Tender Value
₹2.8 Cr
EMD Value
₹2.9 L
Closing Date
1 Oct 2026, 6:00 pm4d left
Executive Engineer, K. B. C. Division No.1/1,Radhanpur -385340
Flood Damage Restoration Work Of Radhanpur Branch Canal Slice-2 And It s Network for year 2026
344065
16 of 2026-2027
Open
Civil Works - Canal
Works
Patan
7 documents required · 7 mandatory
₹4,248
Executive Engineer K.B.C. Division No. 1-1, Radhanpur
₹2.9 L
10 Sept 2026
10 Sept 2026
10 Sept 2026
1 Oct 2026
10 Sept 2026
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and are
given to provide a common basis forbidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far
as it is otherwise provided under the Contract, include all constructional plant,
layout, supervision, materials, erection, maintenance, insurance, profit, taxes and
duties, together with all general risks, liabilities and obligations set out or implied
in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included
in the items provided in the priced Bill of Quantities, and where no Items are
provided the cost shall be deemed to be distributed among the rates and prices
entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. ErrorswillbecorrectedbytheEmployerforanyarithmeticerrorspursuantto
Clause29oftheInstructionstoBidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of compressed
air drilling for its removal, and which cannot be extracted by ripping with a tractor
of at least 150 kw with a single rear mounted heavy duty ripper.
BILLOF QUANTITIES
(Attached Separately)
(A) For Percentage Rate Tender (For upto INR 50 Cr.):
Name of Work: Flood Damage Restoration Work Of Radhanpur Branch Canal Slice-2 And
Its Network for year
Item. Description of item Total Unit Rate Amount
1 (a) Clearing silt from canal /drain bed by digging 13021.47 cum 236.70
the same to the required bed level and gradiant
incl. depositing the excavated earth regularly in
spoil bank for utilising the same for preparing
the bund after breaking clods as and where
directed for lead up to 200 m & lift up to 3 m as
under (excluding weed cutting).
(d) For canal above 500 Cusecs.
1 (b) Additional Lift For 3.0 mt. 4090.44 cum 29.50
1 (c) For canal 20 to 250 Cusecs. 19649.24 cum 177.50
1 (d) For canal below 20 Cusecs. 1924.09 cum 147.90
2 Desilting of canal/drain with lead upto 50 meter 2870.31 cum 349.50
and lift upto 3.0m including dewatering if any
required for following depth etc. complete as
(B) Slushy & Muddy Condition of Canal /Drain
(C ) For canal 20 to 250 Cusecs.
3 (a) Dismantling the C.C. lining including disposing
off the dismentalled materials as directed etc.
7.5 cm Thick lining 23904.34 Sqmt. 86.50
3 (b) 10 cm Thick lining 3943.50 Sqmt. 115.50
4 Trimming of the canal section manually for 27847.84 Sqmt. 72.80
preparing subgrade for laying cement concrete
lining in all sorts of soil and murrum including
watering and compacting bed etc. complete.
5 Providing & laying 7.5 cms thick cast insitu C.C. 23904.34 Sqmt. 344.10
1:2:4 grade with the use of crushed aggregates
for canal lining works incl. use of all
equipments, scaffolding, centering form work
etc. with finishing as required to the exposed
surface, makingasphalt joints as directed and
watering and curing (without sleepers)with all
lead & lifts etc. complete.
(b)7.5 cm thick lining
6 Providing & laying 10 cms thick cast in situ 3943.50 Sqmt. 419.60
C.C.1:2:4 grade with the use of crushed
aggregates for canal ling works incl. use of all
equipments,scaffolding, centering form work
etc, with finishingas required to the exposed
surface, makingasphalt joints as directed &
watering & curing(without sleepers) with all
lead and lifts etc.complete.
7 Earth work in embankment from borrow pits in 23223.80 cum 88.00
all sorts of soil and soft murrum or other
suitable strata as directed including breaking
the clods and dressing to the design sections
including cutting the proud section with lead as
under and all lift including site clearing etc.
(A) For all canal capacity
8 Extra lead charges for each additional km lead 23223.80 cum 51.00
or part thereof beyond 1.0 km and upto 5.0 km
for embankment work including all lifts etc.
= 3 km lead * 17 Rs.
9 Compaction of earthwork in embankment in 23223.80 cum 8.42
uniform layers of optimum moisture content to
require dry density including watering,
ramming manually etc complete.
10 Providing and laying CC 1:2:4 grade using 314.70 Cum 5053.10
cement, sand & crushed metal incuding
providing & erecting necessary form work,
centering, vibrating, smooth finishing,watering
& curing as directed with all leads & lifts etc.
(a) Super structures
11 Excavation inall sortsof soil (includingwet and 10647.46 Cum 92.00
slushy condition of soil) with yellow, sandy,
gravelly soil including soft murrum & H.M.
including sorting & stacking and depositing the
excavated stuff in uniform layers as and where
directed upto lead of 30m and lift as shown
below including clearing the site
etc.compute(including dewatering).(A)For all
(c) 6 to 9 Mt. depth
12 Dismentalling the Existing RCC pipes including 15.00 Rmt. 363.50
shorting out and staking of usefull
material(pipe) up to 200 mt. as directed as
(ii) 450 mm to 600 mm Diameter
13 Providing and fixing in position ( different 15.00 metre 2039.60
diameter ) I.S.,NP-3 class reinforced pipe with
caulking the joints with cement mortar 1:1
proportion,using jute string soaked in cement
slurry, finishing joints and laying pipes to the
designed grade and levels, curing etc. complete
for all leads and lifts.
NP-3 class 600 mm dia pipe.
I/We am/are willing to carry out the work at… …................... % above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under. Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above Net Net In words In words
(A)Total Tendered Amount
(B)Rebate on above tendered amount(if any)%(in figure)………………………………
(C)Net Tendered Amount(A-B)(infigure)………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken asper
Govt. G.R. NO.: MIS102010/17/K1 Dated:30/07/2018 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item
At the rate of in put rate mentioned in all the tender.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ 1.1 E.pdf
SBD Flood 2026 11 E.pdf
special instruction .pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .