Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.9 L+₹2,880 (1.02%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹2.9 L
EMD Value
₹5,760
Closing Date
25 Sept 2026, 6:00 pmClosed
Executive Engineer Rew Baramulla
REW BARAMULLA
CONSTRUCTION OF B PATH FROM MASJID MADINA TO HO NAZIR BHATI AND OTHERS ,C/O B PATH FROM MAIN ROAD TO GRAEYARD MIR MOHALLA ,C//O B PATH FROM HO FAROOQ BHATI TO HO RASHEED AH BHATTI AND C/O B PATH FROM HO MUTAWALR MIR AND OTHERS W2 AT DARAGUTLIYAN UNDE
2026_RDPR_325234_4
231/2026-27 Dated 19-09-2026 (RETENDER)
Open Tender
Civil Works
Percentage
45 days
Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Baramulla
₹5,760
28 Sept 2026
19 Sept 2026
26 Sept 2026
19 Sept 2026
25 Sept 2026
19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth,
leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge.
All kinds of soil | 188.8 | sqm | 91.75 | ₹17,322.4 |
| 2 | Providing/Laying Stone soling hand packed on level in foundation trenches including carriages of material | 18.88 | cum | 1,250 | ₹23,600 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 | 16.36 | cum | 5,202 | ₹85,104.72 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level | 20.62 | cum | 5,733 | ₹1,18,214.46 |
| 5 | Centering and shatering in foundation | 54.7 | sqm | 286 | ₹15,644.2 |
| 6 | Carraigevof sand bajri for all leads | 49 | cum | 550 | ₹26,950 |
| 7 | P/F of information sign board and site photographs. | 1 | Job | 1,164 | ₹1,164 |
stage.html
html • 0.02 MB
finance_1098577.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_1098577.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .