Loading…
Loading…
Tender Value
Refer Docs
Closing Date
9 Oct 2026, 5:00 pm
Capt. Pankaj Kumar, DGM I/c.
As per tender document
DRYDOCKING / REPAIRS OF VISHVA EKTA AND VISHVA VIKAS
2026_SCIL_851619_1
SCI/BNT/DD/VISHVA EKTA AND VISHVA VIKAS/2026-27
Limited.
Miscellaneous Services
Works
SCI OWNED SHIP
SELECTED SCI EMPANELLED YARDS ONLY.
1 document required · 1 mandatory
₹0
Exempted
18 Sept 2026
18 Sept 2026
9 Oct 2026
18 Sept 2026
9 Oct 2026
18 Sept 2026
18 Sept 2026 - 2 Oct 2026
Instructions for Price in Excel - Dry docking Quantity and Rate Template
Sr no Instructions
1 # Tender (RFx) and Bid (RFx Response) templates are available as separate sheets with prefix as Template # Example of Comparative Statement reports, which will be generated from BI, (Rank L1 and Detail & LOL), are also available in separate sheets with prefix CS # Data entered in this template is dummy and needs to be replaced with the actual production data # Please refrain from using special characters such as """,",", "&", "$", "*", "#", "/", "\", "!" while creating the actual template document
2 Template - Tender # Please refer to sheet "Template - Tender" for tender with existing rate template. This template should be completed ONLY by dealing officer to upload the estimated rates into BI system # Do NOT attach this template into the tender (RFx) document # Columns in LIGHT BLUE should be completed by dealing officer # Columns in DARK BLUE (Group level 1, Group level 2, Group level 3) heading can be renamed as required by dealing officer. Data type and field length (char 60) should NOT be changed # Do NOT edit data or DELETE any content from cells which are in GRAY # Mandatory columns are mentioned as Mandatory, kindly ensure that the data is populated in those columns/cells # Row 4 and 7 are deliberately hidden. It contains the technical name wherein the data will be populated in the SAP BI system # Do NOT delete row from 1 to 8. Each row has specific meaning in the SAP BI upload program # The upload program will upload all rows above the first occurrence of empty Tender Line Item No cell, the row with empty Tender Line Item no and the subsequent rows (below it) will be ignored in the BI comparative statement report # Similarly, the upload program will upload all columns before the first occurrence of empty column in row 7, the column column and the subsequent columns (after it) will be ignored in the BI comparative statement report
3 Template - Bid # Please refer to sheet "Template - Bid 1" for Tender with existing rate template # Kindly protect the sheet in such way that bidder should be able to update the cells in WHITE as their Bid response. Steps to protect sheet is mentioned below in points 7 and 8. # Columns in LIGHT BLUE to be completed by dealing officer from SCI. After protection the document, bidder should NOT be able to edit these columns. # Columns in DARK BLUE (Group level 1, Group level 2, Group level 3) heading can be renamed as required by dealing officer from SCI. Data type and field length (char 60) should NOT be changed. # Do NOT edit data or DELETE any content from cells which are in GRAY # Mandatory columns are mentioned as Mandatory, kindly ensure that the data is populated in those columns/cells # Row 4 and 7 are deliberately hidden. It contains the technical name wherein the data will be populated in the SAP BI system # Do NOT delete row from 1 to 8. Each row has specific meaning in the SAP BI upload program # The upload program will upload all rows above the first occurrence of the blank Tender Line Item No, the row with blank Tender Line Item no and the subsequent rows below it will be ignored in the comparative statement report # Similarly, the upload program will upload all columns before the first occurrence of the blank columns in row 7, the blank column and the subsequent columns after it will be ignored in the comparative statement report # Taxes are considered in the Financial implication, the comprative statement will be calculated on the Finanical implication. However, the Tax details will not be populated in the Comparative statement
4 Template Bid 1 / Bid 2 / Bid 3 # These templates are dummy examples of the price response from bidders # Each of these price response document should be converted in to comma separated (CSV) format and then uploaded into BI system by dealing officer # Once all the price response and tender template is uploaded into BI system, the comparative statement will be generated from BI system
5 Comparative Statement - Rank (L1) # This sheet gives an example of BI Comparative statement, generated in SAP BI, for Rank L1 query
6 Comparative Statement - Detail and LOL # This sheet gives an example of BI Comparative Statement, generated in SAP BI, for Detail and LOL query
7 Steps to protect sheet, such that bidder is only able to change selective cells/columns # Select the entire sheet by clicking on the top leftmost cell, right click --> Format Cells --> Protection --> select Lock # Select the cell/columns that bidders should be able to update, right click --> Format Cells --> Protection --> unselect Lock # File menu options --> Tools --> Protection --> Protect sheet - enter password with Protect worksheet and content of locked cells, Selected locked cell and Selected unlocked cell option checked
8 Steps to unprotect sheet # File menu options --> Tools --> Protection --> enter password to unprotect sheet
THE SHIPPING CORPORATION OF INDIA LTD.
(A Government of India Enterprise)
TENDER Tender for Dry Docking Qty and Rate
/BIC/ZTR_TYPE /BIC/ZTDR_ID /BIC/ZTR_DESC CURRENCY /BIC/ZEXC_DATE /BIC/ZTDR_DATE
RFx Type (Mandatory) RFx No (char 10 - Mandatory) RFx Name (char 40 - Mandatory) Currency (char 5 - Mandatory) Exchange Rate Date (DD-MM-YYYY -- Mandatory) Price Opening Date (DD-MM-YYYY)
DryDocking-Qty&Rate
ZINFLAG ZBDITEM ZMATERIAL ZMATDESC ZGROUP1 ZGROUP2 ZGROUP3 Z_PCODE ZPCODEDESC ZVOLUME ZUNIT ZRATE ZCURRENCY ZRATEPU ZECOST
Information line (char 1) RFx Line Item No (char 20 - Mandatory) Material/Service ID (char 18) Material/Service Description (char 60 - Mandatory) Group Level 1 (char 60) Unit of Measure (char 60) Qty/Volume (9999999999999.99) Port Code (char 5) Port Description (char 60) Qty/Volume (9999999999999.99) UOM (char 3) Bid Price/Rate (9999999999999.99) Bid Currency (char 5) Price per Unit ((9999999999999) Estimated Cost (9999999999999.99)
I MV VISHVA EKTA/MV VISHVA VIKAS DRY-DOCK /REPAIRS SPECIFICATIONS 2026-27 DECK EA USD 1.00 0.00
I YARDS TO QUOTE THEIR COST/ RATES AS GIVEN IN THIS FORMAT ONLY -AGAINST ALL THE ITEMS SPECIFIED HEREWITH (IN BID PRICE / RATE - COLUMN "L") DECK EA USD 1.00 0.00
I DECK SIDE DECK EA USD 1.00 0.00
I ITEM: GENERAL INSTRUCTION TO YARD DECK EA USD 1.00 0.00
I AS FAR AS POSSIBLE, VESSEL TO BE PROGRAMMED TO ENTER DRY-DOCK IMMEDIATELY ON ARRIVAL AT THE YARD. DECK EA USD 1.00 0.00
I WHEN VESSEL IS NOT DOCKED FOR DRY-DOCKING REPAIR THEN, VESSEL TO BE SAFELY BERTHED AT A SUITABLE REPAIR BERTH FOR THE DURATION OF REPAIR PERIOD. NORMAL SERVICES AS REQUIRED TO BE PROVIDED DURING REPAIR PERIOD. IN CASE, VESSEL IS DOUBLE BANKED THEN THE YARD TO ENSURE ADEQUATE CRAINAGE FACILITIES AVAILABLE SO THAT THE WORK IS NOT HAMPERED. DECK EA USD 1.00 0.00
I VESSEL TO BE SAFELY DOCKED IN SUITABLE DRYDOCK ON BLOCK OF ADEQUATE HEIGHT.MINIMUM CLEARANCE AVAILABLE ON SIDE FOR GRIT/HYDRO BLASTING AND PAINTING TO BE INDICATED BY YARD. DECK EA USD 1.00 0.00
I ADEQUATE LIGHTING TO BE PROVIDED DURING HOURS OF DARKNESS AND WORK SHOULD BE CONTINUED ON WEEK ENDS AND HOLIDAYS ON ROUND THE CLOCK BASIS. DECK EA USD 1.00 0.00
I YARD TO ARRANGE TUGS PILOTS RIGGERS BOATMEN FOR MOORING, UNMOORING, SHIFTING AND DOCKING OF VESSEL. IF VESSEL IS SHIFTED FOR YARDS CONVENIENCE, NO CHARGES TO BE LEVIED TO THE VESSEL. YARD TO QUOTE LUMPSUM CHARGES FOR EACH SHIFTING OR MOVEMENT. DECK EA USD 1.00 0.00
I YARD TO DISPLAY SUITABLE PRECAUTIONARY WARNING NOTICES AT VARIOUS LOCATIONS TO AVOID ACCIDENTS & ALSO ENSURE SUFFICIENT SAFETY MEASURES DURING VESSELS STAY IN YARD. DECK EA USD 1.00 0.00
I FIREMEN TO WEAR DISTINCTIVE UNIFORM WHICH TO BE MADE KNOWN TO SHIPS OFFICERS/CREW ON ARRIVAL. THE FIREMAN WOULD REPORT TO MASTER & CHIEF ENGINEER TWICE EVERY DAY. DECK EA USD 1.00 0.00
I YARD SHALL PROVIDE CRANE FACILITIES ON WRITTEN REQUEST FROM SHIPS STAFF AS AND WHEN REQUIRED TO LIFT SHIFT PROVISION , STORES, SPARES ETC. TOTAL TIME CRANE USED SHOULD BE CERTIFIED BY SHIPS STAFF. DECK EA USD 1.00 0.00
I YARD WOULD ARRANGE GAS FREE/HOT WORK CERTIFICATE FOR ALL SPACES ON BOARD AS REQUIRED DURING THE REPAIR PERIOD.COPY OF GAS FREE/HOT WORK CERTIFICATES IS TO BE HANDED OVER TO THE MASTER/CHIEF ENGINEER OFFICER WHENEVER ANY CHECK HAS BEEN MADE. IN CASE ANY SPACE IS FOUND TO BE UNSUITABLE FOR MAN ENTRY OR HOT WORK SAME TO BE BROUGHT TO THE NOTICE OF SHIPS STAFF. DECK EA USD 1.00 0.00
I IF COOLING WATER FOR DOM. FRIDGE/AC IS THROUGH SAME LINE AS FIRE LINE YARD TO ENSURE SUFFICIENT PRESSURE IN THE FIRE LINE. DECK EA USD 1.00 0.00
I ALL ITEMS IN THE SPECIFICATIONS REPAIRED BY THE YARD SHOULD BE TESTED TO THE SATISFACTION OF ATTENDING SUPERINTENDENT & SHIPS STAFF. TESTING, PURGING, PICKLING, HOSE TESTING SHOULD BE INCLUDED IN THE QUOTED COST ITEM WISE. DECK EA USD 1.00 0.00
I QUOTATION FOR EACH ITEM SHOULD INCLUDE ALL REQUIRED STAGING, TEMPORARY LIGHTING, VENTILATION AND FIRE PRECAUTIONS (IF REQUIRED) FOR THE USE OF YARD PERSONNEL ACCOMPLISHING EACH JOB. DECK EA USD 1.00 0.00
I ALL PAINTS WILL BE SUPPLIED BY OWNERS AND ARE TO BE APPLIED BY AIRLESS SPRAY MACHINES HAVING SUFFICIENT PRESSURE TO FULLY ATOMIZE THE HEAVY COATINGS. NO PAINTS TO BE APPLIED ON DAMP SURFACE. DECK EA USD 1.00 0.00
I DEFICIENCIES IN FILM THICKNESS TO BE MADE GOOD BEFORE APPLYING FINAL COATS TO AVOID PATCH APPEARANCE. DRYING/CURING TIME TO BE ALLOWED AS PER RECOMMENDATIONS OF PAINT MAKERS TECHNICIAN AND IN CONSULTATION WITH ATTENDING SUPERINTENDENT. DECK EA USD 1.00 0.00
I QUOTATION FOR VARIOUS SERVICES BE BASED ON TIME IN DRY-DOCK OR AT REPAIR BERTH QUOTED BY THE YARD. QUOTATIONS FOR EACH SERVICE SHALL BE ALL INCLUSIVE, I.E; INCLUDING CONNECTION/DISCONNECTION INSTALLATION/REMOVAL AND ANY OTHER ACTIVITIES CONNECTED WITH THE SERVICES. DECK EA USD 1.00 0.00
I ON IDENTIFICATION OF REPAIR ITEMS TO YARD PERSONNEL A DETAILED BAR CHART DISPLAYING WORK SCHEDULE AND COMPLETION OF REPAIR ITEMS TO BE ENDORSED AND SUBMITTED TO ATTENDING SUPERINTENDENT. DECK EA USD 1.00 0.00
I IF DURING VESSEL'S STAY IN SHIPYARD, ANY ITEM OF MACHINERY/ EQUIPMENT OR PIPING SYSTEM OR ELECTRICAL SYSTEM IS OBSERVED NOT FUNCTIONING NORMALLY OR HAS BEEN WRONGLY ASSEMBLED / FITTED, IT WOULD BE THE DUTY OF SHIPYARD PERSONNEL TO BRING IT TO THE NOTICE OF ATTENDING SUPERINTENDENT AND REMEDIAL ACTION TAKEN IN CONSULTATION WITH CONCERNED SUPERINTENDENT. DECK EA USD 1.00 0.00
I AT THE TIME OF COMMISSIONING AND TRIALS OF EQUIPMENT, IT IS NECESSARY THAT, REPRESENTATIVES OF SHIPYARD FROM VARIOUS DEPT ARE PRESENT TO ENABLE COMMISSIONING AND TESTING DEFECTS TO BE RESOLVED IMMEDIATELY. DECK EA USD 1.00 0.00
I ALL WORKS TO BE CARRIED OUT AS PER THE INTERNATIONAL STANDARDS AND CONSISTENT WITH SAFE MARINE PRACTICES ON ROUND THE CLOCK BASIS. DECK EA USD 1.00 0.00
I DUE CONSIDERATION TO BE GIVEN TO INSTRUCTIONS AND GUIDELINES OF THE OWNERS AND THEIR SAFETY MANAGEMENT SYSTEM. DECK EA USD 1.00 0.00
I ALL CONCUMABLES ARE BE TO SUPPLIED BY THE YARD UNLESS MENTIONED FOR OWNER’S SUPPLY. YARD TO QUOTE ACCORDINGLY. DECK EA USD 1.00 0.00
I ON COMPLETION OF ALL REPAIR WORK (PRIOR DEPARTURE), ENTIRE VESSEL TO FRESH WATER WASH. DECK EA USD 1.00 0.00
I ALL NEW PIPES FITTED ON MAIN DECK AS PER VARIOUS SPECIFICATIONS SHOULD BE PROVIDED WITH LEAD STRIP BETWEEN PIPE AND CLAMP AND PIPE BOTTOM SUPPORT AT PLACE OF BOLTING.ALL NEW PIPES CLAMPS FITTED NEED TO BE COATED BY YARD. ALL PAINTS OWNER'S SUPPLY. ALL PIPELINES TO BE COATED INTERNALLY PRIOR FITTMENT. YARD TO QUOTE ACCORDINGLY. DECK EA USD 1.00 0.00
I YARD TO USE SUITABLE ELECTRODES AS REQUIRED FOR RESPECTIVE JOB INVOLVING MILD STEEL, ALUMINIUM, STAINLESS STEEL ETC. DECK EA USD 1.00 0.00
I YARD TO EFFECTIVELY COVER THE DOPPLER AND ECHO SOUNDER TRANSDUCERS DURING HULL TREATMENT TO AVOID ANY DAMAGE.SAME TO UNCOVER AFTER HULL TREATMENT IS COMPLETED/BEFORE REFLOATING. DECK EA USD 1.00 0.00
I BALLAST TANKS PLUGS TO BE REMOVED AFTER VESSEL IS SITTING ON THE BLOCKS AND DOCK IS COMPLETELY DRY TO FACILITATE DRAINING OF BALLAST TANKS.ALL PLUGS TO BE PUT BACK BEFORE COMMENCEMENT OF OF BALLASTING & VACUUM TEST TO BE CARRIED OUT IN PRESENCE OF MASTER/CHIEF OFFICER OR ANY OTHER RESPONSIBLE OFFICER DEPUTED BY MASTER/CO. DECK EA USD 1.00 0.00
I ANY JOB SCOPE NOT MENTIONED IN THE ORIGINAL JOB SCOPE TO BE ATTENDED AFTER THE INSTRUCTION / PERMISSION FROM THE ATTENDING SUPDT. DECK EA USD 1.00 0.00
I ALL DAMAGED AND BURNT PAINT AREAS TO BE MADE FAIR AND APPLY WITH ONE COAT OF PRIMER AND FINISH PAINT AS PER THE PAINTING SPECIFICATION. DECK EA USD 1.00 0.00
I VESSEL IS ISPS COMPLIANT,YARD TO ENSURE THEIR ISPS COMPLIANCE. ONCE VESSEL ENTERS THE YARD, YARD TO TAKE FULL RESPONSIBILTY FOR THE SAFETY AND SECUIRTY OF THE VESSEL. HOT WORK AND ENCLOSED SPACE ENTRY , PROPER APPROVED WORK PERMITS TO BE EXECUTED WITH THE KNOWLEDGE OF SHIP'S STAFF. DECK EA USD 1.00 0.00
I WHILE CARRY OUT O'HAULING OF VALVES, PRESSURE TESTING OF PIPELINES, MAINTENANCE OF AIR PIPE VENT HEADS ETC, YARD TO CONSIDER ISOLATION BY BLANKING AND OTHER FIRE HAZARD/SAFTY ISSUES AND QUOTE ACCORDINGLY. DECK EA USD 1.00 0.00
I ENGINE/PUMP ROOM BILGES VALVES PIPE LINES, FLOOR PLATES AND BULKHEADS SHALL BE CLEANED AFTER REPAIRS TO BRING TO ORIGNAL CONDITION ON YARD ACCOUNT. DECK EA USD 1.00 0.00
I YARD TO PROVIDE SAFE ACCESS TO THE VESSEL AT REPAIR BERTH AND IN DOCK. ALL YARD ARRANGEMENT. DECK EA USD 1.00 0.00
I YARD TO ALLOW OWNER ARRANGED SERVICE ENGINEER/COMPETENT ENGINEER DURING ENTIRE STAY OF VESSEL AT REPAIR YARD AT NO COST TO OWNER. DECK EA USD 1.00 0.00
I SAFETY GUARDS PLACEMENT FOR VARIOUS OPENINGS AND CARGO TANK ENTRY TILL 1ST PLATFORM AS PER YARD SAFETY STANDARD TO CARRY OUT. NO ADDITIONAL JOB SCOPE/COST TO BE CHARGED SEPARATELY. DECK EA USD 1.00 0.00
I ALL NEW /RENEWED STEEL VIZ; PIPE PLATE CLAMP RAILING ETC AND THE DAMAGED PAINT COATING DURING HOT WORK ARE TO BE CURED AND COATED WITH PAINTS AS PER ON BOARD PAINTING SPECIFICATION. YARD TO QUOTE FOR SAME ACCORDINGLY. IT IS APPLICABLE FOR ALL THE REPAIR/RENEWAL JOB ON BOARD DURING THE DRY DOCKING/REPAIR PERIOD. DECK EA USD 1.00 0.00
i QUOTE SHOULD BE ALL INCLUSIVE. ANY ADDITIONAL COST WILL NOT BE ENTERTAINED AND IN CASE OF ANY DEVIATION IN QUANTITY, SAME WILL BE SETTLED STRICTLY ON PRORATA BASIS. DECK EA USD 1.00 0.00
i YARD TO ISSUE ALL REQUIRED CERTIFCATES IN LINE WITH APPLICABLE REGULATIONS. DECK EA USD 1.00 0.00
I REMOVE DEBRIS AND DIRT ARISING OUT OF REPAIRS AT REGULAR INTERVALS THROUGHOUT THE REPAIR PERIOD ON YARD ACCOUNT AND SHOULD BE CLEAR OF DEBRIS AND DIRT PRIOR DEPARTURE.EVERY ENDEAVOUR SHOULD BE MADE TO REMOVE DEBRIS AND DIRT ARISING OUT OF REPAIRS AT REGULAR INTERVALS THROUGHOUT THE REPAIR PERIOD ON YARD ACCOUNT. DECK EA USD 1.00 0.00
I D26001-MOORING/UN-MOORING/DOCKING/UN-DOCKING/WHARFAGE/GENERAL SERVICES DECK EA USD 1.00 0.00
I VESSEL TO BE SAFELY BERTHED AT SUITABLE REPAIR BERTH FOR THE DURATION OF REPAIR PERIOD ON ARRIVAL. NOTE: IN CASE THE VESSEL IS DOUBLE/TRIPPLE BANKED, THEN YARD TO ENSURE THAT ADEQUATE CRANE FACILITIES ARE AVAILABLE SO THAT WORK IS NOT HAMPERED. QUOTE ALL INCLUSIVE. DECK INSTRUCTION EA USD 1.00 0.00
D26001.1 YARD TO QUOTE LUMSUMP WHARFAGE DUES FOR ENTIRE PERIOD OF REPAIR AT REPAIR BERTH. DECK LS 1.00 1.00 EA USD 1.00 0.00
D26001.2 LUMPSUM COST FOR UNBERTHING TO ENTER DRY-DOCK FROM REPAIR BERTH. DECK LS 1.00 1.00 EA USD 1.00 0.00
D26001.3 QUOTE LUMPSUM COST FOR BERTHING AT REPAIR BERTH AFTER UNDOCKING FROM DRY-DOCK DECK LS 1.00 1.00 EA USD 1.00 0.00
D26001.4 QUOTE LUMPSUM COST FOR UNBERTHING FROM REPAIR BERTH FOR SAILING,QUOTE ALL INCLUSIVE DECK LS 1.00 1.00 EA USD 1.00 0.00
D26001.5 VESSEL TO BE SAFELY DOCKED ON BLOCKS ENSURING SUFFICIENT HEIGHT AND CLERANCE ARE BEING MAINTAINED FOR EFFECTIVE DOCKING REPAIR. QUOTE SHOULD INCLUDES DOCKING CHARGES,UNDOCKING CHARGES AND DOCK CHARGES FOR ENTIRE PERIOD OF STAY IN DOCK. DECK LS 1.00 1.00 EA USD 1.00 0.00
I IF THE VESSEL IS SHIFTED FOR YARD'S CONVENIENCE NO CHARGES FOR SAME WOULD BE APPLICABLE. DECK INSTRUCTION EA USD 1.00 0.00
I VESSEL TO BE SAFELY DOCKED IN SUITABLE DRYDOCK ON BLOCKS OF ADEQUATE HEIGHT. MINIMUM CLEARANCE AVAILABLE ON THE SIDES FOR GRIT BLASTING AND PAINTING TO BE INDICATED BY YARD. WORK SHOULD BE CONTINUED ON WEEK ENDS AND HOLIDAYS. NOTE: THE ABOVE PRICE SHOULD INCLUDE CHARGES FOR ALL REQUIRED SHORING AND DIVER. THERE SHOULD BE NO SEPARATE CHARGES FOR EXTRA SHORING. WHILE ESTIMATING, TOTAL TIME FOR ALL WORKS AS SPECIFIED IN OUR REPAIR SPECIFICATION SHOULD BE TAKEN INTO CONSIDERATION. DECK INSTRUCTION EA USD 1.00 0.00
I YARD TO QUOTE MOOR/UNMOOR AND SHIFT THE VESSEL WITH ASSISTANCE OF PILOT, TUGS ( CONSIDER 4 TUGS FOR EACH MOVEMENTS), RIGGERS AND BOATMEN. QUOTE ALL INCLUSIVE. DECK INSTRUCTION EA USD 1.00 0.00
D26001.6 TO SUPPLY SEA WATER FOR SHIP’S FIRE MAIN LINES AT ALL TIMES. PRESSURE IN THE FIRE MAIN LINE ON DECK TO BE MAINTAINED AT LEAST 5.0 KG/CM2 SO THAT THE MINIMUM OF 2 FIRE HOSES CAN BE USED SIMULTANEOUSLY IN CASE REQUIRED. YARD TO QUOTE LUMPSUM PRICE ASSUMING SUPPLY THROUGH TWO LINES. PRICE INCLUSIVE OF CONNECTION/DISCONNECTION AND ATTENDANT. YARD TO PROVIDE CHARGED FIRE HOSE WITH DUAL TYPE NOZZLE AT LOCATION OF ALL HOT WORK. DECK LS 1.00 1.00 EA USD 1.00 0.00
D26001.7 PROVIDE 02 FIRE WATCHMEN DURING ENTIRE PERIOD OF VESSEL'S STAY IN YARD PREMISES. YARD TO QUOTE LUMPSUM PRICE AS PER YARD REQUIREMENT. DECK LS 1.00 1.00 EA USD 1.00 0.00
I NOTE: FIRE WATCHMEN SHOULD WEAR DISTINCTIVE UNIFORM WHICH SHOULD BE MADE KNOWN TO THE SHIP’S OFFICERS/CREW ON ARRIVAL. FIRE WATCHMAN WOULD BE REQUIRED TO REPORT TO THE MASTER AND THE CHIEF ENGR. OFFICER ONCE EVERY SHIFT. DECK INSTRUCTION EA USD 1.00 0.00
I ANY ADDITIONAL ITEM OR SAFETY SERVICES TO BE SPECIFIED INCLUDED AND ACCORDINGLY QUOTED FOR IF YARD OR LOCAL REGULATIONS DEMAND. DECK INSTRUCTION EA USD 1.00 0.00
I IN CASE ANY REPAIRS ARE TO BE CARRIED OUT ON FIRE MAIN LINE YARD IS REQUIRED TO ENSURE THAT THE SECTION OF THE PIPELINE UNDER REPAIR IS ISOLATED FROM THE SHIPS FIRE MAIN. DECK INSTRUCTION EA USD 1.00 0.00
I THE PERIOD REQUIRED FOR ISOLATING THE LINE WHEN NO WATER PRESSURE WILL BE AVAILABLE IN THE FIRE MAIN IS TO BE KEPT TO THE MINIMUM AND THE DUTY OFFICER AND DUTY ENGINEER SUITABLY INFORMED WHEN THIS WORK IS BEING DONE. DECK INSTRUCTION EA USD 1.00 0.00
I DURING THE PERIOD REPAIRS ARE BEING CARRIED OUT TO THE FIRE MAIN AN ALTERNATIVE ARRANGEMENT SHOULD BE MADE IN THE AREA WHERE WATER HAS BEEN CUT OFF. DECK INSTRUCTION EA USD 1.00 0.00
D26001.8 YARD TO QUOTE LUMPSUM CHARGES INCLUSIVE OF CONNECTION/DISCONNECTION OF CABLES ASSESSING SHIPS TOTAL CONSUMPTION AS 50000 KWH. VESSELS POWER REQUIREMENT WOULD BE 440 VOLTS 60 HERTZ; 400 AMP AND 3 PHASES.ANY DEVIATION IN CONSUMPTION WILL BE SETTLED AS PER PRORATA BASIS. NOTE: VESSELELECTRICAL OFFICER/RESPONSIBLE OFFICER TO SIGHT AND RECORD RECORD SUPPLY METER READINGS. DECK KWH 50000.00 50000.00 EA USD 1.00 0.00
D26001.9 YARD TO ARRANGE REMOVAL OF GALLEY REFUSE DOMESTIC WASTE AND PLASTIC REFUSE PER DAY AND PROVIDE CERT AS PER REQUIREMENTS. QUOTE FOR ENTIRE PERIOD OF DRYDOCK AND REPAIR DECK LS 1.00 1.00 EA USD 1.00 0.00
D26001.10 SHIP SANITARY SYSTEM WILL BE USED AS FAR AS POSSIBLE. YARD TO QUOTE FOR CONNECTING/DISCONNECTING PIPE FOR SEWAGE DISPOSAL WHILE VESSEL IS AT YARD . NOTE : DURING THE COURSE OF REPAIR OF SEWAGE PLANT AND SURVEY, SANITATION FACILITIES TO BE PROVIDED FOR SHIPS STAFF. DECK LS 1.00 1.00 EA USD 1.00 0.00
D26001.11 TO BE PROVIDED AS AND WHEN REQUIRED ON WRITTEN REQUEST OF SHIP’S STAFF TO TAKE STORES, PROVISIONS, SPARES, LANDING OF MACHINERY COMPONENTS FOR REPAIRS BY OWNER ARRANGED SERVICE PROVIDERS; ETC.TOTAL TIME CRANE USED SHOULD BE CERTIFIED BY SHIP’S STAFF INDICATING DATE AND HOURS OF EVERY CRANE USE. QUOTE FOR THROUGH OUT PERIOD OF DRYDOCK/ REPAIR PER HOURLY BASIS.APPROX 100HRS.MINIMUM CHARGES SHOULD NOT BE APPLICABLE. YARD TO QUOTE LUMP SUM CHARGES PRICE INCLUSIVE OF SLINGS AND RIGGERS ASSUMING CARNE REQUIRED FOR 2HRS EVERY DAY.ANY DEVIATION WILL BE SETTLED IN PRORATA BASIS DECK HRS 100.00 100.00 EA USD 1.00 0.00
D26001.12 TO ARRANGE GAS FREE/HOT WORK CERTIFICATES FOR ALL SPACES ON BOARD INCLUDING TANKS AS REQUIRED DURING THE REPAIR PERIOD. COPIES OF GAS FREE/HOT WORK CERTIFICATES ARE TO BE HANDED OVER TO THE MASTER AND CEO WHENEVER ANY CHECK HAS BEEN MADE. IN CASE ANY SPACE IS FOUND TO BE UNSUITABLE FOR MAN ENTRY OR FOR HOT WORK SAME TO BE IMMEDIATELY BROUGHT TO THEIR NOTICE. ASSUME 20 COMPARTMENTS TO BE CERTIFIED PERIODICALLY YARD TO QUOTE LUMPSUM PRICEPER DAY.ANY ADDITION/DELETION WILL BE SETTLED ON PRORATA BASIS. DECK LS 1.00 1.00 EA USD 1.00 0.00
D26001.13 FRESH WATER SUPPLY FOR SHIPS DOMESTIC USE TO BE SUPPLIED AS AND WHEN REQUIRED. QUOTE LUMP SUM CHARGES OF CONNECTION /DISCONNECTION OF HOSES .WATER PURITY CERTIFICATE FOR DOMESTIC WATER USE TO BE PROVIDED.ANY ADDITION/DELETION WILL BE SETTLED ON PRORATA BASIS. DECK MT 500.00 500.00 EA USD 1.00 0.00
D26001.14 TO SUPPLY COOLING WATER FOR FRIDGE AND/AIR CONDITIONING UNITS / MAIN AIR COMPRESSOR/LT COOLER DURING THE TIME WHEN VESSEL IS IN DRYDOCK.YARD TO QUOTE LUMPSUM CHARGES ASSUMING SUPPLY THROUGH ONE/TWO LINES PRICE INCLUSIVE OF CONNECTION / DISCONNECTION THROUGH OUT REPAIR PERIOD. DECK LS 1.00 1.00 EA USD 1.00 0.00
I NOTE: IN CASE SUPPLY OF COOLING WATER FOR DOMESTIC FRIDGE AND OR AIR CONDITIONING UNITS IS COMMON WITH THE FIRE MAIN LINE. YARD TO TAKE STEPS TO ENSURE THAT ADEQUATE PRESSURE IS MAINTAINED IN THE FIRE MAIN LINE AT ALL TIMES. DECK EA USD 1.00 0.00
D26001.15 TO SUPPLY COMPRESSED AIR FOR SHIP’S STAFF; BOTH DECK AND MACHINERY SPACE; USE OF PNEUMATIC TOOLS EQUIPMENTS DURING THE ENTIRE REPAIR PERIOD .AIR PRESSURE TO BE MAINTAINED 6 BAR.YARD TO QUOTE LUMPSUM CHARGES PRICE FOR 02 LINES PER DAY INCLUSIVE OF CONNECTION/ DISCONNECTION DECK LS 1.00 1.00 EA USD 1.00 0.00
D26001.16 TO FILL BALLAST WATER IN 4 CARGOS/BALLAST TANKS AS REQUIRED IN 12 HOURS. TO QUOTE FILLING 15000 MTONS OF BALLAST WATER (S.W). THE COST SHOULD PRICE INCLUDE RIGGING/ UNRIGGING OF YARDS PUMPS AND ATTENDANCE DURING OPERATION.ANY DEVIATION IN QTY WILL BE SETTLED ON PRORATA BASIS. DECK MT 15000.00 15000.00 EA USD 1.00 0.00
D26001.17 TO DE-BALLAST ABOVE CARGO/BALLAST TANKS (AS REQUIRED) IN 12 HOURS. QUOTE FOR PUMPING OUT 15000 MTONS BALLAST WATER USING YARD’S PUMPS. THE COST SHOULD INCLUDE RIGGING / UNRIGGING OF PUMPS AND ATTENDANCE DURING OPERATION.ANY DEVIATION IN QTY WILL BE SETTLED ON PRORATA BASIS. DECK MT 5000.00 5000.00 EA USD 1.00 0.00
D26001.18 TO FIT & REMOVE 16 WOODEN PLUG WITH SPOUTS TO SCUPPERS AND PIPES IN DRYDOCK AND AT WET BERTH. YARD TO QUOTE LUMPSUM PRICE. DECK PCS 6.00 6.00 EA USD 1.00 0.00
D26001.19 YARD TO QUOTE LUMPSUM PRICE FOR REMOVAL 200 MTONS DIRTY WATER FROM CARGO HOLDS( ALL INCLUSIVE). ANY DEVIATION IN QTY WILL BE SETTLED ON PRORATA BASIS. DECK MT 200.00 200.00 EA USD 1.00 0.00
D26001.20 ENGINE ROOM BILGES TO BE REMOVED ON DAILY BASIS DURING ENTIRE REPAIR PERIOD AND REQUIRED CERTIFICATES TO BE ISSUED FOR ENDORSEMENT IN OLB. YARD TO QUOTE LUMPSUM PRICE ALL INCLUSIVE. QUANTITY = 100 TONS DIRTY WATER/OILY WATER.ANY DEVIATION IN QTY WILL BE SETTLED ON PRORATA BASIS. DECK MT 100.00 100.00 EA USD 1.00 0.00
i TO PROVIDE TRIAL BERTH AND ARRANGEMENTS FOR SEA TRIAL; IF CONSIDERED NECESSARY BY ATTENDING SUPERINTENDENT AND SURVEYORS. DECK INSTRUCTION EA USD 1.00 0.00
D26001.21 YARD TO QUOTE CHARGES ON THE BASIS OF BERTH TRIAL OF 3 HOURS DURATION AND SEA TRIAL FOR 6 HOURS DURATION INCLUSIVE OF NECESSARY ASSISTANCE OF 6 YARD PERSONNEL; DURING THE TRIAL. DECK HRS 9.00 9.00 EA USD 1.00 0.00
D26001.22 TO PROVIDE 15 VENTILATING FANS OF SUFFICIENT CAPACITY TO PROVIDE VENTILATION FOR CARGO HOLDS/BALLAST TANKS/BALLAST TANKS/STEERING ROOM/ENGINE ROOM FOR EXCLUSIVE USE TO FULFILL OWNERS REQUIREMENT( ALL INCLUICIVE) DURING ENTIRE STAY AT REPAIR BERTH/INSIDE THE DOCK THE QUOTE SHOULD BE ALL INCLUSIVE. VENTILATORS USED BY YARD TO CARRY OUT VARIOUS JOBS IN CARGO/BALLAST TANKS/ENGINE ROOM/ PUMP ROOM ETC TO BE INCLUDED IN QUOTE FOR THE JOBS DECK LS 1.00 1.00 EA USD 1.00 0.00
D26001.23 TO PROVIDE AND LAY THICK POLYTHENE SHEET COVERING FOR 6 CABINS (MASTER; CEO; CO; 2EO; OWNER; OFFICE; CCR; CONFERENCE ROOM); 3 DINING SPACES; 3 LOUNGE AREAS; 6 STAIRWAYS CHAIRS IN OFFICERS/CREW LOUNGE AND 300 RUNNING METRES OF ALLEYWAYS IN ACCOMMODATION. TOTAL APPROX AREA 300 SQ MTRS TWO TIMES. ANY DEVIATION WILL BE SETTLED PRORATA BASIS. DECK M2 300.00 300.00 EA USD 1.00 0.00
D26001.24 YARD TO ALLOW FOR RENEWAL OF 12 NOS. BOTTOM PLUGS (SS) ALONG WITH HOUSING WITH ALL TEST AS PER CLASS.QUOTE ALL INCLUSIVE ANY DEVIATION WILL BE SETTLED PRORATA BASIS. DECK NOS 12.00 12.00 EA USD 1.00 0.00
I YARD TO QUOTE UNIT RATES FOR THE FOLLOWING : SAME RATES MAY BE APPLIED ACROSS THE QUOTATION.SERVICE WILL BE TAKEN AS REQUIRED AND BILL WILL BE SETTLED AS PER BELOW QUOTED RATE. DECK Inclusive EA USD 1.00 0.00
D26001.25 I. SKILLED LABOUR DECK Man Day 1.00 1.00 EA USD 1.00 0.00
D26001.26 II. SEMI SKILLED LABOUR DECK Man Day 1.00 1.00 EA USD 1.00 0.00
D26001.27 III. UNSKILLED LABOUR DECK Man Day 1.00 1.00 EA USD 1.00 0.00
D26001.28 IV. VENTILATION FAN OF 12 HP PER DAY DECK Set per day 1.00 1.00 EA USD 1.00 0.00
D26001.29 V. QUOTE UNIT RATE OF STAGING IN OPEN AREA I.E ; ON DECK ETC DECK M3 10.00 10.00 EA USD 1.00 0.00
D26001.30 VI. QUOTE UNIT RATE OF STAGING IN CLOSED AREA I.E; INSIDE TANKS;ENGINE ROOM ETC DECK M3 10.00 10.00 EA USD 1.00 0.00
D26001.31 VII. QUOTE UNIT RATE FOR TRANSPORTATION OF ITEMS FROM SHIP TO WORKSHOP AND BACK PER TRIP LUMPSUMP DECK TRIP 10.00 10.00 EA USD 1.00 0.00
D26001.32 VIII.QUOTE UNIT RATE FOR LIGHTING IN BALLAST TANK DB AS WELL AS TST IF REQUIRED DECK NOS 10.00 10.00 EA USD 1.00 0.00
D26001.33 IX. QUOTE UNIT RATE FOR LIGHTING IN CARGO HOLD HIGH POWERED IF REQUIRED DECK NOS 10.00 10.00 EA USD 1.00 0.00
D26001.34 X. REMOVAL OF SLUDGE/DIRTY OIL DECK CBM 10.00 10.00 EA USD 1.00 0.00
D26001.35 Xi.REMOVAL OF OILY WATER DECK CBM 10.00 10.00 EA USD 1.00 0.00
D26001.36 XII.REMOVAL OF MUD/MOCH DECK CBM 100.00 100.00 EA USD 1.00 0.00
D26001.37 XIII. TRANSFER OF HFO/DO/L.O DECK CBM 100.00 100.00 EA USD 1.00 0.00
D26001.38 XIV.CLEANING WITH RAG( YARD SUPPLY) DECK M2 200.00 200.00 EA USD 1.00 0.00
D26001.39 XV. CHEMICAL( YARD SUPPLY) CLEANING OF BULK HEADS PIPES DECK ETC. DECK M2 50.00 50.00 EA USD 1.00 0.00
I D26002: HULL TREATMENT AND PAINTING DECK EA USD 1.00 0.00
I WORK SPECIFICATIONS: DECK EA USD 1.00 0.00
i HIGH PRESSURE WASHING: DECK EA USD 1.00 0.00
D26002.1 ALL EXTERNAL SURFACES SHOULD BE HOSED WITH FRESH WATER AT HIGH PRESSURE TO REMOVE FOULING AND SALT DEPOSITS. WATER USED SHOULD NOT BE A PRESSURE BELOW 250 KG/CM2. TOTAL HULL SURFACE AREA 12500 M2. DECK M2 12500.00 12500.00 EA USD 1.00 0.00
D26002.2 HAND SCRAPPING TO BE CARRIED OUT TO REMOVE BARNACLES & MARINE GROWTH FROM UNDER WATER HULL. TO BE DONE AFTER WASHING. DECK M2 500.00 500.00 EA USD 1.00 0.00
i STAIN REMOVAL: DECK INSTRUCTION EA USD 1.00 0.00
D26002.3 OIL AND GREASE STAINS ON SHIPSIDE SHOULD BE REMOVED BEFORE COMMENCING PAINTING. CHEMICALS IF ANY; REQUIRED WILL BE SUPPLIED BY THE YARD. QUOTE PER M2 ASSUMING STAINED AREA OF 100 M2. DECK M2 100.00 100.00 EA USD 1.00 0.00
I GRIT/HYDRO BLASTING AND PAINTING SPECIFICATIONS: DECK EA USD 1.00 0.00
I ALL PAINTS WILL BE SUPPLIED BY OWNERS AND WILL BE APPLIED BY AIR LESS SPRAY. DECK EA USD 1.00 0.00
I i. GRIT/HYDRO BLASTING TO BE OF SA 2.0/SA 1.0 STANDARD AND EDGES OF GRIT/HYDRO/ BLASTED AREAS TO BE SMOOTHENED BACK TO A FIRM EDGE. OWNERS REPRESENTATIVES WILL INSPECT ALL BLASTED AREA BEFORE APPLICATION OF ANY PAINT. DECK INSTRUCTION EA USD 1.00 0.00
I ii. BLASTING/SURFACE PREPARATION TO BE AS PER APPROVED PAINTING SCHEME DECK EA USD 1.00 0.00
I BLASTING AND COATING TO BE DONE DECK EA USD 1.00 0.00
I A. TOPSIDE AREA: 2500 M2 DECK EA USD 1.00 0.00
D26002.4 BLASTING AS PER INSTRUCTION i) SA2.0 DECK M2 500.00 500.00 EA USD 1.00 0.00
D26002.5 BLASTING AS PER INSTRUCTION ii) SA1.0 DECK M2 600.00 600.00 EA USD 1.00 0.00
D26002.6 2x125m DFT EPOXY PRIME DECK M2 1200.00 1200.00 EA USD 1.00 0.00
D26002.7 1x50m DFT POLYURETHANE FINISH BLACK DECK M2 2500.00 2500.00 EA USD 1.00 0.00
I B. VERTICAL BOTTOM AREA: 5700 DECK EA USD 1.00 0.00
i B1. BOOT TOPPING : 2700 DECK EA USD 1.00 0.00
D26002.08 BLASTING AS PER INSTRUCTION i) SA2.0 DECK M2 500.00 500.00 EA USD 1.00 0.00
D26002.09 BLASTING AS PER INSTRUCTION ii) SA1.0 DECK M2 600.00 600.00 EA USD 1.00 0.00
i TOUCH UP COAT DFT DECK EA USD 1.00 0.00
D26002.10 1ST COAT 125m DFT EH EPOXY-SHADE BROWN DECK M2 1200.00 1200.00 EA USD 1.00 0.00
D26002.11 2ND COAT 125m DFT EH EPOXY- SHADE BLACK DECK M2 1200.00 1200.00 EA USD 1.00 0.00
D26002.12 3RD COAT 125m DFT SPC ANTIFOULING -SHADE PLUM DECK M2 1200.00 1200.00 EA USD 1.00 0.00
i FULL COAT DFT DECK EA USD 1.00 0.00
D26002.13 1ST FULL COAT 125m DFT SPC ANTIFOULING-SHADE PINK- 2000 M2 (SILICONE PAINT/LOW FRICTION PAINT) DECK M2 2700.00 2700.00 EA USD 1.00 0.00
D26002.14 2ND FULL COAT 125m DFT SPC ANTIFOULING-SHADE RED BROWN FINAL COAT- 2000 M2 (SILICONE PAINT/LOW FRICTION PAINT) DECK M2 2700.00 2700.00 EA USD 1.00 0.00
I B.2 VERTICAL BOTTOM AREA: 3000 M2 DECK EA USD 1.00 0.00
D26002.15 BLASTING AS PER INSTRUCTION i) SA2.0 DECK M2 500.00 500.00 EA USD 1.00 0.00
D26002.16 BLASTING AS PER INSTRUCTION ii) SA1.0 DECK M2 600.00 600.00 EA USD 1.00 0.00
I TOUCH UP COAT DFT DECK EA USD 1.00 0.00
D26002.17 1ST COAT 125m DFT EH EPOXY-SHADE BROWN DECK M2 1200.00 1200.00 EA USD 1.00 0.00
D26002.18 2ND COAT 125m DFT EH EPOXY- SHADE BLACK DECK M2 1200.00 1200.00 EA USD 1.00 0.00
D26002.19 3RD COAT 125m DFT SPC ANTIFOULING -SHADE PLUM DECK M2 1200.00 1200.00 EA USD 1.00 0.00
I FULL COAT DFT DECK EA USD 1.00 0.00
D26002.20 1ST FULL COAT 125m DFT SPC ANTIFOULING-SHADE PINK- (LOW FRICTION PAINT) DECK M2 3000.00 3000.00 EA USD 1.00 0.00
D26002.21 2ND FULL COAT 125m DFT SPC ANTIFOULING-SHADE RED BROWN FINAL COAT- 1966 M2((LOW FRICTION PAINT) DECK M2 3000.00 3000.00 EA USD 1.00 0.00
I C. FLAT BOTTOM AREA: 4300 M2 DECK EA USD 1.00 0.00
D26002.22 BLASTING AS PER INSTRUCTION i) SA2.0 DECK M2 1250.00 1250.00 EA USD 1.00 0.00
D26002.23 BLASTING AS PER INSTRUCTION ii) SA1.0 DECK M2 1500.00 1500.00 EA USD 1.00 0.00
I TOUCH UP COAT DFT DECK EA USD 1.00 0.00
D26002.24 1ST COAT 125m DFT EH EPOXY-SHADE BROWN DECK M2 2500.00 2500.00 EA USD 1.00 0.00
D26002.25 2ND COAT 125m DFT EH EPOXY- SHADE BLACK DECK M2 2500.00 2500.00 EA USD 1.00 0.00
D26002.26 3RD COAT 100m DFT SPC ANTIFOULING -SHADE PLUM DECK M2 2500.00 2500.00 EA USD 1.00 0.00
I FULL COAT DECK EA USD 1.00 0.00
D26002.27 i.1ST FULL COAT 125m DFT SPC ANTIFOULING-SHADE PINK- 5000 M2 (SILICONE PAINT/LOW FRICTION PAINT) DECK M2 4300.00 4300.00 EA USD 1.00 0.00
D26002.28 ii.2ND FULL COAT 125m DFT SPC ANTIFOULING-SHADE RED BROWN FINAL COAT- 5000 M2 (SILICONE PAINT /LOW FRICTION PAINT) DECK M2 4300.00 4300.00 EA USD 1.00 0.00
D26002.29 TO PAINT WITH 2 COATS ON VARIOUS HULL MARKLINGS WHICH INCLUDES FOLLOWING MARKINGS: DECK LS 1.00 1.00 EA USD 1.00 0.00
I A. FORWARD; MIDSHIP AND AFT DRAFT MARKS ON BOTH PORT AND STARBOARD SIDE PAINT DECK INCLUSIVE EA USD 1.00 0.00
I B. PLIMSOL MARKS PORT AND STARBOARD;DECKLINE DECK INCLUSIVE EA USD 1.00 0.00
I C. INTERTANK BULKHEAD AND TANK MARKINGS DECK INCLUSIVE EA USD 1.00 0.00
I D. "T" MARKS FOR TUGS PORT AND STARBOARD DECK AND SHIPSIDE. DECK INCLUSIVE EA USD 1.00 0.00
I E. BOW MARK AND EMBLEM & BULBOS BOW MARK ON BOW P&S DECK INCLUSIVE EA USD 1.00 0.00
I F. SHIPS NAME IN HINDI AND ENGLISH PORT AND STARBOARD FORWARD DECK INCLUSIVE EA USD 1.00 0.00
i G. SHIP'S NAME PORT OF REGISTRY & IMO NUMBER MARKING ON AFT IN HINDI AND ENGLISH DECK INCLUSIVE EA USD 1.00 0.00
I H. SHIP’S NAME AND PORT OF REGISTRY AFT IN HINDI AND ENGLISH DECK INCLUSIVE EA USD 1.00 0.00
i I. PILOT BOARDING MARKING DECK INCLUSIVE EA USD 1.00 0.00
I J. MULTIPLE LOADLINES MIDSHIP DECK INCLUSIVE EA USD 1.00 0.00
I K. CAUTION BOARD ON THE POOP DECK. DECK INCLUSIVE EA USD 1.00 0.00
I L. RECOMMENDED 9 M FREEBOARD MARK WHITE OVER RED ON P&S SIDES DECK INCLUSIVE EA USD 1.00 0.00
I M. UNDER WATER PROBE/FITTINGS DECK INCLUSIVE EA USD 1.00 0.00
D26002.30 ALL SEA CHESTS INCLUDING EMERGENCY SEA CHEST GRATINGS TO BE OPENED; INSIDE CLEANED , REQUIRED CHIPPING TO BE CARRIED OUT FOLLOWED BY PAINTING AS PER PAINTING SCHEME WASTED ANAODES TO RENEW (OWNER SUPPLIED) & GRATINGS TO BE SECURED AS PER ORIGINAL ARRANGEMENTS. ALL THE GRATINGS TO BE FITTED AND SECURED WITH LOCKING NUTS AND BOLTS.ADDITIONAL SECURING TO BE DONE BY SEIZING WIRE. DECK LS 1.00 1.00 EA USD 1.00 0.00
I A. ALL PAINTS OWNERS SUPPLY. ALL PAINTS PRICE INCLUDING ANTI FOULING ARE TO BE APPLIED BY AIRLESS SPRAY. AIRLESS SPRAY MACHINES SHALL BE CAPABLE ON GENERATING SUFFICIENT PRESSURE TO FULLY ATOMISE THE HEAVY COATINGS. DECK INCLUSIVE EA USD 1.00 0.00
I B. NO PAINT IS TO BE APPLIED ON DAMP SURFACES. ONLY CLEAN; STAIN / RUST FREE AND DRY SURFACES ARE TO BE PAINTED. DECK INCLUSIVE EA USD 1.00 0.00
I C. OWNER REPRESENTATIVE WILL ADVICE THE CONTRACTOR OF HIS REQUIREMENT WITH REGARD TO ALLOWABLE TEMPERATURE AND HUMIDITY CONDITIONS AND THESE ARE TO BE STRICTLY ADHERED TO. DECK INCLUSIVE EA USD 1.00 0.00
I D. ALL COATINGS ARE TO BE SMOOTHLY APPLIED FREE FROM SAGS AND RUNS DECK INCLUSIVE EA USD 1.00 0.00
I E. DEFECIENCIES IN FILM THICKNESS AND OR UNEVENNESS OF SURFACES ARE TO BE MADE UP/LEVELED PRIOR TO THE APPLICATION TO THE FINAL COAT. DECK INCLUSIVE EA USD 1.00 0.00
I F. MINIMUM OVERCOATING INTERVALS AS PER PAINT MANUFACTURERS TO BE ADHERED TO. DECK INCLUSIVE EA USD 1.00 0.00
I G. ALL ECHO SOUNDER; DOPPLER LOG AND ANODES TO BE COVERED WITH PROTECTIVE COATING AGAINST PAINT AND TO BE REMOVED BEFORE FLOODING DECK INCLUSIVE EA USD 1.00 0.00
I H. SURFACE PREPARATION TO BE VERIFIED BY SUPERINTENDENT/OWNER'S REPRESENTATIVE. REQUIRED SURFACE PREPARATION (AIR BLOW/ FRESH WATER WASHING) TO BE CARRIED OUT PRIOR APPLICATION OF EACH COAT. DECK INCLUSIVE EA USD 1.00 0.00
I I) ENTIRE HULL SURFACES SHOULD BE HOSED WITH FRESH WATER AT LOW PRESSURE TO REMOVE ALL GRIT/HYDRO AND SALT DEPOSITS PRIOR APPLYING FINAL COAT. DECK INCLUSIVE EA USD 1.00 0.00
I J) ENTIRE HULL SURFACES IF REQUIRED TO BE BLOWN THROUGH WITH COMPRESSED AIR PRIOR APPLYING PAINT SHOULD BE INCLUDED IN ABOVE COST. DECK INCLUSIVE EA USD 1.00 0.00
I K) BARNACLES AND MARINE GROWTH ON THE SURFACE OF TRANSDUCER UNITS/UNDER WATER PROBES TO BE CLEANED THOROUGHLY AND TO BE COVERED WHILE PAINT COATING. DECK INCLUSIVE EA USD 1.00 0.00
I L) TO EXECUTE ABOVE JOB NECESSARY CHERRY PICKER STAGING AS CONVENEIENT TO BE UTILISED (ALL INCLUSIVE). DECK INCLUSIVE EA USD 1.00 0.00
I M) ALL SEA CHESTS AND EMERGENCY SEA CHEST GRATINGS TO BE REMOVED INSIDE TO BE CLEANED AND PAINT COAT TO BE APPLIED AS PER PAINTING SCHEME. DECK INCLUSIVE EA USD 1.00 0.00
I N) LP WASHING OF UNDERWATER HULL AREA AND TOPSIDE AREA AFTER APPLICATION OF 1ST COAST OF PAINT AT 1000PSI TO BE CARRIED OUT. DECK INCLUSIVE EA USD 1.00 0.00
D26002.31 12 NOS. BOTTOM PLUGS TO BE OPENED AND CLOSED USING THREAD SEAL TAPE; LEAD WASHER AND VACCUM TESTED AND FINALLY CEMENTED.MATERIAL OF BOTTOM PLUGS IS STEEL SUS 316. OPENING AND CLOSING OF BOTTOM PLUGS IS TO BE DONE IN THE PRESENCE OF NOMINATED OFFICER FROM THE VESSEL. QUOTE ALL INCLUSIVE ANY DEVIATION WILL BE SETTLED PRORATA BASIS. DECK PCS 12.00 12.00 EA USD 1.00 0.00
I D26003: COATING OF DECK PIPELINES AND STRUCTURES ON MAIN DECK DECK INCLUSIVE EA USD 1.00 0.00
I RUSTED AREAS OF MAIN DECK, ASSOCIATED STRUCTURES, DECK PIPELINES/PIPE CLAMPS, SHIPSIDE/WALKWAY RAILINGS ON EXPOSED DECKS (MAIN DECK , POOP DECKS AND MAST HOUSES, FWD AND MAIN MAST, ALL 05 HATCH COAMINGS AND SUPPORTINGS) TO BE POWER TOOLED ST2 STD, CLEANED AND APPLIED 3 COATS OF OWNER SUPPLIED PAINTS AS PER PAINTING SCHEME. (AREA OF EXPOSED DECKS AND STRUCTURES - 3600 SQ MTR AND PIPELINES - 1000 SQ MTRS) PAINTS SUPPLY BY OWNER. QUOTE ALL INCLUSIVE PRICE ANY DEVIATION WILL BE SETTLED STRCTLY AS PER PRORATA BASIS. DECK INSTRUCTION EA USD 1.00 0.00
D26003.1 HP WASHING; MIN 250 BAR - TO THE SATISFACTION OF OWNER'S REPRESENTATIVE. DECK M2 3600.00 3600.00 EA USD 1.00 0.00
D26003.2 CHEMICAL CLEANING DECK M2 300.00 300.00 EA USD 1.00 0.00
D26003.3 POWER TOOLING TO ST2 STANDARD DECK M2 1000.00 1000.00 EA USD 1.00 0.00
D26003.4 1ST COAT PRIMER 75 m DFT DECK M2 1000.00 1000.00 EA USD 1.00 0.00
D26003.5 2ND COAT PRIMER 100 m DFT DECK M2 1000.00 1000.00 EA USD 1.00 0.00
D26003.6 3RD COAT FINISH DECK RED BROWN 100 m DFT DECK M2 3600.00 3600.00 EA USD 1.00 0.00
I JOB TO CARRY OUT WITH EFFECTIVE SURFACE PREPARATION AS PER PAINTING SCHEME UNDER THE SUPERVISION OF PAINT SUPPLY REP AND OWNER'S REPRESENTATIVE. DECK EA USD 1.00 0.00
I PRECAUTIONS TO TAKE TO AVOID DAMAGE TO ADJACENT EQUIPMENT , CABLES SENSOR. NECESSARY PROTECTION TO CARRY OUT (YARD ACCOUNT). DECK EA USD 1.00 0.00
I STRIP COAT OF ALL DECK PROJECTIONS TO ENSURE COMPLETE DECK AREA IS COVERED. DECK EA USD 1.00 0.00
I DRYING AND OVER COATING TIME TO BE ALLOWED AS PER RECOMMENDATIONS OF PAINT MANUFACTURERS. DECK EA USD 1.00 0.00
I ALL PAINTS TO BE APPLIED BY AIRLESS SPRAY. SPRAY MACHINE SHOULD BE CAPABLE OF GENERATING SUFFICIENT PRESSURE TO FULLY ATOMISE THE HEAVY COATING. DECK EA USD 1.00 0.00
I PIPELINES ARE LOCATED ABOUT 3 MTR ABOVE MAIN DECK. WHILE APPLYING PAINT UNDER PIPELINES PORTABLE PLANKS MAY BE PLACED ON TOP OF DECK FRAMES TO REACH. DECK EA USD 1.00 0.00
I D26004: PAINTING OF ACCOMODATION, SUPERSTRUCTURE BULKHEAD, UPPERDECK AND FUNNEL AREA DECK EA USD 1.00 0.00
I WORK SPECIFICATIONS: DECK EA USD 1.00 0.00
I RUSTED AREAS OF ACCOMMODATION SUPERSTRUCTURE BULKHEADS ,ACCOMODATION DECKS TO SPOT POWER TOOLED, PORT HOLE LIP AREAS TO BE NEEDLE GUN CHIPPED AND EDGE OF CHIPPED AREA TO BE SMOOTHED BACK TO A FIRM EDGE AND PITTINGS TO BE BUILT UP WITH EPOXY. OWNERS REPRESENTATIVE/ PAINT MANUFACTURERS WILL INSPECT AND POWER TOOLED AREAS BEFORE APPLICATION OF PAINT. PAINTS SUPPLY BY OWNER.QUOTE ALL INCLUSIVE PRICE ANY DEVIATION WILL BE SETTLED STRCTLY AS PER PRORATA BASIS. DECK INSTRUCTION EA USD 1.00 0.00
D26004.1 HP WASHING MINIMUM 250 BAR DECK M2 1900.00 1900.00 EA USD 1.00 0.00
D26004.2 CHEMICAL CLEANING DECK M2 100.00 100.00 EA USD 1.00 0.00
D26004.3 POWER TOOLING TO ST 2.0 DECK M2 300.00 300.00 EA USD 1.00 0.00
D26004.4 1 COAT OF TOUCH UP EPOXY PRIMER 75 m DFT DECK M2 500.00 500.00 EA USD 1.00 0.00
D26004.5 1 COAT OF TOUCH UP EPOXY MIOCOAT 100 m DFT DECK M2 500.00 500.00 EA USD 1.00 0.00
D26004.6 1 COAT OF POLYURETHANE FINISH WHITE 75 m DFT DECK M2 1900.00 1900.00 EA USD 1.00 0.00
D26004.7 TO CARRY OUT SURFACE PREPARATION AND COATING OF BRIDGE FRONT (APPROX AREA 20M X 20 M) YARD TO ARRANGE SHORE CRANE WITH BASKET AND QUOTE ACCORDINGLY. DECK LS 1.00 1.00 EA USD 1.00 0.00
D26004.8 RUSTED AREAS OF FUNNELTO GRIT/HYDRO BLAST CLEANED AND APPLIED 3 COATS OF OWNER SUPPLY PAINTS AS PER PAINTING SCHEME BELOW. TOTAL AREA 200 M2 DECK M2 200.00 200.00 EA USD 1.00 0.00
D26004.9 POWER TOOLING TO ST 2.0 DECK M2 70.00 70.00 EA USD 1.00 0.00
D26004.10 1ST COAT PRIMER 75 m DFT DECK M2 40.00 40.00 EA USD 1.00 0.00
D26004.11 2ND COAT PRIMER 100 m DFT DECK M2 40.00 40.00 EA USD 1.00 0.00
D26004.12 ENTIRE FUNNEL (AREA 200 M2) TO BE HIGH PRESSURE WASHED AND COATED WITH 1 COAT OWNER SUPPLY PAINT (HR PAINT). ALLOW FOR USE OF SHORE CRANE WITH BASKET TO UNDERTAKE ABOVE JOB. DECK M2 200.00 200.00 EA USD 1.00 0.00
D26004.13 BOTHSIDE COMPANY EMBLEM (ASHOKA CHAKRA) TO PAINT DECK NOS 2.00 2.00 EA USD 1.00 0.00
I ALL PAINTS OWNERS SUPPLY. ALL PAINTS ARE TO BE APPLIED BY AIRLESS SPRAY. DECK EA USD 1.00 0.00
I MOVABLE TROLLEY STAGE WOULD BE REQUIRED AT 3 LOCATIONS L :3M . B: 2M X 2 M HEIGHT; SO AS TO DO THE ENTIRE ACCOMDATION UNDER DECK AREAS. DECK EA USD 1.00 0.00
I PRECAUTIONS TO BE TAKEN TO ENSURE THAT ALL ACOMMODATION DOORS; PORTHOLES AND SENSITIVE EQUIPMENT ETC. WELL PROTECTED/COVERED DURING ABOVE JOB. DECK EA USD 1.00 0.00
I IN CASE OF UNAVAIBALITY OF MOVING TROLLEY STAGING TO BE USED. DECK EA USD 1.00 0.00
I D26005: CLEANING AND EPOXY COATING IN BALLAST TANKS AND FRESH WATER TANKS: DECK EA USD 1.00 0.00
I WORK SPECIFICATIONS: DECK EA USD 1.00 0.00
D26005.1 TO CARRY OUT EPOXY COATING QUOTE FOR REMOVAL OF APPROX. 05 TONS OF MUD FROM EACH BALLAST TANK. (FROM 12 TANKS) INCLUDING DISPOSAL OF MUD. DECK TON 10.00 10.00 EA USD 1.00 0.00
D26005.2 TANK BOTTOM AREA TO BE HOSED DOWN TO CLEAR MUD DECK M2 500.00 500.00 EA USD 1.00 0.00
D26005.3 DAMAGED EPOXY COATED AREA (APPROXIMATELY 50 M2 IN EACH WBT/COFFER DAM) TOP PLATFORM AND BOTTOM PLATFORM TO BE POWER TOOLED TO ST3 STANDARD; POWER TOOLING BRUSHED; SAND DISCED AND CLEANED WITH THINNER; DECK M2 100.00 100.00 EA USD 1.00 0.00
D26005.4 AFTER SURFACE TREARTMENT TOUCHED UP WITH 2 COATS OF PAINT 75m DFT; DECK M2 500.00 500.00 EA USD 1.00 0.00
I ALL PAINT OWNER’S SUPPLY. DURING PAINTING; HUMIDITY WILL BE REQUIRED TO BE CONTROLLED INSIDE THE TANKS. DECK EA USD 1.00 0.00
I D26006: TANK CLEANING DECK EA USD 1.00 0.00
I FOLLOWING TANKS BOTTOM AREA TO BE CLEANED, GAS FREED AND TO BE OFFERED FOR INSPECTION TO CALSS SURVEYOR. VESSEL UNDERGOING 15 YEARLY RENEWAL SURVEY. YARD TO USE PORTABLE LADDERS AND ANY OTHER SUITABLE GEARS FOR CARRYING OUT TANK CLEANING.VENTILATION LIGHTING AND ALL REQUIRED ARRANGEMENTS TO BE ARRANGED BY YARD. ASSOCIATED MANHOLES TO OPEN AND SAME TO BOX BACK USING YARD SUPPLIED CONSUMABLES ( PACKING/RUBBER PACKING/ NUT BOLTS- CONSIDER OPENING OF 60 MANHOLE DOORS & RENEWAL OF 240 NUTS/STUDS). ANY DEVIATION WILL BE SETTLED ON PRORATA BASIS. QUOTE ALL INCLUSIVE. NOTE: QUOTED COST SHOULD ACCOUNT FOR REMOVAL OF SLUDGE OILY WATER MUD MUCK ETC AND SAME WILL BE DISPOSED AS PER MARPOL REGULATIONS. BALLAST TANKS IS INCLUSIVE OF WING TANK AND DB TANKS DECK Instruction EA USD 1.00 0.00
D26006.1 F.P.TK. DECK CBM 120.40 120.40 EA USD 1.00 0.00
D26006.2 NO.1 B.S.W.B.TK.P DECK CBM 322.50 322.50 EA USD 1.00 0.00
D26006.3 NO.1 B.S.W.B.TK.S DECK CBM 322.50 322.50 EA USD 1.00 0.00
D26006.4 NO.2 B.S.W.B.TK.P DECK CBM 366.20 366.20 EA USD 1.00 0.00
D26006.5 NO.2 B.S.W.B.TK.S DECK CBM 366.20 366.20 EA USD 1.00 0.00
D26006.6 NO.3 B.S.W.B.TK.P DECK CBM 366.20 366.20 EA USD 1.00 0.00
D26006.7 NO.3 B.S.W.B.TK.S DECK CBM 366.20 366.20 EA USD 1.00 0.00
D26006.8 NO.4 B.S.W.B.TK.P DECK CBM 366.20 366.20 EA USD 1.00 0.00
D26006.9 NO.4 B.S.W.B.TK.S DECK CBM 366.20 366.20 EA USD 1.00 0.00
D26006.10 NO.5 B.S.W.B.TK.P DECK CBM 270.30 270.30 EA USD 1.00 0.00
D26006.11 NO.5 B.S.W.B.TK.S DECK CBM 270.30 270.30 EA USD 1.00 0.00
D26006.18 A.P.TK. DECK CBM 73.00 73.00 EA USD 1.00 0.00
D26006.19 VARIOUS TANKS TO BE INTERNALLY COATED AFTER PROPER SURFACE PREPARATION OF EFFECTED AREAS. COATING TO BE CARRIED OUT WITH APPROVED PAINT ( SHIP SUPPLIED), QUOTE ALL INCLUSIVE CONSIDERING TOTAL AREA 2000 M2. DECK M2 2000.00 2000.00 EA USD 1.00 0.00
I D26007: TREATMENT IN CARGO HOLDS AND BILGE WELL TOTAL 5 CARGO HOLD TANKS DECK EA USD 1.00 0.00
I WORK SPECIFICATIONS: DECK EA USD 1.00 0.00
I WATER WASHING TO BE CARRIED OUT.RUSTED AREAS OF CARGO HOLDS BILGE WELL AND ASSOCIATED STRUCTURES TO GRIT/HYDRO BLAST CLEANED PAINTED WITH 3 COATS OF OWNER SUPPLIED PAINTS AS PER PAINTING SCHEME. (AREA OF CARGO HOLDS , TANK TOP & BILGE HOLDING TANK = 19500 M2).QUOTE ALL ALL INCLUSINVE. COST SHOULD INCLUDE COST OF ALL NECESSARY FACILITIES SUCH AS STAGING COST, CHERRY PICKER , TRANSPORTATION, CONSUMMABLES ETC. DECK Instruction EA USD 1.00 0.00
D26007.1 ALL CARGO HOLDS TO BE THOROUGHLY WASHED WITH HP FRESHWATER AT 200 KG/CM2 UPON DOCKING. PRIOR SAND BLASTING AND GENERATED MOCK/MUD/DIRTY WATER TO BE REMOVED TO SHORE .PRIOR TO APPLICATION OF PAINT, LP WATER WASH TO BE CARRIED OUT . THE WATER WASH SHALL INCLUDE ALL SHADOW AREAS BEHIND ANGLE BARS OF FRAMES GIRDERS ETC .AFTER COMPLETION OF JOB,ENTIRE HOLD AREAS TO BE THORUGHLY CLEANED.TOTAL AREA OF CARGO HOLDS AND ITS BILGES INCLUDING TANK TOP= 19500 M2. QUOTE ALL ALL INCLUSIVE. DECK M2 19500.00 19500.00 EA USD 1.00 0.00
D26007.2 CHEMICAL CLEANING DECK M2 500.00 500.00 EA USD 1.00 0.00
D26007.3 GRIT/HYDRO BLAST TO SA 2.0 DECK M2 2000.00 2000.00 EA USD 1.00 0.00
D26007.4 GRIT/HYDRO BLAST TO SA 1.0 DECK M2 3000.00 3000.00 EA USD 1.00 0.00
D26007.5 1x 125 m DFT EPOXY Coating DECK M2 12000.00 12000.00 EA USD 1.00 0.00
D26007.6 1x 125 m DFT Epoxy Final Coat DECK M2 19500.00 19500.00 EA USD 1.00 0.00
D26007.7 REPAINTING OF CARGO HOLD MARKINGS DECK LS 1.00 1.00 EA USD 1.00 0.00
D26007.8 HANDTOOLING OF CARGOHOLD BEHIND ANGLE BARS DECK M2 500.00 500.00 EA USD 1.00 0.00
I QUOTATION MUST INCLUDE ALL STAGING AND CHERRY PICKER FOR CARRYING OUT CLEANING AND PAINTING DECK INCLUSIVE EA USD 1.00 0.00
I D26008: COATING IN CARGO HOLDS HATCH COVERS OUTSIDE AND INSIDE DECK EA USD 1.00 0.00
I RUSTED AREAS OF CARGO HOLDS HATCH COVERS INSIDE ,OUTSIDE COAMING AND ASSOCIATED STRUCTURES ( INCLUDING TRACKWAYAND COMPRESSION BARS) TO GRIT/HYDRO BLAST/ CLEANED AND APPLIED 3 COATS OF OWNER SUPPLIED PAINTS AS PER PAINTING SCHEME (TOTAL AREA 4500 M2). QUOTE ALL INCLUSIVE INCLUDING STAGING COST. DECK Instruction EA USD 1.00 0.00
D26008.1 ALL CARGO HOLDS HATCH COVERS TO BE THOROUGHLY WASHED WITH FRESHWATER AT 200 KG/CM2 BEFORE PAINTING INCLUDING ALL SHADOW AREAS. DECK M2 4500.00 4500.00 EA USD 1.00 0.00
D26008.2 GRIT/HYDRO BLAST TO SA 2.0 DECK M2 500.00 500.00 EA USD 1.00 0.00
D26008.3 GRIT/HYDRO BLAST TO SA 1.0 DECK M2 1000.00 1000.00 EA USD 1.00 0.00
D26008.4 1x 125 m DFT EPOXY Coating DECK M2 2000.00 2000.00 EA USD 1.00 0.00
D26008.5 1x 125 m DFT Epoxy Final Coat DECK M2 4500.00 4500.00 EA USD 1.00 0.00
I D26009: ANCHOR CABLES AND CHAIN LOCKERS DECK EA USD 1.00 0.00
I INSPECT ANCHOR CHAINS AND CABLES FOR WEAR,CORROSSION,PITTING,ELONGATION,CRACKS,DEFORMATION,BROKENOR MISSING LINK,DAMAGED AND SEIZED CONNECTING SHACKLES. INSPECT CHAIN LOCKERS FOR CORROSION ,STRUCTURAL DAMAGE,LOOSE OR DAMAGED SECURING POINTS. PORT AND STARBOARD CABLE ORIGINAL DIAMETER 76 MM,PORT 12 SHAKCLES, STBD-12 SHACKLES. DECK INSTRUCTION EA USD 1.00 0.00
D26009.1 PORT AND STARBOARD ANCHORS AND CABLES TO BE RANGED IN DRYDOCK (BITTER ENDS TO BE REMOVED) AND DESRUSTING TO BE CARRIED OUT BY CHIPPING & CLEANED WITH HIGH PRESSURE FRESH WATER JET PRIOR TO EXAMINATION. DECK SET 2.00 2.00 EA USD 1.00 0.00
D26009.2 BOTH ANCHORS CHAINS TO BE RANGED; CALIBRATED AND REPORT TO BE FURNISHED. DECK SET 2.00 2.00 EA USD 1.00 0.00
D26009.3 ONE COMPLETE LENGTH TO BE MADE READY USING GOOD CHAIN LENGTH OF BOTH THE CHAINS AND SAME TO BE FITTED IN PORT/STBD SIDE USING NEW SHORT LENGTH/SWIVEL/D -SHAKLE. DECK SET 1.00 1.00 EA USD 1.00 0.00
D26009.4 STBD SIDE / PORT ANCHOR CABLE TO BE CHANGED COMPLETELY ALONG WITH NEW SHORT LENGTH FROM SHIP SUPPLIED SPARE CHAIN & ACCESORIES. DECK SET 1.00 1.00 EA USD 1.00 0.00
D26009.5 LOOSE STUDS ON CHAIN LINK TO BE WELDED ON ONE SIDE USING LOW HYDROGEN ELECTRODES. DECK PCS 60.00 60.00 EA USD 1.00 0.00
D26009.6 FULL LENGTH OF CABLES (FROM BITTER END) TO BE PAINTED WITH OWNER SUPPLY BITUMASTIC PAINT. DECK MTR 330.00 330.00 EA USD 1.00 0.00
D26009.7 PORT AND STARBOARD CHAIN LOCKERS BOTTOM AREA TO BE CLEANED THOROUGHLY(APPROXIMATE 70M2) WITH HIGH PRESSURE FRESH WATER. WASHINGS ARE TO BE PUMPED OUT USING YARD'S PUMP. DECK SET 2.00 2.00 EA USD 1.00 0.00
D26009.8 ALLOW FOR REMOVAL OF MUD FROM BOTH CHAIN LOCKER DURING CLEANING. TWO NUMBERS FLOOR PLATES ARE TO BE REMOVED AND REFITTED. CONSIDER REMOVAL OF MUD= 10CBM. DECK CBM 10.00 10.00 EA USD 1.00 0.00
I AFTER DRYING OUT CHAIN LOCKERS (P & S). PAINT DAMAGED AREAS TO BE POWER TOOLED AND POWER BRUSHED TO ST 2 STANDARD AND TWO COATS OF COALTAR EPOXY (OWNERS SUPPLY) PAINT TO BE APPLIED. (ALLOW FOR 60 M2 AREAS TO BE POWER TOOLED/BRUSHED AND 150 M2 AREA TO BE PAINTED;). ALLOW FOR STAGING TO A HEIGHT OF 10 MTR. PAINT OWNER SUPPLY DECK INSTRUCTION EA USD 1.00 0.00
D26009.9 HP WASHING DECK M2 150.00 150.00 EA USD 1.00 0.00
D26009.10 POWER TOOLING DECK M2 60.00 60.00 EA USD 1.00 0.00
D26009.11 COATING DECK M2 150.00 150.00 EA USD 1.00 0.00
D26009.12 STAGING; HEIGHT 10 M; CIRCULAR1.0 MTRS EACH SIDE DECK M3 80.00 80.00 EA USD 1.00 0.00
D26009.13 BOW STOPPER SECURING PIN TO BE STREIGHTENED / RENEWED (SHIP SUPPLY) DECK LS 2.00 2.00 EA USD 1.00 0.00
D26009.14 ALL JOINING SHACKLES TO BE OPENED (24+2 NOS) INCLUDING ANCHOR JOINING SHACKLES OF BOTH ANCHORS AND REFITTED. RETAINING PIN OF ALL JOINING SHACKLES TO BE RENEWED IF REQUIRE WITH NEW STAINLESS STEEL PINS. DECK NOS 25.00 25.00 EA USD 1.00 0.00
D26009.15 SPURLING PIPE COVER TO BE MADE DECK NOS 2.00 2.00 EA USD 1.00 0.00
D26009.16 HAWSE PIPE COVERS FOR ISPS ON BOTH SIDES TO BE CROPPED AND RENEWED. (8MM MS PLATE 1.0 M X 0.8 M) DECK NOS 2.00 2.00 EA USD 1.00 0.00
D26009.17 PORT AND STBD ANCHOR CABLE SHORT LENGTH ALONG WITH SWIVEL AND D SHACKLE TO RENEW(SHORT LENGTH & ACCESSORIES OWNER SUPPLY). DECK NOS 2.00 2.00 EA USD 1.00 0.00
D26009.18 BOTH PORT AND STBD SIDE ANCHOR ROLLERS( POWELL) TO BE COMPLETELY OVERHAULED. GREASE NIPPLES TO BE RENEWED. BUSH TO BE RENEWED. (BUSH AND CONSUMABLES YARD SUPPLY). DECK LS 2.00 2.00 EA USD 1.00 0.00
I D26010: SACRIFICIAL ANODES (HULL & SEA CHESTS) & BALLAST TANKS DECK EA USD 1.00 0.00
I WORK SPECIFICATIONS: DECK EA USD 1.00 0.00
D26010.1 SEA CHEST ANODES TO RENEW WITH OWNER'S SUPPLIED ANODES DECK NOS 10.00 10.00 EA USD 1.00 0.00
D26010.2 TO RENEW (ZN-AL-CD) WEIGHT-7.8KG ANODES (300X100X40MM) IN WBT SECURED WITH WEKDING/U-BOLT & NUT AT BOTH ENDS. (OWNER SUPPLIED ANODE). DECK NOS 200.00 200.00 EA USD 1.00 0.00
I D26011: THICKNESS GAUGING DECK EA USD 1.00 0.00
I WORK SPECIFICATIONS: DECK EA USD 1.00 0.00
D26011.1 VESSEL WILL UNDERGO 3RD SPECIAL SURVEY/REPAIRS AND DRY DOCKING. TO CARRY OUT THICKNESS GAUGING OF VESSELS VARIOUS AREAS VIZ. CARGO HOLDS/BALLAST TANKS /VOID SPACES/STOOL SPACES/ OPEN DECKS STUB E/R DB TANKS DB BALLAST TANKS BILGE WELL SEACHEST MAIN SEA LINE CONNECTING LOW & HIGH SEACHEST STUB PIECES ETC & AS PER CLASS/SUPERINTENDENT REQUIREMENT. ON COMPLETION OF GAUGING REPORTS (4 HARD COPIES & SOFT COPIES: FOR VESSEL'S BOTH CLASSES HO AND VESSEL) TO BE SUBMITTED. GAUGING TEAM TO HAVE IRS AND DNV APPROVAL. ESTIMATE 4000 POINTS FOR GAUGING.CERTFIED FOR REMAINING AREA TECHNICIAN WILL BE ARRANGED BY OWNER.THICKNESS GAUGING TEAM TO BE APPROVED BY IRS AND BV DECK POINTS 2000.00 2000.00 EA USD 1.00 0.00
D26011.2 TO ARRANGE 2 NOS. CHERRY PECKER FOR THICKNESS GAUGING OF SHELL PLATE DECK DAY 10.00 10.00 EA USD 1.00 0.00
I D26012: STORM VALVES DECK EA USD 1.00 0.00
I FOLLOWING STORM VALVES ARE TO BE OPENED UP; FOR OVERHAULING IN WORKSHOP. VALVES SEATS TO BE GROUND; LAPPED AND INTERNAL CASING TO BE CLEANED AND PAINTED WITH APEXIOR NO.3 (YARD SUPPLY). VALVES TO BE PRESENTED FOR SURVEY. NEOPRENE LEATHER PADS AND BRASS RETAINER RINGS ARE TO BE RENEWED. ON COMPLETION OF OVERHAULING VALVES TO BE FITTED BACK WITH YARDS SUPPLIED CONSUMABLES ( NUTS/BOLTS AND PACKING ETC). ALL SPARES/CONSUMABLES YARD SUPPLY. DECK INCLUSIVE EA USD 1.00 0.00
D26012.1 GREY WATER O'BOARD (P & S) STORM V/V 10K ,VALVE SIZE:DN 125A(02 NOS STRAIGHT+02 NOS ANGLE STORM VALVE) DECK PCS 4.00 4.00 EA USD 1.00 0.00
D26012.2 SEWAGE DIRECT O'BOARD STORM V/V 10K ,VALVE SIZE:DN 150(01 NOS STRAIGHT+01 NOS ANGLE STORM VALVE) DECK PCS 2.00 2.00 EA USD 1.00 0.00
I D26013: STEEL RENEWAL ON SHIPSIDE / INNER SHELL PLATING / BALLAST TANKS/CARGO HOLDS DECK EA USD 1.00 0.00
I WORK SPECIFICATIONS: THE VESSEL IS UNDERGOING SPECIAL SURVEY/DRY DOCKING SURVEY.STEEL RENEWAL WORK SHALL BE CARRIED OUT IN ACCORDANCE WITH CLASS RULES.RENEWAL STEEL TO BE OF APPROVED GRADE,THICKNESS, MATERIALS AS PER CLASS REQUIREMENT.WELDING TO BE CARRIED OUT BY CLASS APPROVED WELDERS USING APPROVED WELDING PROCEDURES AND APPROVED CONSUMABLES. QUOTE ALL INCLUSIVE. DECK INSTRUCTIONS EA USD 1.00 0.00
D26013.1 RENEWAL OF WASTED / DAMAGED / DEFORMED SHELL PLATING AS IDENTIFIED DURING SURVEY AND INSPECTION. DECK TON 10.00 10.00 EA USD 1.00 0.00
D26013.2 RENEWAL OF WASTED / DAMAGED / DEFORMED SHELL PLATING ON CARGO HOLD AS IDENTIFIED DURING SURVEY AND INSPECTION. DECK TON 15.00 15.00 EA USD 1.00 0.00
D26013.3 RENEWAL OF WASTED / DAMAGED / DEFORMED SHELL PLATING ON BALLAST TANK AS IDENTIFIED DURING SURVEY AND INSPECTION. DECK TON 25.00 25.00 EA USD 1.00 0.00
D26013.4 RENEWAL OF HATCH COAMING CHANNEL DENTED SAME TO BE HEATED AND STRAIGHTENED. DECK MTR 100.00 100.00 EA USD 1.00 0.00
D26013.5 PARTIAL RENEWAL OF HATCH COMING CHANNEL TO CARRY OUT. DECK MTR 400.00 400.00 EA USD 1.00 0.00
I ALSO CONSIDER FOLLOWING FOR RENEWAL IN HULL AREA DECK INSTRUCTIONS EA USD 1.00 0.00
D26013.6 PIECE OF 15 KG OR LESS DECK PCS 50.00 50.00 EA USD 1.00 0.00
D26013.7 PIECE OF 15 KG TO 20 KG DECK PCS 50.00 50.00 EA USD 1.00 0.00
D26013.8 PIECE OF 20 KG TO 25 KG DECK PCS 50.00 50.00 EA USD 1.00 0.00
D26013.9 FUNNEL BULKHEAD HOLED AT VARIOUS LOCATION, SAME TO BE RENEWED WITH CLASS APPROVED STEEL, THICHNESS 12MM. DECK MT 4.00 4.00 EA USD 1.00 0.00
I NOTE: DECK EA USD 1.00 0.00
I § ATTENDING SUPERINTENDENT WILL EXAMINE AND FINALISE QUANTUM OF STEEL RENEWAL DECK INCLUSIVE EA USD 1.00 0.00
I § IN CASE STEEL RENEWAL IS LESS THAN QUANTITY INDICATED HEREIN; ANY ADDITIONAL TIME/COST IN DRYDOCK FOR THE PURPOSE OF THIS STEEL RENEWAL IS TO BE PROPORTIONALLY REDUCED. DECK INCLUSIVE EA USD 1.00 0.00
I § ALLOW FOR; CLASS IRS APPROVED AH32 AND AH 36 GRADE STEEL PLATE DECK INCLUSIVE EA USD 1.00 0.00
I § STEEL RENEWAL ARE TO BE COMMENCED ONLY AFTER THE TANK AND LOCATION ARE OIL FREE AND AREA IS CERTIFIED FIT FOR HOT WORK. YARD TO CARRY OUT NECESSARY CLEANING TO PREPARE FOR HOT WORK AT ALL LOCATIONS. DECK INCLUSIVE EA USD 1.00 0.00
I § STEEL RENEWAL COST SHOULD BE ALL INCLUSIVE INCLUDING RESTORING OF DISTURBED PAINT, LOCAL CLEANING OF AREAS IWO AND STEEL RENEWAL VACUUM TESTING AND XRAY TO THE SATISFACTION OF CLASS SURVEYOR AND ATTENDING SUPERINTENDENT DECK INCLUSIVE EA USD 1.00 0.00
I D26014: WORN OUT WELD SEAMS DECK EA USD 1.00 0.00
I WORK SPECIFICATIONS: DECK EA USD 1.00 0.00
D26014.1 TO BUILD UP WORN OUT WELD SEAMS WITH REQUIRED RUNS WELDING ON HULL / DECK ON STARBOARD AND PORTSIDE AS PER SURVEY REPORT USING LOW HYDROGEN BAKED ELECTRODES. DECK MTR 1000.00 1000.00 EA USD 1.00 0.00
D26014.2 PITTED SPOTS ON RUDDER TO BE BUILT UP BY WELDING AND GROUND SMOOTH (ASSUME 10 PITS; EACH 4 CM X 2 CM X 6 MM DEEP). PIT FILLING WORK ON RUDDER TO BE CARRIED OUT USING NORMAL STAGING RIGGED FOR RUDDER AND PROPELLER WORK. DECK POINTS 50.00 50.00 EA USD 1.00 0.00
D26014.3 ABOUT 20 RUNNING METRES OF WORN OUT WELD SEAMS ON VERTICAL BOTTOM ABOVE TURN OF BILGE ON PORT AND STARBOARD SIDE TO BE GOUGED OUT AND REWELDED WITH REQUIRED RUNS OF WELDING. DECK MTR 20.00 20.00 EA USD 1.00 0.00
D26014.4 ABOUT 10 RUNNING METRES OF WORN OUT WELD SEAMS ON POOP DECK / CARGO HOLDS/BALLAST TANKS TO BE BUILT UP WITH REQUIRED RUNS OF WELDING USING LOW HYDROGEN BAKED ELECTRODES. DECK MTR 10.00 10.00 EA USD 1.00 0.00
D26014.5 TO BUILD UP WORN OUT WELD SEAMS DUE TO ANCHOR RANGING WITH REQUIRED RUNS OF WELDING ON BOW AREA (ON STARBOARD AND PORTSIDE) AS PER SURVEY REPORT USING LOW HYDROGEN BAKED ELECTRODES. DECK MTR 10.00 10.00 EA USD 1.00 0.00
D26014.6 PORT AND STARBOARD HAWSE PIPE LIP AREA PARTLY WORN OUT SECTIONS TO BE BUILT UP. ALLOW FOR TOTAL BUILD UP OF 10 RUNNING METRES WITH 10 RUNS OF WELDING (AREA : 2X30MM X 100MM X 500MM ). DECK MTR 10.00 10.00 EA USD 1.00 0.00
D26014.7 PITTED SPOTS ON THE HAWSE PIPE LIP AREA TO BE BUILT UP AND GRINDING TO BE DONE FOR SMOTTHENING OF SURFACE. (ASSUME 15 PITS OF 50 MM RADIUS TO A DEPTH OF 10 MM). DECK POINTS 50.00 50.00 EA USD 1.00 0.00
I CONSIDER USE OF CHERRY PICKER FOR 2 SHIFTS FOR ABOVE JOB. DECK INCLUSIVE EA USD 1.00 0.00
I JOBS TO CARRY OUT IMMEDIATELY WHEN IN DOCK TO FACILITAE PAITING ALONG WITH HULL COATING AFTER WELDING. DECK INSTRUCTION EA USD 1.00 0.00
I ATTENDING SUPERINTENDENT WILL EXAMINE AND FINALISE THE QUANTUM OF WORK. DECK INSTRUCTION EA USD 1.00 0.00
I ALL JOB TO BE COMPLETED BEFORE HULL BLASTING AND COATING. DECK INSTRUCTION EA USD 1.00 0.00
I D26015: WINDLASS AND MOORING WINCHES MOORING EQUIPMENT MAKER FLUTEK-KAWASAKI, MODEL ELECTRIC-HYDRAULIC TYPE DECK EA USD 1.00 0.00
I WORK SPECIFICATIONS: DECK EA USD 1.00 0.00
D26015.1 TO BUILD UP PANAMA LEAD GROOVED BOTTOM AREA (20MM WIDTH 50MM LENGTH GROOVEING HEIGHT 4MM) DECK NOS 10.00 10.00 EA USD 1.00 0.00
D26015.2 TO POWER TOOL AND PAINT ALL MOORING WINCHES' WARPING DRUMS AND WINDLASSES AS PER PAINTING SCHEME. PAINT OWNER'S SUPPLY. DECK NOS 10.00 10.00 EA USD 1.00 0.00
D26015.3 ALL BRAKE HINGES TO BE FREED AND LUBRICATED DECK NOS 8.00 8.00 EA USD 1.00 0.00
D26015.4 ALL OPERATING LEVER OF WINCHES 8 NOS. WINDLASSES 2 NOS AND BRAKES TOTAL 10 NOS. HAS BEEN WASTED FROM THE TOP. SAME TO BE RENEWED.(LEVER & ACCESSORIES YARD SUPPLY) DECK NOS 10.00 10.00 EA USD 1.00 0.00
D26015.5 GREASE POINT TO BE FABRICATED & FITTED WITH GREASING NIPPLES MADE ON WINCH BREAK ARRANGEMENT. DECK NOS 50.00 50.00 EA USD 1.00 0.00
D26015.6 20 NOS OF ROLLER / OLD MAN / FAIR LEAD / HORIZONTAL ROLLERS GETTING JAMMED. SAME TO BE OPENED OVERHAULED AND FITTED BACK USING YARD SUPPLIED CONSUMABLES. DECK NOS 20.00 20.00 EA USD 1.00 0.00
D26015.7 ALL FAIRLEAD ROLLER COVERS TO BE RENEWED AND ALL COVERS TO PROVIDE WITH GREASING CAPS. DECK NOS 20.00 20.00 EA USD 1.00 0.00
D26015.8 NUT BOLTS OF CAPS - 300 PIECES TO RENEW ( YARD SUPPLY ) DECK NOS 300.00 300.00 EA USD 1.00 0.00
D26015.9 GYPSY GEAR/TEETH TO BE CHECKED FOR WORN OUT , TO BUILD UP WITH SUITABLE ELECTRODES,GRIND,POLISH AND LUBRICATED AS REQUIRED BY CLASS SURVEYORS DECK NOS 2.00 2.00 EA USD 1.00 0.00
I D26016: WATER INGRESS DETECTION SYSTEM MAKER :PANASIA MODEL:HR-665261 AND PR-30EX-1 DECK EA USD 1.00 0.00
D26016.1 WATER INGRESS DETECTION SYSTEM FOR CARGO HOLDS NO 1 2 3 4 AND 5, BOSUN STORES ,PAINT STORE, WINDLASS CNTRL RM, CARPENTER RM ,VOID SPACE INCLUDING DEWATERING SYSTEM TO CHECKED THOROUGHLY FOR PROPER FUNCTIONING AND TO BE CALIBRATED AS REQUIRED. AS PER SOLAS XII/12 INCLUDING ALARM MONITORING PANEL IN NAVIGATION BRIDGE IS BARRIER/BOX AND LEVEL SENSOR IN CARGO HOLDS AND OTHER SPACES AS REQUIRED BY SOLAS XII/REG 12 MSC145(77) IACS UI SC 180 TO BE OVERHAULED AND TESTED BY COMPETENT ENGINEER/MAKER SERVICE ENGINEER TO THE SATISFACTION OF CLASS IRS AND BV.ALL WIRING CABLES OF MASTER PANEL AND ALARM MONITOR TO BE CHECKED. MAINTENANCE AND TEST TO BE CARRIED OUT AS PER IMO RES MSC(145)77 2.2.4. DECK LS 1.00 1.00 EA USD 1.00 0.00
D26016.2 COST FOR SUPPLY AND FITTING OF SENSORS SHIP SUPPLY INCLUSIVE OF ALL. DECK NOS 3.00 3.00 EA USD 1.00 0.00
D26016.3 COST FOR SUPPLY AND FITTING OF CONVERTER SHIP SUPPLY. DECK NOS 3.00 3.00 EA USD 1.00 0.00
D26016.4 COST FOR FINE FILTERS FITTING AND SUPPLY YARD SUPPLY. DECK NOS 10.00 10.00 EA USD 1.00 0.00
D26016.5 DEWATERING SYSTEM FULL SYSTEM FOR BOSUN STORES VOID SPACES AND FOREPEAK TO BE OVERHAULED AND TESTED TO THE SATISFACTION OF IRS AND DNV SURVEYORS. DECK LS 1.00 1.00 EA USD 1.00 0.00
D26016.6 ALL DEWATERING HYDRAULIC VALVES, NR V/VS & ACTUATORS TO BE OVERHAULED. DECK NOS 11.00 11.00 EA USD 1.00 0.00
I FPK STORES- 04 NOS. DECK INCLUSIVE EA USD 1.00 0.00
I OVERBOARD VALVE-01 NOS. DECK INCLUSIVE EA USD 1.00 0.00
I EDUCTOR DRIVES – 1 NOS. DECK INCLUSIVE EA USD 1.00 0.00
I CARGO HOLD BILGES- 05 NOS. DECK INCLUSIVE EA USD 1.00 0.00
i D26017: CARGO HOLDS HATCH COVERS FOLDING TYPE HYDRAULIC SYSTEM MAKE: SEOHAE MARINE SYSTEM: DECK EA USD 1.00 0.00
i YARD TO ARRANGE COMPETENT TEAM TO CARRY OUT VARIOUS REAPIR ON HATCH COVER AND UTMOST PRECAUTIONS TO BE EXERCISED THRORUGH OUT THE REPAIR PERIOD TO AVOID, ANY ACCIDENT/INCIDENT, DAMAGE DUE TO HEAVY NATURE OF JOB.YARD TO QUOTE ALL INCLUSIVE. DECK EA USD 1.00 0.00
D26017.1 HYDRAULIC SYSTEM TANK OIL TO BE DRAINED IN A CLEAN DRUM AND TANK TO BE CLEANED THOROGHLY AND CLEAN OIL TO FILL TANK CAPACITY 1200 L OIL SHIPS SUPPLY. DECK NOS. 1.00 1.00 EA USD 1.00 0.00
i TO RENEW EXISTING DAMAGED MS HYDRULIC PIPE LINE TO SEAMLESS SS 316 ( ASTM A312,316 ERW ) SHEDULE 80 AS PER BELOW DETAILS .ON COMPLETION OF THE ABOVE REPAIRS HYD. LINES TO BE PRESSURE TESTED FOR LEAKAGES. ALL LEAKAGES MUST BE ARRESTED. DECK INSTRUCTION EA USD 1.00 0.00
D26017.2 MAIN HYDR. PRESSURE LINE ,DIA - 35 MM, PRESSURE - 280 BAR ,SCH 80 S.S.- PIPE CONNECTION TYPE -FLANGE IN EVERY 6 MTRS. RENEW U-CLAMPS 100 NOS FOR THE ENTIRE LENGTH. DECK MTR 20.00 20.00 EA USD 1.00 0.00
D26017.3 MAIN HYD. RETURN LINE ,DIA - 42 MM,SCH- 80 S.S., PIPE CONNECTION TYPE -FLANGE IN EVERY 6 MTRS, RENEW U-CLAMPS 100 NOS FOR THE ENTIRE LENGTH. DECK MTR 20.00 20.00 EA USD 1.00 0.00
D26017.4 HYD. BRANCH LINE ,DIA - 25 MM, SCH-80 S. S. , PIPE CONNECTION TYPE -FLANGE, EVERY 6 MTRS, U-CLAMPS 100 NOS FOR THE ENTIRE LENGTH. DECK MTR 20.00 20.00 EA USD 1.00 0.00
D26017.5 HYDRAULIC RAMS – 4 IN EACH HATCH (TOTAL 20 NOS) TO BE TESTED AT DESIGNED PRESSURE FOR LEAKS ON BOARD IN PRESENCE OF THE SHIP’S STAFF . DECK NOS 20.00 20.00 EA USD 1.00 0.00
D26017.6 TO OVERHAUL HATCH COVERS HYDRAULIC RAMS INCLUSIVE OF CROME PLATING OF PISTON AND RENEW SEALS. SEALS & CONSUMABLES YARD SUPPLY. DETAILS/SPECIFICATION: 2500MM ,WP=200BAR. DECK NOS 5.00 5.00 EA USD 1.00 0.00
D26017.7 TO OPEN AND OVERHAUL 4 NOS EACH HATCH ROLLERS ON ALL 5 HATCH COVERS. BEARINGS TO BE RENEWED(BEARINGS & CONSUMABLES YARD SUPPLY) .TOTAL 20 NOS TRACKS FOR ALL 05 NOS HATCH PONTOONS' ROLLERS TO BE INSPECTED FOR UNEVEN -NESS . DECK NOS 20.00 20.00 EA USD 1.00 0.00
D26017.8 HATCH COVER SECURING HINGE PIN BUSH BEARING REQUIRE TO BE REPLACED . BOTH HATCH COVER #1 & #5 TO BE TAKEN OUT AND THRORUGH , REPAIR, CHIPPING & PAINTING TO BE CARRIED OUT. AFTER REPAIR/MAINTENACE , BOTH THE HATCH COVER TO BE , ALIGNED & FITTED BACK AND OPERATIONAL TRIALS TO BE GIVEN. DECK SETS 2.00 2.00 EA USD 1.00 0.00
D26017.9 HATCH COVER SECURING HINGE PIN BUSH BEARING REQUIRE TO BE REPLACED INSITU. THRORUGH , REPAIR, CHIPPING & PAINTING TO BE CARRIED OUT (3 SETS HATCH COVER-#2,#3 & #4). AFTER REPAIR/MAINTENACE ,THE HATCH COVERS TO BE , ALIGNED & FITTED BACK AND OPERATIONAL TRIALS TO BE GIVEN. DECK SETS 3.00 3.00 EA USD 1.00 0.00
D26017.10 FLEXIBLE HYDRAULIC HOSES TO BE RENEWED. (HOSES YARD SUPPLY) . SIZE- FEMALE- 300K 20S- 1/2"- 1.2 M (15 NOS) FEMALE- 300K 20S- 3/4"- 1.2 M (5 NOS) FEMALE- 300K 20S- 3/4"- 1.1 M (10 NOS) DECK NOS 30.00 30.00 EA USD 1.00 0.00
D26017.11 SOCKET FITTINGS (JIS PIPE CONNECTION) FOR FEXIBLE HYDRAULIC HOSE OF HATCH OPERATING LEVER. BADLY CORRODED SAME TO BE RENEWED. SIZE- G 3/4" -20A (40 NOS) AND G 3/4" -25A (30 NOS) - YARD SUPPLY DECK NOS 30.00 30.00 EA USD 1.00 0.00
D26017.12 CONTROL PANEL VALVES FOR OPENING AND CLOSING HATCH COVERS TO BE OPENED ,OVERHAULED AND FITTED BACK.5NOS- SPARE KITS & CONSUMABLES YARD SUPPLY. DECK NOS 5.00 5.00 EA USD 1.00 0.00
D26017.13 NO. 1 SEGREGATION VALVE ON MAIN LINE DIA - 42 MM TO BE OPENED , OVERHAULED AND FITTED BACK . DECK NOS 10.00 10.00 EA USD 1.00 0.00
D26017.14 DAMAGE RESTING PADS TE BE RENEWED APPROX SIZE 400X150x100 ALONG WITH YARD SUPPLIED RESTING PAD AS PER SAMPLE ALONG WITH NUTS & BOLTS: DECK NOS 75.00 75.00 EA USD 1.00 0.00
D26017.15 HATCH COVER DRAIN PLUG TOTAL 20 NO. TO BE OPENED AND INSPECTED. BALL VALVES (NRV TYPE) BALLS TO BE RENEWED. YARD SUPPLY DECK NOS 20.00 20.00 EA USD 1.00 0.00
D26017.16 WATSED DRAIN CHANNELS ALONG WITH ASSOCIATED HATCH COVER STRUCTURES TO BE CROPPED AND RENEWED WITH FLAT BARS DECK MTRS 250.00 250.00 EA USD 1.00 0.00
D26017.17 HATCH COVER RESTING PADS DAMAGED AT VARIOUS LOCATIONS, SAME TO BE REPLACED BY YARD SUPPLIED PADSS AS PER SAMPLE DECK NOS 50.00 50.00 EA USD 1.00 0.00
D26017.18 UPON COMPLETION OF REPAIR, CHALK TEST & HOSE TEST TO CARRY OUT ON ALL HACTH COVERS OF ALL HOLDS TO ENSURE WEATHER TIGHTNESS OF HATCH COVERS. DECK SETS 5.00 5.00 EA USD 1.00 0.00
I D26018: BALLAST AND CARGO HOLD BILGES VALVE HYDRAULIC REMOTE CONTROL SYSTEM MAKE:DAMCOS: DECK EA USD 1.00 0.00
I YARD SHOULD ARRANGE COMPETENT TEAM AND WORK SHOULD BE CARRIED OUT UNDER SUPERVIOSN OF COMPETENT ENGR. QUOTE SHOULD BE ALL INCLUSIVE . DECK EA USD 1.00 0.00
I WORK SPECIFICATIONS: DECK EA USD 1.00 0.00
D26018.1 HYDRAULIC SYSTEM TANK OIL TO BE DRAINED IN A CLEAN DRUM .TANK TO BE CLEANED THOROGHLY ALONG WITH CLEANING OF FILTERS AND AIR BREATHER AND CLEAN OIL TO FILL UP. OIL SHIP SUPPLY DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26018.2 HYDRAULIC SYSTEM ALL VALVES ACTUATOR TO BE OVERHAULED INCLUDING ISOLATING VALVES, NR VALVES ,RELIEF VALVES, TC AND PRESSURE TESTED FOR LEAKAGES-REPAIR KIT AND CONSUMABLES FOR ACTUATORS YARD SUPPLY . TOTAL VALVES 30 NOS. CONSUMABLES YARD SUPPLY. DECK NOS 30.00 30.00 EA USD 1.00 0.00
D26018.3 VRC HYDRAULIC SYSTEM NITROGEN ACCUMULATOR TO BE OVERHAULED AND REFILLED WITH GAS SUPPLIED BY YARD DECK LS 1.00 1.00 EA USD 1.00 0.00
D26018.5 ALL CONTROL IN BCR FOR VALVE REMOTE CONTROL SYSTEM TO BE CHECKED INCLUDING ALL INDICATORES IN THE PANEL IN THE BCR, E/R AND FORE PEAK AND RECTIFIED FAULT IF ANY ALL CONSUMABLES YARD SUPPLY. CONSIDER RNEWAL OF 20 NOS INDICATORS& ACCESSORIES.SATISFACTORY TRIAL TO BE SHOWN TO SHIPSTAFF WHILE VESSEL IN FLOATING CONDITION. DECK LS 1.00 1.00 EA USD 1.00 0.00
I D26019: BALLAST TANK BELL MOUTH DECK EA USD 1.00 0.00
I WORK SPECIFICATIONS DECK EA USD 1.00 0.00
D26019.1 THE SUCTION BELL MOUTHS OF ALL BALLAST TANKS TO DISMANTLE AFTER REMOVING THE PIPE CLAMPS AND NUTS / BOLTS. ON COMPLETION OF INSPECTION/REPAIR; THE BELL MOUTHS TO BE FITTED IN PLACE WITH YARD SUPPLIED CONSUMABLES (NEW PIPE CLAMP; NUTS/BOLTS AND PACKING). DECK NOS 12.00 12.00 EA USD 1.00 0.00
I ON COMPLETION OF INSPECTION/REPAIR; THE BELL MOUTHS TO BE FITTED IN PLACE WITH YARD SUPPLY NEW PIPE CLAMP; NUTS/BOLTS AND PACKING. DECK INCLUSIVE EA USD 1.00 0.00
I D26020: EDUCTORS FOR BALLAST CARGO HOLDS BILGE BOSUN STORES CHAIN LOCKER DECK EA USD 1.00 0.00
I WORK SPECIFICATIONS: DECK EA USD 1.00 0.00
I FOLLOWING EDUCTORS TO BE OPENED FOR INSPECTION AND BOXED BACK AFTER CHECK FOR EDUCTOR INTERNAL CONDITION; NOZZLE LOCKED FIT IN POSITION. EDUCTOR TO BE BOXED BACK WITH YARD SUPPLY NUTS; BOLTS AND PACKING AND TO BE TRIED OUT TO THE SATISFACTION OF MASTER/ATTENDING SUPERINTENDENT/SURVEYOR DECK INSTRUCTION EA USD 1.00 0.00
D26020.1 BALLAST EDUCTOR DECK SET 1.00 1.00 EA USD 1.00 0.00
D26020.2 CARGO HOLD BILGE EDUCTOR DECK SET 1.00 1.00 EA USD 1.00 0.00
D26020.3 FORE PEAK STORE/BOSUN STORE/CHAIN LOCKER EDUCTOR DECK SET 1.00 1.00 EA USD 1.00 0.00
D26020.4 OVERHAULING OF EDUCTOR VALVE DECK SET 1.00 1.00 EA USD 1.00 0.00
D26020.5 CARGO HOLD BILGE EDUCTOR SUCTION PRESSURE & DRIVE PRESSURE GAUGES TO BE FITTED NO GAUGES PROVIDED SPARES YARD SUPPLY DECK LS 1.00 1.00 EA USD 1.00 0.00
D26020.6 BALLAST TANK EDUCTOR SUCTION AND DRIVE PRESSURE GAUGES TO BE FITTED NO GAUGES PROVIDED SPARES YARD SUPPLY DECK LS 1.00 1.00 EA USD 1.00 0.00
I D26021: BUTTERFLY VALVES IN BALLAST TANKS AND CARGO HOLDS BILGE HOLDING VALVE MAKE: KEYSTONE/TYCO ACTUATOR MAKE:DAMCOS MAKE: NORDIC DECK EA USD 1.00 0.00
I WORK SPECIFICATIONS: DECK EA USD 1.00 0.00
I THE VALVE SYSTEM TO BE PRESSURE TESTED FOR IDENTIFICATION OF LEAKY VALVES. FOLLOWING VALVES TO BE REMOVED FROM PLACE HIGH QUALITY SEAT RING (YARD'S SUPPLY) TO REPLACE VALVES TO BE TESTED AND BOXED BACK WITH NEW CONSUMABLES (NEW NUTS/BOLTS/PACKING AS REQUIRED). HYDRAULIC ACTUATORS TO BE DISCONNECTED AND BOTH PORTS BLANKED AND FITTED BACK AFTER BOXING BACK THE VALVE. ON COMPLETION OF JOB VALVES TO BE TESTED/PR TESTED & TRY OUT FOR SATISFACTORY OPERATION IN PRESENCE OF SUPTDS/RESPONSIBLE OFFICER. VALVES TO BE SECURED IN PLACE WITH NEW JOINT, NUTS/BOLTS.QUOTE SHOULD INCLUDE ALL INCLUSIVE, REPAIR KIT AND CONSUMABLES YARD SUPPLY. DECK INSTRUCTION EA USD 1.00 0.00
D26021.1 NO.1 TO 5 P & S WB DB TANKS MAIN VALVE -DN 250 DECK PC 10.00 10.00 EA USD 1.00 0.00
D26021.2 NO 1 TO 5 CARGO HOLDS BILGE SUCTION VALVES INCLUDING N/R V/V -DN 125 DECK PC 10.00 10.00 EA USD 1.00 0.00
D26021.3 BALLAST LINE V/V FOR NO 3 CARGO HOLD BALLASTING -DN 125 DECK PC 2.00 2.00 EA USD 1.00 0.00
D26021.4 NO.1 & 2 WB PUMP SUCTION VALVES-DN 350 DECK PC 4.00 4.00 EA USD 1.00 0.00
D26021.5 NO.1 & 2 WB PUMP DISCH V/V-DN 350,BUTTERFLY DECK PC 4.00 4.00 EA USD 1.00 0.00
D26021.6 FPK TANK VALVE AND ISOLATION VALVE-SIZE & TYPE- DN150 BUTTERFLY TO RENEW WITH YARD SUPPLIED V/VS. DECK PC 2.00 2.00 EA USD 1.00 0.00
D26021.7 BALLAST EDUCTOR SUCTION & DRIVE VALVE -SIZE-DN150 BUTTERFLY. DECK PC 4.00 4.00 EA USD 1.00 0.00
D26021.8 CARGO HOLD BILGE EDUCTOR VALVES -DN 125,BUTTERFLY DECK PC 2.00 2.00 EA USD 1.00 0.00
D26021.9 HYDRAULIC ACTUATOR FOR BALLAST REMOTE VALVES TO OVER HAUL (SPARES & REPAIR KIT YARD SUPPLY) DECK PC 20.00 20.00 EA USD 1.00 0.00
I TO FACILITATE THE JOB, ADJACENT PIPELINES/SUPPORTS TO CUT AND FIT BACK IN PLACE ON COMPLETEION.LINES WITH VALVES TO BE TESTED ON COMPLETION. NECESSARY COATING TO THE DAMAGED PAINTS TO ATTEND AS PER COATING SPECIFICATION. PAINT OWNWER SUPPLY.JOB TO BE CARRIED OUT IN DOCK ONLY. YARD TO QUOTE FOR DOCKING DAYS ACCORDINGLY. DECK INSTRUCTION EA USD 1.00 0.00
I FOLLOWING NON RETURN VALVES TO BE TRANSPORTED TO WORKSHOP; OVERHAULED AND TO BE FITTED BACKWITH NEW NUTS/BOLTS/PACKING (YARD SUPPLY). DECK INDTRUCTION EA USD 1.00 0.00
D26021.10 NO. 1 AND 2 WB PUMP DISCH NR DIA 350 MM DECK PC 2.00 2.00 EA USD 1.00 0.00
D26021.11 TO FABRICATE AND RENEW THE NR FLAP OF MATERIAL SS-SIZE DIA APPROX- 350MM. DECK PC 2.00 2.00 EA USD 1.00 0.00
D26021.12 HIGH AND LOW SEA SUCTION V/V (HYDRAULIC) TO BE REMOVED, OVERHAULED AND PRESSURE TESTED 8 KG/CM2 FITTED BACK. DECK NO. 2.00 2.00 EA USD 1.00 0.00
D26021.13 AFT PEAK BUTERFLY WAFER V/V TO BE REMOVED SERVICED PRESSURE TESTED 8 KG/SQ CM AND FITTED BACK. IF REQUIRED SEAT RING TO BE RENEWED. DN 250,BUTTERFLY. DECK NO 1.00 1.00 EA USD 1.00 0.00
D26021.14 NO.3 HOLD BALLAST LINE, V/V S AND BLANK TO BE OPENED INSPECTED AND FITTED BACK. DECK NO 2.00 2.00 EA USD 1.00 0.00
D26021.15 N/R VALVE IN HOLD BILGES 14 NOS. TO BE DISMANTLED, REMOVED TO THE WORKSHOP, CLEAN/OVERHAULED, RUBBER RINGS RENEWED, DESHAPED/FACE PLATE POLISHED/ RENEWED TO ACHIEVE WATER TIGHTNESS AND PRESSURE TESTED AT 5KG/CM2 BEFORE FITTING BACK. DECK NOS 10.00 10.00 EA USD 1.00 0.00
D26021.16 QUOTE FOR PRESSURE TESTING OF EACH BILGE LINE FROM DUCT KEEL TO BELL MOUTH 10 NOS. ON COMPLETION OF REPAIRS PRESSURE TESTING (5KG) OF BILGE LINES TO BE CARRIED OUT FOR RECTIFYING ANY LEAKAGES AND CHECKING PROPER FUNCTIONING OF THE ENTIRE SYSTEM. (QUOTE LUMP SUM) DECK LS 1.00 1.00 EA USD 1.00 0.00
D26021.17 TOTAL 4 NOS GLOBE V/V FOR DRAFT GAUGE SYSTEM TO BE REMOVED OVERHAULED AND PRESSURE TESTED SIZE 8 KG/CM2 FITTED BACK. SAME TO BE SHOWN TO CLASS SURVEYOR BEFORE FITTING BACK IN PLACE. DN 25 DECK NO 4.00 4.00 EA USD 1.00 0.00
D26021.18 21 NO. OF BALLAST VALVE IN E/R TO BE OPENED AND OVERHAULED TO CHECK WEAR AND TEAR. , O/HAULED, IF REQUIRED RENEWED AND FITTED BACK. SIZE DECK NOS. 21.00 21.00 EA USD 1.00 0.00
D26021.19 AFTER FITTING ALL THE DB’S VALVE BALLAST LINE(TST ABD DB’S) , F.P.K , NO.3 HOLD TO BE PRESSURE TESTED TO THE SATISFACTION OF ATTENDING SURVEYORS (QUOTE LUMPSUM) DECK NOS 1.00 1.00 EA USD 1.00 0.00
I VALVES : ACCOMMODATION/DECK PIPE LINES AND VALVES O/HAULING DECK INSTRUCTION EA USD 1.00 0.00
D26021.20 TO OVERHAUL AND PRESSURE TEST ISOLATION VALVES FOR DECK AND ACCOMMODATION ON FIRE LINE GATE VALVE SIZE 125 MM . DECK NO 2.00 2.00 EA USD 1.00 0.00
D26021.21 MANUAL GLOBE VALVES 8 NOS IN FOREPEAK STORE TO BE OPENED , OVERHAULED AND FITTED BACK WINCH COOLING WATER LINE . QUOTE SHOULD BE ALL INCLUSIVE.DN25 DECK NOS 8.00 8.00 EA USD 1.00 0.00
D26021.22 SUPPLY AND FIT THE ANCHOR WASH GLOBE VALVE ON FOCASTLE DECK YARD SUPPLY-SZIE-? DECK NOS 2.00 2.00 EA USD 1.00 0.00
D26021.23 PORT HOLES OF ACCOMMODATION RUBBER PACKING TO RENEW, RUBBER PACKING YARD SUPPLY DECK NOS 20.00 20.00 EA USD 1.00 0.00
D26021.24 ALL RUBBER PACKING OF WHEEL HOUSE GLASS TO RENEW. RUBBER PACKING YARD SUPPLY DECK NOS 17.00 17.00 EA USD 1.00 0.00
I D26022: LIFE SAVING APPLIANCES DECK EA USD 1.00 0.00
I WORK SPECIFICATIONS: DECK EA USD 1.00 0.00
I FREE FALL LIFEBOAT MAKE: QINGDAO BEIHAI TYPE: BH-F750 , PERSONS-30 , 7500X2850X3100X1200 GRP HULL DECK EA USD 1.00 0.00
I YARD TO ARRANGE FOR SHORE CRANE REQUIRED WEIGHT (ANODE/WATER GALLON ETC) FOR LOAD TEST OF FREE LIFE BOATS IN PRESENCE OF CLASS SURVEYORS. DECK INSTRUCTION EA USD 1.00 0.00
I JOBS SPECS AS PER RECOMMENDATION OF OEM 15 YEARLY ROUTINE DECK INSTRUCTION EA USD 1.00 0.00
D26022.1 TO CARRY OUT ANNUAL AND 15 YEARLY INSPECTION AND SERVICING BY OEM/ CLASS APPROVED FIRM AND CERTIFICATE TO ISSUE UPON COMPLETION OF JOB . TO TAKE FREE FALL ENCLOSED LIFE BOAT ASHORE AND PLACED ON SUITABLE PLATFORM FOR THE NECESSARY REPPAIRS.AFTER INSPECTION AND REPAIR SAME TO BE FITTED BACK IN PLACE. QUOTE SHALL BE INCLUSIVE OF ALL THE ASPECTS RELATED TO ANNUAL/ 15 YEARLY SERVICING. ANY SPARES REQUIREMENTS SUPPLIED BY OWNERS.INCLUDING LOAD TEST AS PER TEH REQUIREMENT. DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26022.4 FREE FALL LIFE BOAT TO BE HIGH PRESSURE WASHED AND SURFACE PREPARED THEREAFTER. FREE FALL LIFE BOATS TO BE PAINTED (L/B PAINTS YARD SUPPLY).ALL STENCILLING TO BE CARRIED OUT FOR IDENTIFICATION AS PER SOLAS REQUIREMENT. DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26022.5 RETRO-REFLECTIVE TAPES (WHITE) TO BE RENEWED (YARD SUPPLY). DECK LS 1.00 1.00 EA USD 1.00 0.00
D26022.6 L/B ALL SEATS INCLUDING BELT AND HEADREST TO BE RENEWED (YARD SUPPLY). DECK NOS 10.00 10.00 EA USD 1.00 0.00
D26022.8 BILGE HAND PUMP NO. 1 WITH CONNECTING HOSE TO BE RENEWED YARD SUPPLY DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26022.9 RELEASE HOOK TO BE OVERHAULED DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26022.10 AFT SHACKLE - 1 NO. TO BE RENEWED (YARD SUPPLY) DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26022.11 FWD SHACKLE - 1 NO. TO BE RENEWED (YARD SUPPLY) DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26022.12 AFT LIFTING RIG - 1 NO. TO BE RENEWED (YARD SUPPLY) DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26022.13 FWD LIFTING RIG - 1 NOS. TO BE RENEWED (YARD SUPPLY) DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26022.14 RELEASE LEVER -01 NO. TO BE OVERHAULED DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26022.15 DEVIT TO O'HAUL PIPING AND HYDRAULIC RAM AND CYLINDER DEFECTIVE PIECE TO BE EXAMINED AND RENEW IF REQUIRED(YARD SUPPLY) HYDRAULIC OIL TO RENEW(SHIP SUPPLY) DECK SET 2.00 2.00 EA USD 1.00 0.00
D26022.16 ACCUMULATORS TO BE CHARGED WITH NITROGEN 230 BAR NEW OIL TO BE TAKEN(SHIP SUPPLY).IF ANY DROP IN PRESSURE SAME TO BE RECTIFIED BY YARD SUPPLIED MATERIAL. DECK SET 1.00 1.00 EA USD 1.00 0.00
D26022.17 TO RECTIFY/RENEW ANY HYDRAULIC LINE LEKAGES NON RETURN V/VS IN LINE TO RENEW. DECK PCS 1.00 1.00 EA USD 1.00 0.00
D26022.18 DAMAGED FRP TO REPAIRED WITH YARD SUPPLIED MATERIAL & CONSUMABLES DECK SQR MTR 3.00 3.00 EA USD 1.00 0.00
I D26023: RESCUE BOAT MAKE: QINGDAO BEIHAI MODEL: BH-R4 DECK EA USD 1.00 0.00
D26023.1 TO CARRY OUT ANNUAL AND FIFTEEN YEARLY INSPECTION AND SERVICING BY OEM/AUTHORISE FIRM INCLUDING LOAD TEST AND CERTIFICATE TO ISSUE UPON COMPLETION OF JOB. TO TAKE OPEN RESCUE BOAT ASHORE AND PLACED TO BE ON SUITABLE PLATFORM.AFTER INSPECTION AND REPAIR SAME TO BE FITTED BACK IN PLACE.QUOTE SHALL BE INCLUSIVE OF ALL THE ASPECTS RELATED TO ANNUAL/ 15 YEARLY SERVICING. ANY SPARES REQUIREMENTS SUPPLIED BY OWNERS. DECK LS 1.00 1.00 EA USD 1.00 0.00
D26023.2 YARD TO ARRANGE FOR SHORE CRANE REQUIRED WEIGHT (ANODE/WATER GALLON ETC) FOR LOAD TEST OF RESCUE BOATS IN PRESENCE OF CLASS SURVEYORS. YARD TO ARRANGE MAKER'S SERVICE ENGINEER FOR LSA OVERHAULING AND RESCUE BOAT ENGINE OVERHAULING . LUMPSUMP QUOTE TO BE INCLUSIVE OF ALL CHRGES DECK LS 1.00 1.00 EA USD 1.00 0.00
D26023.3 OPEN RESCUE BOAT TO BE HIGH PRESSURE WASHED AND SURFACE PREPARED THEREAFTER. RESCUE BOATS TO BE PAINTED (PAINTS YARD SUPPLY).ALL STENCILLING TO BE CARRIED OUT FOR IDENTIFICATION AS PER SOLAS REQUIREMENT DECK LS 1.00 1.00 EA USD 1.00 0.00
D26023.4 RETRO-REFLECTIVE TAPES (WHITE) TO BE RENEWED (YARD SUPPLY). DECK LS 1.00 1.00 EA USD 1.00 0.00
D26023.6 3 POINT LIFTING SLINGS TO BE RENEWED (YARD SUPPLY). DECK NOS 3.00 3.00 EA USD 1.00 0.00
D26023.7 BILGE PUMP WITH CONNECTING HOSE TO BE RENEWED . DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26023.8 RELEASE HOOK TO BE OVERHAULED DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26023.9 RESCUE BOAT TO BE LOWERED AND PLACED ON JETTY WITH PROPER SUPPORTS.DEVIT TO BE O'HAUL. HYDRAULIC PIPES TO BE EXAMINED AND RENEW IF REQUIRED (YARD SUPPLY).HYDRAULIC OIL TO RENEW(SHIP SUPPLY) DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26023.10 INDICATION LIGHT OF RESCUE BOAT TO BE RENEWED( COMPLETE SET) YARD SUPPLY DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26023.11 LASHING ARRANGEMENT OF RESCUE BOAT TO BE RENEWED.(YARD SUPPLY) DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26023.12 HYDRAULIC TANK TO BE CLEANED.HYDRAULIC TANK OIL FILLING CAP FOUND DAMAGED SAME TO BE RECTIFIED. DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26023.13 BOTTOM PLUG FLOATING BALL OF RESCUE BOAT TO BE RENEWED YARD SUPPLY DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26023.14 DAMAGED FRP TO REPAIRED WITH YARD SUPPLIED MATERIAL & CONSUMABLES DECK SQR MTR 1.00 1.00 EA USD 1.00 0.00
D26023.15 HYDRAULIC SHUTTLE V/VS, DIRECTION CONTROL V/V TO BE OVERHAULED/RENEWED. DECK LS 1.00 1.00 EA USD 1.00 0.00
I D26024: FREE FALL LIFE BOAT LAUNCHING DAVIT MAKE:QINGDAO BEIHAI TYPE: BD-FF80B DECK EA USD 1.00 0.00
D26024.1 TO CARRY OUT ANNUAL AND 15 YEARLY INSPECTION AND SERVICING BY OEM .. DECK LS 1.00 1.00 EA USD 1.00 0.00
I RECOVERY TEST DECK Inclusive EA USD 1.00 0.00
I APPEARANCE TEST AND CHECKING OF OPERATIONS DECK Inclusive EA USD 1.00 0.00
I FULL LOAD DAVIT LAUNCHING TEST DECK Inclusive EA USD 1.00 0.00
I FULL LOAD FREE FALL LAUNCHING TEST DECK Inclusive EA USD 1.00 0.00
D26024.2 DAVIT FALLS TO REMOVE AND NEW WIRE (SHIP SUPPLY) TO RIG. DECK LS 1.00 1.00 EA USD 1.00 0.00
D26024.3 ALL SHEAVES FLOATING BLOCK ASSEMBLY OPENED OVERHAULED CLEANED THIN DOWN REPLACED IF ANY GRIT/HYDRO BLAST PAINTED AND FITTED BACK IN POSITION DECK LS 1.00 1.00 EA USD 1.00 0.00
D26024.4 DAVIT TO BE GRIT/HYDRO BLASTED AND PAINTED PAINT SHIP SUPPLY DECK LS 1.00 1.00 EA USD 1.00 0.00
D26024.5 AFTER LOWERING OF LB ON JETTY, DEVIT LIFTING HYDRAULIC RAM AND CYLINDER 2NOS. TO BE REMOVED OVERHAULLED AND FITTED BACK . HYDRAULIC OIL AND SEAL AND CONSUMABLES YARD SUPPLY. DECK LS 1.00 1.00 EA USD 1.00 0.00
D26024.6 HOISTING WINCH FOUNDATION SECURING NUTS/BOLTS TO RENEW SS NUTS/BOLTS 100NOS OF SPANNER SIZE 36MM LENGTH 100MM WITH LOCK NUT (YARD SUPPLY) DECK LS 1.00 1.00 EA USD 1.00 0.00
D26024.7 YARD TO PROVIDE REQUIRED CRANE SERVICE AND WEIGHTS FOR THE 5 YEARLY LOAD TEST OF THE DAVITS/WINCHES PREFERABLY DURING DOCKING (AFTER THE OVERHAULING OF SHEAVES/WINCHES AND INSPECTION BY MAKER'S SERVICE ENGINEER) DECK LS 1.00 1.00 EA USD 1.00 0.00
D26024.8 TO SUPPLY AND FIT DAVIT/WINCH LIMIT SWITCHES DECK NOS 2.00 2.00 EA USD 1.00 0.00
D26024.9 ALL PULLEY TOTAL 4 NOS TO BE OVERHAULED DECK NOS 4.00 4.00 EA USD 1.00 0.00
D26024.10 LOAD TEST TO BE CARRIED OUT LIFE BOAT WEIGHT 7716 KGS ( TOTAL - FULL LADEN ) MAX. HOISTING LOAD - 50KN MAX. WORKING LOAD - 75KN DECK LS 1.00 1.00 EA USD 1.00 0.00
D26024.11 FLOATING BLOCK ASSEMBLY 1 NO TO BE OPENED,OVERHAULED AND FITTED BACK SPARES YARD IF REQUIRES DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26024.12 DAVIT HYDRAULIC SYSTEM TO BE CHECKED OIL REPLACED AND HYDRAULIC PIPES TO BE CHECKED AND RENEWED IF REQUIRES YARD SUPPLY OIL SHIP SUPPLY DECK LS 1.00 1.00 EA USD 1.00 0.00
D26024.13 TO SUPPLY AND RENEW GREASE NIPPLES FOR ALL SHEAVES AND HEEL PINS DECK NOS 30.00 30.00 EA USD 1.00 0.00
D26024.14 LIFE BOAT LASHING AND SECURING ARRANGEMENTS INCLUDING BRACKETS, WIRE ,D SHACKLES AND BOTTLE SCREWS TO RENEW DECK LS 1.00 1.00 EA USD 1.00 0.00
I D26025: RESCUE BOAT AND LIFE RAFT DAVIT MAKE:QINGDAO BEIHAI TYPE: BD-SA21A DECK EA USD 1.00 0.00
D26025.1 TO CARRY OUT ANNUAL AND FIFTEEN YEARLY INSPECTION AND SERVICING BY OEM AND CERTIFICATION TO BE ISSUED AFTER COMPLETION OF JOB. DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26025.2 LOAD TEST TO BE CARRIED OUT RESCUE BOAT WEIGHT 1143 ( TOTAL - FULL LADEN ) MAX. WORKING LOAD - 21KN DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26025.3 FALLS TO BE RENEWED, WIRE SHIP SUPPLY DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26025.4 TO GRIT/HYDRO BLAST / POWER TOOL AND PAINT DAVITS WINCHES,WARPING DRUMS AS PER PAINTING SCHEME. PAINT OWNER'S SUPPLY. SA 2 ZINC EPOXY PAINT DECK LS 1.00 1.00 EA USD 1.00 0.00
D26025.5 HYDRAULIC SYSTEM TO BE OVERHAULED INCLUDING MANUAL VALVE , HAND PUMP, ACCUMULATOR. SYSTEM TO BE CHARGED WITH OIL AND NITROGEN. SPARES IF REQUIRES YARD SUPPLY. HYDRAULIC OIL TO BE REPLACED WITH SHIP SUPPLY DECK LS 1.00 1.00 EA USD 1.00 0.00
D26025.6 HOISTING WINCH FOUNDATION SECURING ALL NUTS/BOLTS AND DEVIT COLUMN NUT/BOLTS 100 NOS TO RENEW WITH SS NUTS/BOLTS OF SPANNER SIZE 36MM LENGTH 100MM WITH LOCK NUT (YARD SUPPLY) DECK LS 1.00 1.00 EA USD 1.00 0.00
D26025.7 20 NOS GREASE NIPPLES TO RENEW AND ON COMPLETION ALL GREASE POINT TO BE GREASED.(YARD SUPPLY) DECK NOS 20.00 20.00 EA USD 1.00 0.00
D26025.8 LIFE BUOY STAND FOR MOB MARKER (P&S) TO BE CROPPED & RENEWED DECK NOS 2.00 2.00 EA USD 1.00 0.00
D26025.9 TO RENEW AND FIT CRADLE FOR LIFE RAFT DECK NOS 5.00 5.00 EA USD 1.00 0.00
D26025.10 TO RENEW SAFETY CHAINS ON LIFE RAFT DECK DECK MTRS 30.00 30.00 EA USD 1.00 0.00
D26025.11 LIFE BUOY STANDS TO BE CROPPED & RENEWED DECK NOS 5.00 5.00 EA USD 1.00 0.00
i D26026: FIRE EXTINGUISHERS/ FIRE DAMPERS/ FIRE HOSE BOXES/ FIRE PLAN BOX / LIFERAFT DECK EA USD 1.00 0.00
D26026.1 GALLEY CO2 & WET CHEMICAL FIRE EXTINGUISHER SYSTEM TO SERVICE BY AUTHORISED SERVICE ENGINEER DECK SET 1.00 1.00 EA USD 1.00 0.00
D26026.2 TO FABRICATE AND FIT FREE FALL LIFEBOAT AND RESCUE BOAT LAUNCHING INSTRUCTION (LETTER OF SIZE 12MM HEIGHT, GROOVE DEPTH 1MM IN RED COLOUR) TO BE ENGRAVED ON (500 x 600 MM, 3MM THICK SS) YARD SUPPLY PLATE AND TO SECURE ON LUGS WELDED ON BULKHEAD EMBARKATION DECK. DECK NO. 2.00 2.00 EA USD 1.00 0.00
D26026.3 TO FABRICATE AND FIT LIFERAFT LAUNCHING INSTRICTION (LETTER OF SIZE 12MM HEIGHT, GROOVE DEPTH 1MM IN RED COLOUR) TO BE ENGRAVED ON (400 x 700MM, 3MM THICK SS) YARD SUPPLY PLATE AND TO SECURE ON LUGS WELDED ON BULKHEAD EMBARKATION DECK. DECK NO. 2.00 2.00 EA USD 1.00 0.00
D26026.4 TO RENEW FIXING SUPPORT FOR 6KG FOAM FIRE EXTINGUISHERS DECK PCS 10.00 10.00 EA USD 1.00 0.00
D26026.5 TO RENEW/OVERHAUL CO2 VALVES OF NO 3 CARGO HOLDS DECK NOS 4.00 4.00 EA USD 1.00 0.00
I D26027: ACCOMMODATION LADDER: MAKE-SAMGONG CO. PILOT COMBINATION: MAKE-DALIAN GLORY MARINE TECHNOLOGY CO. LTD. AND MOT LADDER DECK EA USD 1.00 0.00
I WORK SPECIFICATIONS: DECK EA USD 1.00 0.00
D26027.1 ALL FOURS ACCOMMODATION LADDERS /GANGWAYS WIRES TO DISCONNECT REMOVE FROM LOCATION AND TO BE TAKEN ASHORE FOR INSPECTION AND REPAIR. ON COMPLETION OF REPAIRS, GANGWAYS TO FIT BACK IN LOCATION WITH NEW OWNER SUPPLY WIRES. ALL FOUR GANGWAYS TO BE CLEANED; BUFFED (WIRE BRUSH); HP FW WASH AND PAINTED WITH ONE COAT ALUMINUM PAINT (PAINT OWNER SUPPLY) . QUOTE SHOULD BE INCLUSIVE (INCLUDING CONSUMABLES) ALL CHARGES. DECK SET 4.00 4.00 EA USD 1.00 0.00
I TEFLON PACKING OF 4MM THICKNESS TO BE PLACED BETWEEN THE LADDER SIDE BEAM AND MS SECURING PLATE TO AVOID BIMETALLIC CORROSION. DECK INCLUSIVE EA USD 1.00 0.00
I ALL FOUR GANGWAYS/ACCOMMODATION LADDER BOTTOM PLATFORM TO BE FAIRED UP AND SECURED WITH PROPER SPRING TENSION PINS IF REQUIRED RENEW THE SAME (4SETS). DECK INCLUSIVE EA USD 1.00 0.00
I TO CHECK SIDE ROLLERS OF 4 GANGWAYS/ACCOMMODATION LADDER FOR CRACKS IN WELDING IF REQUIRED TO BE REWELDED 4SETS DECK INCLUSIVE EA USD 1.00 0.00
I TOP PLATFORM PINS AND ROLLERS TO DISMANTLE FROM POSITION AND CHECKED FOR ANY WEAR DOWN PINS BETWEEN UPPER TWO PLATFORMS. PRESENTLY GANGWAY PLATFORM DOES NOT HAVE ANY SUPPORT WHEN SPREAD OUT. TO MAKE SUPPORTING ARRANGEMENT FOR GANGWAYS/ACCOMMODATION LADDER 4NOS. DECK INCLUSIVE EA USD 1.00 0.00
D26027.2 TO RENEW AXIS / SWINGING OUT PIPE OF GANGWAY DIA: 140 MM; LENGTH: 9700 MM TOTAL 04 DECK NOS 4.00 4.00 EA USD 1.00 0.00
D26027.3 BOTH GANGWAYS BOTTOM ROLLERS TO BE OPENED SAME TO BE FITTED BACK WITH NEW RUBBERIZED ROLLERS 2 NOS. DECK NOS 2.00 2.00 EA USD 1.00 0.00
D26027.4 TO OVERHAUL 20 NOS PULLEY BLOCKS IF REQUIRED RENEW AND PROVIDE TEST CERTIFICATE. CONSIDER RENEWAL OF 6 NOS PULLEYS. DECK NOS 20.00 20.00 EA USD 1.00 0.00
I CONSIDER FOLLOWING MATERIAL FOR RENEWAL (YARD SUPPLY) DECK INCLUSIVE EA USD 1.00 0.00
D26027.5 ALUMINUM BEAM (460 X 50 X 45 MM) THICKNESS 10MM DECK MTR 4.00 4.00 EA USD 1.00 0.00
D26027.6 ALUMINUM STEMS (CORUGATED) 60 X 30X 04 MM DECK NOS 4.00 4.00 EA USD 1.00 0.00
D26027.7 GANGWAY TOP PLATFORM/TURN TABLE TO BE DISMANTLED AND GRIT/HYDRO BLASTED ASHORE AND BOXED BACK WITH YARD SUPPLIED CONSUMABLES (NEW NUTS/BOLTS/PACKING). PAINT SHIP SUPPLY (TRANSPORTATION INCLUSIVE). DECK NOS 4.00 4.00 EA USD 1.00 0.00
D26027.8 GANGWAY SUSPENSION BEAM TO POWER TOOL AND COATED WITH 3 COATS OF OWNER SUPPLY PAINTS. DECK NOS 4.00 4.00 EA USD 1.00 0.00
D26027.9 ALL SHEAVES DIA. 150 MM WITH BRASS BUSH TO DISMANTLE; CHECK AND FITBACK IN PLACE. DECK NOS 30.00 30.00 EA USD 1.00 0.00
D26027.10 WIRE GUIDE ROLLER DIA.: 80 MM TO DISMANTLE AND FIT BACK. MATERIAL: 4MM TEFLON DECK NOS 8.00 8.00 EA USD 1.00 0.00
D26027.11 CONSIDER RENEWAL OF SHEAVE OF DIA. 150 MM (YARD SUPPLY) DECK NOS 4.00 4.00 EA USD 1.00 0.00
D26027.12 CONSIDER RENEWAL OF GUIDE ROLLER DIA. 80 MM (YARD SUPPLY) MATERIAL: 4MM TEFLON DECK NOS 6.00 6.00 EA USD 1.00 0.00
D26027.13 GANGWAY MOTOR FOUNDATION TO REMOVE TO CARRY OUT CLOSE UP CHECK UP ; IF NECESSARY FOUNDATION / SUPPORTING BRACKETS TO BE RENEWED AND ALL NUTS/BOLTS TO BE RENEWED; AS PER SHIP DWG. DECK NOS 4.00 4.00 EA USD 1.00 0.00
D26027.14 ALL FOUR AIR FILTERS TO RENEW WITH NECESSARY MODIFICATION YARD SUPPLY DECK PCS 4.00 4.00 EA USD 1.00 0.00
D26027.15 DETACHED WELD / CRACKS TO BUILD UP BY ALUMINUM WELDING. DECK MTR 10.00 10.00 EA USD 1.00 0.00
D26027.16 BEND ALUMINUM HANDRAILS TO STRAIGHNED UP DECK MTR 20.00 20.00 EA USD 1.00 0.00
D26027.17 TO RENEW LADDERS STANCHIONS (L 1.2 M; DIA 40MM) WITH EYES ON TOP AND SIDE (YARD SUPPLY) DECK NOS 20.00 20.00 EA USD 1.00 0.00
D26027.18 TO RENEW ALUMINUM HANDRAIL OF DIA 40 MM(YARD SUPPLY) DECK MTR 30.00 30.00 EA USD 1.00 0.00
D26027.19 GANGWAY WIRE SHEAVE HOUSING BRACKET FITTED IN GANGWAY BASE TO REMOVE; GRIT/HYDRO BLAST AND PAINTED AND FITTED WITH NEW YARD SUPPLY 4MM TEFLON PACKING; SS NUTS/BOLTS DECK SET 4.00 4.00 EA USD 1.00 0.00
D26027.20 SECURING CLEATS FOR GANGWAY TO RENEW (MATERIAL MS) WITH NEW SS NUTS/BOLTS AND TEFLCON PACKING.S/S 01 NOS ANGLE BAR OF SECURING COMBINATION TO BE STRAIGHTENED DECK NOS 10.00 10.00 EA USD 1.00 0.00
D26027.21 YARD TO QUOTE FOR THE FABRICATION AND FITMENT OF BOTTOM PLATFORM ROLLER (100 MM DIA; LENGTH 700 MM) WITH 10 MM RUBBER LINING (YARD SUPPLY) DECK NOS 2.00 2.00 EA USD 1.00 0.00
D26027.23 15 YRLY LOAD TESTING OF GANGWAYS/ACCOMMODATION LADDER AFTER ALL REPAIRS (IF ANY) TO BE DONE AND CERT TO ISSUE. JOB TO BE DONE WITH LOADS ON GANWAY AND OPERATED AFTER RIGGING NEW WIRE AND OVERHAULING OF ALL SHEAVES AND MOTORS. DECK NOS 4.00 4.00 EA USD 1.00 0.00
D26027.24 TO FABRICATE AND FIT NEW SWITCH BOX OF STBD GANGAWAY/PORT GANGWAY DECK NOS 2.00 2.00 EA USD 1.00 0.00
D26027.25 TOP PLATFORM PIN AND ROLLER OF ALL FOUR ACCOMMODATION LADDER TO BE DISMANTLED INSPECTED AND RENEWED IF REQUIRED. 4 NOS. YARD SUPPLY DECK NOS 4.00 4.00 EA USD 1.00 0.00
D26027.26 TO PROVIDE SAFETY/ PREVENTOR WIRE ARRANGEMENT FOR ALL ACCOMMODATION LADDERS. 4 NOS. DECK NOS 4.00 4.00 EA USD 1.00 0.00
D26027.27 WIRES OF TWO NOS GANGWAYS AND TWO NOS COMBINATION LADDERS TO BE RENEWED (WIRE SHIP SUPPLY). DECK NOS 4.00 4.00 EA USD 1.00 0.00
D26027.28 TO CARRY OUT MODIFICATION ON PILOT TRANSFER ARRANGEMENT AS PER SOLAS REGULATION 05/2023 AND IMO GUIDELINE 1045(27) AND ISO 799. DECK NOS 4.00 4.00 EA USD 1.00 0.00
I NOTE:- ON COMPLETION OF ALL THE REPAIR TRIALS ON BOTH THE GANGWAYS AND PILOT LADDER TO BE GIVEN FOR HOISTING AND LOWERING IN PRESENCE OF CLASS SURVEYORS SUPDT & SHIP’S STAFF. ALSO GANGWAYS TO BE LOAD TESTED AS PER INSTRUCTIONS FROM CLASS SUREVYORS. DECK INCLUSIVE EA USD 1.00 0.00
I D26028: CRANES: DECK EA USD 1.00 0.00
i DECK CRANES: TYPE /CAPACITY / DETAILS: MAC GREGOR (SWE), ELECTRO HYDRUALIC CRANES TYPE: GLB3628-2/282GR: CAPACITY 36 TONS REACH 28 MTRS. DECK EA USD 1.00 0.00
I YARD TO ARRANGE COMPETENT HYDRAULIC, MECHANICAL & AUTOMATION TEAM TO CARRY OUT INSPECTION AND SERVICING OF ALL DECK CRANE. UPON SATISFACTORY COMPLETION OF REPAIR, RUNNING TRIAL TO BE SHOWN TO SHIPSTAFF INCLUDING TESTING OF ALL THE CRANE IN LINE WITH MAKER GUIDELINES. DECK INSTRUCTION EA USD 1.00 0.00
D26028.1 HYDRAULIC TANK OIL OF ALL FOUR CRANES TO BE REMOVED FROM CRANE MAST. TANKS TO BE CLEANED UP TO STAISFACTION OF SHIP's STAFF AND ALL FILTERS FOR EACH TANK TO RENEW(SHIP SUPPLY) & SAME OIL IF FOUND OK TO BE PUT BACK IN TANKS.TANK LEVEL INDICATOR TO BE CLEANED. QUOTE TO BE INCLUSIVE OF ALL CONSUMABLES MATERIAL LABOUR TRANSPORTATION STAGGING IF ANY ETC DECK SET 4.00 4.00 EA USD 1.00 0.00
D26028.2 JIB OF ALL FOUR CRANES TO BE REMOVED FROM PLACE TAKEN ASHORE CAREFULLY AND TO BE KEPT AT SUITABLE PLACE FOR OVERHAULING/ REPAIR/ CLEANING /BLASTING/ PAINTING HAVING ADEQUATE FACILITY.AFTER THOROUGH REPAIR JIB TO INSTALLED BACK ON CRANE WITH NEW/OLD USUABLE WIRE ROPES .FITTED WIRE TO BE ADEQUATELY GREASED .WIRE ROPE OWNER SUPPLY. DECK NOS 4.00 4.00 EA USD 1.00 0.00
D26028.3 JIB FOOT BEARING ARRANGEENTS/ HOUSING/PINS (ON CRANE & ON JIBS) TO BE THRORUGHLY CHECKED TRUENESS TO BE CHECKED AND REPAIRED/RECONDITIOINED/RENEWED PRIOR TO PUTTING THE JIBS BACK IN PLACE. DECK NOS 8.00 8.00 EA USD 1.00 0.00
D26028.4 ALL FOUR JIBS THICKNESS TO BE GAUGED BUILD UP AND THIN DOWN PLATES TO BE RENEWED WITH SUITABLE GRADE OF PLATE. ALL WASTED SUPPORTS AND BRACKETS TO BE RENEWED. CONSIDER RENEWAL OF APPROX 0.75 MT STEEL ON EACH CRANE. DECK MT 3.00 3.00 EA USD 1.00 0.00
D26028.5 ALL JIB HEAD SHEAVES TO BE COMPLETELY STRIPPED OVERHAULED AND FITTED IN PLACE WITH NEW CONSUMABLES/LOG REINFORCEMENT KITS TO BE INSTALLED IN PRESENCE OF OEM'S ENGR.CONSUMABLE SHIP SUPPLY. DECK SET 4.00 4.00 EA USD 1.00 0.00
D26028.6 ALL SHEAVES/PULLEYS TO BE DISMANTLED OVERHAULED AND FITTED BACK WITH SHIP SUPPLIED BEARINGS. DECK SET 4.00 4.00 EA USD 1.00 0.00
D26028.7 GREASE LINES (COMPLETE)AND ALL GREASE NIPPLES TO BE RENEWED WITH YARD SUPPLIED PIPES AND NIPPLES. DECK SET 4.00 4.00 EA USD 1.00 0.00
D26028.8 CONSIDER RENEWAL OF YARD'S SUPPLIED 2 SHEAVE SHAFT & ACCESSORIES . QUOTE FOR SUPPLY OF GOOD QUALITY PULLY SHAFT( DIMENSION=) & ACCESSORIES. DECK NOS 2.00 2.00 EA USD 1.00 0.00
D26028.9 HYDRAULIC OIL COOLERS COMPLETE WITH MOTORS AND ACCESSORIES TO BE REMOVED FROM PLACE TO BE SHIFTED TO YARD TO BE THOROUGHLY CLEANED( ULTRASONIC/CHEMICAL CLEANING) TO BE PR TESTED AND FITTED BACK WITH YARD SUPPLIED CONSUMABLES. DECK NOS 4.00 4.00 EA USD 1.00 0.00
D26028.10 ALL HYDRAULIC HOSES OF CRANE NO.1 & 4 TO BE RENEWED WITH SHIP SUPPLIED HOSES DECK SET 2.00 2.00 EA USD 1.00 0.00
D26028.11 HOISTING WINCH GEAR BOX WITH BRAKE ASSEMBLY TO BE COMPLETELY OVERHAULED( GEAR BOX PUMP BRAKE ASSEMBLY ETC) WITH SHIP SUPPLIED SPARES. OTHER CONSUMABLES( GASKETS BOLTS NUTS CLAMPS ETC- YARD SUPLY). DECK SET 2.00 2.00 EA USD 1.00 0.00
D26028.12 LUFFING WINCH GEAR BOX WITH BRAKE ASSEMBLY TO BE COMPLETELY OVERHAULED( GEAR BOX PUMP BRAKE ASSEMBLY ETC) WITH SHIP SUPPLIED SPARES. OTHER CONSUMABLES( GASKETS BOLTS NUTS CLAMPS ETC- YARD SUPLY). DECK SET 2.00 2.00 EA USD 1.00 0.00
D26028.13 ALL FOUR CRANES LIMIT SWITCHES TO OVERHAUL WITH SHIP SUPPLIED SPARES AND SATISFACTORY TRIALS TO BE GIVEN IN PRESENCE OF SHIP STAFF/SUPTDS. DECK SET 4.00 4.00 EA USD 1.00 0.00
D26028.14 FLOATING BLOCK SHEAVES OF ALL CRANE TO BE GRIT/HYDRO BLASTED INSPECTED FOR THINNED DOWN SHEAVES BUILD UP IF REQUIRED OVERHAULED AND FITTED BACK BY RENEWING THE SHIP SUPPLIED BEARINGS. DECK SET 4.00 4.00 EA USD 1.00 0.00
D26028.15 JIB HEAD SHEAVES(7x4=28) TO BE GRIT/HYDROBLASTED INSPECTED BUILT UP AS REQUIRED OVERHAULED AND FITTED BACK WITH SHIP SUPPLIED BEARINGS. DECK SET 4.00 4.00 EA USD 1.00 0.00
D26028.16 RUBBER PACKING OF OPERATORS CABIN DOOR SIDE ACCESS DOOR TO BE RENEWED AS PER EXISTING SAMPLE OF ALL 4 CRANES YARD SUPPLY RUBBER PACKINGS ESTIMATION: 40MTRS DECK MTR 40.00 40.00 EA USD 1.00 0.00
D26028.17 TO RENEW DAMAGED OPERATORS CABIN DOOR LOCKING ARRANGEMENT IN ALL 4 CRANES. DECK NOS 4.00 4.00 EA USD 1.00 0.00
D26028.18 CRANE CABIN TOUGHENED GLASSES TO BE RENEWED ALONG WITH CLOSING LEVERS. DECK SET 4.00 4.00 EA USD 1.00 0.00
D26028.19 CRANE SAFETY CAGE TO BE RENEWED FOR ALL FOUR CRANES SEMI CIRCLE DIA-0.5 MTR BREADTH-50MM T-4MM LENGTH-1.8 MTR DECK MTR 50.00 50.00 EA USD 1.00 0.00
D26028.20 TO RENEW GREASE NIPPLES OF CRANES & JIBS. YARD SUPPLY DECK NOS 70.00 70.00 EA USD 1.00 0.00
D26028.21 CORRODED AND THINNED DOWN RAILINGS GIVEN ON ALL FOUR CRANE COLUMN INNER AND OUTER TO BE CROPPED AND RENEWED APPROX DIA 10 MM DECK MTR 50.00 50.00 EA USD 1.00 0.00
D26028.22 ONE PLATFORM TO BE WELDED WITH SUITABLE STIFFNERS NEAR JIB FOOT BEARING TO ACCESS BEARING FOR REPAIR/MAINTAINANCE( 1MTRX1MTR) DECK SET 4.00 4.00 EA USD 1.00 0.00
D26028.23 SUITABLE STAGING TO BE ERECTED ON ALL FOUR CRANES MAST CRANES TO BE THORUGHLY CLEANED FROM INSIDE AND OUTSIDE CRANE MAST TO BE DERUSTED FROM BOTH SIDES CLEANED/ CHEMICALLY CLEANED AND PAINTED. ALL GRAESING POINT TO BE THROLUGHLY CLEANED FLUSHED THROIUGH AND FRESH GREASED TO BE APPLIED. SPOT DERUSTING (APPROX. 40 SQ. MTR); CHEMICAL CLEANING (ABOUT 20 SQ MTR) AND HP FW WASH TO CARRY OUT. THE CRANE COLUMN AND ENTIRE BOOM TO BE PAINTED . TOTAL AREA 100 SQ MTR APPROX EACH CRANE PAINT SHIPS SUPPLY DECK SET 4.00 4.00 EA USD 1.00 0.00
D26028.24 ALL LUBRICATING POINTS TO MAKE FREE AND LUBRICATE USING YARD PUMP TO THE SATISFACTION OF SHIP'S STAFF/SUPERINTENDENT. GREASE OWNER'S SUPPLY. DECK SET 4.00 4.00 EA USD 1.00 0.00
D26028.25 ALL 4 NOS DECK CRANE OPERATION CONTROL SWITCHES IN BAD CONDITION SAME TO BE RENEWED. DECK PCS 4.00 4.00 EA USD 1.00 0.00
D26028.26 ALL DECK CRANE EMERGENCY STOP SWITCHES TO BE RENEWED.3 NOS IN EACH CRANE. DECK PCS 12.00 12.00 EA USD 1.00 0.00
D26028.27 ALL 4 CRANES BRAKE CONTROL HYDRAULIC V/VS TO OVERHAUL. DECK PCS 24.00 24.00 EA USD 1.00 0.00
D26028.28 ALL DECK CRANE ELECTRONIC CONTROL TO BE CHECKED FAULTS TO BE RECTIFIED.LIMIT SWITCH TO BE ADJUSTED.SPARE SHIP SUPPLIED DECK SET 4.00 4.00 EA USD 1.00 0.00
D26028.29 LUFFING AND HOISTING SHEAVES LOCATED ON TOP MAST TO BE DISMANTLED AND BEARING TO REPLACE FROM SHIP SUPPLY. DECK SET 4.00 4.00 EA USD 1.00 0.00
D26028.30 JIB HEAD LIGHTING ARRANGEMENT TO BE SUPPLIED AND FITTED WITH SHIPS VOLTAGE ( TWO ON EACH CRANE) DECK SET 4.00 4.00 EA USD 1.00 0.00
i PROVISION CRANES - ER OVERHEAD CRANE DAVITS : DONGNAM MARINE CRANE CO. LTD DECK EA USD 1.00 0.00
i YARD TO ARRANGE COMPETENT HYDRAULIC, MECHANICAL & AUTOMATION TEAM TO CARRY OUT INSPECTION AND SERVICING OF ALL DECK CRANE. UPON SATISFACTORY COMPLETION OF REPAIR, RUNNING TRIAL TO BE SHOWN TO SHIPSTAFF INCLUDING TESTING OF ALL THE CRANE IN LINE WITH MAKER GUIDELINES. DECK EA USD 1.00 0.00
D26028.32 EXISTING WIRES TO REMOVE AND OWNER SUPPLY NEW WIRES TO RIG IN PROVISISON CRANE AND E/R OVERHEAD CRANES. DECK NOS 2.00 2.00 EA USD 1.00 0.00
D26028.33 ENGINE ROOM OVERHEAD CRANE AND PROVISION CRANE HOISTING BRAKE ASSEMBLY TO OVERHAULED, BRAKE LINING BUSHES & BEARING CONDITIONS TO BE EXAMINED.IF REQUIRED BRAKE LINING (YARD SUPPLY) TO BE RENEWED.FLOATING BLOCK TO BE O'HAULED.BEARINGS(YARD SUPPLY) TO BE RENEWED.DAMAGED CONTROL CABLES TO CUT AND CONNECTED TO PENDANT.SUCCESFUL TRIAL OF CRANE TO BE SHOWN TO CEO. DECK SET 2.00 2.00 EA USD 1.00 0.00
D26028.34 OVER HEAD CRANE'S GEAR BOXES(2 NOS.) FOR PORT-STBD AND FWD-AFT MOVEMENT TO TAKE OUT FROM PLACE DISMANTLE AND PARTS TO CHECK RENEW IF NECESSARY AND TO FIT BACK WITH NEW SHAFT SEALS.FRESH GEAR OIL TO TAKE IN THE GEAR BOXES SAME TO FIT BACK IN PLACE. DECK PCS 1.00 1.00 EA USD 1.00 0.00
D26028.35 TO FIT EMEREGENCY STOP SWITCHES AND MAKE OPERATIONAL(YARD SUPPLY). DECK LS 1.00 1.00 EA USD 1.00 0.00
D26028.36 SUEZ CANAL LIGHT(SINGLE ARM DAVIT) DAVIT ALL FITTINGS CEASED AND DAVIT INOPERATIONAL.DAVIT TO CROP AND RENEW.CAPACITY:01 TON. DECK LS 1.00 1.00 EA USD 1.00 0.00
D26028.37 BUNKER DAVIT(SINGLE ARM DAVIT) P&S TO BE COMPLETELY DISMANTLED, ALL FITTING TO BE OVERHAULED AND FITTED BACK IN PLACE. REPAIR MATERIAL (BEARINGS & CONSUMABLES) YARD SUPPLY. DECK NOS 2.00 2.00 EA USD 1.00 0.00
I PERIODICAL LOAD TEST OF FOLLOWING LIFTING GEAR TO BE CARRIED OUT INLINE WITH REQUIREMENTS /MAKER'S GUIDE LINES/STANDARD PROCEDURE AND REGISTER OF MACHINERY AND CHAINS TO BE ENDORSED BY COMPETENT AUTHORITY/ DNV/IRS SURVEYOR DECK INSTRUCTION EA USD 1.00 0.00
D26028.38 CARGO HANDLING CRANES - SWL 36 T DECK LS 4.00 4.00 EA USD 1.00 0.00
D26028.39 PROVISION CRANES - SWL 3.0 T DECK LS 1.00 1.00 EA USD 1.00 0.00
D26028.40 E/R OVERHEAD CRANE; SWL 3 T; DECK LS 1.00 1.00 EA USD 1.00 0.00
D26028.41 SUEZ SEARCH LIGHT DAVIT; SWL 0.5 T; HEAD SHEAVE TO OVER HAUL. LOAD TEST TO DO AFTER COMPLETION OF ALL REPAIRS. ALL ITEMS YARD SUPPLY DECK LS 1.00 1.00 EA USD 1.00 0.00
D26028.42 BUNKER HOSE LIFTING DAVIT,SWL0.99 T DECK SET 2.00 2.00 EA USD 1.00 0.00
D26028.43 LOOSE GEARS TO LOAD TEST AND CERTIFICATE TO ISSUE. DECK SET 2.00 2.00 EA USD 1.00 0.00
D26028.44 CHAIN BLOCK (1T; 2T; 3T; 5T) DECK NOS 12.00 12.00 EA USD 1.00 0.00
D26028.45 EYE BOLTS DECK NOS. 10.00 10.00 EA USD 1.00 0.00
D26028.46 WIRE SLING (1T; 2T; 3T ETC) DECK NOS. 18.00 18.00 EA USD 1.00 0.00
D26028.47 CHAIN SLING (ASSORTED SWL) DECK NOS. 10.00 10.00 EA USD 1.00 0.00
I D26029:MAGNETIC COMPASS: MAKE-KEIKI MODEL-5549 DECK EA USD 1.00 0.00
I WORK SPECIFICATIONS: DECK EA USD 1.00 0.00
D26029.1 MAGNETIC COMPASS ADJUSTMENT TO CARRY OUT AFTER COMPLETION OF ALL REPAIRS AND CERTIFICATE TO ISSUE DURING SEA TRIAL. DECK LS 1.00 1.00 EA USD 1.00 0.00
I D26030: DOPPLER SPEED LOG MAKE CONSILIUM-SAL SD4-3 DECK EA USD 1.00 0.00
I WORK SPECIFICATIONS: DECK EA USD 1.00 0.00
D26030.1 TO CHECK TRANSDUCER IN DRY DOCK. REMOVE IF NECESSARY; CLEAN AND EXAMINE TRANSDUCER /TANK. TO CHECK FOR WATER TIGHTNES & PAINT; IF REQUIRED CHANGE GASKET OF MANHOLE. THE ZINC RING SHOULD BE CHECKED AND CHANGED IF CORRODED BADLY. VALVE TO OVERHAUL. RENEW TRANDUCER IF NECESSARY,TRANSDUCER SHIP SUPPLY. DECK SET 1.00 1.00 EA USD 1.00 0.00
D26030.2 REPEATERS IN ENGINE ROOM; BRIDGE NAVIGATION CONSOLE TO BE COMPARED AND SYNCHORONIZED. DECK SET 2.00 2.00 EA USD 1.00 0.00
I YARD TO ARRANGE COMPETENT TEAM TO CARRY OUT REPAIR/ RENEWAL JOB.AFTER COMPLETION OF CHECKS/REPAIR/RENEWAL/COMMISIONING, SATISFACTORY TRIALS/SIMULATION TRIALS TO BE SHOWN. QUOTE ALL INCLUSIVE. DECK INCLUSIVE EA USD 1.00 0.00
I D26031: ECHO SOUNDER MAKE SKIPPER MODEL-GDS 101 DECK EA USD 1.00 0.00
I WORK SPECIFICATIONS: DECK EA USD 1.00 0.00
D26031.1 TO CHECK TRANSDUCER IN DRY DOCK. REMOVE, CLEAN THE CHAMBER AND REPLACE THE DEFECTIVE TRANSDUCER. REQUIRED CHANGE GASKET OF MANHOLE. THE ZINC RING SHOULD BE CHECKED AND CHANGED. DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26031.2 PRINTER TO BE FITTED .PRINTER YARD SUPPLY APS. DECK NOS 1.00 1.00 EA USD 1.00 0.00
I YARD TO ARRANGE COMPETENT TEAM TO CARRY OUT REPAIR/ RENEWAL JOB.AFTER COMPLETION OF CHECKS/REPAIR/RENEWAL/COMMISIONING, SATISFACTORY TRIALS/SIMULATION TRIALS TO BE SHOWN. QUOTE ALL INCLUSIVE. DECK INCLUSIVE EA USD 1.00 0.00
I D26032: DRAFT GAUGE AND WATER BALLAST TANKS LEVEL GAUGING SYSTEM: MAKE- AKSHTRONICA WAGO, MODEL-PAN INDIA 3000 DECK EA USD 1.00 0.00
I BALLAST TANKS GAUGING SYSTEM DECK EA USD 1.00 0.00
D26032.1 INSPECT ALL LEVEL SENSORS/TRANSMITTERS FITTED IN BALLAST TANKS. CHECK SENSOR MOUNTING, PROTECTION PIPES, FLANGES, AND BRACKETS. INSPECT SIGNAL AND POWER CABLES FOR DAMAGE, CORROSION, OR INSULATION BREAKDOWN. INSPECT JUNCTION BOXES FOR WATER INGRESS AND CORROSION. VERIFY CONDITION AND OPERATION OF LOCAL AND REMOTE DISPLAY UNITS. DECK SET 12.00 12.00 EA USD 1.00 0.00
D26032.2 CLEAN SENSORS AND PROTECTION PIPES OF SCALE, MUD, AND MARINE GROWTH.RENEW DEFECTIVE OR INACCURATE LEVEL SENSORS/TRANSMITTERS AS REQUIRED. REPLACE DAMAGED CABLES, GLANDS, CONNECTORS, OR TERMINAL BLOCKS. RENEW GASKETS, SEALS, AND O-RINGS TO ENSURE WATERTIGHT INTEGRITY.SECURE AND RE-ALIGN SENSORS AS PER NORDIC FLOW INSTALLATION GUIDELINES. DECK SET 12.00 12.00 EA USD 1.00 0.00
D26032.3 CALIBRATE EACH BALLAST TANK LEVEL SENSOR IN ACCORDANCE WITH APPROVED PROCEDURES.VERIFY ZERO, SPAN, AND ALARM SET POINTS.TEST HIGH-LEVEL AND OVERFLOW ALARMS WHERE FITTED.CROSS-CHECK READINGS AGAINST MANUAL SOUNDING OR ULLAGE MEASUREMENTS.DEMONSTRATE ACCURATE AND STABLE READINGS ON ALL DISPLAYS. DECK SET 12.00 12.00 EA USD 1.00 0.00
I DRAFT GAUGING SYSTEM DECK EA USD 1.00 0.00
D26032.4 INSPECT FORWARD, MIDSHIP, AND AFT DRAFT SENSORS/TRANSDUCERS (AS FITTED).CHECK SENSOR HOUSINGS, ISOLATION VALVES, PROTECTIVE PIPING, AND MOUNTING ARRANGEMENTS.INSPECT CABLING, JUNCTION BOXES, AND DECK PENETRATIONS.VERIFY OPERATION OF BRIDGE AND REPEATER DISPLAY UNITS. CLEAN DRAFT SENSORS AND PROTECTION PIPES.RENEW DAMAGED OR MALFUNCTIONING DRAFT SENSORS/TRANSDUCERS. REPAIR OR REPLACE DEFECTIVE CABLING, GLANDS, AND CONNECTORS.ENSURE WATERTIGHT SEALING OF ALL HULL PENETRATIONS.SECURE SENSORS IN CORRECT POSITION AND ORIENTATION. CALIBRATE DRAFT GAUGE SYSTEM AFLOAT OR ALONGSIDE AS PER MANUFACTURER’S PROCEDURE.COMPARE ELECTRONIC READINGS WITH PHYSICAL DRAFT MARKS. ALL CONSUMABELS YARD SUPPLY. ADJUST SYSTEM TO ACHIEVE CORRECT FORWARD, AFT, AND MEAN DRAFT VALUES CARRY OUT OPERATIONAL TEST OVER FULL MEASURING RANGE.DEMONSTRATE SYSTEM ACCURACY TO OWNER/CLASS. DECK SETS 4.00 4.00 EA USD 1.00 0.00
I NAV (MISC) DECK EA USD 1.00 0.00
D26033.6 WHISTLE TIME CONTROLLER (AUTO MODE) IS NOT WORKING. FAULT TO BE RECTIFIED. DECK SET 1.00 1.00 EA USD 1.00 0.00
D26033.7 BAROMETER CALIBARATION TO BE CARRIED OUT. DECK SET 1.00 1.00 EA USD 1.00 0.00
D26033.8 FWD AND AFT HORN TO BE REMOVED FROM PLACE , DISMANTLED AND COMPLETELY OVERHAULED. PACKING,NEW PACKING, NUTBOLTS & CONSUMABLES YARD SUPPLY. DECK SET 2.00 2.00 EA USD 1.00 0.00
D26033.9 AFT AIR HORN MANUALLY OPERATE WIRE,SOLENOID VALVE AND PIPE NEED TO BE RENEWED . 10MM PIPE/5 MTR. DECK SET 1.00 1.00 EA USD 1.00 0.00
D26033.10 SIDE LIGHTS BASE PLATE AND LIGHT STRUCTURAL PLATE TO BE RENEWED. DECK NO.S 2.00 2.00 EA USD 1.00 0.00
D26033.11 MAIN MAST BASE PLATE, DECK PLATE THINNED DOWN. SAME TO CROP AND RENEW., LXBXT 3M X 3M X 10MM, MATERIAL GRADE A IE MILD STEEL DECK NO.S 1.00 1.00 EA USD 1.00 0.00
D26033.12 MAIN MAST LADDER SIDE GUARD RAILING TO BE RENEWED 15 MTR LENGTH. DECK NO.S 1.00 1.00 EA USD 1.00 0.00
D26033.14 FWD MAIN MAST LIGHT TO BE RENEWED. DECK SET 1.00 1.00 EA USD 1.00 0.00
I D26034: PIPELINE RENEWAL ON DECK CARGO HOLDS BILGE LINE BALLAST TANKS PIPE LINE DECK EA USD 1.00 0.00
I TO QUOTE FOR RENEWAL OF PIPELINES ON DECK/ BALLAST TKS AND DUCT KEEL AS FOLLOWS: COST TO BE QUOTED FOR UNIT LENGTH FOR EACH ) MEASURMENT SHALL BE ON AS PER ACTUALS. PIPELINES TO BE FITTED WITH NEW JOINTS/NUTS/BOLTS AND U-CLAMPS (YARD SUPPLY) DECK INSTRUCTION EA USD 1.00 0.00
D26034.1 CO2 LINE ON DECK : OD 28 MM/ SCH 80 SEAMLESS PIPE : 200 MTRS DECK MTR 200.00 200.00 EA USD 1.00 0.00
D26034.2 FE LINE ON DECK OD-40MM/LENGTH-80MTR -SCH80 DECK MTR 80.00 80.00 EA USD 1.00 0.00
D26034.3 AIR LINE ON DECK TO RENEW BY YARD SUPPLIED MATERIAL : OD : 23 MM LENGTH: 80 MTRS SCH 40 , YARD SUPPLY DECK MTR 80.00 80.00 EA USD 1.00 0.00
D26034.4 FIRE LINE ON DECK TO BE RENEW YARD SUPPLIED MATERIAL: OD :- 76 MM DECK MTR 20.00 20.00 EA USD 1.00 0.00
D26034.5 FIRE LINE ON MAIN DECK -OD 100MM -SCH 80-50MTR DECK MTR 50.00 50.00 EA USD 1.00 0.00
I RENEWAL OF VARIOUS FOLLOWING MS SUPPORTS ON DECK (YARD SUPPLY). DECK INSTRUCTION EA USD 1.00 0.00
D26034.6 CONDUIT LINE SUPPORTS-74MM,75MM,50MM DECK MTRS 50.00 50.00 EA USD 1.00 0.00
D26034.7 CROSS DECK SUPPORT HAND RAIL-44MM DECK MTRS 50.00 50.00 EA USD 1.00 0.00
D26034.8 CROSS DECK STAIRWAY SUPPORT- 66MM THICKNESS- 18MM DECK MTR 50.00 50.00 EA USD 1.00 0.00
D26034.9 CROSS DECK BELOW HAND RAIL SOLID ROD- 21MM DECK MTR 50.00 50.00 EA USD 1.00 0.00
D26034.10 HATCH INSPECTION SUPPORT/ PLATFORM AREA -830X520MMX10 NOS DECK NOS 10.00 10.00 EA USD 1.00 0.00
D26034.11 HATCH INSPECTION ANGLE BAR-75MMX75MM DECK NOS 10.00 10.00 EA USD 1.00 0.00
i D26035: PRESSURE TEST OF PIPE LINE DECK EA USD 1.00 0.00
I FOLLOWING PIPE LINES TO PRESSURE TEST (HYDROTEST) AFTER COMPLETION OF REPAIRS. QUOTEALL INCLUSIVE. ALL ASSOCIATED JOB VIZ; BLANKING FILLING/DRAINING/ FW REMOVAL/REFIT OF ANY DISTANCE PIECE TO BE CONSIDERED WHILE CARRYING OUT BELOW JOB AND YARD TO QUOTE ACCORDINGLY. DECK INSTRUCTION EA USD 1.00 0.00
D26035.1 BALLAST LINES DECK SET 1.00 1.00 EA USD 1.00 0.00
D26035.2 FIRE LINE DECK SET 1.00 1.00 EA USD 1.00 0.00
D26035.3 DO LINE DECK SET 1.00 1.00 EA USD 1.00 0.00
D26035.4 HO LINE DECK SET 1.00 1.00 EA USD 1.00 0.00
D26035.5 ER BILGE LINE DECK SET 1.00 1.00 EA USD 1.00 0.00
D26035.6 CARGO HOLD BILGE EDUCTION LINE DECK SET 2.00 2.00 EA USD 1.00 0.00
I D26036: MISCLLENEOUS STEEL WORK DECK EA USD 1.00 0.00
D26036.1 SOUNDING PIPE OF WBT TANKS TO BE RENEWDED ALONG WITH SOUNDING CAPS. CAPS TO BE SECURED WITH SECURING CHAIN.(DIA 78 MM SCH80) LENGTH 20 MTRS EACH .FPK(21 MTRS), AFT PK(10 MTRS) .,NO3 STBD SOUNDING PIPE COMPLTELY RENEWED DECK NOS 10.00 10.00 EA USD 1.00 0.00
D26036.2 STRIKER PLATES BELOW SOUNDING PIPES OF ALL BALLAST TANKS TO BE CHECKED FOR WEAR- DOWN AND IF REQUIRED TO BE RENEWED. STRIKER BELOW BELMOUTH OF ALL WBTS (THICKNESS 10 MM) TO BE RENEWED DECK NOS 10.00 10.00 EA USD 1.00 0.00
D26036.3 SOUNDING PIPE OF BILGES 10 NOS TO BE RENEWDED ALONG WITH SOUNDING CAPS. CAPS TO BE SECURED WITH SECURING CHAIN.(DIA 78MM SCH80) LENGTH 20 MTRS EACH IF REQUIRES AFTER INSPECTION DECK Nos 10.00 10.00 EA USD 1.00 0.00
D26036.4 STRIKER PLATES OF ALL CARGO HOLD BILGE SOUNDING PIPES TO BE CHECKED FOR WEAR DOWN/ABSENCE AND IF REQUIRED TO BE RENEWED. DECK Nos 10.00 10.00 EA USD 1.00 0.00
D26036.5 TEMPERATURE PIPE IN CARGO HOLDS TO BE RENEWED ALONG WITH CAPS .CAPS TO BE SECURED WITH SECURING CHAIN.(DIA 78MM SCH80) LENGTH 12 MTRS EACH IF REQUIRES DECK Nos 5.00 5.00 EA USD 1.00 0.00
D26036.6 STRIKER PLATES OF CHAIN LOCKERS SOUNDING PIPES TO BE CHECKED FOR WEAR DOWN/ABSENCE AND IF REQUIRED TO BE RENEWED. DECK Nos 2.00 2.00 EA USD 1.00 0.00
D26036.7 MISSING/ BROKEN HANDLES OF MANHOLE COVERS TO BE RENEWED IN VARIOUS HOLDS-20 NOS. DECK NOS 20.00 20.00 EA USD 1.00 0.00
D26036.8 SIDE PROTECTION CHAIN IN WAY OF RAILINGS,AT A DECK PORT AND STBD,NEAR GANGWAY PORT AND STBD,FWD NEAR EMBARKATION LADDER PORT AND STBDDIA 10 MM TO FABRICATE AND FIT DECK MTR 50.00 50.00 EA USD 1.00 0.00
D26036.9 LIGHT STANDS INCLUDING EMG LIGHT ON MAIN DECK FOR, PILOT LADDER, GANGWAY, FWD LIFE RAFT TO BE CROPPED AND RENEWED DECK NOS 4.00 4.00 EA USD 1.00 0.00
D26036.10 HATCH CONTROLER STANDING PLATFORMS SIZE (600MM X 500MM )+ ( 600MMX220MM) TO BE RENEWED DECK NOS 5.00 5.00 EA USD 1.00 0.00
D26036.11 LIFE BOAT BOARDING CHEQURED PLATE & SUPPORTING BRACKET TO BE RENEWED 2.5 MTR X 2.5 MTR DECK M2 7.50 7.50 EA USD 1.00 0.00
D26036.12 HATCH DRAIN PIPES TO BE RENEWED SIZE (50 CM ) DIA 42MMMM DECK NOS 8.00 8.00 EA USD 1.00 0.00
D26036.13 WARNING PLATE FOR "BEWARE OF PROPPLER" WITH SUPPORT 'P' AND 'S' TO BE MADE ( SIZE 1.2 M X 0.8 M) DECK NOS 2.00 2.00 EA USD 1.00 0.00
D26036.14 ALL BOOBY HATCHES LOCKING HANDLE & CLEATS TO BE FABRICATED AND FITTED DECK NOS 50.00 50.00 EA USD 1.00 0.00
D26036.15 SAVE OIL TRAYS DRAIN AND DRAIN PLUGS TO BE RENEWED UPPER DECK PORT AND STBD SIDE BOTH DECK NOS 20.00 20.00 EA USD 1.00 0.00
D26036.16 STOPPER PINS OF HOLD ENTRANCE BOOBY HATCHES TO BE FITTED WHERE MISSING AND SECURED WITH SECURING CHAIN. DECK NOS 10.00 10.00 EA USD 1.00 0.00
D26036.17 HATCH COVER STOPPER PINS TO BE OPENED OVERHAULED AND FITTED BACK DECK NOS 20.00 20.00 EA USD 1.00 0.00
D26036.18 QUOTE FOR PROVIDING BOTH ANCHOR EXTRA LASHING . DECK NOS 2.00 2.00 EA USD 1.00 0.00
D26036.19 LIFE BOAT OPERATING LEVER BOX FOR LIFE BOAT TO BE RENEWED ( SIZE 40 CM X 40 CM X 45 CM ) DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26036.20 STANCHIONS WITH TWO SPIRAL EYES FOR LIFE LINE TO FABRICATE AND FIT ON MAIN DECK PORT AND STBD.(CONSUMABLES YARD SUPPLY) DECK NOS 24.00 24.00 EA USD 1.00 0.00
D26036.21 FRESH WATER SOUNDING PIPE ON DECK TO BE RENEWED ALONG WITH SOUNDING CAPS. CAPS TO BE SECURED WITH SECURING CHAIN.(DIA 65A SCH80) LENGTH 10 MTRS EACH AND PAD LOCKING DECK SET 2.00 2.00 EA USD 1.00 0.00
D26036.22 GREASING PLATFORMS OF LIFE BOATS TO BE RENEWED ( SIZE 1.5 MTR X 1 MTR ) DECK NO 1.00 1.00 EA USD 1.00 0.00
D26036.23 SKY LIGHT OF ENGINE ROOM TO BE OPENED THINNED AREA IF REQUIRED , TO BE FABRICATED AND BUILD UP( SIZE 2MTRS X 1.5 MTRS) 46 NOS NUT BOLTS TO BE CHANGED.(SS NUT BOLTS, PACKING YARD SUPPLY) DECK NO 1.00 1.00 EA USD 1.00 0.00
D26036.24 BASE STAND FOR ANTENNA ON MONKEY ISLAND TO BE RENEWED DECK NOS 10.00 10.00 EA USD 1.00 0.00
D26036.25 FWD AND AFT MOORING WINCH HYDRAULIC PIPELINES( PR LINE & RETURN LINE)TO BE RENEWED WITH SCH 120, SEAMLESS PIPE, DIA50MM DECK MTRS 30.00 30.00 EA USD 1.00 0.00
D26036.26 REBEWAL OF SCUPPER LINE IN GALLEY, DIA 60MM DECK MTRS 50.00 50.00 EA USD 1.00 0.00
D26036.27 BALLAST FILING PIPES CONNECTING LOWER HOPPER TO UPPER HOPPER IN HOLD TO RENEW, DIA 250 MM SCH40 DECK MTRS 50.00 50.00 EA USD 1.00 0.00
D26036.28 FRESH WATER PIPES IN OFFICER MESS ROOM TO RENEW, DIA 25MM. DECK MTRS 30.00 30.00 EA USD 1.00 0.00
i D26037: MISCELLENEOUS DECK REPAIRS: DECK EA USD 1.00 0.00
I DAMAGED ,CORRODED OR DEFORMED CONDUIT SECTION TO BE REMOVED.NEW CONDUIT PIPES OF APPROVED MATERIAL,SIZE AND SPECIFICATION (YARD SUPPLY) TO BE FABRICATED AND FITTED.BENDS,JUNCTION BOX,GLANDS,SUPPORTS TO BE RENEWED.AFTER COMPLETION OF JOB , ELECTRICAL WIRES TO BE PULL AND FITTED IN PLACE.DEFCETIVE PORTION OF FIRELINE TO CROP AND RENEW FROM FLANGE TO FLANGE. DECK INSTRUCTION EA USD 1.00 0.00
D26037.1 FIRE LINE DRAIN VALVE TO BE OVERHAULED.(16K 25) DECK NOS 3.00 3.00 EA USD 1.00 0.00
D26037.2 FIRE LINE FOC’SLE & BRIDGE WING PRESSURE GAUGES TO BE FITTED WITH NEW BALL VALVE. SIZE- 3/8”.PRESSURE GAUGE, V/V & CONSUMABLES YARD SUPPLY. DECK NO 3.00 3.00 EA USD 1.00 0.00
D26037.3 PIPE SUPPORTING BRACKET AND CLAMPS TO BE CHANGED WITH YARD SUPPLY AS PER BELOW DETAILS i)CONDUIT -75 ii)FIRE LINE-40 III)CO2 LINE- 25 DECK NOS 140.00 140.00 EA USD 1.00 0.00
D26037.4 THE CONDUIT PIPES ON DECK DIA- 70MM (APPX. 150 M) HAVING ELECTRICAL CABLES NEEDS TO BE CROPPED AND RENEWED WITH NEW FLANGES WITHOUT DISTURBING EXISTING CABLES USING S.S. BOLTS, NEW GI “U” CLAMPS WITH S.S. NUTS AND TO BE MOUNTED ON EXISTING BRACKET SUPPORTS USING SUITABLE NEOPRENE PACKINGS THE NEW PIPES NEED TO BE SCHEDULE 40, TO BE SHOP PRIMERED PRIOR FITMENT ENABLE GIVE 2 FINAL COATS MODIFIED EPOXY ALL PAINTS OWNERS TO SUPPLY EXCEPT SHOP PRIMER. THE NEW LINES NEED TO HAVE EARTHING CONDUCTORS IN WAY OF ALL THE FLANGES AND IN WAY OF THE JUNCTION BOXES. MATERIALS AND CONSUMABLES YARD SUPPLY. FITTING SHOULD BE WATER PROOF. DECK MTR 150.00 150.00 EA USD 1.00 0.00
D26037.5 EIGHT NOS JUNCTION BOXES SIZE APPROX 1200MM X 1600MM X 900MM NEED TO BE CROPPED AND RENEWED USING 8 MM MS PLATES AND NEED TO BE FITTED WITH ONE NUMBER EACH DRAIN PLUG WITH GI CHAIN OF SUITABLE LENGTH . ALL THE BOXES NEED TO BE HAVING TOP LIDS WITH SS BOLTS / NUTS AND GASKETS. ALL THE BOXES NEED TO BE COATED INTERNALLY AND EXTERNALLY WITH MODIFIED EPOXY PAINT. FITTING SHOULD BE WATER PROOF. MATERIALS AND CONSUMABLES YARD SUPPLY. DECK NOS 8.00 8.00 EA USD 1.00 0.00
D26037.6 CONDUIT LINE EXPANSION JOINTS BOLTS TO BE RENEWED ( SIZE: LENGTH-190MM, DIA-20MM, & LENGTH -155M, DIA- 12MM) DECK NOS 500.00 500.00 EA USD 1.00 0.00
i D26038: MISCELLENOUS DECK REPAIRS: MANHOLE COVERS AND BOOBY HATCH OPENING / CLOSING WORK SPECS DECK EA USD 1.00 0.00
I MANUAL COVERS AND BOOBY HATCH COVERS TO BE OPENED UP FOR INSPECTION. COVER COAMING AND SEATING FACE STUDS , HINGES TO BE THOROUGHLY CLEANED AND OVERHAULED. NEW GASKET NUT BOLTS TO BE RENEW( BOLTS NUTS & CONSUMABLES YARD SUPPLY). DECK INSTRUCTION EA USD 1.00 0.00
D26038.1 TO OPEN 40 NOS. D.B/TST/FW/FPK/APK TANK MANHOLE COVERS AND TO BOX THEM BACK AFTER RENEWING PACKING AND FITTING NEW SS. NUTS/ BOLTS. RENEWAL OF 400 NUT/BOLT WITH SS NUT/ BOLTS OF SIZE 30 MM DIA X 65 MM. ENSURE - WATER TIGHTNESS OF ALL MANHOLE COVERS AFTER ABOVE JOB 40 IN NOS. PACKING , NUT, BOLTS YARD SUPPLY DECK NOS 40.00 40.00 EA USD 1.00 0.00
D26038.2 VOID SPACES, MANHOLES 10 NOS. TO OPEN, MAN ENTRY TO BE MADE AND DRAIN COCKS/ VALVES OF VOID SPACES TO BILGES TO BE CLEARED, TRY OUT AND BOX BACK THE MANHOLE COVERS USING NEW PACKING. ALL VOID SPACES TO BE CLEANED AND DRIED, RUSTED AREA TO BE SCRAPPED /CHIPPED AND APPLY PRIMER AND FINISH COAT OF EPOXY PAINT. (OWNER’S SUPPLY) CONSIDER - 10M2 AREA IN EACH VOID SPACE TO BE PAINTED. PACKINGS AND NUT/BOLTS YARD SUPPLY. QUOTE TO BE INCLUSIVE OF ALL ACTIVITIES, SUPPLY MATERIAL, STAGGING ETC DECK NOS 10.00 10.00 EA USD 1.00 0.00
D26038.3 10 NOS HATCH INSPECTION GRAIN LOADING MANHOLE COVERS TO BE OPENED NUT BOLTS TO BE RENEWED (500 NUT BOLTS) (SS) ,MANHOLE COVERS TO BE CHIPPED AND PAINTED PACKINGS TO RENEW ( PACKING, NUT BOLTS & CONSUMABLES- YARD SUPPLY, PAINT-SHIP SUPPLY). DECK NOS 10.00 10.00 EA USD 1.00 0.00
D26038.4 ALL BOOBY HATCH COVER TO BE SCRAPPED /CHIPPED AND APPLY PRIMER AND FINISH COAT OF EPOXY PAINT. (PAINT OWNER’S SUPPLY) 15 NOS. (QUOTE FOR EACH) . LOCKING ARRANGEMENT TO BE MADE FOR ALL BOOBY HATCHES BY YARD SUPPLIED MATERIAL & CONSUMABLES). DECK NOS 15.00 15.00 EA USD 1.00 0.00
D26038.5 BOOBY HATCH COVER SPRING ARRANGEMENT TO BE OVERHAULED AND MADE OPERATIONAL. NO 1 HATCH FWD,NO2 HATCH FWD AND STRG GEAR RM. DECK NOS 3.00 3.00 EA USD 1.00 0.00
D26038.6 DAMAGE AND MISSING BILGE COVER BASE BOLTS TO BE RENEWED YARD SUPPLY DECK NOS 30.00 30.00 EA USD 1.00 0.00
D26038.7 BUTTERFLY NUTS (SS) TO BE FITTED IN BOOBY HATCHES WHERE MISSING. (APPROX. 20 NOS) DECK NOS 20.00 20.00 EA USD 1.00 0.00
D26038.8 QUOTE FOR RENEWAL OF NUT & STUDS - STAINLESS STEEL, FOR DB TANKS, TST TANKS AND VOID SPACE MANHOLE COVERS - 200 NOS. SIZE 30MM DECK NOS 200.00 200.00 EA USD 1.00 0.00
D26038.9 MANHOLE COVER OF NO 3 HEAVY WEATHER BALLAST TO BE RENEWED. CONSIDER RENEWAL OF 2 NOS COVER. SIZE-DIA APPROX- 0.5MTR. DECK NOS 2.00 2.00 EA USD 1.00 0.00
D26038.10 WARNING NOTICES ON SS PLATES ARE WASTED IN CARGO HOLDS BOOBY HATCHES. SAME TO BE REPLACED WITH NEW ONES ( SIZE 300MM X 200 MM) DECK NOS 10.00 10.00 EA USD 1.00 0.00
D26038.11 MANHOLES IN THE LANDING AREA (HOLD INSPECTION UPPER PLATE FORM) OF UPPER STOOLS CORRODED AND THINNED DOWN AT VARIOUS HOLDS SAME TO BE CROPPED AND RENEWED.( 760 MM X 760MM ) THICKNESS : - 12 MM TOTAL 30 NOS DECK NOS 30.00 30.00 EA USD 1.00 0.00
D26038.12 MANHOLE COVER OF NO 3 HEAVY WEATHER BALLAST TO BE RENEWED(0.5X0.5 MTRS) DECK NOS 3.00 3.00 EA USD 1.00 0.00
i D26039: MISCELLENOUS DECK REPAIRS -VENTILATORS/ AIR VENT HEAD FOR BALLAST TANKS, STOOL SPACES ,VOID SPACES AND FRESH WATER TANKS ,FO TANKS DECK EA USD 1.00 0.00
I ALL ALL MUSHROOMVENTILATORS TO BE OPENED UP AND TRANSPORTDE TO YARD FOR OVERHAULING. COVERS,COMINGS AND SEATING FACE ,STUDS,NUTS,WIRE MESS TO THOROUGHLY CLEAN AND OVERHAUL. NEW GASKETS,NUTS,BOLTS/CONSUMABLES( YARD SUPPLY). DECK INSTRUCTION EA USD 1.00 0.00
D26039.1 ALL MUSHROOM VENTILATORS FOR STEERING GEAR ROOM CO2 ROOM PAINT STORES GALLEY MUSHROOM VENT AND MUSHROOM VENT TO BE REMOVED FROM PLACE TAKEN TO SHIPYARD FOR GRIT/HYDRO BLASTING, PAINTING AND RENEWAL IF ANY AND BRING BACK ON BOARD RENEW NUTS BOLTS, REPLACE RUBBER PACKING AND WIRE MESH/NET AND FITTED BACK . QUOTE ALL INCLUSIVE INCLUDING ALL CONSUMABLES AND TRANSPORTATION . DECK NOS 8.00 8.00 EA USD 1.00 0.00
D26039.2 STORE VENTS (WALL TYPE) SIZE 350MM X 350MM, LOUVER,RUBBER RETAINING CHANNEL AND RUBBER PACKING TO BE RENEWED,BUTTERFLY NUTS TO BE RENEWED. MATERIAL YARD SUPPLY. . DECK NOS 20.00 20.00 EA USD 1.00 0.00
D26039.3 HOLD VENTILATORS WALL TYPE 40 NOS. SIZE- 710 MM X 520 MM TO BE REPAIRED , BUTTERFLY NUTS (160 NOS. ) TO BE RENEWED (YARD SUPPLY ) PACKING RETAINING CHANNEL AND LOUVERS TO BE FABRICATED AND RENEWED WHERE NECESSARY ( YARD SUPPLY)- ALL MATERIAL, PACKING, NUTS BOLTS YARD SUPPLY. DECK NOS 20.00 20.00 EA USD 1.00 0.00
D26039.5 TO CROP AND RENEW ACCOMMODATION VENTS AT VARIOUS LOCATIONS AND RENEW RUBBER RETAINING CHANNEL & RUBBER PACKING OF SAME. TOTAL 25 NOS. RUBBER PACKING: 100 M YARD SUPPLY. DECK NOS 25.00 25.00 EA USD 1.00 0.00
D26039.6 ALL AIR VENT HEAD OF BALLAST TANKS ,VOID SPACES, STOOL SPACES, FRESH WATER TANKS, S/T ,CWT ,FO ,DO TANKS ON MAIN DECK TO BE OPENED, TRANSPORT TO YARD WORKSHOP INSPECT, GRIT/HYDRO BLAST , APPLY PAINT , BRING BACK ON BOARD, FIT BACK WITH NEW PACKINGS AND WIRE MESH/NET NUTS AND BOLTS ALL YARD SUPPLY . QUIOTE ALL INCLUSIVE INCLUDING COST OF TRANSPORTION, (DIMENSION FROM 50A TO 450A) PERMANENT STENCIL OR MARKING OR PROVISION OF NAME PLATE. ALL CONSUMABLES YARD SUPPLIED. DECK NOS 30.00 30.00 EA USD 1.00 0.00
D26039.6.1 REPLACEMENT OF VENT HEADS & CONSUMABLES WITH YARD SUPPLIED CLASS APPROVED WITH CERTIFICATES. CONSIDER 15 NOS. DECK NOS 15.00 15.00 EA USD 1.00 0.00
D26039.7 LOCKING ARRANGEMENT TO BE MADE FOR WALL TYPE NAT VENTS YARD TO MAKE DECK NOS 40.00 40.00 EA USD 1.00 0.00
D26039.8 TO CROP & RENEW WIRE MESH AND LOUVER OF SUCTION OF EMERGENCY GENERATOR SUPPLY VENT SIZE: (700 MM X 650 MM) DECK NOS 2.00 2.00 EA USD 1.00 0.00
D26039.9 CROP & RENEW A/C INLET VENTS ALONG WITH LOUVER AND ALSO MAKE ARRANGEMENT FOR EASY REMOVAL BY PROVIDING BOLTS ON THE SIDES OF LOUVER.(SIZE 1400 MM X 500 MM) THICKNESS 8 MM QTY : 02 NOS. ON B DECK PORT SIDE. DECK NOS 2.00 2.00 EA USD 1.00 0.00
D26039.10 TO RENEW THE SAFETY LINES ON BOTH PORT AND STBD SIDE. TO CHANGE THE COATED/INSULATED WIRE 220M- 05MM DIA (YARD SUPPLY) AND THE ASSOCIATED LOOSE GEARS LIKE BOTTLE SCREW( 1T- 06 NOS) AS PER APPROPRIATE SIZE. DECK LS 1.00 1.00 EA USD 1.00 0.00
D26039.11 REPLACEMENT OF VENT HEADS WITH THE YARD SUPPLIED VENT HEADS WITH THE YARD GASKETS AND REDUCERS DECK NOS 10.00 10.00 EA USD 1.00 0.00
i D26040: MISC DECK REPAIRS:TO CROP & RENEW FOLLOWING LADDERS/RAILINGS ON VARIOUS DECKS AT FOLLOWING LOCATIONS: (QUOTE IN EACH CASE SEPARATELY)TO CROP & RENEW FOLLOWING LADDERS/RAILINGS ON VARIOUS DECKS AT FOLLOWING LOCATIONS: (QUOTE IN EACH CASE SEPARATELY) DECK EA USD 1.00 0.00
I A) MAIN DECK TO 1ST POOP DECK (P&S SIDE): DECK INSTRUCTION EA USD 1.00 0.00
D26040.1 (i) STEPS OF 700MM X 220X43 MM ON EACH P & STBD QTY: 4 NOS. TO RENEW. DECK NOS 4.00 4.00 EA USD 1.00 0.00
D26040.2 (ii) RAILING: DIA 40 MM X 10000 MM MS HOLLOW BAR TO RENEW ON PORT & STBD side DECK MTR 10.00 10.00 EA USD 1.00 0.00
I B) 1ST POOP DECK TO 2ND POOP DECK: (P&S SIDE), DECK INSTRUCTION EA USD 1.00 0.00
D26040.3 (i) STEPS OF 700MM X 220X43 MM . ON EACH P & STBD QTY: 4 NOS. TO RENEW. DECK NOS 3.00 3.00 EA USD 1.00 0.00
D26040.4 (ii) RAILING: DIA 40 MM X 10000 MM MS HOLLOW BAR TO RENEW ON PORT & STBD side . DECK MTR 10.00 10.00 EA USD 1.00 0.00
I C) 2ND POOP DECK TO 3RD POOP DECK. (P&S SIDE): DECK INSTRUCTION EA USD 1.00 0.00
D26040.5 (i) STEPS OF 700MM X 220X43 MM ON EACH P & STBD QTY: 10 NOS. TO RENEW. DECK NOS 3.00 3.00 EA USD 1.00 0.00
D26040.6 (ii) RAILING: DIA 40 MM X 10000 MM MS HOLLOW BAR TO RENEW ON PORT & STBD side . DECK MTR 5.00 5.00 EA USD 1.00 0.00
I D) 3RD POOP DECK TO 4TH POOP DECK. (P&S SIDE): DECK INSTRUCTION EA USD 1.00 0.00
D26040.7 (i) STEPS OF 700MM X 220X43 MM ON EACH P & STBD QTY: 10 NOS.. TO RENEW. DECK NOS 3.00 3.00 EA USD 1.00 0.00
D26040.8 (ii) RAILING: DIA 40 MM X 10000 MM MS HOLLOW BAR TO RENEW ON PORT & STBD side DECK MTR 5.00 5.00 EA USD 1.00 0.00
D26040.9 STEPS OF 700MM X 220X43 MM TO RENEW ON EACH PORT & STBD QTY: 10 NOS. TO RENEW. DECK NOS 10.00 10.00 EA USD 1.00 0.00
D26040.10 ALL HOLDS TO BE FITTED WITH PERFORATED CIRCULAR GUARD PLATES FOR WATER INGRESS SYSTEM SENSORS WITH EXISTING NUT AND BOLTS THICKNESS: 10 MM MATERIAL: MS QTY: 5 NOS IN CARGO HOLDS NO.1, 2, 3, 4 & 5. DECK NOS 5.00 5.00 EA USD 1.00 0.00
D26040.11 ISPS LIGHT SUPPORTS TO RENEW DECK MTR 10.00 10.00 EA USD 1.00 0.00
D26040.12 FORWARD MAST,AFT MAIN MAST SAFETY CAGE WASTED. TO RENEW AS NECESSARY DECK MTR 30.00 30.00 EA USD 1.00 0.00
D26040.13 TO RENEW DECK AIR LINE OF MAIN MAST, DIA 1 INCH DECK MTR 5.00 5.00 EA USD 1.00 0.00
D26040.14 PLATFORM ON FWD AND MAIN MAST TO BE RENEWED PLATING AROUND 4 MTR2 TO BE RENEWED DECK MTR 2 4.00 4.00 EA USD 1.00 0.00
D26040.15 TO RENEW SHIPSIDE RAILINGS ON VARIOUS LOCATION ON MAIN DECK, DIA 1 INCH DECK MTR 150.00 150.00 EA USD 1.00 0.00
D26040.16 CHQUERED PLATFORM ON FWD AND MAIN MAST TO BE RENEWED PLATING AROUND 4 MTR TO BE RENEWED(2X2M2) DECK MTR 10.00 10.00 EA USD 1.00 0.00
D26040.17 TO RENEW SHIPSIDE RAILINGS ON VARIOUS LOCATION ON MAIN DECK DIA 42MM SCHED 80 DECK MTR 10.00 10.00 EA USD 1.00 0.00
D26040.18 TO CROP AND RENEW SUPPORTS OF BUNKER MANIFOLD(119MMX52MM) DECK MTR 10.00 10.00 EA USD 1.00 0.00
i D26041: OPENING AND CLOSING APPLIANCES: HATCH COVERS, W/T DOORS,MAKE: TTS HATCH COVERS DECK EA USD 1.00 0.00
I TO RENEW RUBBER PACKING INCLUDES ADHESIVES AND ANY OTHER SPARES REQUIRED FOR RENEWAL NOTE: ON COMPLETION OF REPAIRS, HATCH COVERS TO BE PRESENTED FOR SATISFACTORY OPERATION AND WEATHER TIGHTNESS TO OWNERS/ IRS /DNV SURVEYORS FOR ULTROSNIC LEAK TEST. CHALK TEST OF RUBBER PACKING WITH COMPRESSION BAR TO PROVE PERFECT BEFORE HIGH PRESSURE HOSE TEST BY WATER TO BE CARRIED OUT. DECK INSTRUCTION EA USD 1.00 0.00
I FOLLOWING RUBBER PACKING TO BE RENEWED DECK INSTRUCTION EA USD 1.00 0.00
D26041.1 1.TO RENEW RUBBER PACKING ALL FIVE HATCH COVERS RUBBER PACKINGS 94X55MM STRAIGHT SEAL OWNER SUPPLY DECK MTRS 500.00 500.00 EA USD 1.00 0.00
D26041.2 2.FLAT CORNER SEAL - 20 OWNER SUPPLY DECK NOS 20.00 20.00 EA USD 1.00 0.00
D26041.3 3.3 WAY VERTICAL CORNER (LEFT AND RIGHT)OWNER SUPPLY DECK NOS 20.00 20.00 EA USD 1.00 0.00
D26041.4 4.END PIECE SEAL OWNER SUPPLY DECK NOS 20.00 20.00 EA USD 1.00 0.00
D26041.5 5. 4 WAY CORNER PIECE REQUIRED LEFT AND RIGHT OWNER SUPPLY DECK NOS 10.00 10.00 EA USD 1.00 0.00
D26041.6 6.30 DEG FLAT END JOINT SEAL OWNER SUPPLY DECK NOS 10.00 10.00 EA USD 1.00 0.00
D26041.7 TO RENEW DRAIN CHANNEL OF ALL HATCH COVER. QUOTE ALL INCLUSIVE. DECK MTRS 50.00 50.00 EA USD 1.00 0.00
D26041.8 HATCH COVER RUBBER RETAINING CHANNEL AND COAMING CHANNEL TO BE CROPPED AND RENEWED OF ALL 05 HATCHES. QUOTE ALL INCLUSIVE. DECK MTRS 500.00 500.00 EA USD 1.00 0.00
D26041.9 TO INSPECT TRACKWAY,COMPRESSION BAR (SS) ,AND OTHER FTTINGS ON TOP OF HOLD COAMING OF ALL 05 CARGO HOLDS, AND IF REQUIRED REPAIR/RENEW. CONSIDER RENEWAL OF 100MTR OF SS COMPRESSION BAR.QUOTE ALL INCLUSIVE. DECK MTRS 100.00 100.00 EA USD 1.00 0.00
D26041.10 WEATHER TIGHT DOORS : 26 NOS. WEATHER TIGHT DOORS ON MAIN DECK, F’CLE DECK, POOP DECKS - RUBBER PACKING RETAINING CHANNEL TO BE CHIPPED, CLEANED, REPAIRED OR RENEWED AS REQUIRED AND RUBBER PACKING TO BE RENEWED 42MM(B)X22MM(T). TOTAL RUNNING LENGTH 150 MTRS RUBBER PACKINGS YARD SUPPLY DECK NOS 26.00 26.00 EA USD 1.00 0.00
D26041.11 20 NOS OF QUICK ACTING CLEATS OF HATCH COVERS TO BE OVERHAULED OR RENEWED IF REQUIRED. DECK NOS 20.00 20.00 EA USD 1.00 0.00
D26041.12 BILGE INNER BAFFLE PLATE (PERFORATED) & STRUM BOXES TO CHECK IN ALL HOLDS.STRUM BOXES IN HOLD BILGES TO BE CHIPPED AND PAINTED(PAINT SHIP SUPPLY). HANDLE FOR 10 NOS. HOLD BILGE COVERS TO BE RENEWED. 10 NOS. BAFFLE PLATES SS BUTTERFLY NUTS TO BE RENEWED. DECK NOS 10.00 10.00 EA USD 1.00 0.00
D26041.13 HATCH CLEATS SUPPORTS TO BE RENEWED . DECK NOS 10.00 10.00 EA USD 1.00 0.00
D26041.14 TO RENEW RETAINING CHANNEL OF BOOBY HATCH ALONGWITH RUBBER PACKING DECK NOS 10.00 10.00 EA USD 1.00 0.00
D26041.15 ALL 5 HATCH CONTROL PANEL BOXES TO BE RENEWED(450 MMX 450MM X 500MM). DECK NOS 5.00 5.00 EA USD 1.00 0.00
D26041.16 CONTROL PANEL LEVER FOR HATCH OPENING/CLOSINGTO BE RENEWED. YARD SUPPLY ( MAKE TTS HUAHAI) DECK NOS 5.00 5.00 EA USD 1.00 0.00
D26041.17 HATCH COAMING STAY ON MAIN DECK AND CROSS DECK , TOES OF STAY THINNED DOWN . SAME TO CROP AND RENEW SIZE LxBxT - 300mmx250mmx15mm . DECK NOS 140.00 140.00 EA USD 1.00 0.00
D26041.18 TO CHECK AND INSPECT ALL 05 CARGO HOLDS FWD & AFT BOOBY HATCH RUBBER PACKING, AND TO INSPECT RETAINING CHANNEL,BUTTERFLY NUTS & RENEW, IF REQUIRED. CONSIDER RNEWAL OF 2.5 MTR CHANNEL & REBBER PACKING ON EACH HATCH. DECK NOS 10.00 10.00 EA USD 1.00 0.00
D26041.19 ALL 05 CARGO HOLDS, BOTH FORWARD AND AFT HATCH COVER UNDERNEATH PORTION/PLATINGS AND SIDE HATCH COAMINGS ARE HAVING DEEP PITTING/ HOLES/PLATE THINNED DOWN EXCESSIVELY, SAME NEED TO BE CROP AND RENEWED. QUOTE ALL INCLUSI]VE INCLUDING STAGING/CHERRY PICKER. DECK TONS 10.00 10.00 EA USD 1.00 0.00
D26041.20 AFTER RENEWAL OF SEALING PACKING , TO CARRY OUT HOSE DOWN TEST OF HATCH COVERS TO CHECK WATER INTEGRIT/HYDROY. ALL NECESSARY ARRANGMENTS TO BE MADE TO CARRY PRESSURE TESTING IN FRONT OF CLASS SURVEYOR/OWNER FOR ALL FIVE HATCH COVERS AND COAMINGS DECK LS 5.00 5.00 EA USD 1.00 0.00
i D26042: ACCOMODATION UPHOLSTERY, PORT HOLES, WHEEL HOUSE , ACCOMMODATION DECK EA USD 1.00 0.00
D 26042.1 04 NOS BRIDGE FRONT GLASSES TO BE FITTED WITH SUN SCREEN DECK NOS 4.00 4.00 EA USD 1.00 0.00
D 26042.2 OLD BRIDGE WINDOW WIPERS TO BE REMOVED AND NEW BRIDGE WINDOW WIPER 04 NOS TO BE FITTED WITH FULL SET. NEW WIPER YARD SUPPLY. DECK NOS 4.00 4.00 EA USD 1.00 0.00
D 26042.3 ROLLER BEARINGS OF BRIDGE SLIDING DOOR TO BE RENEWED/DOORS TO RENEW LOCKING ARRANGEMENT TO BE ATTENDED.(YARD SUPPLY) DECK NO 6.00 6.00 EA USD 1.00 0.00
D 26042.4 TO PROCURE AND RENEW HEAVY DUTY HYDRAULIC DOOR CLOSERS IN ACCOMMODATION . SPECIAL ATTENTION TO BE GIVEN TO THOSE PERTAINING TO THE FIRE DOORS/ENGINE ROOM ENTRANCES.(YARD SUPPLY) DECK NO 12.00 12.00 EA USD 1.00 0.00
D 26042.5 CREW CABIN PORT HOLE & CREW RECRATION ROOM (TOTAL 24 NOS) RUBER PACKING TO RENEW(YARD SUPPLY) DECK NOS 24.00 24.00 EA USD 1.00 0.00
D 26042.6 BOTH MOB FRAMES CORRODED AND WASTED SAME TO BE CROPPED AND RENEWED. MS PLATE 50MM X 40 MM -L 02M DECK NOS 2.00 2.00 EA USD 1.00 0.00
D 26042.7 UPPER DECK P & S ENTRANCE DOOR DAMAGED SAME TO BE RENEWED. DECK NOS 2.00 2.00 EA USD 1.00 0.00
D 26042.8 DRAINS CHOCKED AT THE THE FOLLOWING LOCATIONS SAME TO BE CLEARED BATH ROOM DRAINS CHOCKED 3, GALLEY(05 NOS) ,GARBAGE ROOM(01 NOS) , WASH BASIN OFF PANTRY,B DECK PORT AND STBD,WHEELHOUSE. DECK LS 1.00 1.00 EA USD 1.00 0.00
D 26042.9 CABIN PORT HOLE TOP EYE BROW FROM OUT SIDE TO BE RENEWED IF CORREDED OR HOLED. EXPECTING 25 NOS REEWAL , MATL YARD SUPPLY . DECK NOS 15.00 15.00 EA USD 1.00 0.00
i D26043: FIRE FIGHTING APPLIANCES, FIBRE GLASS WORKS, FIRE EXTINGUISHER DECK EA USD 1.00 0.00
I WORK SPECIFICATIONS DECK EA USD 1.00 0.00
D26043.1 TO RENEW FIRE HOSE BOXES ALONG WITH SUPPORT BRACKETS YARD SUPPLY DECK NOS 6.00 6.00 EA USD 1.00 0.00
D26043.2 TO OVERHAUL FIRE HYDRANTS ON MAIN DECK, MACHINERY SPACES AND IN ACCOMODATION IF REQ TO CHANGE WITH NEW(SHIP SUPPLY) DECK NOS 10.00 10.00 EA USD 1.00 0.00
D26043.4 ANNUAL MAINTENANCE AND HYDRAULIC PRESSURE TESTING OF FIXED FIRE FIGHTING SYSTEM OF GALLEY AND PAINT ROOM EXTINGUISHER TO BE CARRIED OUT. 2 NOS DECK NOS 2.00 2.00 EA USD 1.00 0.00
D26043.5 TO RENEW FOUR VJ COUPLING OF FIRE MAIN LINE YARD SUPPLY AND TO CHANGE RUBBER PACKINGS OF V J COUPLING OF FIRE LINE 2 NUMBERS YARD SUPPLY DECK LS 4.00 4.00 EA USD 1.00 0.00
D26043.6 U-CLAMPS OF FIRE LINE TO BE RENEWED (YARD SUPPLY) DECK NOS 50.00 50.00 EA USD 1.00 0.00
i D26044: ACCOMODATION LADDERS WALKWAYS, COMBINATION AND AUSTRALIAN LADDERS WALKWAYS DECK EA USD 1.00 0.00
I WORK SPECIFICATION DECK EA USD 1.00 0.00
D26044.1 ALL HOLD SPIRAL LADDER PLATFORM RAILING & FOOT STEP BAAR IF BROKEN / DENTED / COORODED / WASTED IN ANY LOCATION TO BE REPAIRED, CONSIDER DIA 40 MM, 20 MM SOLID BARS. DECK MTRS 100.00 100.00 EA USD 1.00 0.00
D26044.2 TO RENEW RUNGS OF LADDERS IN VARIOUS HOLDS 25 MM SQUARE BAR 400 MM. DECK NOS 100.00 100.00 EA USD 1.00 0.00
D26044.3 ALSO QUOTE FOR RENEWAL OF APPROX 75 MTRS OF RAILINGS ON HOLD LADDERS. 20 MM SOLID BARS & VERTICAL LADDERS’ STEP. DECK MTRS 100.00 100.00 EA USD 1.00 0.00
D26044.4 PROTECTION GUARD RINGS: 25 MMX 25 MM SQUARE BAR DECK MTRS 70.00 70.00 EA USD 1.00 0.00
D26044.5 PROTECTION GUARDS PLATES IN HOLDS ( FOR LADDER 5 M X 5M ) DECK NOS 6.00 6.00 EA USD 1.00 0.00
D26044.6 SPIRAL LADDER SUPPORT BRACKETS TO BE RENEWED. DECK NOS 20.00 20.00 EA USD 1.00 0.00
D26044.7 RENEWAL OF CARGO HOLD STRAIGHT LADDER PLATFORM .0.8MTRX0.6 MTR, 10MM THICK M.S. DECK NOS 5.00 5.00 EA USD 1.00 0.00
D26044.8 RENEWAL OF CARGO HOLD STRAIGHT LADDER SUPPORT BRACKET. DECK NOS 40.00 40.00 EA USD 1.00 0.00
D26044.9 RENEWAL OF CARGO HOLD VERTICAL LADDER IN EACH HOLD ARROUND 12 MTRS, RESPECTIVE THINED DOWN / CORRODED SIDE BAR & FOOT REST BAR DECK MTRS 60.00 60.00 EA USD 1.00 0.00
D26044.10 PROTECTION GUARDS CAGE ARROUND BALLAST FILLING LINE IN HOLDS ( 800 MM X 1500M ) TO BE RENEWED 8 NOS IN EACH HOLD AND REQUIRED FOR FIVE HOLDS. DECK LS 5.00 5.00 EA USD 1.00 0.00
i D26045: ACCOMODATION AND GANGWAY LADDER ELECTRICAL MOTOR AND SYSTEM DECK EA USD 1.00 0.00
D26045.1 MOTOR TO BE TAKEN OUT FOR THOROUGH OVERHAULING AT YARD WORKSHOP AFTER DISMANTLING FROM CUOPLING. DECK NOS 4.00 4.00 EA USD 1.00 0.00
D26045.2 INSPECT OVERLOAD RELAY,CONTACTORS,STARTER,OVERLOAD RELAY AND VALUES TO BE SET AS PER MANUAL.LOCAL AND REMOTE FUNCTIONS TO BE CHECKED FOR PROPER OPERATION. DECK NOS 4.00 4.00 EA USD 1.00 0.00
D26045.3 NO LOAD TEST ,FULL LOAD TEST,TRIP AND PROPER OPERATION OF LIMIT SWITCHES TO BE CHECKED. DECK SET 4.00 4.00 EA USD 1.00 0.00
i D26046: MISCELLANEOUS JOBS DECK EA USD 1.00 0.00
I TO MAKE PERMANENT ADDITIONAL LIGHTING( HEAVY DUTY MARINE TYPE LED LIGHT FITTING) ARRANGEMENTS AT FOLLOWING LOCATIONS- DECK INSTRUCTIONS EA USD 1.00 0.00
D26046.1 CRANE JIB HEAD 100 WATTS: 220 VOLTS: FREQUENCY:60HZ DECK LS 5.00 5.00 EA USD 1.00 0.00
D26046.2 CRANE TOP 100 WATTS: 220 VOLTS: FREQUENCY:60HZ DECK LS 20.00 20.00 EA USD 1.00 0.00
D26046.3 DUCT KEEL 60 WATTS: 220 VOLTS: FREQUENCY:60HZ DECK LS 24.00 24.00 EA USD 1.00 0.00
D26046.4 BOTH BOW STOPPER PIVOT PIN SLOT AND LOCKING SLOT TO BE BUILT UP FOR ITS ORIGINAL SIZE. ALSO WEAR DOWN AREA ON THE CENTER OF BAR TO BE BUILT UP AS REQUIRED. DECK NOS 2.00 2.00 EA USD 1.00 0.00
D26046.5 TO CROP AND RENEW PAINT STORE EXHAUST DUCTING PIPE. DIA :- 300 MM LENGTH :- 2.5 MTR DECK MTR 2.50 2.50 EA USD 1.00 0.00
D26046.6 THE TANK TOP OF NO.2 CARGO HOLD BADLY DENTED-SAME TO BE INSPECTED CROPPED & RENEWED SIZE: 3Mx 3M THICKNESS 16MM BETWEEN FRAME 160 -175 DECK M2 2.00 2.00 EA USD 1.00 0.00
D26046.7 RESCUE BOAT PAINTER SECURING ASSEMBLY TO BE RENEWED DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26046.8 RESCUE BOAT DAVIT HYDRULIC OIL TANK TO BE FABRICATED DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26046.9 BRIDGE WINGS BOTH PORT & STBD SEARCH LIGHT STANDS TO BE CROPPED AND RENEWED DECK NOS 2.00 2.00 EA USD 1.00 0.00
D26046.10 FRESH WATER LINE & SPRAY NOZZLES ON BRIDGE FOR CLEANING THE FRONT GLASS TO BE RENEWED(YARD SUPPLY) DIA :32 MM LENGTH 18 MTRS DECK MTR 18.00 18.00 EA USD 1.00 0.00
D26046.11 WHEEL HOUSE PA SYSTEM REMOTELY OPERATION IS NOT WORKING , FAULT TO CHECK AND RECTIFY DECK SET 1.00 1.00 EA USD 1.00 0.00
D26046.12 BOTH DGPS PORT SIDE FREQUENTLY LOSE ALL DATA IN OPERARION MODE. FAULT TO CHECK AND RECTIFY DECK SET 2.00 2.00 EA USD 1.00 0.00
D26046.13 WHEEL HOUSE CLOCK/CLINOMETER DIMMER IS NOT WORKING. SAME TO BE RECTIFIED DECK SET 1.00 1.00 EA USD 1.00 0.00
D26046.14 WHEEL HOUSE MASTER CLOCK LED DIGITAL LIGHT NOT WORKING IN ORDER. SAME TO CHECK AND RECTIFY. DECK SET 1.00 1.00 EA USD 1.00 0.00
D26046.15 CRANE CABIN WIPERS ASSEMBLY TO BE FITTED DECK SET 4.00 4.00 EA USD 1.00 0.00
D26046.16 DUNNNAGE ON CRUTCHES FOR CRANE JIB HEAD PARKING TO BE RENEWED DECK NOS 4.00 4.00 EA USD 1.00 0.00
D26046.17 MECHANICAL EXHAUST OF HOLD NO 5 BROKEN ,GARBAGE AND PAINT LOCKER NOT WORKING.SAME TO BE RECTIFIED DECK NOS 3.00 3.00 EA USD 1.00 0.00
D26046.18 VENT PIPES IN BUNKER MANIFOLD TRAY TO BE FABRICATED AND RENEWED DECK MTR 40.00 40.00 EA USD 1.00 0.00
D26046.19 WARPING DRUMS OF ALL MOORING WINCHES ARE WASTED & THINNED DOWN SAME TO BE RENWED DECK SET 4.00 4.00 EA USD 1.00 0.00
D26046.20 CONTROL LEVER BOXES OF HATCH COVERS TO BE RENEWED DECK SET 5.00 5.00 EA USD 1.00 0.00
D26046.21 MECHANICAL VENTILATION OF CARGO HOLDS TO BE OVERHAULED GIVING LOW INSULATION ALARMS DECK NOS 20.00 20.00 EA USD 1.00 0.00
D26046.22 ELECTRIC PIPE NECK AT POOP DECK TO BE RENEWED CAUSING LEAKAGE OF WATER INTO STEERING GEAR ROOM DECK MTR 5.00 5.00 EA USD 1.00 0.00
D26046.23 PORT HOLES IN VARIOUS CABINS AND GYMNASIUM HAVE LEAKAGE,SAME TO BE RECTIFIED DECK NOS. 10.00 10.00 EA USD 1.00 0.00
D26046.24 PORT SIDE WINDLASS CHAIN GUIDING BAR FOUND BROKEN.SAME TO BE FABRICATED & RENEWED. DECK SET 1.00 1.00 EA USD 1.00 0.00
D26046.25 STBD SIDE MOORING WINCH FWD BUSH DAMAGED-MAKING ABNORMAL NOISE DURING OPEARTION, SAME TO RENEW. BUSH & CONSUMABLES,YARD SUPPLIED. DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26046.26 RESCUE BOAT RESERVOIR TANK FOUND LEAKING TO BE RECTIFIED DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26046.27 RESCUE BOAT DAVIT WINCH CRANKING LEVER TO BE RENEWED-SLIP DURING OPERATION DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26046.28 SMOKE EXTRACTION LINE ALARM ON BRIDGE PANEL.SAME TO BE RECTIFIED DECK NOS 1.00 1.00 EA USD 1.00 0.00
D26046.29 TO RENEW GOOSE NECK PIPES OF ELECTRICAL WIRES AT POOP DECK DECK NOS 20.00 20.00 EA USD 1.00 0.00
D26046.30 TO CROPE AND RENEW PAINT STORE EXHAUST DUCTING PIPE. DIA :- 300 MM LENGTH :- 2.5 MTR DECK MTR 3.00 3.00 EA USD 1.00 0.00
D26046.31 BOOBY HATCH COVER TO ENTER IN HATCHES TO BE REPAIRED NO.4 AFT,NO3 AFT, NO 1 FWD DECK NOS 3.00 3.00 EA USD 1.00 0.00
D26046.32 STBD ANCHOR FLUKE HAS A SLIGHT BEND,SAME TO BE RECTIFIED DECK NOS 1.00 1.00 EA USD 1.00 0.00
i ENGINE SIDE ENGINE EA USD 1.00 0.00
I E26001: RUDDER AND SKEG (SURVEY):STOCK DIA 450 mm ENGINE EA USD 1.00 0.00
I TYPE/CAPACITY/DETAILS: 7.2 M X 5.2 M X 0.72 M ENGINE EA USD 1.00 0.00
I PREPARE VESSEL FOR RUDDER REMOVAL, INCLUDING SECURING RUDDER, MARKING OF COMPONENTS, AND SUPPORTING RUDDER WEIGHT. DISCONNECT STEERING GEAR RUDDER STOCK AND REMOVE LOCKING DEVICES AS APPLICABLE. REMOVE RUDDER CARRIER/BEARING ARRANGEMENT AND PINTLE NUTS/BOLTS AS REQUIRED. LOWER AND REMOVE RUDDER BY SUITABLE LIFTING EQUIPMENT WHILE VESSEL IS IN DRY DOCK. TRANSPORT RUDDER TO YARD WORKSHOP OR DESIGNATED STORAGE AREA. PROTECT RUDDER STOCK, BEARING SURFACES, PINTLES, AND MACHINED AREAS AGAINST DAMAGE AND CORROSION. ALL WORKS TO BE CARRIED OUT IN ACCORDANCE WITH MAKER’S INSTRUCTIONS AND CLASS REQUIREMENTS, UNDER ATTENDANCE OF SHIP’S REPRESENTATIVES AS REQUIRED. ENGINE INSTRUCTION EA USD 1.00 0.00
E26001.1 DRAIN PLUGS (2 SETS) FOR RUDDER TO REMOVE IN PRESENCE OF CEO / SUPDT/SURVEYOR AND TO CHECK FOR WATER INGRESS; IF ANY. ENGINE PCS 2.00 2.00 EA USD 1.00 0.00
E26001.2 RUDDER TO PRESSURE TEST TO 3 PSI IN CASE OF LEAKAGE OBSERVED IN RUDDER AND TO COAT INTERNALLY WITH FLOAT COAT A ( UNISERVICE 210) AFTER THOROUGH REPAIR. ENGINE LS 1.00 1.00 EA USD 1.00 0.00
E26001.3 RUDDER LEAKAGES IF OBSERVED; LEAKAGES TO BE RECTIFIED BY “V” GOUGING AND WELDING –QUOTE FOR 1 MTR LENGTH WELDING . ENGINE LS 1.00 1.00 EA USD 1.00 0.00
E26001.4 TRANSOM SPACE AND SKEG AREA TO BE CHECKED AND AFTER THOROUGH CLEANING ,PAINT TO BE APPLIED AS PER PAINTING SCHEME. PAINT YRD SUPPLY ENGINE LS 1.00 1.00 EA USD 1.00 0.00
E26001.5 JUMPING CLEARANCE TO BE CHECKED AND ADJUSTED IN LINE WITH MAKER'S GUIDELINES. ENGINE SET 1.00 1.00 EA USD 1.00 0.00
E26001.6 REMOVE BOTH TOP AND BOTTOM PINTLE INSPECTION COVERS (FITTED WITH SCREWS). BOTH PINTLE BUSH CLEARANCES TO CHECK; RUDDER DROP IN STEERING FLAT TO BE RECORDED ENGINE LS 1.00 1.00 EA USD 1.00 0.00
E26001.7 BOTH RUDDER AND RUDDER STOCK TO BE TAKEN OUT AND LAND ASHORE AFTER LOOSENING THE RUDDER STOCK NUT AND BOTTOM PINTLE NUT.BOTH PINTLE TO BE CALIBRATED PRIOR FITTING.QUOTE ALL INCLUSIVE ENGINE LS 1.00 1.00 EA USD 1.00 0.00
E26001.8 BOTH TOP AND BOTTOM PINTLE BUSH TO BE RENEWED FROM SHIP SUPPLIED SPARES ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26001.9 BEFORE FITTING THE PINTLE CHROME LINER ON PINTLE TO POLISH OR SKIM TO REMOVE ECCENTRICITY IF ANY ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26001.10 RUDDER STOCK SEAL IN STEERING COMPARTMENT TO RENEW.SEAL SHIP SUPPLIED.QUOTE ALL INCLUSIVE ENGINE SET 1.00 1.00 EA USD 1.00 0.00
E26001.11 CALIBRATION OF COMPLETE RUDDER STOCK TO CARRIED OUT AS PER CLASS REQUIREMENTS THE RADII OF THE ORING GROOVES TO SMOOTHENED TO REDUCE THE NOTCHING EFFECT. ENGINE LS 1.00 1.00 EA USD 1.00 0.00
E26001.12 SUPPLY, INSTALLATION AND COMMISSIONING OF AUTO GREASE PUMP FOR CARRY OUT AUTO GREASING OF RUDDER STOCK.PUMP, CONTROL PANEL, PIPES & ACCESSORIES YARD SUPPLIED. ENGINE LS 1.00 1.00 EA USD 1.00 0.00
E26001.13 AFTER COMPLETION OF THE WORK/ASSEMBLY OF COMPLETE SYSTEM,TEST / TRIALS TO BE SHOWN TO THE SATISFACTION OF CLASS/SUPTD. ENGINE LS 1.00 1.00 EA USD 1.00 0.00
i E26002: PROPELLER AND TAIL SHAFT (SURVEY): ENGINE EA USD 1.00 0.00
I TYPE/CAPACITY/DETAILS - KEYLESS; PROPELLER - 4 BLADES; DIA- 6000 MM. MATERIAL : NI-AL-BRONZE CU3; SILA METAL CO.LTD. ENGINE EA USD 1.00 0.00
I PREPARE VESSEL AND SHAFT LINE FOR SHAFT WITHDRAWAL, INCLUDING JACKING, SECURING, AND PROPER MARKING OF PROPELLER SHAFT AND INTERMEDIATE SHAFT FOR CORRECT REINSTALLATION. DRAIN STERN TUBE LUBRICATION OIL AND REMOVE STERN TUBE SEALS AS REQUIRED. DISCONNECT AND REMOVE COUPLING BOLTS, NUTS, LOCKING ARRANGEMENTS BETWEEN PROPELLER SHAFT, INTERMEDIATE SHAFT. REMOVE SHAFT BEARINGS, ROPE GUARD, AND ASSOCIATED FITTINGS AS REQUIRED TO FACILITATE SHAFT WITHDRAWAL. WITHDRAW PROPELLER SHAFT AFT AND INTERMEDIATE SHAFT FORWARD USING SUITABLE LIFTING, PULLING, AND HANDLING EQUIP-MENT. TRANSPORT REMOVED SHAFTS TO DESIGNATED STORAGE AREA. PROTECT SHAFT JOURNALS, COUPLING FACES AND LINERS AGAINST DAMAGE AND CORROSION DURING HANDLING AND STORAGE. ALL WORKS TO BE CARRIED OUT IN ACCORDANCE WITH MAKER’S INSTRUCTIONS AND CLASS REQUIREMENTS, UNDER ATTENDANCE OF SHIP’S REPRESENTATIVES AS REQUIRED. QUOTE ALL THE LINE ITEM INCLUSIVE INCLUDING STAGING. ENGINE INSTRUCTION EA USD 1.00 0.00
E26002.1 REMOVE ROPE GUARDS; BLAST CLEAN & PAINT INTERNALLY & EXTERNALLY. BOTH TOP AND BOTTOM HALF OF ROPE GUARD WITH ANODE TO REPLACE BY YARD SUPPLIED MATERIAL. ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26002.2 MEASURE AND RECORD PROPELLER DROP KEEPING BLADE MARKED "A "ON TOP IN PRESENCE OF CEO & OWNERS REP (CONSIDER 2 READINGS INTIAL AND FINAL); ENGINE TIMES 2.00 2.00 EA USD 1.00 0.00
E26002.3 PROPELLER AND BONNET TO BE SCRAPPED FREE FROM THE BARNACLES.BREAK PROPELLER CEMENT FAIRWEATHER CONE(BONNET) TO OPEN UP & OLD TALLOW TO REMOVE. AFTER REPAIR;NEW PROPELLER CONE (PBCF) TO BE FITTED BACK WITH FRESH TALLOW; 200 KG TALLOW (YARD SUPPLY). ENGINE LS 1.00 1.00 EA USD 1.00 0.00
E26002.4 PROPELLER TO BUFF / POLISH AND SURFACE FINISH OF BLADES SHALL HAVE A ROUGHNESS LESS THAN 6 MICRONS FROM 0.3 RADIUS TO TIP OF BLADES. BLADE ROOTS AND TIPS TO CHECK FOR PRESENCE OF CRACKS USING DYE PENETRANT. ENGINE LS 1.00 1.00 EA USD 1.00 0.00
E26002.5 ERODED PORTION OF THE PROPELLER BLADES TO REPAIR BY CLASS APPROVED METHEODS EITHER BY WELDING OR BLADE ATTACHMENTS.QUOTE FOR MINOR WELDING REPAIR. ENGINE LS 1.00 1.00 EA USD 1.00 0.00
E26002.6 PROPELLER NUT LOCKINGS TO REMOVE. PROPELLER NUT REMOVE AS PER MAKER'S INSTRUCTION HYD PRESSURE TO RECORD.NUT TRAVEL FROM ORIGINAL POSITION TO RECORD.REMOVE PROPELLER AS PER MAKER'S INSTRUCTIONS AFTER REPAIR AND SURVEY; PROPELLER TO BE PUSHED-IN HYDRAULICALLY ENGINE SET 1.00 1.00 EA USD 1.00 0.00
E26002.7 MARK COUPLING NUTS AND BOLTS ON BOTH SIDE OF INTERMEDIATE SHAFT.SLACKEN AND REMOVE COUPLING NUTS & BOLTS. ENGINE LS 1.00 1.00 EA USD 1.00 0.00
E26002.8 FABRICATION COST OF 02 COUPLING BOLT WITH ALL MEATERIAL CERTIFCATE TO THE SATISFACTION CALSS SURVEYORS ENGINE SET 2.00 2.00 EA USD 1.00 0.00
E26002.9 REMOVE TOP HALVES OF INT.SHAFT BEARINGS.LIFT THE INT.SHAFT ON CENTRE LINE USING CHAIN BLOCKS.SHIFT THE INT.SHAFT TO PORT SIDE AND HOLD THE SAME IN PLACE IN BY MEANS OF WIRE ROPE ARRANGEMENTS.PREPARE SHAFT FOR SURVEY ON COMPLETION CARRY OUT SURVEYORS RECOMMENDATION. ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26002.10 REMOVE INT.SHAFT BEARINGS BOTTOM HALFVES FOR THE SURVEY AS PER SURVEYOR INSTRUCTIONS. ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26002.11 WITHDRAW THE TAIL END SHAFT AS PER RECOMENDED PROCEDURE TAKING ALL SAFETY PRECAUTION.AFTER THE WITHDRAWAL OF TAIL END SHAFT THOROUGHLY CLEAN TAPPER AND THREADED PORTION OF TAILEND SHAFT.TAPER TO BE CHECKED FOR PRESENCE OF ANY CRACKS BY DYE PENERATION METHOD/MAGNAFLUX AND SHOWN TO CLASS SURVEYOR. ENGINE LS 1.00 1.00 EA USD 1.00 0.00
E26002.12 BOTH FWD AND AFT SIMPLEX SEALS TO REMOVE FROM PLACE AND TAKEN TO SHOP. BOTH SEAL BOXES TO BE ASSEMBLED WITH NEW SEALING RINGS(OWNER SUPPLY).BOTH SIMPLEX SEAL BOXES TO BE FITTED BACK IN PLACE WITH NEW/OLD CHROME LINER. ENGINE BOX 2.00 2.00 EA USD 1.00 0.00
E26002.13 BOTH CHROME LINERS TO INSPECT & CALIBERATE . IF NEEDED THE INNER AND OUTER EDGES OF CHROME LINERS TO BE SKIMMED BY MAINTAING MANUFACTURER TOLERANCES IN CONCURRENCE WITH SURVEYORS. RECORDED READINGS TO SUBMIT.IF CHROME LINERS ARE WORN OUT BEYOND ACCEPTABLE LIMITS THEN SAME BE RENEWED WITH SHIP SUPPLIED CHROME LINER. ENGINE PCS 2.00 2.00 EA USD 1.00 0.00
E26002.14 AFTER SUCCESFUL COMPLETION OF INSPECTION / 15 YEARLY SURVEY ON TAILEND SHAFT; INTERMEDIATE SHAFT; STERN TUBE BEARING /HOUSING TAIL END SHAFT TO BE REPOSITIONED / REFITTED IN REVERSE ORDER PROPELLER TO BE PUSHED-IN HYDRAULICALLY ON THE TAIL END SHAFT TAPPER AS PER MAKER'S INSTRUCTIONS.PROPELLER TRAVEL ON THE SHAFT AND TOTAL PRESSURE APPLIED TO BE RECODED . ENGINE SET 1.00 1.00 EA USD 1.00 0.00
E26002.15 FWD AND AFT STERN TUBE BEARINGS TO BE CALIBRATED AND REPORTS TO BE SUBMITTED. ENGINE SET 1.00 1.00 EA USD 1.00 0.00
E26002.16 QUOTE FOR RENEWAL OF AFT STERN TUBE BEARING( BEARING SHIP SUPPLY). ENGINE SET 1.00 1.00 EA USD 1.00 0.00
E26002.17 INT.SHAFT BEARING BOTTOM HALVES WITH PORTABLE SEATS TO BE FITTED BACK IN PLACE. REMOVE ANY SHARP EDGES ON THE COUPLING BOLT HOLES.CONSIDER REAMING OF SIX NOS COUPLING BOLT HOLES. INT.SHAFT TO BE LOWERED BACK IN PLACE ON TOP OF BEARING BOTTOM HALVES.COUPLING BOLTS TO BE FITTED BACK AND BEARING TOP HALVES BOXED BACK IN PLACE.SHAFT BEARNING TO BE REALIGNED IN POSITION.COUPLING BOLTS LOCKING TO SECURE.ALL GAURDS AND FLOORING CUT FOR FACILITATING THE JOBS TO BE FITTED BACK ON COMPLITION OF JOB. ENGINE SET 1.00 1.00 EA USD 1.00 0.00
E26002.18 LOAD TESTING OF INTERMEDIATE SHAFT BEARING TO BE CARRIED IN FLOATING CONDITION AND ADJUSTED IN LINE WITH MAKER RECOMMENDED VALUE. ENGINE SET 1.00 1.00 EA USD 1.00 0.00
E26002.19 OIL TO BE TAKEN IN STERN TUBE (OIL SHIP SUPPLY). INTACTNESS OF SEALS TO BE CHECKED UNDER STATIC HEAD FOR ATLEAST 48 HRS. IF ANY ANAMOLIES TO BE ATTENDED WITHOUT ANY EXTRA COST TO OWNER5. ENGINE SET 1.00 1.00 EA USD 1.00 0.00
E26002.20 POKER GAUGE READINGS TO CHECK & RECORD. ENGINE SET 2.00 2.00 EA USD 1.00 0.00
i E26003: STEERING GEAR: ENGINE EA USD 1.00 0.00
I TYPE / CAPACITY / DETAILS: ROTARY VANE TYPE :RV 1050-3 ROTARY VANE STEERING GEAR ENGINE EA USD 1.00 0.00
I MAKE : KONGSBERG:RV 1050-3 ROTARY VANE; ENGINE EA USD 1.00 0.00
I ISOLATE, DRAIN, DISMANTLE, CLEAN, AND INSPECT ROTARY VANE STEERING GEAR. INSPECT VANES, HOUSING, SEALS, BEARINGS, SHAFTS, AND COMPONENTS; RENEW WORN/DEFECTIVE PARTS WITH SHIP SUPPLIED SPARES. OVERHAUL HYDRAULIC POWER UNIT, VALVES, AND ASSOCIATED PIPING AS REQUIRED. REASSEMBLE WITH NEW SEALS AND GASKETS; REFILL, BLEED, AND ADJUST SYSTEM. CARRY OUT FUNCTIONAL, PRESSURE, AND OPERATIONAL TESTS IN ACCORDANCE WITH SOLAS/CLASS REQUIREMENTS. ENGINE INSTRUCTION EA USD 1.00 0.00
E26003.1 COMPLETE OVERHAUL OF STEERING GEAR SYSTEM INCLUDING ALL CONSUMABLE SEALS RENEWAL ,BOTH TOP AND BOTTOM BUSH BEARING AND THRUST BEARING.OTHER ACCESORIES JOBS IN LINE WITH MAKER GUIDELINE.TO BE CARRIED OUT AS PER BY COMPETENT YARD TEAM .ALL CONSUMABLES REQUIRED FOR OVERHAULING WILL BE SHIP SUPPLY.QUOTE ALL INCLUSIVE ENGINE SET 1.00 1.00 EA USD 1.00 0.00
E26003.2 HYDRAULIC POWER PACK TO BE DRAINED OFF LUB OIL. MANHOLE TO BE OPENED FOR STEERING GEAR PUMP INSPECTION AS REQUIRED .TWO NOS.HYD.AXIAL PISTON P/P TO TO REPLACE. RELIEF V/V'S TO BE SET AS PER MAKER'S INSTRUCTION. FILTERS TO BE RENEWED. ALL CONNECTION INSIDE THE TANKS AND OUTSIDE THE TANK TO BE CHECKED FOR TIGHNESS.LO TO BE TAKEN AFTER WORK. ENGINE SET 2.00 2.00 EA USD 1.00 0.00
E26003.3 01 NO RELIEF VALVE BLOCK FITTED ON HYDRAULIC MOTOR BODY TO OVERHAUL AND PRESSURE TESTED TO MAKER RECOMMENDED VALUE. ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26003.4 02 NOS DIRECTION CONTROL VALVE BLOCK TO BE OVERHAULED AND PRESSURE TESTED TO MAKER RECOMMENDED VALUE ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26003.5 LO COOLERS TO BE CLEANED AFTER REMOVAL OF BOTH END COVER. ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26003.6 SKIMMING/POLISHING OF INSIDE SURFACE OF ROTOR HOUSING AND ROTOR TO BE CARRIED OUT .THRUST BEARINGS AND BOTH TOP AND BOTTOM BUSH BEARINGS TO RENEW.AFTER REPLACING THE SEALS ON ROTOR VANES,ROTOR HOUSING PRESSURE TESTING TO BE CARRIED OUT TO MAKER RECOMENDED VALUE OF 120 BAR TO ENSURE PROPER SEALING OF RUDDER VANE SEALING ARRANGEMENT. QUOTE ALL INCLISIVE ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26003.7 THRUST BEARING CLEARANCE TO BE CHECKED BETWEEN THE ROTOR VANE AND BOTTOM OF THE HOUSING. (MIN CLEARANCE AS PER MAKER.THIS CAN BE DONE WITHOUT DETTACHING ACTUATOR FROM THE RUDDER SHAFT. ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26003.8 IF CLEARANCE IS LESS THAN 0.1 MM THEN ACTUATOR TO BE TAKEN OFF FROM RUDDER STOCK OLD BEARING TO BE REMOVED AND NEW BEARING TO BE FITTED. BEARING SHIP SUPPLY ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26003.9 AFTER COMPLETION OF STEERING GEAR SYSTEM REPAIR,SATISFACTORY TRIAL TO BE SHOWN TO SHIP'S STAFF/SUPTD/CLASS SURVEYOR. ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
i E26004: SEACHEST GRID AND FILTER (SURVEY): ENGINE EA USD 1.00 0.00
I TYPE / CAPACITY / DETAILS: ENGINE EA USD 1.00 0.00
I 1. PREPARATION IDENTIFY FILTERS TO BE OPENED, CLEANED, AND BOXED BACK WITH NEW GASKETS. ARRANGE FOR PURGING OF VALVES OF FILTER COVERS (35 MM DIAMETER) PRIOR TO OVERHAUL. 2. FILTER ELEMENT RENEWAL INSPECT FILTER ELEMENT FOR DAMAGE. IF DAMAGED, REPLACE WITH A STAINLESS STEEL PERFORATED SHEET OF 6 MM THICKNESS. 3. FILTER CHAMBER TREATMENT THOROUGHLY CLEAN THE SURFACE OF THE FILTER CHAMBER. APPLY 3 COATS OF EPOXY PAINT AFTER CLEANING. 4. QUOTATION AND STAGING PROVIDE AN ALL-INCLUSIVE QUOTATION COVERING ALL WORK AND STAGING REQUIREMENTS. 5. SUPERVISION AND APPROVAL CONDUCT ALL IMPORTANT WORK UNDER THE SUPERVISION OF CEO/ SUPERINTENDENT. THE YARD MUST COORDINATE AND ARRANGE FOR SURVEYORS AS REQUIRED.BOX BACK ALL ITEMS ONLY AFTER RECEIVING SURVEYOR AP-PROVAL. ENGINE INSTRUCTION EA USD 1.00 0.00
E26004.1 3 NO SEA CHEST GRATINGS TO OPEN(HINGED TYPE).GRIDS AND SEA CHESTS TO SCRAPE CLEAR OF BARNACLE GROWTH AND THEN TO BE CLEANED WITH FRESH HIGH PRESSURE JET.TO CLEAN THE CHEST OF WEEDS MARINE GROWTH ETC.CLEANING TO BE EXAMINED BY CEO/SUPDT.AFTER COMPLETION OF JOB ALL GRIDS TO FIT BACK WITH 3/4 INCH STAINLESS STEEL LOCK WAHSERS AND SECURING NUTS TO BE WIRE LASHED WITH STAINLESS STEEL WIRE. ENGINE NOS 3.00 3.00 EA USD 1.00 0.00
E26004.2 ULTRASONIC THICKNESS TO BE DETERMINED FOR EACH CHEST INCLUDING COMMON PIPE BETWEEN HIGH AND LOW SEA CHEST-CONSIDER MINIMUM 20 POINTS EACH CHEST.REPORT TO BE SUBMITTED. ENGINE POINTS 100.00 100.00 EA USD 1.00 0.00
E26004.3 SEA CHEST AND GRIDS TO BE PAINTED WITH 3 COATS AS PER THE HULL PAINTAING SCHEME.WATSED ANODES WITHIN CHESTS TO BE RENEWED.CONSIDER 6 NOS ANODES PER CHEST(ANODES: SHIP'S SUPPLY) WHICH IS TO BE SUITABLY PROTECTED PRIOR PAINTING. ENGINE NOS 6.00 6.00 EA USD 1.00 0.00
E26004.4 4 NOS. CATHODIC ELECTRODES TO BE RENEWED (SHIP SUPPLY). ENGINE LS 1.00 1.00 EA USD 1.00 0.00
I ALL IMPORTANT WORK TO BE CARRIED OUT IN PRESENCE OF SUTDS/SURVEYORS . ALL ITEMS TO BE BOXED BACK ONLY AFTERAPPROVAL OF SUPTDS/ SURVEYORS. ENGINE EA USD 1.00 0.00
E26004.5 LOW SEA SUC FILTER( 860 MM DIA*1100MM HEIGHT) TO RENEW-1 NO ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26004.6 HIGH SEA SUC FILTER( 860 MM DIA*1100MM HEIGHT) TO RENEW-1 NO ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26004.7 EMG.FIRE PUMP SUC FILTER (270 MM DIA* 370 MM HEIGHT) TO RENEW-1 NO. ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26004.8 FILTER FOR EJECTOR P/P SUCTION (222 MM DIA * 750 MM HEIGHT)(RENEW) ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
i E26005: SEA SUCTION VALVES IN E/R (SURVEY): ENGINE EA USD 1.00 0.00
I TYPE / CAPACITY / DETAILS - ENGINE EA USD 1.00 0.00
I OPEN UP SPECIFIED SEA INJECTION VALVES FOR OVERHAULING. CLEAN AND INSPECT ALL VALVE PARTS FOR CORROSION, WEAR, AND DAMAGE. RENEW WORN/DEFECTIVE PARTS & CONSUMABLES TO THE SATISFACTION OF CLASS/SUPTDS. NUT /BOLTS/DEFECTIVE PARTS & CONSUMABLES-YARD SUPPLY. PITTED VALVE SEAT AND LID GROOVES TO BE REMOVED, TRANSPORTED TO YARD WORKSHOP, LIGHTLY SKIMMED, AND RETURNED TO SHIP. GRIND VALVES ON SEATS; TAKE BLUE IMPRESSIONS OF VALVE SEATS AND LIDS AND PRESENT TO C/E, 2/E, AND SURVEYOR. VALVES TO BE PRESSURE TESTED AND PRESENT VALVES TO SURVEYOR AFTER APPROVAL, REASSEMBLE USING NEW JOINTS AND PACKINGS,CONSUMABLE DULY APPROVED BY C/E & 2/E (YARD SUPPLY). VALVE CASINGS TO BE INTERNALLY SCRAPED, CLEANED, AND EPOXY COATED. CLEAN INTERNALLY COMPLETE SEA INJECTION PIPE BETWEEN HIGH SEA CHEST AND LOW SEA CHEST BY SEPARATING FROM FLANGES. CARRY OUT ULTRASONIC THICKNESS GAUGING OF VALVE BODIES AND COVERS (MINIMUM 20 POINTS) AND SUBMIT REPORT. YARD TO ARRANGE VULCANIZATION OF BUTTERFLY SEA SUCTION VALVE SEATING AREA(MINOR DAMAGE). QUOTATION TO BE ALL INCLUSIVE (MANPOWER, TOOLS, CONSUMABLES, JOINTS, PACKINGS, TRANSPORTATION, AND INCIDENTAL WORKS). ENGINE INSTRUCTION EA USD 1.00 0.00
I LOW SEA CHEST: ENGINE EA USD 1.00 0.00
I VALVES DIMENSIONS TYPE ENGINE EA USD 1.00 0.00
E26005.1 MAIN SEA SUCTION V/V BEFORE FILTER DN550 BUTTERFLY . ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26005.2 MAIN SEA SUCTION V/V AFTER FILTER DN 550 BUTTERFLY. ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26005.3 AIR VENT VALVE . DN 80 GATE ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26005.4 FILTER HOUSING DRAIN VALVE DN 30 ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26005.5 COMMON V/V FOR STEAM /COMPRESSED AIR BLOW OFF DN 40 GLOBE . ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26005.6 AIR VENT V/V FOR FILTER . 25 MM GLOBE ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
I HIGH SEA CHEST: ENGINE EA USD 1.00 0.00
E26005.8 MAIN SEA SUCTION V/V BEFORE FILTER DN550 BUTTERFLY ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26005.9 MAIN SEA SUCTION V/V AFTER FILTER DN 550 BUTTERFLY ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26005.10 AIR VENT VALVE DN 80 GATE ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26005.11 COMMON V/V FOR STEAM /COMPRESSED AIR BLOW OFF DN 40 GLOBE ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26005.12 AIR VENT V/V FOR FILTER 25 MM GLOBE ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26005.13 MOULDING OF BUTTERFLY VALVES DN 550 BUTTERFLY VALVE DN550 BUTTERFLY ENGINE NOS 4.00 4.00 EA USD 1.00 0.00
E26005.14 SEA SUCTION COMMON MANIFOLD BETWEEN HIGH SEA SUCTION CHEST AND LOW SEA SUCTION CHEST TO BE CLEANED INTERNALLY. CHECK INSIDE CONDITION OF RUBBER COATING . CHECK THICKNESS OF SUCTION COMMON MANIFOLD AND COATING ( 100 POINTS) TO ACERTAIN DAMAGE .VULCANIZATION OF RUBBER COATING TO BE CARRIED OUT IF FOUND DAMAGED. ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26005.15 QUOTE FOR RENEWAL OF DAMAGED RUBBER /PLASTIC COATING , L-05 MTR, ID 0.5MTR, THICKNESS=10MM ENGINE MTR 5.00 5.00 EA USD 1.00 0.00
i EMERGENCY SEA CHEST: ENGINE EA USD 1.00 0.00
E26005.16 SEA SUCTION VALVE (HYD. OPERATED BUTTERFLY VALVE) DN-100 MM BUTTERFLY VALVE) ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26005.17 EMERGENCY FIRE P/P DISCHARGE V/V DN100 GLOBE ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26005.18 QUOTE FOR RENEWAL OF DAMAGED RUBBER/PLASTIC COATING L= 10MTR ID 0.5 MTR THICKNESS = 10MM ENGINE M 10.00 10.00 EA USD 1.00 0.00
E26005.19 QUOTE FOR RENEWAL OF DAMAGED SEA SUCTION MANIGOLD AS PER CLASS APPROVED STEEL MATERIAL L= 10MTR MATERIAL S.S SCH 80 ENGINE MTR 10.00 10.00 EA USD 1.00 0.00
i E26006: OVERBOARD DISCHARGE VALVES (SURVEY): ENGINE EA USD 1.00 0.00
i TYPE / CAPACITY / DETAILS : ENGINE EA USD 1.00 0.00
i OPEN UP SPECIFIED OVERBOARD VALVES FOR OVERHAULING. CLEAN AND INSPECT ALL PARTS FOR CORROSION, WEAR, AND DAMAGE. RENEW WORN/DEFECTIVE PARTS & CONSUMABLES TO THE SATISFACTION OF CLASS/SUPTDS. NUT /BOLTS/DEFECTIVE PARTS & CONSUMABLES-YARD SUPPLY. PITTED GROOVES ON VALVE SEATS AND LIDS TO BE REMOVED, TRANSPORTED TO YARD WORKSHOP, SKIMMED, AND RETURNED TO SHIP. GRIND VALVES ON SEATS; TAKE BLUE IMPRESSIONS OF VALVE SEATS AND LIDS AND PRESENT TO C/E, 2/E, AND SURVEYOR. PRESENT VALVES TO SURVEYOR AFTER PRESSURE TEST; AFTER APPROVAL, REASSEMBLE USING NEW JOINTS AND PACKINGS ,CONSUMABLES (YARD SUPPLY), DULY APPROVED BY C/E & 2/E. INTERNALLY SCRAPE, CLEAN, AND EPOXY COAT ALL VALVE CASINGS. QUOTATION TO BE ALL INCLUSIVE (MANPOWER, TOOLS, CONSUMABLES, JOINTS, PACKINGS, TRANSPORTATION, AND INCIDENTAL WORKS). ENGINE EA USD 1.00 0.00
i VALVES DIMENSIONS TYPE ENGINE INSTRUCTION EA USD 1.00 0.00
E26006.1 MAIN SEA COOLING WATER OVERBOARD V/V STBD DN-300 MM BUTTERFLY ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26006.2 FIRE& BILGE G.S. OVERBOBARD DN- 200MM GLOBE ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26006.3 BALLAST OVBD(FOR STBD SIDE TANKS) DN-350 BUTTERFLY ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26006.4 BALLAST OVBD(FOR PORT SIDE TANKS) DN-350 BUTTERFLY ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26006.5 EJECTOR P/P DISCHAGRE OVBD V/V DN-80 BUTTERFLY ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26006.6 SEWAGE OVBD V/V DN 150 ANGLE STORM ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26006.7 SEWAGE OVBD V/V DN 150 STORM ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26006.8 BILGE WATER SEPARATOR OVERBOARD DISCH. V/V DN -40 MM GLOBE ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26006.9 BILGE & BALLAST EDUCTION DISCH OVBD STBD DN -350 MM BUTTERFLY ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26006.10 BOILER BLOW DOWN OVBD V/V DN 40 GLOBE ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26006.11 GREY WATER DISCH.OVBD V/V DN 125, STORM ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26006.12 GREY WATER DISCHARGE OVBD .V/V DN 125 , ANGLE STORM ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
i E26007: INTERMEDIATE SEA WATER VALVES: ENGINE EA USD 1.00 0.00
i TYPE / DETAILS : ENGINE EA USD 1.00 0.00
i REMOVE SPECIFIED INTERMEDIATE AND BUTTERFLY VALVES AND TRANSPORT TO YARD WORKSHOP. DISMANTLE ALL VALVES; CLEAN AND INSPECT ALL PARTS FOR CORROSION, WEAR, AND DAMAGE IN PRESENCE OF 2/E & C/E. RENEW WORN/DEFECTIVE PARTS & CONSUMABLES TO THE SATISFACTION OF CLASS/SUPTDS. NUT /BOLTS/DEFECTIVE PARTS & CONSUMABLES-YARD SUPPLY. THOROUGHLY CLEAN VALVE BODIES INTERNALLY. LIGHTLY SKIM GROOVES ON VALVE SEATS AND LIDS; GRIND VALVES ON SEATS. TAKE BLUE IMPRESSIONS OF VALVE SEATS AND LIDS; PRESENT TO 2/E & C/E. PAINT VALVE BODIES INTERNALLY WITH TWO COATS OF EPOXY OR EXTERNALLY AS APPLICABLE (YARD SUPPLY). CHECK VALVE SPINDLES FOR FREE OPERATION; INSPECT VALVE LOCKING ARRANGEMENTS. BUTTERFLY VALVES: CHECK SEAT RINGS, OPERATING GEAR, AND LOCKING ARRANGEMENTS; RENEW DAMAGED/DEFORMED PARTS (YARD SUP-PLY). REASSEMBLE ALL VALVES USING NEW JOINTS ,PACKINGS AND CONSUMABLES (YARD SUPPLY) AND ENSURE CORRECT ALIGNMENT. PRESSURE TEST ALL VALVES TO APPLICABLE STANDARDS. QUOTATION TO BE ALL INCLUSIVE (MANPOWER, TOOLS, CONSUMABLES, JOINTS, PACKINGS, TRANSPORTATION, AND INCIDENTAL WORKS). ENGINE EA USD 1.00 0.00
i VALVE DESCRIPTION DIMENSION TYPE ENGINE EA USD 1.00 0.00
E26007.1 MAIN SEA WATER P/P #1 & #2 INLET VALVE DN 300 BUTTERFLY VALVE ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26007.2 MAIN SEA WATER P/P #1 & #2 OUTLET VALVE DN 250 ANGLE GLOBE ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26007.3 LT COOLER BYPASS SEA WATER VALVE DN 300 BUTTERFLY VALVE ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.4 LI COOLERS S.W. IN/OUT V/V DN 200 BUTTERFLY V/V ENGINE NOS 4.00 4.00 EA USD 1.00 0.00
E26007.5 EJECTOR PUMP SUCTION VALVE DN 100 BUTTERFLY ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.6 EJECTOR PUMP DELIVERY VALVE DN100 GLOBE ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.7 INTERMIDITAE V/V B/W EJECTOR P/P DIS LINE AND FIRE/GS P/P DN 100 GLOBE ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.8 FIRE & G.S P/P TO FIRE MAIN DN 150 GLOBE ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.9 FIRE & BILGE P/P TO FIRE MAIN DN 150 GLOBE ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.10 FIRE & GS P/P & FIRE & BILGE P/P TO OVERBOARD DN150 GLOBE ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26007.11 EMERGENCY FIRE PUMP OUTLET VALVE DN 100 MM GLOBE ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.12 M.C.S.W PUMP TO/FRM SLOPE & SEWAGE TAK V/V DN 40 GLOBE ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.13 FIRE & G.S. PUMP TO AFT PEAK TK DN150 BUTTERFLY ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.14 BILGE & G.S. PUMP TO AFT PEAK TK DN 150 BUTTERFLY ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.15 CARGO HOLD BILGE STRIPPING EDUCTOR DRIVE VALVE DN125 BUTTERFLY ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.16 CARGO HOLD BILGE STRIPPING EDUCTOR INLET VALVE DN 150 ANGLE GLOBE ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.17 CARGO HOLD BILGE STRIPPING EDUCTOR DISCHARGE VALVE DN200 BUTTERFLY ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.18 NO.1 BALLAST STRIPPING EDUCTOR DRIVE VALVE DN 125 BUTTERFLY ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.19 NO.1 BALLAST STRIPPING EDUCTOR INLET VALVE DN125 BUTTERFLY ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.20 NO.1 BALLAST STRIPPING EDUCTOR DISCHARGE VALVE DN200 BUTTERFLY ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.21 AFTER PEAK TANK BALLAST VALVE DN150 MM BUTTERFLY ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.22 FIRE & G.S. P/P SUC FROM SEA MAIN DN 200 BUTTERFLY ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.23 BILGE & G.S. P/P SUC FROM SEA MAIN DN 200 BUTTERFLY ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.24 FIRE & G.S. P/P SUC FROM BILGE MAIN DN 200 BUTTERFLY ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.25 BILGE & G.S. P/P SUC FROM BILGE MAIN DN 200 BUTTERFLY ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.26 FIRE & G.S. P/P SUC FROM F.W. WASHING TANK. DN 150 BUTTERFLY ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.27 FIRE & BILGE. P/P SUC FROM F.W. WASHING TANK DN 150 BUTTERFLY ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.28 MSW P/P DISCHARGE SIDE NRV DN250 NRV ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26007.29 NO.1 BALLAST STRIPPING EDUCTOR INLET SIDE NRV DN125 NRV ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.30 NO.2 BALLAST STRIPPING EDUCTOR INLET SIDE NRV DN125 NRV ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.31 FIRE & G.S PUMP DISCHAGRE SIDE NRV DN150 NRV ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.32 BILGE & G.S PUMP DISCHAGRE SIDE NRV DN150 NRV ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.33 BILGE & G.S PUMP DISCHAGRE TO AFT PEAK TANK. NRV DN200 NRV ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.34 FIRE & G.S PUMP DISCHAGRE TO AFT PEAK TANK NRV DN 150 NRV ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.35 FIRE & GS PUMP TO FIRE MAIN LINE NRV DN150 NRV ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.36 BILGE & GS PUMP TO FIRE MAIN LINE NRV DN150 NRV ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.37 QUOTE FOR SUPPLY OF HIGH GRADE NEOPRENE SEAT RING FOR 50 MM BUTTERFLY VALVE SIZE,QTY-02 EACH ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26007.39 QUOTE FOR SUPPLY OF HIGH GRADE NEOPRENE SEAT RING FOR 100 MM BUTTERFLY VALVE SIZE,QTY-02 EACH ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26007.40 QUOTE FOR SUPPLY OF HIGH GRADE NEOPRENE SEAT RING FOR 125 MM BUTTERFLY VALVE SIZE,QTY-02 EACH ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26007.41 QUOTE FOR SUPPLY OF HIGH GRADE NEOPRENE SEAT RING FOR 150 MM BUTTERFLY VALVE SIZE,QTY-02 EACH ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26007.42 QUOTE FOR SUPPLY OF HIGH GRADE NEOPRENE SEAT RING FOR 200 MM BUTTERFLY VALVE SIZE,QTY-02 EACH ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26007.43 QUOTE FOR SUPPLY OF HIGH GRADE NEOPRENE SEAT RING FOR 250 MM BUTTERFLY VALVE SIZE,QTY-02 EACH ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26007.44 QUOTE FOR SUPPLY OF HIGH GRADE NEOPRENE SEAT RING FOR 300 MM BUTTERFLY VALVE SIZE,QTY-02 EACH ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26007.45 QUOTE FOR SUPPLY OF HIGH GRADE NEOPRENE SEAT RING FOR 350 MM BUTTERFLY VALVE SIZE,QTY-02 EACH ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
i ATMOSPHERIC CONDENSOR:DONGHWA ENTEC ENGINE EA USD 1.00 0.00
E26007.46 STEAM TO DUMP CONDENSER INLET & OUTLET V/VS DN 65 GLOBE ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26007.47 AUTO DUMP VALVE DN80 GLOBE ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.48 MANUAL DUMP VALVE DN65 GLOBE ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.49 ATM CONDENSOR INLET/OUTLET DN65 GLOBE ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.50 STEAM TO CONDENSOR DN32 GLOBE ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26007.51 SEA WATER INLET/OUTLET TO CONDENSOR DN 150 BUTTERFLY ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.52 LT COOLER FRESH WATER INLET/OUTLET DN200 BUTTERLFY ENGINE NOS 4.00 4.00 EA USD 1.00 0.00
i FRESH WATER GENERATOR: MAKE-DONGHWA ENTEC (Dx-a-25) ENGINE EA USD 1.00 0.00
E26007.53 FRESH WATER GENERATOR JACKET INLET DN100 GLOBE ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.54 FRESH WATER GENERATOR JACKET OUTLET DN 100 GLOBE ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.55 JACKET WATER BYPASS DN100 GLOBE ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
i BILGE (DAILY) TRANSFER PUMP: MAKE- SHIN SHIN HAMWORTHY P 102 ENGINE EA USD 1.00 0.00
E26007.56 SUCTION FROM BILGE MAIN DN 40 GLOBE N/R ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.57 SUCTION FROM BILGE HOLDING TANK DN40 ANGULAR GLOBE N/R ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.58 DISCHARGE TO BILGE HOLDING TANK DN40 GLOBE N/R ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26007.59 BILGE WELL PORT/STBD/AFT SUCTION DN100 GLOBE NR ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
i STEAM V/VS: ENGINE EA USD 1.00 0.00
E26007.60 H.F.O /LSFO SETTLING TANK STEAM INLET V/V & OUTLET V/V DN25 STOP V/V ENGINE NOS 8.00 8.00 EA USD 1.00 0.00
E26007.61 H.F.O/LSFO SERVICE TANK STEAM INLET V/V & OULET V/V DN25 STOP V/V ENGINE NOS 8.00 8.00 EA USD 1.00 0.00
E26007.62 NO.1 PORT/STBD,NO.2 PORT/STBD, PORT/STBD STORAGE TANK STEAM INLET V/V AND OUTLET VALVE WITH STEAM TRAP DN25 STOP V/V ENGINE NOS 12.00 12.00 EA USD 1.00 0.00
E26007.63 H.F.O OVERFLOW TANK STEAM INLET V/V & OUTLET V/V DN25 STOP V/V ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26007.64 HO/LO PURIFIER HEATER STEAM INLET V/V & OUTLET V/V DN25 STOP V/V ENGINE NOS 6.00 6.00 EA USD 1.00 0.00
E26007.65 INCINERATOR WASTE OIL SETTLING TK OBT, SLUDGE TK INLET & OUTLET V/V DN25 STOP V/V ENGINE NOS 6.00 6.00 EA USD 1.00 0.00
i E26008:SEA WATER FILTERS: ENGINE EA USD 1.00 0.00
i TYPE / CAPACITY / DETAILS: ENGINE EA USD 1.00 0.00
i THE FOLLOWING FILTERS ARE TO BE OPENED, CLEANED, AND BOXED BACK WITH NEW GASKETS. PURGING VALVES OF THE FILTER COVERS (35 MM DIA) ARE TO BE OVERHAULED. FILTER ELEMENTS ARE TO BE RENEWED WITH STAINLESS STEEL PERFORATED SHEETS OF 6 MM THICK-NESS, IF FOUND DAMAGED. THE FILTER CHAMBERS ARE TO BE COATED WITH THREE (3) COATS OF EPOXY PAINT. ENGINE INSTRUCTION EA USD 1.00 0.00
E26008.1 TO FABRICATE SEA CHEST FILTER BODY ALONG WITH COVER INCLUDING SUPPLY OF NUTS AND BOLTS APS:OD: 1100MM, TOP COVER THICKNESS: 30MM, HOUSING HEIGHT: 1120MM, BOLT DIA: 30MM, NO. OF BOLTS: 20, PCD: 1020MM,BOLT PITCH CIRCLE RADIUS: 510MM, BOLT ANGULAR SPACING: 18° ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26008.2 FILTER DRAIN COVERS TO OPEN; COVER HOLDING STUDS (6 NO. × 5/8 DIA) TO BE REPLACED WITH G.I. STUDS AND NUTS AND COVERS TO FIT BACK WITH NEW PACKINGS FOR ITEM NOS. 01 TO 06. ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26008.3 MAIN HIGH SEA & LOW SEA SUCTION LINE FILTERS × 2 NOS. ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26008.4 FILTERS FOR G.S. P/P & FIRE & BILGE PUMP SUCTION ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26008.5 EJECTOR PUMP SUCTION ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26008.6 FILTER FOR EMC'Y FIRE P/P ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26008.7 SEA SUCTION PIPE; BETWEEN HIGH SEA CHEST AND LOW SEA CHEST DN 550 TO BE CLEARED FROM SEA GROWTH MANUALY WITH SCRAPING.RENEW DAMAGED COATING. ENGINE MTR 10.00 10.00 EA USD 1.00 0.00
i E26009: ENGINE ROOM PUMPS (SURVEY): ENGINE EA USD 1.00 0.00
i TYPE / CAPACITY / DETAILS : ENGINE EA USD 1.00 0.00
i ISOLATION & REMOVAL: ELECTRICALLY ISOLATE, DISCONNECT, AND REMOVE THE PUMP MOTOR. DISCONNECT INLET AND DISCHARGE PIPELINES AND REMOVE THE COMPLETE PUMP FROM ITS LOCATION. TRANSPORT THE PUMP TO THE YARD WORKSHOP. DISMANTLING & INSPECTION: DISMANTLE THE PUMP COMPLETELY. CLEAN ALL COMPONENTS THOROUGHLY AND PRESENT PARTS FOR INSPECTION TO THE ATTENDING CLASS SURVEYOR. CHECK MOUTH RING AND WEAR RING CLEARANCES. REPAIRS & RENEWALS: ADJUST MOUTH RING AND WEAR RING CLEARANCES BY MACHINING MOUTH RINGS AND MANUFACTURING/FITTING NEW WEAR RINGS (YARD SUPPLY), AS REQUIRED. INSPECT THE SHAFT AND CHECK FOR TRUENESS; BUILD UP THE SHAFT BY APPROVED METAL SPRAY METHOD IF REQUIRED. INSPECT THE IMPELLER AND BUILD UP WITH SUITABLE APPROVED MATERIAL IF REQUIRED. INSPECT PUMP CASING; BUILD UP AND MACHINE SEATING SURFACES IF REQUIRED. BEARINGS, MECHANICAL SEALS, BUSHES, SLEEVES, WEAR RINGS, AND OTHER DAMAGED PARTS TO BE RENEWED AS REQUIRED (YARD SUPPLY). ROTATING ASSEMBLY & BALANCING: ASSEMBLE THE ROTATING ASSEMBLY AND CARRY OUT DYNAMIC BALANCING TO MANUFACTURER/CLASS REQUIREMENTS. PRIMING UNIT: OVERHAUL ALL ASSOCIATED PRIMING UNITS. RENEW FLOATS, RUBBER RINGS, AND SEALS AS REQUIRED (YARD SUPPLY). REASSEMBLY & TRANSPORT: AFTER SATISFACTORY SURVEY, REASSEMBLE THE PUMP IN GOOD WORKING ORDER. TRANSPORT THE OVERHAULED PUMP BACK TO THE VESSEL. FOUNDATION & REINSTALLATION: INSPECT PUMP FOUNDATION AND DRESS/REPAIR IF REQUIRED. INSTALL THE PUMP ON THE FOUNDATION USING RENEWED BOLTS, NUTS, AND WASHERS (YARD SUPPLY). RECONNECT INLET AND DISCHARGE PIPELINES WITH NEW GASKETS/JOINTING. RENEW PRESSURE GAUGE, CAPILLARY TUBING, AND PRESSURE GAUGE CONNECTIONS. MOTOR REINSTALLATION & ELECTRICAL WORK REFIT THE MOTOR AND RESTORE ELECTRICAL SUPPLY. CHECK ALIGNMENT BETWEEN MOTOR AND PUMP AFTER INSTALLATION. TESTING & TRIALS CARRY OUT SATISFACTORY OPERATIONAL TRIALS OF THE PUMP TO THE SATISFACTION OF THE CHIEF ENGINEER / ATTENDING SUPERINTEN-DENT. DURING REPAIR AND AFTER COMPLETION, THE PUMP TO BE PRESENTED TO THE CLASS SURVEYOR FOR INSPECTION AND ACCEPTANCE PRIOR TO AND AFTER ONBOARD INSTALLATION. ACCESS & RESTORATION REMOVE PLATFORMS AND HANDRAILS AROUND THE PUMP AS REQUIRED FOR ACCESS AND REFIT THEM AFTER COMPLETION OF THE JOB. CONSUMABLES & COST INCLUSION ALL BOLTS, NUTS, WASHERS, GASKETS, JOINTING MATERIALS, PACKINGS, AND WASTED FASTENERS TO BE RENEWED (YARD SUPPLY). QUOTATION FOR PUMP OVERHAULING TO BE INCLUSIVE OF ALL TOOLS, CONSUMABLES, MANPOWER, TRANSPORTATION, MACHINING, BAL-ANCING, AND ASSOCIATED WORKS. ENGINE INSTRUCTION EA USD 1.00 0.00
i DETAILS OF THE P/PS AS FOLLOWS: ENGINE EA USD 1.00 0.00
E26009.1 BALLAST PUMPS Maker :SHIN SHIN MACHINERY CO., LTD; MODEL:DB350V1D CAPACITY:-1000M3/Hx25m MOTOR: 95 KWX 1200 RPM 440 V 60 Hz 3 PH ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26009.2 MAIN S.W PUMPS Maker ;SHIN SHIN MACHINERY CO; LTD; MODEL: DB250 V1D : VERTICAL CENTRIFUGAL PUMP :CAPACITY:-540M3/Hx20m MOTOR: 50 KWX 1800 RPM 440 V 60 Hz 3 PH ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26009.3 FIRE AND GS PUMP; FIRE & BILGE PUMP CENTRIFUGAL PUMP; SHIN SHIN MACHINERY CO; LTD; MODEL : SVF150 CAPACITY:- 120/240 M3/H X 80/30M MOTOR: 70KWX1800 RPM; 440V; 60 Hz; 3 PH ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26009.4 EMERGENCY FIRE PUMP SHIN SHIN MACHINERY CO; LTD; MODEL: SVS100;CAPACITY-72M3/HR X 80M;MOTOR:37KW X1800RPM;440V;60HZ;3PH ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26009.5 MAIN ENGINE L.O.PUMP NO 1 AND 2 TO BE OVERHAULED CENTRIFUGAL PUMP; MODEL : MLO 200A1 CAPACITY: 211 M3/HX M ; MOTOR: 60KWX1800 ; 440V 60 HZ 3PH ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26009.6 BILGE TRANSFER PUMP;Maker : SHIN-SHIN MACHINERY CO LTD; MODEL: P102 : PISTON PUMP; CAPACITY: 5 M3/H; MOTOR: 2.2 KWX 1800 RPM X 60HZ X 3PH ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26009.10 BOILER FEED PUMP MAKER SHIN SHIN MACHINERY CO LTD MODEL TSH 50A CAPACITY 3 M3/HR HEAD 120M MOTOR 440/3PH/60HZ/3600RPM ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26009.11 F.W.G. EJECTOR PUMP . MAKE:SHIN SHIN MACHINERY MODEL: MSC 100D; CAP: 61 m3/hr; HEAD: 48m; 1800 rpm. ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
i E26010: F.O. HEATERS / HEAT EXCHANGERS ENGINE EA USD 1.00 0.00
I TYPE / CAPACITY / DETAILS : ENGINE EA USD 1.00 0.00
I HEATER OVERHAULING: DISCONNECT THE HEATER BY REMOVING ALL CONNECTED PIPES AND VALVES. TRANSPORT THE HEATER TO THE YARD WORKSHOP. DISMANTLE THE HEATER COMPLETELY. CHEMICALLY CLEAN BOTH SHELL SIDE AND TUBE SIDE. OVERHAUL THE RELIEF VALVE AND SET THE PRESSURE AS PER MAKER’S RECOMMENDATIONS. BOX BACK THE HEATER USING NEW O-RINGS, GASKETS, AND VENT COCKS, AS REQUIRED. CARRY OUT PRESSURE TESTING; RECTIFY ANY LEAKAGE FOUND AND RETEST UNTIL SATISFACTORY. TRANSPORT THE HEATER BACK ONBOARD AND RECONNECT ALL PIPES AND VALVES. SCOPE & COST INCLUSION: QUOTATION FOR HEATER OVERHAULING TO BE INCLUSIVE OF ALL REPAIR TOOLS, RENEWAL OF TUBES (IF REQUIRED), CONSUMABLES, NEW JOINTS AND PACKINGS, TUBE PLUGGING MATERIALS, MANPOWER, TRANSPORTATION, AND ALL ASSOCIATED WORKS. ENGINE INSTRUCTION EA USD 1.00 0.00
E26010.1 FCM FWD AND AFT F.O. HEATERS MODEL : MX 20 L =1400 SHELL AND TUBE TYPE HEAT EXCHANGRES(STEAM PRESS. 7 KG) ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26010.2 MAIN ENGINE JACKET COOLING PRE HEATER Maker :DONGHWA ENTEC SHELL AND TUBE TYPE(DIA-40 CM,L-75 CM) ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26010.3 D.O./H.O. PURIFIER HEATER Maker : DONGHWA ENTEC, SHELL AND TUBE TYPE (L= 972MM, WT. 140KG) ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26010.4 LO PURIFIER HEATER Maker :DONGHWA ENTEC SHELL AND TUBE TYPE (L= 962MM, WT= 110 KG) ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26010.5 M/E L.O. COOLER (PLATE TYPE HEAT EXCHANGER) TO OPEN UP; CHEMICALLY CLEANED; GASKETS TO BE RENEWED IF REQUIRED (YARD SUPPLY); ASSEMBLED AND SATISFACTORY TRIAL TO BE SHOWN TO SHIP'S STAFF. ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
i E26011: MAIN ENGINE : ENGINE EA USD 1.00 0.00
I TYPE / CAPACITY / DETAILS : MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM ENGINE EA USD 1.00 0.00
I SCOPE OF WORK: MAJOR OVERHAULING/DECARBONISATION OF THE MAIN ENGINE UNIT TO BE CARRIED OUT BY THE YARD’S COMPETENT TEAM. ALL WORK MUST STRICTLY FOLLOW THE MANUFACTURER’S MAINTENANCE INSTRUCTIONS, WITH ALL NECESSARY SAFETY PRECAUTIONS OBSERVED. CHARGES: YARD TO PROVIDE A LUMP-SUM QUOTATION PER MAIN ENGINE UNIT FOR THE COMPLETE DECARBONISATION. SUPPLIES AND TOOLS: ALL REQUIRED SPARES AND TOOLS TO BE SUPPLIED BY THE SHIP. COORDINATION AND APPROVALS: YARD TO COORDINATE WITH SURVEYORS AS AND WHEN REQUIRED. ALL SURVEYABLE ITEMS MUST BE PRESENTED TO SURVEYORS FOR APPROVAL PRIOR TO ASSEMBLY. ENGINE INSTRUCTION EA USD 1.00 0.00
E26011.1 MAIN ENGINE CRANK SHAFT DEFLECTION TO BE TAKEN BEFORE DISMANTLING AND AFTER ASSEMBLING.ALL READINGS TO BE SUBMITTED. ENGINE PCS 2.00 2.00 EA USD 1.00 0.00
E26011.2 ISOLATE ALL SIX UNITS DRAIN COOLING WATER FUEL OIL ETC. REMOVE ALL NECESSARY CYLINDER HEAD CONNECTIONS REMOVE CYLINDER HEADS WITH EXHAUST VALVES AND TRANSPORT SAME TO YARD WORKSHOP. ENGINE SET 6.00 6.00 EA USD 1.00 0.00
E26011.3 COMPLETE OVERHAULING OF CYLINDER HEAD AND MOUNTINGS AS PER MAKER GUIDELINE-DISCONNECT AND REMOVE ALL CYLINDER HEAD MOUNTINGS. DISMANTLE CYLINDER HEADS AND SEPARATE THEM FROM COOLING JACKETS. THROUGHLY CLEAN CYLINDER HEADS AND COOLING JACKET SURFACES.RENEW ALL “O”RINGS & CONSUMABLES AND ASSEMBLE CYLINDER HEADS AND COOLING JACKETS.CYLINDER HEAD COOLING SURFACES TO BE PRESSURE TESTED TO 06 KG/CM2 AND SHOWN TO 2EO & CEO.ALL CYLINDER HEAD MOUNTINGS POCKETS AND SEATS TO BE THOROUGHLY CLEANED AND SEATS TO BE LAPPED.FUEL VALVE AREA TO BE CHECKED FOR CORROSION ATTACK AND IF SAME EXCEEDS THE LIMIT SPECIFIED BY MAKER THEN NECESSARY REPAIR TO BE CARRIED OUT AS PER MAKER RECOMENDATION.CYLINDER AIR STARTING V/VS RELIEF V/VS FUEL V/VS AND INDICATOR VALVES TO BE O'HAULED AND TESTED TO PROVE SATISFACTORY OPERATION AND SHOWN TO 2EO/CEO.CYLINDER HEAD RELIEF V/VS TO BE PRESSURE TESTED TO CORRECT OPENING PRESSURE AND SHOWN TO 2EO/CEO.INDICATOR V/VS LEAK TEST TO BE SHOWN TO 2EO / CEO.AFTER THE APPROVAL OF SURVEYORS & SUPDT ALL THE MOUNTINGS TO BE ASSEMEBLED AND FITTED BACK IN PLACE.QUOTE INCLUSIVE OF ALL ASSOCIATED JOBS. ENGINE SET 6.00 6.00 EA USD 1.00 0.00
E26011.4 COMPLETE OVERHAULING OF EXHAUST VALVE AS PER MAKER GUIDELINE-DISMANTLE THE EXHAUST V/VS COMPLETELY. THOROUGHLY CLEAN ALL PARTS & SHOWN TO SURVEYORS & SUPTD. RENEW ALL WORN / DEFECTIVE PARTS AS REQUIRED & ALL SEAL RINGS FROM SHIP’S SPARES. CHECK THE VALVE & SEATS, IF REQUIRED GROUND THE VALVES & SEATS AS PER MAKER’S INSTRUCTIONS. THOROUGHLY CLEAN EXHAUST V/VS COOLING WATER SURFACES. ASSEMBLE THE EXHAUST VALVES AS THE ORIGINAL AND FIT THE EXHAUST VALVES IN PLACE ON CYLINDER HEADS. ALL CYLINDER HEAD ASSSEMBLIES TO BE TRANSPORTED BACK ONBOARD.QUOTE INCLUSIVE OF ALL ASSOCIATED JOB. ENGINE SET 6.00 6.00 EA USD 1.00 0.00
E26011.5 LINERS TO BE REMOVED FROM PLACE AND THOROUGH CLEANING OF LINER AND JKT TO BE CARRIED OUT.ALL LINER SURFACES & SCAVENGE PORTS TO BE THROUGHLY CLEANED. L.O.QUILL PASSAGES TO BE THROUGHLY BLOWN THROUGH WITH COMPRESSED AIR & CLEARED. LINERS TO BE CALIBRATED AND READINGS TO BE RECORDED.CARRY OUT DYE CHECK ON ALL CYLINDER LINERS IN WAY OF L.O.GROOVES FOR DETECTING CRACKS, IF ANY AND SAME TO BE SHOWN TO SURVEYOR AND SUPDT. ALL L.O. QUILLS TO BE O'HAULED & FUNCTION TESTED IN PRESENCE OF 2EO/CEO.LINER PORTS EDGES TO BE SMOOTHENED IF REQUIRED.OLD/NEW LINERS TO BE BOXED BACK USING NEW O-RINGS AND CONSUMABLES.QUOTE ALL INCLUSIVE FOR LINER RENEWAL. ENGINE SET 6.00 6.00 EA USD 1.00 0.00
E26011.6 COMPLETE OVERHAULING OF PISTON AND STUFFING BOX AS PER MAKER GUIDELINE-PISTON HOLDING NUTS TO BE OPENED. LINER TOP RIDGES TO CLEAN AND GRIND. PISTON TO BE WITHDRAWN ALONG WITH STUFFING BOXES AND SHIFTED/TRANSPORTED TO SHOP.PISTON RING & STUFFING BOX TO BE REMOVED STUFFING BOX TO BE DISMANTLED CLEANED INSPECTED AND ASSEMBLED WITH NEW SPARE SHIP SUPPLY CHECK THE PISTON CROWN WEAR DOWN BY WEARDOWN GAUGE. PISTON RING GROOVES TO BE THOROUGHLY CLEANED. GROOVES & PISTON RINGS TO BE CALIBRATED & READINGS TO BE RECORDED AND SHOWN TO CEO/SUPDT.IF PISTON RING GROOVE FOUND ENLARGED ,CROWN AND ACCESSORIES TO BE RENEWED FROM SHIP'S STOCK.ALL PARTS TO BE PRESENTED TO SURVEYORS & SUPTD & AFTER THEIR APPROVAL ASSEMBLE ALL PISTONS AS PER MAKER’S INSTRUCTIONS. ALL PISTONS TO BE PRESSURE TESTED WITH OIL TO 10 BARS/MAKER GUIDELINE IN PRESENCE OF SURVEYORS & SUPTD/CEO. PISTON ROD TO BE GAUGED. PISTONS TO BE ASSEMBLED WITH NEW PISTON RINGS. PISTON ROD STUFFING BOX ALL PARTS TO BE THOROUGHLY CLEANED. STUFFING BOX CALIBRATIONS TO CHECK AND RECORD THE READINGS. ALL WORNOUT / DAMAGED PARTS TO BE RENEWED FROM SHIP’S SPARES. STUFFING BOXES TO BE ASSEMBLED ON PISTON RODS USING NEW SEAL RINGS SCRAPER RINGS & SPRINGS. PISTON WITH RODS ALONG WITH STUFFING BOXES TO BE TRANSPORTED BACK ONBOARD AND FITTED BACK IN PLACE STRICTLY IN LINE WITH MAKER'S GUIDELINES.CROSS HEAD SURFACES TO BE CLEANED THOROUGHLY. LOWER THE PISTONS IN PLACE ALONG WITH THE STUFFING BOXES AND TIGHTEN THE NUTS AS PER MAKER’S INSTRUCTIONS.STUFFING BOX BOLTS TO BE TIGHTENED. ALL LASHINGS / LOCKINGS TO BE RESTORED. LOWER THE CYLINDER HEADS ALONG WITH EXHAUST V/VS AND TIGHTEN THE NUTS. ALL CYLINDER HEAD CONNECTIONS TO BE RESTORED BACK AS THE ORIGINAL. C.W. TO BE TRIED OUT AND ENSURE NO LEAKAGES. F.O. & L.O. TO BE TRIED OUT. F.O.LINES TO BE PRIMED. ALL LAGGINGS TO BE FIT BACK TO ITS ORIGINAL POSITION AND SECURE. ENGINE SET 6.00 6.00 EA USD 1.00 0.00
E26011.7 PISTON CROWN TO BE DISMANTLED FROM THE ROD,TO BE THRORUGHLY CLEANED ,TO BE CALIBRATED & RECORDED, NEW/OLD CROWN TO BE FITTED BACK USING NEW D RINGS & ACCESORIES, PISTON TO BE PR TESTED IN LINE WITH MAKER'S GUIDELINES. PISTON TO BE FITTED BACK IN PLACE STRICTLY IN LINE WITH MAKER'S GUIDE LINES USING SHIP SUPPLIED SPARES.QUOTE ALL INCLUSIVE. ENGINE SET 6.00 6.00 EA USD 1.00 0.00
E26011.8 SCAVENGE RELEIF DEVICES CRANKCASE DOORS AND RELIEF DEVICES TO OVERHAUL AND TO BE SHOWN TO THE CLASS SURVEYOR ENGINE LS 1.00 1.00 EA USD 1.00 0.00
E26011.9 HYDRAULIC ACTUATOR FOR EXH VALVES TO BE OVERHAULED. HOUSING AND PISTON TO BE LIFTED PARTS TO BE DISMANTLED INSPECTED AND SHOWN TO SURVEYOR.OIL CYLINDER LINER TO CALIBRATE.SAFETY V/VS AND NON RETURN V/VS TO BE OVERHAULED.AFTER SURVEY ACTUATOR TO BOXED BACK WITH NEW PISTON RING AND FITTED ON ITS PLACE WITH ALL CONNECTION. ENGINE NOS. 6.00 6.00 EA USD 1.00 0.00
E26011.10 AUTOMATIC STARTING AIR SHUT OFF VALVE TO OVERHAUL.ALL SPARES SHIP SUPPLY. ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26011.11 ALL UNITS UNDER PISTON AND SCAVENGE SPACES TO BE THOROUGHLY CLEANED .EXH.MANFIFOLD INCPECTION DOORS TO BE OPENED UP FOR CLEANING.ENTIRE EXHAUST MANIFOLD TO BE THOROUGHLY DECARBONISED AND CLEANED USING WIRE BRUSHES AND SHOWN TO CEO/2EO.TURBOCHARGER INLET GRIDS TO BE THOROUGHLY CLEANED AND INSPECTED FOR WEAR DOWN/DAMGE.IF REQUIRED SAME TO BE REPAIRED OR RENEW.ALL UNDER PISTON AND SCAVENGE SAPCES TO BE INSPECTED.EXHAUST MANIFOLD INSPECTION DOORS & UNDER PISTON & SCAVENGE SPACE DOORS TO BE BOXED BACK AS THE ORIGINAL USING NEW JOINTS(YARD SUPPLY).CONSIDER RENEWAL OF 24 NOS BOLST/STUDS WITH NUT OF ASSORTED SIZES.C/CASE TO BE THOROUGHLY CLEANED & INSPECTED.C/CASE DOORS TO BE BOXED BACK WITH NEW JOINTS(YARD SUPPLY)AS THE ORIGINAL.SCAVENGE RELIEF DEVICES CRANK CASE DOORS AND RELIEF DEVICES TO OVERHAUL AS REQUIRED AND TO BE SHOWN TO THE CLASS SURVEYOR. ENGINE LS 1.00 1.00 EA USD 1.00 0.00
E26011.12 ME TO BE TURNED ON TURNING GEAR WITH L.O. PUMP RUNNING FOR SOME TIME.SATISFACTORY MAIN ENGINE RUNNING TRIAL(BASIN TRIALS) TO BE GIVEN TO THE SATISFICATION OF SHIP'S STAFF.MAIN ENGINE SEA TRIALS FOR ABOUT 4-6 HOURS ALSO TO BE GIVEN.CONSIDER 12 PERSONNEL FORM YARD ALONG WITH SHIP REPAIR MANAGER ACCOMAPNY THE SHIP FOR SEA TRIALS. ENGINE LS 1.00 1.00 EA USD 1.00 0.00
E26011.13 DRIVING GEAR & CHAIN TENSIONING TO BE CHECKED THRORUGHLY UNDER THE SUPERVISION OF COMPETENT/SERVICE ENGINEER AND PUT UP TO SURVEYOR FOR CHECKS AND VERIFICATION UNDER CSM SURVEY. CHAIN TENSION TO BE ADJUSTED, IF REQUIRED. ENGINE LS 1.00 1.00 EA USD 1.00 0.00
E26011.14 THOROUGH INSPECTION OF CRANSHAFT & ITS WEB, CAM CASE, ROLLER FOLLOWER , CAMS AND ENSURE ALL ARE IN ORDER. ENGINE SET 6.00 6.00 EA USD 1.00 0.00
E26011.15 EXHAUST CAM ROLLER FOLLOWERS AND AND FUEL CAM ROLLER FOLLOWER TO BE DISMANTLED, CHECKED, OPVERHAULED USING SHIP SUPPLIED AND FITTED BACK STRICTLY INLINE WITH MAKER'S GUIDE LINES. ENGINE SET 6.00 6.00 EA USD 1.00 0.00
i E26012: MAIN ENGINE FUEL INJECTION PUMPS: ENGINE EA USD 1.00 0.00
I TYPE / CAPACITY / DETAILS :MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM ENGINE EA USD 1.00 0.00
I FOLLOWING JOBS TO CARRY OUT UNDER THE SUPERVISION OF COMPETENT ENGINEER/ SERVICE ENGINEER. ISOLATE EMERGENCY STOP BUTTON AS LONG AS ANY WORK IS CARRIED ON FUEL PUMP BLOCKS. ENGINE INSTRUCTION EA USD 1.00 0.00
E26012.1 ALL INLET AND OUTLET CONNECTIONS TO BE REMOVED AND FUEL P/P BLOCKS TO BE TAKEN OUT FROM PLACE TRANSPORTED TO YARD'S WORKSHOP. PUMPS TO BE COMPLETELY DISMANTLED FOR INSPECTION, PARTS TO BE CLEANED , OVERHAULED AND MADE READY FOR SURVEY.ALL UNIT PLUNGER BARREL TO OVERHAULED/RENEWED AND SEALING RING TO BE RENEWED.PUNCTURE VALVE AND SUCTION VALVE TO BE OVERHAULED. ALL FUEL INJECTION PUMPS TO PRESENT TO CLASS SURVEYORS & AFTER COMPLETION OF SURVEY TO BOX BACK AS ORIGINAL.INDIVIDUAL P/P TIMING TO CHECK & ADJUSTED AS NECESSARY & TO BE RECORDED. SHOCK ABSORBER TO BE CHECKED AND OVERHAULED . FUEL CAM TO BE CHECKED AND LEAD TO BE MEASURED.SATISFACTORY SEA TRIAL TO BE GIVEN DURING BASIN/SEA TRIAL. ENGINE NOS 6.00 6.00 EA USD 1.00 0.00
E26012.3 VIT GEAR TO BE CHECKED AND OVERHAUL/ADJUSTED, IF REQUIRED ENGINE SET 6.00 6.00 EA USD 1.00 0.00
i E26012: MAIN ENGINE FUEL INJECTION VALVES ENGINE EA USD 1.00 0.00
i TYPE / CAPACITY / DETAILS :MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM ENGINE EA USD 1.00 0.00
I FOLLOWING JOBS TO CARRY OUT UNDER THE SUPERVISION OF COMPETENT ENGINEER/ SERVICE ENGINEER. ENGINE EA USD 1.00 0.00
E26014.1 FUEL INJECTION V/VS TO BE DISMANTLED, THRORUGHLY CLEANED, OBVERHAULED, BOXED BACK & PRESSURE TESTED STRICKTLY IN LINE WITH MAKER'S GUIDE LINES USING SHIP SUPPLIED SPARES/ REPAIR KITS. ENGINE NOS 12.00 12.00 EA USD 1.00 0.00
i E26013: MAIN ENGINE MAIN BEARINGS, CRANK PIN BEARINGS & THRUST BEARINGS: ENGINE EA USD 1.00 0.00
I TYPE / CAPACITY / DETAILS :MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM ENGINE EA USD 1.00 0.00
E26014.2 MAIN BEARING AND JOURNAL TO BE OPENED UP FOR CSM SURVEY.CHECK AND RECORD ALL BRG CLEARANCES BEFORE AND AFTER INSPECTION.ALL PARTS TO CLEAN AND PRESENT TO CLASS SURVEYOR.AFTER SUCCESSFUL COMPLETION OF SURVEY BEARINGS TO BE BOXED BACK AS ORIGINAL. JOURNALS TO POLISH PRIOR TO BOXING UP.DYE PENETRANT TEST TO BE CARRIED OUT FOR CHECKING ANY CRACK. ENGINE PCS 2.00 2.00 EA USD 1.00 0.00
E26014.3 CRANK PIN BEARING AND JOURNAL TO BE OPENED UP FOR CSM SURVEY.CHECK AND RECORD ALL BRG CLEARANCES BEFORE AND AFTER INSPECTION.ALL PARTS TO CLEAN AND PRESENT TO CLASS SURVEYOR.AFTER SUCCESSFUL COMPLETION OF SURVEY BEARINGS TO BE BOXED BACK AS ORIGINAL. JOURNALS TO POLISH PRIOR BOXING UP.DYE PENETRANT TEST TO BE CARRIED OUT FOR CHECKING ANY CRACK. ENGINE PCS 2.00 2.00 EA USD 1.00 0.00
E26014.3.1 ALL AHEAD AND ASTERN THRUST BEARINGS PADS TO BE OPENED UP AS PER MANUAL AND SAME TO BE PUT UP FOR SURVEY UNDER CSM SURVEY.UPON COMPLETION OF SURVEY, SAME TO BE BOXED BACK. ENGINE PCS 2.00 2.00 EA USD 1.00 0.00
E26014.4 ALL UNIT CLEARANCES MUST BE MEASURED BEFORE AND AFTER INSPECTION. ENGINE LS 1.00 1.00 EA USD 1.00 0.00
i E26015:MAIN ENGINE CROSS HEAD BEARINGS: ENGINE EA USD 1.00 0.00
I TYPE / CAPACITY / DETAILS :MAN B & W 6S50MC-C8 TIER II POWER = 9480 KW @ 127 RPM ENGINE EA USD 1.00 0.00
E26015.1 ME CROSS HEAD BRG TO BE OPENED UP FOR SURVEY. FOLLOWING JOBS TO BE CARRIED OUT AS PER MAKER'S INSTRUCTIONS.QUOTE FOR PER UNIT. NO OF UNIT WILL BE DECIDED AS PER SURVEYOR ADVICE. CHECK AND RECORD CROSSHEAD BRGS AND GUIDESHOE CLEARANCES BEFORE OPENING THE XHD BEARING AND AFTER ASSEMBLY OF XHD BRGS. DISMANTLE BRG AS PER MAKER'S INSTRUCTION.BOTH TOP AND BOTTOM BEARING TO BE TAKEN OUT. ALL PARTS TO BE CLEANED.BOTH TOP AND BOTTOM BRG SHELLS AND CROSSHEAD PINS TO BE EXAMINED. CROSSEHAD PIN TO CALIBRATE AND READINGS TO RECORD.DYE PENETRANT TEST TO BE CARRIED OUT. ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26015.4 TO MEASURE CLEARANCE BETWEEN ALL RECIPROCATING PARTS: 1. CENTERING OF THE LINER. 2. CLEARANCE BETWEEN GUIDE STRIP AND XHD. 3. CLEARANCE BETWEEN GUIDE SHOE AND XHD. ENGINE LS 1.00 1.00 EA USD 1.00 0.00
i E26016:MAIN ENGINE TURBOCHARGER: ENGINE EA USD 1.00 0.00
I TYPE /CAPACITY / DETAILS : MAKE:MAKE:STX ENPACO TYPE-TCA66-2(TCA -21157) ENGINE EA USD 1.00 0.00
I MAX. DESIGN VALUE: 16600 RPM TMAX. 500 DEG C. ENGINE EA USD 1.00 0.00
E26016.1 THE MAIN ENGINE TURBOCHARGER TO BE THOROUGHLY OVERHAULED STRICTLY INLINE WITH MAKERS GUIDELINE BY A COMPETENT TEAM/AUTHORIZED SERVICE ENGINEER USING SHIP-SUPPLIED SPARES (BEARINGS & SEAL KITS). THE ROTOR TO BE REMOVED AND TRANSPORTED TO THE YARD WORKSHOP, ROTOR TO BE CLEANED, BLADES/NOZZLE TO BE SAND/ASH BLASTED AND DYNAMICALLY BALANCING OF ROTOR TO BE CARRIED OUT IN LINE WITH MAKER'S GUIDELINE. ASSEMBLING OF TURBOCHARGER TO CARRY OUT AFTER THOROUGH REPAIR IN LINE WITH MAKER GUIDELINE. QUOTATION FOR OVERHAULING TO BE ALL-INCLUSIVE, COVERING ALL REPAIR TOOLS, CONSUMABLES, NEW JOINTS AND PACKINGS, MANPOWER, TRANSPORTATION, AND ALL ASSOCIATED COSTS. SPECIAL TOOLS WILL BE PROVIDED BY SHIP.INSPECTION OF SEALING AIR CHANNEL AND VACCUM BREAKER TO BE CARRIED OUT.INSPECTION OF THRUST COLLAR AND GAS OULET GUIDE TO BE CARRIED OUT. SATISFACTORY TRIALS TO BE SHOWN DURING BASIN/SEA TRIAL. ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26016.2 INSPECTION CLEANING AND NDT OFTURBINE BLADES TO BE CARRIED OUT IF TURBINE BLADES ARE WORN OUT SAME TO BE REPLACED (BLADES SHIP SUPPLY). ENGINE SET 1.00 1.00 EA USD 1.00 0.00
E26016.3 RECONDITIONING OF TURBINE BLADES TO BE CARRIED OUT BY COMPETENT FIRM/MAKER AUTHORISE WORKSHOP ENGINE LS 1.00 1.00 EA USD 1.00 0.00
i E26017: MAIN ENGINE AIR COOLER: ENGINE EA USD 1.00 0.00
I TYPE / CAPACITY / DETAILS :MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM ENGINE EA USD 1.00 0.00
E26017.1 AIR COOLER TO BE REMOVED FROM ITS LOCATION AFTER DISCONNECTING ALL ASSOCIATED CONNECTIONS AND TRANSPORTED TO THE YARD’S WORKSHOP. THE COOLER TO BE DISMANTLED, AND THE ELEMENT TO BE CHEMICALLY AND/OR ULTRASONICALLY CLEANED ON BOTH THE AIR AND WATER SIDES. THE END-COVER ZINC ANODE TO BE RENEWED, AND THE COVERS TO BE PAINTED WITH TEMPERATURE-RESISTANT PAINT (YARD SUPPLY). CLEANING NOZZLES TO BE CLEANED & CLEARED. THE COOLER TO BE PRESSURE TESTED TO 5 BAR AND DEMONSTRATED TO THE SHIP STAFF’S SATISFACTION. UPON SUCCESSFUL COMPLETION OF THE SURVEY, THE AIR COOLER TO BE FITTED BACK IN POSITION USING NEW YARD-SUPPLIED CONSUMA-BLES (GASKETS, NUTS, BOLTS, O-RINGS, ETC.), AND OPERATIONAL TRIALS TO BE DEMONSTRATED. THE QUOTATION FOR OVERHAULING TO BE INCLUSIVE OF ALL REPAIR TOOLS, CONSUMABLES, NEW JOINTS AND PACKINGS, MANPOWER, TRANSPORTATION, AND ALL ASSOCIATED COSTS. ENGINE SET 1.00 1.00 EA USD 1.00 0.00
E26017.2 IF ANY TUBES ARE LEAKING PLUGGING TO BE DONE.QUOTE FOR PLUGGING OF 10 NOS TUBE USING YARD SUPPLIED SUITABLE PLUGS. ENGINE NOS 10.00 10.00 EA USD 1.00 0.00
E26017.3 MANOMETER ASSEMBLY TO RENEW USING YARD SUPPLIED U-TUBE MANOMETETR . ENGINE SET 1.00 1.00 EA USD 1.00 0.00
E26017.4 TWO NO.DRAIN COCKS TO RENEW USING YARD SUPPLIED COCKS. DIA-APPROX 25MM. ENGINE SET 2.00 2.00 EA USD 1.00 0.00
E26017.5 AIR COOLER HOSUING TO BE THORUGHLY CLEANED FROM INSIDE/OUTSIDE AND TO BE COATED WITH WITH SUITABLE COATING/PAINT( YARD SUPPLY). ENGINE LS 1.00 1.00 EA USD 1.00 0.00
