| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.7 LAccepted-AOC H NO ERH1 SAI VIBHA VILLA NOVA ESTATE OPPT QUBA MASJID KHARABAND MARGAO GOA | NORTH GOA | GOA | 403001 | L1 | Accepted-AOC lowest bidder | |
| 2 | L2₹17.7 LSame as L1Rejected-Finance | L2 | Rejected-Finance Second Lowest Bidder | |
| 3 | L3₹17.7 LSame as L1Rejected-Finance GOA GOA | SOUTH GOA | GOA | 403103 | L3 | Rejected-Finance third Lowest Bidder | |
| 4 | L4₹17.7 LSame as L1Rejected-Finance ABADE FARIA ROAD KAKODKAR BLDG MARGAO GOA 403601 | SOUTH GOA | GOA | 403601 | L4 | Rejected-Finance fourth Lowest Bidder | |
| 5 | L5₹17.7 L−₹1.87 (<0.01%)Rejected-Finance | L5 | Rejected-Finance fifth Lowest Bidder |
| Sl No | Description | Qty | Unit | Prashant P. G. Amonkar L3 | Kristly Enterprises L3 | Mangesh Associates L2 | Siddharth Shirodkar L4 | Constancio Fransisco miranda L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical/manual means in all types of strata comprising any of the materials such as soil, sand, clay, silt, gravel, moorum of all varieties,shingles, pebbles, all types of conglomerates, laterite rock, soft rock, ordinary or disintergrated rock, weathered, fissured/shattered decomposed rock and all such other materials either in full or in parts as the case may be adopting any appr. method or methods as may be convenient or permitted inclusive of chiseling, wedging etc. in all conditions such as dry, moist, saturated, submerged, foul conditions etc. incl. setting out cont. of shoring and bracing removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling the excavated earth to the extent required and disposing of the surplus excavated soil/rock as directed by the Engineer in charge etc. for all lead and lifts etc. as specified and directed etc. all complete. | 538.56 | Cum | 235 ₹1,26,561.6 Lowest | 236 ₹1,27,100.16 | 250 ₹1,34,640 | 240 ₹1,29,254.4 | 248.64 ₹1,33,907.56 |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 39.6 | Cum | 1,162.59 ₹46,038.56 | 1,798.69 ₹71,228.12 | 1,240 ₹49,104 | 1,162.43 ₹46,032.23 Lowest | 1,239.36 ₹49,078.66 |
| 3.00 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:
a) All works upto plinth level | 132.6 | Cum | 5,800 ₹7,69,080 | 5,190.01 ₹6,88,195.33 Lowest | 5,524.5 ₹7,32,548.7 | 5,729.99 ₹7,59,796.67 | 5,523.2 ₹7,32,376.32 |
| 4.00 | Centering and shuttering including struttings, propping and removal of formwork for:
a) Foundations, footings, bases for columns and mass concrete | 297.93 | Sqm | 274 ₹81,632.82 Lowest | 422 ₹1,25,726.46 | 290.03 ₹86,408.64 | 280 ₹83,420.4 | 292 ₹86,995.56 |
| 5.00 | Laterite boulder masonry in cement concrete 1:3:6 (1 cement, 3 coarse sand : 6 graded granitic stone aggrt. 40mm nominal size) in foundation. | 154.92 | Cum | 3,000 ₹4,64,760 Lowest | 3,037 ₹4,70,492.04 | 3,130 ₹4,84,899.6 | 3,025 ₹4,68,633 | 3,131.52 ₹4,85,135.08 |
| 6.00 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge
b. 75mm Dia | 64.75 | RM | 167.71 ₹10,859.22 Lowest | 250.04 ₹16,190.09 | 175 ₹11,331.25 | 182.17 ₹11,795.51 | 176.64 ₹11,437.44 |
Tender Value
₹22.1 L
EMD Value
₹44,220
Closing Date
15 Feb 2024, 5:00 pmClosed
EE II, WRD
Aquem Baixo Rawanfond
Construction of protection wall to the side bank of the Verna lake in Sy. No. 131-5A and Sy. No. 131-6 in Village Verna in Nuvem Constituency of Salcete Taluka.
2024_WRD_14079_1
WDII/TECH/F17/45e/2023-24/SN3
Open Tender
Miscellaneous Works
Item Rate
60 days
Rawanfond
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹44,220
13 Aug 2025
7 Feb 2024
16 Feb 2024
7 Feb 2024
15 Feb 2024
7 Feb 2024
Amount
Earthwork in excavation by mechanical/manual means in all types of strata comprising any of the materials such as soil, sand, clay, silt, gravel, moorum of all varieties,shingles, pebbles, all types of conglomerates, laterite rock, soft rock, ordinary or disintergrated rock, weathered, fissured/shattered decomposed rock and all such other materials either in full or in parts as the case may be adopting any appr. method or methods as may be convenient or permitted inclusive of chiseling, wedging etc. in all conditions such as dry, moist, saturated, submerged, foul conditions etc. incl. setting out cont. of shoring and bracing removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling the excavated earth to the extent required and disposing of the surplus excavated soil/rock as directed by the Engineer in charge etc. for all lead and lifts etc. as specified and directed etc. all complete.
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level
Centering and shuttering including struttings, propping and removal of formwork for: a) Foundations, footings, bases for columns and mass concrete
Laterite boulder masonry in cement concrete 1:3:6 (1 cement, 3 coarse sand : 6 graded granitic stone aggrt. 40mm nominal size) in foundation.
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge b. 75mm Dia
Mangesh Associates
Kristly Enterprises
Prashant P. G. Amonkar
Siddharth Shirodkar
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .