3 Technical Bid.pdf
4. Vol-2 Part-2C Form.pdf
1. Vol-1 Pre qualification and Technical Proposal Add. L2-4 TPI.pdf
Corrigendum-1.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .