Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.5 LAdmitted-Finance | -25.00% | ₹17.5 L | L1 | Admitted-Finance |
| 2 | L2₹19.9 LAdmitted-Finance | -15.00% | ₹19.9 L | L2 | Admitted-Finance |
| 3 | L3₹19.9 LAdmitted-Finance | -14.99% | ₹19.9 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical NOT QUALIFIED |
| 5 | Not Admitted-Finance | - | - | - | Not Admitted-Finance Others-Not qualified as per e-NIT conditions |
Tender Value
₹23.4 L
EMD Value
₹46,700
Closing Date
27 Jun 2026, 1:00 pmClosed
OFFICE OF THE XEN JAL SHAKTI PHE DIV. RAJOURI
OFFICE OF THE XEN JAL SHAKTI PHE DIV. RAJOURI
Permanent Restoration by way of construction of protection work to bore well, pump room and allied structure and construction of compound wall at Thandi kassi under WSS Thandi kassi.
2026_PHE_312424_11
e-NIT No. 05 of 2026-27 dated 13-06-2026
Open Tender
Civil Works - Others
30 days
RAJOURI
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
OFFICE OF THE XEN JAL SHAKTI PHE DIV. RAJOURI
₹46,700
6 Jul 2026
15 Jun 2026
29 Jun 2026
15 Jun 2026
27 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavatedearth as directed:
All kinds of soil. | 106.92 | cum | 479.3 | ₹51,246.76 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavatedearth as directed:
Ordinary rock. | 26.73 | cum | 924.8 | ₹24,719.9 |
| 3 | Providing and laying cement concrete 1:4:8 mix (1 cement:4 course sand :8 graded stone aggregate 40mm nominal size) incl. Curing but cxcl. Cost of form work | 6.02 | cum | 5,202.9 | ₹31,321.46 |
| 4 | Providing and laying cement concrete 1:3:6 mix (1 cement:3 course sand :6 graded stone aggregate 20mm nominal size) incl. Curing but cxcl. Cost of form work | 6.91 | cum | 5,733.6 | ₹39,619.18 |
| 5 | Providing and laying in position machine batched and machine mixed design mix M-25
grade cement concrete for reinforced cement concrete work, using cement content as per
approved design mix, including pumping of concrete to site of laying but excluding the
cost of centering, shuttering, finishing and reinforcement, including admixtures in
recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve orkability without impairing strength and durability as per direction of Engineer-incharge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately.All works above plinth level upto floor V level | 109.59 | cum | 9,412.05 | ₹10,31,466.56 |
| 6 | Supply of stones( nallah 225mm nominal size) | 61.25 | cum | 700 | ₹42,875 |
| 7 | Dumping of stones | 72.07 | cum | 237.9 | ₹17,145.45 |
| 8 | Centering and shuttering including strutting, propping etc. And removal of form work for.
Foundation, footing, bases of columns etc. For mass concrete. | 90.2 | sqm | 286.35 | ₹25,828.77 |
| 9 | Centering and shuttering including strutting, propping etc. And removal of form work for. Walls( any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 254.64 | sqm | 628.95 | ₹1,60,155.83 |
| 10 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 infoundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 3.92 | cum | 7,571.55 | ₹29,680.48 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_1011206.xls
BOQ • 0.27 MB
corri.pdf
PDF • 0.72 MB
corri.pdf
PDF • 0.48 MB
nit5.pdf
PDF • 0.73 MB
Download all tender documents and submit your bid