E26017.6 WATER MIST CATCHER IN FRONT OF AIR COOLER TO BE TAKEN OUT AND THOROUGH CLEANING TO BE CARRIED OUT.DRAIN PIPES TO BE CHECKED FOR ANY BLOCKAGE.SAME TO CLEAR AND SHOWN TO SHIPSTAFF PRIOR FIT BACK IN PLACE. ENGINE LS 1.00 1.00 EA USD 1.00 0.00
E26017.7 ALL UNIT UNDERPISTON SPACE AND SCAVENGE DRAIN VALVE TO TAKEN OUT FOR OVERHAULING AND PROPER OPERATION TO BE CHECKED.ANY DEFCETS SAME TO BE REPLACED. DIA 25MM. ENGINE NOS 8.00 8.00 EA USD 1.00 0.00
i E26018:MAIN ENGINE AUXILIARY BLOWERS: ENGINE EA USD 1.00 0.00
I TYPE / CAPACITY / DETAILS :MAN B & W 6S50 MC-C8 TIER II POWER= 9480 KW @ 127 RPM ENGINE EA USD 1.00 0.00
E26018.1 2 NOS M/E AUXILIARY BLOWERS TO BE REMOVED,DISMANTLED,THOROUGHLY CLEANED, ALL PARTS TO BE SHOWN TO SURVEYORS & ROTOR TO BE DYNAMICALLY BALANCED. ONLY AFTER SUPTD/SURVEYORS APPROVAL BLOWERS TO BOX BACK WITH NEW GASKETS (YARD SUPPLY) & GAS LOCK SEALS (YARD SUPPLY). STUFFING BOXES TO OVERHAUL & DEFECTIVE PARTS INCLUDING BLOWER BEARINGS TO RENEW(YARD SUPPLY). SATIFACTORY TRIALS TO BE GIVEN TO CEO/SUPDT. ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
i E26019: PRE-TENSIONING STAY BOLTS; TIE BOLTS FOR M/E: ENGINE EA USD 1.00 0.00
I TYPE / CAPACITY / DETAILS :MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM ENGINE EA USD 1.00 0.00
E26019.1 28 NOS. TIE BOLTS TO BE CHECKED FOR PRETENSION. HYDRAULIC DISMANTLING PRESSURE 1500 BAR (TO CONFIRM).STAY BOLTS TO BE RETIGHTENED IN PAIRS WORKING FROM THE MIDDLE TOWARDS ONE END AND THEN AGAIN FROM THE MIDDLE TOWARDS THE OTHER END.HYDRAULIC PRESSURE TO BE MAINTAINED AT D1 AND STAY BOLT NUTS RETIGHTENED WITH A TOMMY BAR MAKING SURE NUTS BEARING AGAINST CONTACT FACE WITH A FEELER GUAGE. AFTER COMPLETING ALL BOLTS THE FIRST PAIR OF STAY BOLTS TO BE TIGHTENED TO 10% BELOW D1 AND NUT TO BE CHECKED FOR LOOSENESS. IF FOUND LOOSE ALL STAY BOLTS TO BE TIGHTENED ONCE AGAIN. IF NOT LOOSE THE FIRST PAIR TO BE TIGHTENED TO D1 . ENGINE NOS 28.00 28.00 EA USD 1.00 0.00
i E26020: RE-TIGHTENING OF HOLDING DOWN BOLTS & END CHOCKS FOR M/E : ENGINE EA USD 1.00 0.00
I TYPE / CAPACITY / DETAILS :MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM ENGINE EA USD 1.00 0.00
E26020.1 ALL HOLDING DOWN BOLTS TIGHTNESS TO BE CHECKED (USING HYDRAULIC JACK MARKED WITH HOLDING DOWN BOLTS) BY RAISING THE HYDRAULIC PRESSURE SLOWLY WHILE CONSTANTLY ATTEMPTING TO LOOSEN THE NUT WITH THE TOMMY BAR. THE OIL PRESSURE INDICATED BY THE PRESSURE GAUGE WHEN THE NUT COMES TO LOOSE (LOOSENING PRESSURE) IS TO BE RECORDED IN THE CHECKING TABLE. THE BOLTS ARE TIGHTENED TO THE NORMAL TIGHTENINIG PRESSURE THEREAFTER. TIGHTENING PRESSURE – TO CONFIRM. ENGINE LS 1.00 1.00 EA USD 1.00 0.00
E26020.2 END CHOCK BOLTS TIGHTNESS TO BE CHECKED (USING HYDRAULIC JACK MARKED WITH EPOXY CHOCKS) BY RAISING THE HYDRAULIC PRESSURE SLOWLY WHILE CONSTANTLY ATTEMPTING TO LOOSEN THE NUT WITH THE TOMMY BAR. THE OIL PRESSURE INDICATED BY THE PRESSURE GAUGE WHEN THE NUT COMES TO LOOSE (LOOSENING PRESSURE) IS TO BE RECORDED IN THE CHECKING TABLE. THE BOLTS ARE TIGHTENED TO THE NORMAL TIGHTENINIG PRESSURE THEREAFTER. ENGINE LS 1.00 1.00 EA USD 1.00 0.00
I WARNING: ACCIDENTAL APPLICATION OF LARGER JACK (MEANT FOR THE END CHOCK BOLTS) ON THE HOLDING DOWN BOLTS WOULD CAUSE SERIOUS OVER-STRESSING OF EPOXY SUPPORTING CHOCKS. ENGINE INSTRUCTION EA USD 1.00 0.00
I IMMEDIATELY AFTER FINISHING OF CHECKING OF THE LOOSENING PRESSURES OF THE HOLDING DOWN BOLTS AND THE RETIGHTENING OF THE HEIGHT OF THE EPOXY SUPPORTING CHOCKS ARE TO BE CHECKED. ENGINE INSTRUCTION EA USD 1.00 0.00
I E26021:MAIN ENGINE CRANKCASE & SUMP: ENGINE EA USD 1.00 0.00
I TYPE / CAPACITY / DETAILS : MAN B & W 6S50MC-C8 TIER II POWER = 9480 KW @ 127 RPM ENGINE EA USD 1.00 0.00
E26021.1 MAIN ENGINE SUMP (CIRCULATING LUB OIL TK.) LUB OIL TO REMOVE FROM THE TANK & COLLECT IN ABSOLUTELY CLEANED TKS OR DRUMS (YARD SUPPLY); TANK TO BE VENTILATED; MAN ENTRY CERTIFICATE TO BE OBTAINED AND TANK TO BE THOROUGHLY CLEANED OFF SLUDGE.CAPACITY:18.0M3.MANHOLES FOR THE SUMP ENTRY TO BE OPENED AND BOXED BACK AFTER THE WORK. ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26021.2 ENTIRE CRANK CASE WITH GEARS TO BE CLEANED THOROUGHLY TO REMOVE DIRTY OIL STAINS FROM THE WALLS OF CRANK CASE & SURFACES OF THE RUNNING GEARS. ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26021.3 INSPECTION OF CRANKCASE DRAIN TANK STRUCTURE TO BE CARRIED OUT; IF ANY CRACK FOUND IN THE STRUCTURE IN BETWEEN COFFERDAM AND DRAIN TANK; SAME TO BE WELDED / REPAIRED AFTER OBTAINING NECESSARY HOTWORK PERMIT. ENGINE LS 1.00 1.00 EA USD 1.00 0.00
E26021.4 LOW OIL LEVEL ALARM TO BE TRIED OUT AND ANY DEFCETS NOTICE SAME TO RECTIFY PRIOR TAKING OIL INTO SYSTEM.TO PUT BACK IN SUMP AFTER COMPLETION OF CLEANING AND INSPECTION. ENGINE LS 1.00 1.00 EA USD 1.00 0.00
E26021.5 THE NEOPRENE JOINT /DIAPHRAGM BETWEEN THE SUMP AND CRANCASE TO RENEW ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
I ABOVE QUOTE TO BE INCLUSIVE OF CONSUMMABLES, GASKET, MANPOWER , TRANSPORTATION, EMPTY TANK FACILITY, PORTABLE PUMP HOSES ETC. ENGINE INSTRUCTION EA USD 1.00 0.00
i E26022: MAIN ENGINE CYLINDER LUBRICATOR : ALFA LUBRICATOR ENGINE EA USD 1.00 0.00
I TYPE / CAPACITY / DETAILS :MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM ENGINE EA USD 1.00 0.00
I FOLLOWING THOROUGH MAINTENANCE TO BE UNDERTAKEN AS PER MAKER RECOMMENDATION MAINTENANCE SCHEDULE BY COMPETENT/OEM SERVICE ENGINEER. ENGINE EA USD 1.00 0.00
E26022.1 THE FOLLOWING COMPONENTS MUST BE RENEWED FROM SHIP SUPPLIED SPARE AND NITROGEN GAS TO BE CHARGED IN ACCUMULATOR: ACCUMULATORS SOLENOID VALVES NON-RETURN VALVES FEEDBACK SENSORS SEALINGS AND O-RINGS ENGINE SET 6.00 6.00 EA USD 1.00 0.00
E26022.2 PUMP STATION JOB SCOPE: TO CARRY OUT THORUGH CHECKS OF FILTER INSERTS, COULPING SPIDERS AND ALL RELATED COMPONENT. SYSTEM TO BE THOROUGHLY CLEANED AND OVERHAULED, TANK TO BE CLEANED AND ASSEMBLED BACK PROPERLY. ENGINE SET 2.00 2.00 EA USD 1.00 0.00
E26022.3 LUBRICATION PERFORMANCE ENSURE CORRECT LUBRICATION DOSING AS PER SETPOINT CHECK FOR LOW OR MISSING ACCUMULATOR PRESSURE OR EXCESS LUBRICATION ENGINE SET 6.00 6.00 EA USD 1.00 0.00
E26022.4 BOTH MCU AND BCU CARD TO CHECK & SIMULATION TEST TO BE SHOWN SUPTD/SHIP STAFF.LOAD SENSING UNIT TO CHECK FOR PROPER OPERATION AND SAME TO REPLACE IF FOUND DEFECTIVE ENGINE SET 2.00 2.00 EA USD 1.00 0.00
E26022.5 QUOTE SEPARATELY FOR ARRANGEMENT OF COMPETENT SERVICE ENGR/OEM ENGR FOR ABOVE JOB.CONSIDER TWO DAYS OF ATTENADANCE AT THE END OF THE PROJECT. ENGINE DAYS 2.00 2.00 EA USD 1.00 0.00
i E26023:ME VIBRATION DAMPER: ENGINE EA USD 1.00 0.00
i TYPE / CAPACITY / DETAILS :MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM ENGINE EA USD 1.00 0.00
E26023.1 ME VIBRATION DAMPERS TO BE OPEN UP, THOROUGH CHECKS TO CARRY OUT UNDER THE SUPERVISION OF COMPETENT/SERVICE ENGINEER AND PUT UP TO SURVEYOR FOR CHECKS AND VERIFICATION UNDER CSM SURVEY.AFTER COMPLETION OF INSPECTION & REPAIR, SAME TO BE BOXED BACK AS PER MAKER'S GUIDELINES .BOLT AND NUTS TO CHECK FOR TIGHTNESS. ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
i E26024:AUXILIARY ENGINE - 2 SETS YANMAR, 1 SET STX-MAN ENGINE EA USD 1.00 0.00
i A: TYPE / CAPACITY / DETAILS : MAKE : YANMAR (AE#1 & #3) :TYPE:VERTICAL WATER COOLING DIRECT INJECTION TYPE 4 CYCLE DIESEL ENGINE, MODEL: 6EY18ALW, CYLINDER BORE X STROKE:180 X 280 MM, RATED OUT PUT:660 KW,RATED SPEED: 900 RPM ENGINE EA USD 1.00 0.00
i ENGINE TO ISOLATE AND DRAINED, ALL CONNECTIONS, INLET MANIFOLED, OUTLET MANIFOLD, PIPES CONNECTORS, TAPPET ASSEMBLY ETC AND ACCESSORIES TO BE OPENED UP FOR FOLLOWING JOBS AND SAME TO BE FITTED BACK WITH YARD SUPPLIED CONSUMABLES( GASKET, O RINGS, BOLTS & NUTS). INVOICE WILL BE SETTLED ON PRORATA BASIS. ENGINE MAINTENANCE TO BE CARRIED OUT BY COMPETENT YARD TEAM. ENGINE INSTRUCTION EA USD 1.00 0.00
E26024.1 CRANK SHAFT DEFLECTION TO BE TAKEN BEFORE DISMANTLING AND AFTER ASSEMBLING.ALL READINGS TO BE SUBMITTED. ENGINE SET 2.00 2.00 EA USD 1.00 0.00
E26024.2 MAJOR OVERHAULING/12000 HRS ROUTINE & MAINTENANCE: ALL UNIT CYLINDER HEADS TO BE REMOVED.ALL MOUNTINGS INLET V/V EXH VALVE TO O'HAUL PRESSUE TEST AS PER MAKER GUIDELINES (SPARE SHIP SUPPLY) . ALL CYLINDER HEADS TO BE CHEMICALLY CLEANED THOROUGHLY. COOLING WATER SIDE SCALE TO REMOVE AND TO BE PRESSURE TESTED TO 4 BAR. CYLINDER HEAD & MOUNTINGS INCLUDING FUEL INJECTORS TO BE CAREFULLY OVERHAULED IN LINE WITH MAKERS GUIDELINES USING SHIP SUPPLIED SPARES. OVERHALED CYLINDER HEAD TO BE FITTED BACK ON ENGINE. ALL PISTONS WITH CONNECTING ROD ASSEMBLY TO BE WITHDRRAWN, CAREFULLY OVERHAULED, CALIBRATED AND PISTONS/NEW PISTONS AND CON ROD ASSEMBLY TO BE FITTED BACK IN THE ENGINE USING SHIP SUPPLIED SPARES (PISTON RINGS, BEARINGS, BUSHES ETC). PISTON AND LINER TO BE CLEANED AND TO BE CALIBERATED. LINERS TO BE WITHDRAWN, CAREFULLY OVERHAULED, COOLING SPACE TO THOROUGHLY CLEANED AND OLD/NEW LINERS TO BE FITTED BACK ON ENGINE. LINERS TO BE FITTED BACK WITH NEW O-RING(SHIP'S SUPPLY). ALL UNITS TO BE COMPLETELY BOXED BACK. ALL FUEL INJECTORS TO OVERHAUL AND ASSEMBLE BACK USING NEW OVERHAUL KIT( SHIP SUPPLY),PR TESTED, TO BE TRANSPORT TO SHIP , FIT BACK IN PLACE AND ALL CONNECTIONS TO BE MADE. SATISFACTORY ENGINE TRIALS TO BE GIVEN ON NO-LOAD AND ON MAXIMUM RATED LOAD TO SATISFACTION OF SUPTD/SURVEYOR. ENGINE SETS 2.00 2.00 EA USD 1.00 0.00
E26024.3 ALL FUEL INJECTION PUMPS TO REMOVE FROM PLACE; TRANSPORT TO YARD'S WORKSHOP; DISMANTLE COMPLETELY AND TO BE OVERHAULED. ALL DAMAGED; WORNOUT PARTS TO REPLACE WITH NEW SPARES (SHIP'S SUPPLY). ALL FUEL PUMPS TO ASSEMBLE WITH NEW SEAL RINGS & GASKETS; TO BE TRANSPORTED TO SHIP FIT IN PLACE AND ALL CONNECTIONS TO BE MADE.AFTER FITTING IN PLACE INJECTION TIMINGS TO BE CHECKED AND ADJUSTED STRICTLY AS PER MAKER'S GUIDE LINES. ENGINE NOS 12.00 12.00 EA USD 1.00 0.00
E26024.4 ALL FUEL; EXHAUST AND INLET CAMS TO EXAMIN. FOR REPLACING ONE OR MORE CAMS; COMPLETE CAM SHAFT WILL REQUIRE TO BE WITHDRAWN; AFTER REMOVING DRIVE GEAR AND BEARINGS. QUOTE FOR INSPECTION OF CAMS AND RENEWAL OF THREE CAMS ON ONE ENGINE (ONE UNIT SET) ENGINE SET 2.00 2.00 EA USD 1.00 0.00
E26024.5 AUX. ENGINE LUB OIL COOLERS TO BE CHEMICALLY CLEANED( OIL SIDE & WATER SIDE), PRESSURE TESTED AND FITTED BACK USING YARD SUPPLIED CONSUMABLES( GASKETS, NUT, BOLTS ETC) . ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26024.6 AUX. ENGINE JACKET COOLERS TO BE CHEMICALLY CLEANED ( WATER SIDE & WATER SIDE), PRESSURE TESTED AND FITTED BACK USING YARD SUPPLIED CONSUMABLES (GASKETS, NUT, BOLTS ETC) . ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26024.7 AIR COOLERS TO REMOVE FROM PLACE; DISMANTLED BY OPENING COVERS; ELEMENT TO BE ULTRASONICALLY CLEANED /CHEMICALLY CLEANED FOR 24 HRS IN STEAMMED CHEMICAL BATH. AFTYER THOROUGH CLEANING ELEMENT TO BE FURTHER CLEANED WITH WATER. ELEMENT TO BE BOXED BACK & COMPLETE ASSEMBLY OF COOLER TO BE PRESSURE TESTED. ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26024.8 ALL CRANK PIN BEARING, MAIN BEARING & THRUST BEARING CLEARANCE TO BE RECORDED BEFORE OPENING AND AFTER BOXING BACK. BOTH THE AUX ENGINE CONNECTING ROD BOLTS AND CRANK PIN BOLTS TO BE RENEWED (SHIP SUPPLY).CRANK PIN BEARING TO PUT UP FOR SURVEY.CRANKS PINS AND CONNECTING ROD BIG END TO BE GAUGED FOR OVALITY.AFTER COMPLITION OF SURVEY BEARING( NEW/OLD) TO BE FITTED BACK IN PLACE. ENGINE SET 2.00 2.00 EA USD 1.00 0.00
E26024.9 MAIN BEARING AND JOURNAL TO BE OPENED UP FOR CSM SURVEY.CHECK AND RECORD ALL BRG CLEARANCES BEFORE AND AFTER INSPECTION.ALL PARTS TO CLEAN AND PRESENT TO CLASS SURVEYOR.AFTER SUCCESSFUL COMPLETION OF SURVEY BEARINGS TO BE BOXED BACK AS ORIGINAL USING NEW/OLD SHELLS. ENGINE NOS 14.00 14.00 EA USD 1.00 0.00
E26024.10 THRUST BEARING TO BE RENEWED USING SHIP SUPPLIED BEARING PLATES ENGINE SETS 2.00 2.00 EA USD 1.00 0.00
E26024.11 AUX ENGINES ATTACH LO & HT PUMP TO OVERHAUL & FIT BACK (SPARES SHIP SUPPLY). ENGINE SET 2.00 2.00 EA USD 1.00 0.00
E26024.12 THOROUGH OVERHAULING OF AUX ENGINE TURBOCHARGERS (MAKE : MITSUBISHI MET 18-22SRC) TO CARRY OUT INLINE WITH MAKER'S GUIDE LINES INCLUDING DYNAMIC BALANCING OF ROTOR ,ASH/SAND BLASTING OF ROTOR & NOZZLE, BEARING REPLACEMENT AND CONSUMABLE REPLACEMENT.CLEANING AND THICKNESS GAUGING OF GAS OUT LET CASING TO BE UNDERTAKEN.JOB TO BE UNDERTAKEN BY YARD COMPETENT TEAM/SERVICE ENGR INLINE WITH MAKER GUIDELINE. SPARE SHIP SUPPLY.QUOTE ALL INCLUSIVE. ENGINE SET 2.00 2.00 EA USD 1.00 0.00
E26024.13 THOROUGH OVERHAULING OF AUX ENGINE GOVERNOR (WOODWORD- UG 25+) TO BE CARRIED OUT AND BENCH TEST TRIAL TO BE SHOWN TO CEO/SUPTD PRIOR TO INSTALLATION ON BOARD.SATISFACTORY LOAD TEST TRIAL TO BE SHOWN AT MAXIMUM LOAD.ALL CONSUMABLES REQUIRED FOR OVERHAILING OF GOVERNORS TO BE (YARD SUPPLY). JOB TO BE UNDERTAKEN MAKER'S AUTHORIZED TEAM/COMPETENT SERVICE ENGR INLINE WITH MAKER GUIDELINE. MAKE:WOODWARD UG 25+. QUOTE ALL INCLUSIVE INCLUDING SERVICE KIT. ENGINE SET 2.00 2.00 EA USD 1.00 0.00
i B. TYPE / CAPACITY / DETAILS : MAKE : MAN B&W (AE#2) , TYPE:VERTICAL WATER COOLING DIRECT INJECTION TYPE 4 CYCLE DIESEL ENGINE , MODEL: 6L16/24 , CYLINDER BORE X STROKE: 160 X 240 MM, RATED OUT PUT:660 KW,RATED SPEED: 1200 RPM ENGINE EA USD 1.00 0.00
i ENGINE TO ISOLATE AND DRAINED, ALL CONNECTIONS, INLET MANIFOLED, OUTLET MANIFOLD, PIPES CONNECTORS, TAPPET ASSEMBLY ETC AND ACCESSORIES TO BE OPENED UP FOR FOLLOWING JOBS AND SAME TO BE FITTED BACK WITH YARD SUPPLIED CONSUMABLES( GASKET, O RINGS, BOLTS & NUTS). INVOICE WILL BE SETTLED ON PRORATA BASIS.ENGINE MAINTENANCE TO BE CARRIED OUT BY COMPETENT YARD TEAM. ENGINE INSTRUCTION EA USD 1.00 0.00
E26024.14 CRANK SHAFT DEFLECTION, CRANK PIN BEARINGS CLEARANCE, MAIN BEARING & THRUST BEARING CLEARANCES TO BE RECORDED BEFORE DISMANTLING AND AFTER ASSEMBLING.ALL READINGS TO BE SUBMITTED. ENGINE SET 1.00 1.00 EA USD 1.00 0.00
E26024.15 MAJOR OVERHAULING/12000 HRS ROUTINE & MAINTENANCE: ALL UNIT CYLINDER HEADS TO BE REMOVED.ALL MOUNTINGS INLET V/V EXH VALVE TO O'HAUL, PRESSUE TEST AS PER MAKER GUIDELINES (SPARE SHIP SUPPLY) . ALL CYLINDER HEADS TO BE CHEMICALLY CLEANED THOROUGHLY. COOLING WATER SIDE SCALE TO REMOVE AND TO BE PRESSURE TESTED TO 4 BAR. CYLINDER HEAD & MOUNTINGS INCLUDING FUEL INJECTORS TO BE CAREFULLY OVERHAULED IN LINE WITH MAKERS GUIDELINES USING SHIP SUPPLIED SPARES. OVERHAULED CYLINDER HEAD TO BE FITTED BACK ON ENGINE. ALL PISTONS WITH CONNECTING ROD ASSEMBLY TO BE WITHDRRAWN, CAREFULLY OVERHAULED, CALIBRATED AND PISTONS/NEW PISTONS AND CON ROD ASSEMBLY TO BE FITTED BACK IN THE ENGINE USING SHIP SUPPLIED SPARES (PISTON RINGS, BOTTOM END BOLTS BEARINGS, BUSHES ETC). PISTON AND LINER TO BE CLEANED AND TO BE CALIBERATED. LINERS TO BE WITHDRAWN, CAREFULLY OVERHAULED, COOLING SPACE TO THOROUGHLY CLEANED AND OLD/NEW LINERS TO BE FITTED BACK ON ENGINE. LINERS TO BE FITTED BACK WITH NEW O-RING(SHIP'S SUPPLY). CRANKS PINS AND CONNECTING ROD BIG END TO BE GAUGED FOR OVALITY.AFTER COMPLITION OF SURVEY, BOTTOM END BOLTS, BOTTOM END BEARINGS SHELL, MAIN BEARINGS SHELL, PISTON PIN BUSHES , THRUST BEARING PLATES TO BE RENEWED WITH SHIP SUPPLIED SPARES.ALL UNITS TO BE COMPLETELY BOXED BACK. ALL FUEL INJECTORS TO OVERHAUL AND ASSEMBLE BACK USING NEW OVERHAUL KIT (SHIP SUPPLY),PR TESTED, TO BE TRANSPORT TO SHIP , FIT BACK IN PLACE AND ALL CONNECTIONS TO BE MADE. SATISFACTORY ENGINE TRIALS TO BE GIVEN ON NO-LOAD AND ON MAXIMUM RATED LOAD TO SATISFACTION OF SUPTD/SURVEYOR. THE JOB TO BE CARRIED OUT BY YARD'S COMPETENT TEAM STRICTLY IN LINE WITH MAKER'S GUIDE LINE. QUOTE ALL INCLUSIVE. ENGINE SETS 1.00 1.00 EA USD 1.00 0.00
E26024.16 ALL FUEL INJECTION PUMPS TO REMOVE FROM PLACE; TRANSPORT TO YARD'S WORKSHOP; DISMANTLE COMPLETELY AND TO BE OVERHAULED. ALL DAMAGED; WORNOUT PARTS TO REPLACE WITH NEW SPARES (SHIP'S SUPPLY). ALL FUEL PUMPS TO ASSEMBLE WITH NEW SEAL RINGS & GASKETS; TO BE TRANSPORTED TO SHIP FIT IN PLACE AND ALL CONNECTIONS TO BE MADE. AFTER FITTING IN PLACE, INJECTION TIMINGS TO BE CHECKED AND ADJUSTED STRICTLY AS PER MAKER'S GUIDE LINES. ENGINE NOS 6.00 6.00 EA USD 1.00 0.00
E26024.17 ALL UNIT CYLINDER HEADS TO BE REMOVED AND REPLACED WITH NEW CYLINDER HEADS SUPPLIED BY VESSELS USING NEW GASKETS & O RINGS (SPARE SHIP SUPPLIED). ENGINE NOS 6.00 6.00 EA USD 1.00 0.00
E26024.18 ALL FUEL; EXHAUST AND INLET CAMS TO EXAMINE & CAM SHAFT BEARINGS TO RENEW (SPARE SHIP SUPPLIED) STRICTLY IN LINE WITH MAKERS GUIDE LINES. ENGINE ENGINE SET 1.00 1.00 EA USD 1.00 0.00
E26024.19 AUX. ENGINE LUB OIL COOLERS TO BE CHEMICALLY CLEANED( OIL SIDE & WATER SIDE), PRESSURE TESTED AND FITTED BACK USING YARD SUPPLIED CONSUMABLES( GASKETS, NUT, BOLTS ETC) . ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26024.20 AUX. ENGINE JACKET COOLERS TO BE CHEMICALLY CLEANED ( WATER SIDE & WATER SIDE), PRESSURE TESTED AND FITTED BACK USING YARD SUPPLIED CONSUMABLES (GASKETS, NUT, BOLTS ETC) . ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26024.21 AIR COOLERS TO REMOVE FROM PLACE; DISMANTLED BY OPENING COVERS; ELEMENT TO BE ULTRASONICALLY CLEANED /CHEMICALLY CLEANED FOR 24 HRS IN STEAMMED CHEMICAL BATH. AFTYER THOROUGH CLEANING, ELEMENT TO BE FURTHER CLEANED WITH WATER. ELEMENT TO BE BOXED BACK & COMPLETE ASSEMBLY OF COOLER TO BE PRESSURE TESTED. ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26024.22 AUX ENGINES ATTACH LO & HT PUMP TO OVERHAUL & FIT BACK (SPARES SHIP SUPPLY). ENGINE SET 1.00 1.00 EA USD 1.00 0.00
E26024.23 THOROUGH OVERHAULING OF AUX ENGINE TURBOCHARGERS (MAKE : MAKE STX- MAN TCR 12) TO CARRY OUT INLINE WITH MAKER'S GUIDE LINES INCLUDING DYNAMIC BALANCING OF ROTOR ,ASH/SAND BLASTING OF ROTOR & NOZZLE, BEARING REPLACEMENT AND CONSUMABLE REPLACEMENT.CLEANING AND THICKNESS GAUGING OF GAS OUT LET CASING TO BE UNDERTAKEN.JOB TO BE UNDERTAKEN BY YARD COMPETENT TEAM/SERVICE ENGR INLINE WITH MAKER GUIDELINE. SPARE SHIP SUPPLY.QUOTE ALL INCLUSIVE. ENGINE SET 1.00 1.00 EA USD 1.00 0.00
E26024.24 THOROUGH OVERHAULING OF AUX ENGINE GOVERNOR (MODEL:EUROPA RE2800) TO BE CARRIED OUT AND BENCH TEST TRIAL TO BE SHOWN TO CEO/SUPTD PRIOR TO INSTALLATION ON BOARD.SATISFACTORY LOAD TEST TRIAL TO BE SHOWN AT MAXIMUM LOAD.ALL CONSUMABLES REQUIRED FOR OVERHAILING OF GOVERNORS TO BE (YARD SUPPLY). JOB TO BE UNDERTAKEN BY MAKER'S AUTHORIZED COMPETENT TEAM/SERVICE ENGR INLINE WITH MAKER GUIDELINE. QUOTE ALL INCLUSIVE INCLUDING SERVICE KIT FOR OVERHAUL. ENGINE SET 1.00 1.00 EA USD 1.00 0.00
i E26025: ALTERNATOR: ENGINE EA USD 1.00 0.00
I A. AE#1& 3 MAKER : TAIYO, CAPACITY : 450V; 781.25 KVA ; 60Hz ; 900RPM, MODEL : FE647B-8 => 2NOS B. AE#2 MAKER : HYUNDAI, CAPACITY : 450V; 781.25 KVA ; 60Hz ; 1200RPM, MODEL : HFC7 504 - 64K=> 1NO. ENGINE EA USD 1.00 0.00
E26025.1 REMOVAL & PRE-INSPECTION: REMOVE ALTERNATOR END COVERS AND COOLING FANS. MEASURE AND RECORD AIR GAPS AND INSULATION RESISTANCE (MEGGER READINGS) OF ALL WINDINGS BEFORE CLEANING IN THE PRESENCE OF THE ELECTRICAL OFFICER. CLEANING CHEMICALLY CLEAN ALL WINDINGS, ROTOR, AND EXCITER ASSEMBLY USING APPROVED ELECTRICAL CLEANING SOLVENTS. DRY ALL COMPONENTS USING COMPRESSED AIR. CLEAN AIR FILTERS AND COOLING FANS. PRESENT ALL PARTS TO THE SURVEYOR FOR INSPECTION. IN-SITU MAINTENANCE ARRANGE IN-SITU CLEANING OR MAINTENANCE AS REQUIRED. POST-CLEANING TREATMENT BAKE ALL WINDINGS USING EXTERNAL HEATERS AND HOT AIR BLOWERS. EXCITOR COIL TO CLEAN AND BAKED PRIOR FITMENT. APPLY HIGH-QUALITY INSULATION VARNISH TO WINDINGS. CHECK AND RETIGHTEN ALL TERMINAL CONNECTIONS. ADJUSTMENT & ALIGNMENT IF AIR GAPS ARE FOUND TO BE NON-UNIFORM, ADJUST STATOR FEET TO ACHIEVE THE BEST POSSIBLE VALUES WITHOUT ALTERING ROTOR LOCATION OR CRANKSHAFT DEFLECTION. REASSEMBLY & APPROVAL REFIT END COVERS AND COOLING FANS. BOX BACK THE ALTERNATOR ONLY AFTER APPROVAL FROM THE ATTENDING SURVEYOR. ALL WORK TO BE CARRIED OUT BY A COMPETENT YARD TEAM IN ACCORDANCE WITH THE MANUFACTURER’S GUIDELINES. ENGINE SET 3.00 3.00 EA USD 1.00 0.00
E26025.2 ALTERNATOR END BEARING(SHIP SUPPLY)TO REPLACE AND HOUSING TO BE PROPERLGREASED. ENGINE SET 3.00 3.00 EA USD 1.00 0.00
E26025.3 CONSIDER RE-SLEEVING ONE NO ALTERNATOR SET TO BE CARRIED OUT AS PER NEW BEARING DIA. ENGINE SET 1.00 1.00 EA USD 1.00 0.00
E26025.4 SATISFACTORY TRIAL TO BE SHOWN TO ELO/SUPDT. USING SHIPS LOAD DURING SEA TRIAL. ENGINE SETS 3.00 3.00 EA USD 1.00 0.00
i E26026: AUXILIARY ENGINE AUTOMATION & INSTRUMENTATION: ENGINE EA USD 1.00 0.00
i A. TYPE / CAPACITY / DETAILS : TYPE / CAPACITY / DETAILS : TYPE / CAPACITY / DETAILS : MAKE : YANMAR (AE#1 & #3), TYPE:VERTICAL WATER COOLING DIRECT INJECTION TYPE 4 CYCLE DIESEL ENGINE, MODEL: 6EY18ALW, CYLINDER BORE X STROKE:180 X 280 MM, RATED OUT PUT:660 KW,RATED SPEED: 900 RPM, => 2NOS. B. TYPE / CAPACITY / DETAILS : MAKE : MAN B&W (AE#2), TYPE:VERTICAL WATER COOLING DIRECT INJECTION TYPE 4 CYCLE DIESEL ENGINE, MODEL: 6L16/24, CYLINDER BORE X STROKE: 160 X 240 MM, RATED OUT PUT:660 KW,RATED SPEED: 1200 RPM=> 1NO. ENGINE EA USD 1.00 0.00
i ALL THREE AUX.ENGINE ALARMS AND TRIPS TO CHECK AND ADUST AS PER OPERATORS MANUAL SETTINGS. QUOTE ALL INCLUSIVE FOR THE ARRANGEMENTS.JOB TO BE CARRIED OUT BY YARD COMPETENT INSTRUMENTAION & CONTROL TEAM IN LINE WITH MAKER GUIDELINE.QUOTE ALL INCLUSIVE. ENGINE EA USD 1.00 0.00
E26026.1 TO CHECK & SERVICE AUXILIARY ENGINE CONTROL SYSTEM FOR AUTOMATION SEQUENCE OF AUTO STAND BY AUTO START AUTO LOADING & AUTO STOP.SYSTEM TO BE THROUGHLY CHECKED AND FAULTS NOTICED IF ANY TO BE RECTIFIED.DEFECTIVE/DAMAGED PARTS TO BE RENEWED (SPARE SHIP SUPPLY). ENGINE SET 3.00 3.00 EA USD 1.00 0.00
E26026.2 TO O'HAUL MAIN STARTING VALVE, STARTING MOTOR, EMERGENCY STARTING VALVE, STOP CYLINDER AND OVER SPEED DEVICE.ALL CONSUMABLE SPARES SHIP SUPPLY ENGINE SET 3.00 3.00 EA USD 1.00 0.00
E26026.3 CONTROL OF ALL THREE AES TO BE THROUGHLY CHECKED AND CALIBRATED.ALL IMPORTANT PRESSURE GAUGES, REMOTE TEMPERATURE GAUGES, PRESSURE TRANSMITTERS AND TACHOMETERS TO BE CALIBRATED.CALIBERATION CERTIFICATES TO ISSUE. ENGINE NOS 18.00 18.00 EA USD 1.00 0.00
E26026.4 ARRANGE SUPPLY OF 18 NOS PYROMETERS/EQUIVALENT PYROMETERS( APS) ENGINE NOS 18.00 18.00 EA USD 1.00 0.00
E26026.5 ARRANGE SUPPLY OF 12 NOS HIGH QUALITY PR GAUGES FOR ENGINES ( APS) ENGINE NOS 12.00 12.00 EA USD 1.00 0.00
I ALL THREE AUX.ENGINE ALARMS AND TRIPS TO CHECK AND ADUST AS PER OPERATORS MANUAL SETTINGS. QUOTE ALL INCLUSIVE FOR THE ARRANGEMENTS.JOB TO BE CARRIED OUT BY YARD COMPETENT INSTRUMENTAION & CONTROL TEAM IN LINE WITH MAKER GUIDELINE.QUOTE ALL INCLUSIVE.TO CHECK AND SERVICE ALL ALARMS AND TRIP CONDITIONS.IF NECESSARY CALIBERATION AND SETTING OF SHUT DOWN POINTS TO BE DONE AS PER MAKER'S RECOMMENDATIONS.CHECK ALARM CONDITION OF ALL A.E'S AS FOLLOW: ENGINE INSTRUCTION EA USD 1.00 0.00
E26026.6 a) C.W. INLET LOW PRESSURE ALARM ENGINE NOS 3.00 3.00 EA USD 1.00 0.00
E26026.7 b) L.O.INLET LOW PRESS ENGINE NOS 3.00 3.00 EA USD 1.00 0.00
E26026.8 c) C.W. HIGH TEMP.ALARM ENGINE NOS 3.00 3.00 EA USD 1.00 0.00
E26026.9 d) L.O.INLET HIGH TEMP ENGINE NOS 3.00 3.00 EA USD 1.00 0.00
E26026.10 e) EXHAUST GAS HIGH TEMP ENGINE NOS 3.00 3.00 EA USD 1.00 0.00
E26026.11 f) OVER SPEED ENGINE NOS 3.00 3.00 EA USD 1.00 0.00
i E26027: AIR RECEIVERS:MAKE: JIANGSU YONGTAI MODEL: A45-3 NO OF MANUFACTURE:C10-771 ENGINE EA USD 1.00 0.00
E26027.1 BOTH AIR RECEIVERS SHALL BE OPENED UP AND INTERNALLY CLEANED, THEN COATED WITH EPOXY PAINT (YARD SUPPLY). ANY DAMAGE OR PITTING FOUND, IF ANY, SHALL BE SUITABLY BUILT UP. ALL MOUNTINGS AND VALVES ON BOTH AIR RECEIVERS SHALL BE DISMANTLED, LAPPED, PRESSURE TESTED, AND BLUE IMPRESSION TAKEN AND DEMONSTRATED TO THE SHIP STAFF’S SATISFACTION. VALVES FOUND BEYOND REPAIR SHALL BE RENEWED (SHIP SUPPLY). ALL JOINTS AND GASKETS SHALL BE RENEWED (YARD SUPPLY). THE AIR RECEIVERS SHALL BE PRESENTED TO THE SURVEYOR AND COMPLETED TO THE SURVEYOR’S SATISFACTION UNDER CSM SURVEY. THE QUOTATION FOR OVERHAULING SHALL BE INCLUSIVE OF ALL REPAIR TOOLS, CONSUMABLES, NEW JOINTS AND PACKINGS, MANPOWER, TRANSPORTATION, AND ALL OTHER ASSOCIATED COSTS. ENGINE LS 2.00 2.00 EA USD 1.00 0.00
E26027.2 MANHOLES OF THE AUXILIARY AIR RECEIVER9 EMERGENCY AIR RECEIVER), SHALL BE OPENED. ALL MOUNTINGS SHALL BE OPENED, DISMANTLED, CLEANED, AND PRESENTED TO THE SURVEYOR FOR INSPECTION, THEN REASSEMBLED AND REFITTED TO THE RECEIVERS. INTERNAL SURFACES OF THE RECEIVERS SHALL BE CLEANED, AND THE COATING SHALL BE INSPECTED AND REPAIRED WHERE REQUIRED. AF-TER COMPLETION OF THE SURVEY, ALL MOUNTINGS SHALL BE REFITTED. THE QUOTATION FOR VALVE OVERHAULING SHALL BE INCLUSIVE OF ALL REPAIR TOOLS, CONSUMABLES, NEW JOINTS AND PACKINGS, MAN-POWER, TRANSPORTATION, AND ALL OTHER ASSOCIATED COSTS. ENGINE LS 3.00 3.00 EA USD 1.00 0.00
i E26028: COMPOSITE BOILER (TO SURVEY): ENGINE EA USD 1.00 0.00
I TYPE / CAPACITY / DETAILS : TYPE / CAPACITY / DETAILS : MAKE - AALBORG MISSION OC TYPE - COMPOSITE,CAPACITY-1200/1200 KG/HR WORKING PRESSURE: 7 BAR,DESIGN PR.:9 BAR ENGINE EA USD 1.00 0.00
E26028.1 MANHOLE & HANDHOLE INSPECTION: OPEN ALL SMOKE AND WATER SIDE MANHOLE DOORS AND HANDHOLE COVERS. CHECK FOR SURFACE UNEVENNESS. SMOOTHEN LIP SURFACES OF MANHOLE DOORS, HANDHOLES, AND BOILER OPENINGS TO ENSURE PROPER SEALING WHEN BOXED BACK. CLEANING – WATER SIDE THOROUGHLY CLEAN THE WATERSIDE OF THE BOILER, REMOVING SCALE AND HEAVY OIL DEPOSITS. USE HIGH-PRESSURE WATER JET FOR INITIAL CLEANING. CIRCULATE CHEMICAL CLEANING AGENTS USING EXTERNAL PUMP ARRANGEMENTS FOR 48 HOURS. CIRCULATE WATER TO FLUSH OUT RESIDUAL CHEMICALS AFTER CLEANING. CLEANING – SMOKE / GAS SIDE THOROUGHLY CLEAN THE EXHAUST GAS SIDE SURFACES. SCOPE & COST INCLUSION CHEMICAL SUPPLY (PER KG) CONSUMABLES AND MATERIALS REQUIRED LABOUR, TOOLS, PUMPS, AND ALL ASSOCIATED WORKS CONSIDERATION FOR HEAVY OIL DEPOSITS ON WATER SIDE TUBES BOILER FURNACE DOOR TO BE OPENED UP AND ALL TUBES EXHAUST SIDE TO BE THOUROUGHLY CLEANED OFF ALL SOOT AND CARBON DEPOSITS. POST-CLEANING INSPECTION: AFTER CLEANING, INSPECT ALL SMOKE TUBES, WATERSIDE, AND SMOKE SIDE OF THE BOILER FOR PITTING, CORROSION, OR OTHER DEFECTS. PITTINGS ON THE SMOKE TUBE (PIN TUBE) TO BE GROUND AND WELDED AS PER RPOCEDURE AGREED BY SURVEYORS. INSPECT ALL MANHOLE AND HANDHOLE JOINTS. RENEWALS & PREPARATIONS RENEW ALL MANHOLE AND HANDHOLE JOINTS USING YARD-SUPPLIED MATERIALS. HYDRAULIC TESTING CARRY OUT HYDRAULIC TESTING OF THE BOILER IN ACCORDANCE WITH CLASS AND MANUFACTURER REQUIREMENTS. DOCUMENT TEST RESULTS FOR VERIFICATION. SURVEY PRESENTATION PRESENT THE BOILER FOR CLASS/OWNER SURVEY AFTER CLEANING AND HYDRAULIC TESTING. REASSEMBLY AFTER SURVEY APPROVAL, REFIT ALL MANHOLE AND HANDHOLE COVERS WITH NEW JOINTS, NUTS, BOLTS, AND PACKING (YARD SUPPLY). ENSURE PROPER SEALING AND TIGHTNESS FOR OPERATIONAL READINESS. ENGINE SET 1.00 1.00 EA USD 1.00 0.00
E26028.2 BOILER FEED CONTROL & COMBUSTION CONTROL TO BE CHECKED. CONTROLLER TO BE SERVICED & CALIBRATED BY SERVICE ENGINEER. ; SAME TO SHOW TO SHIP STAFF; SATISFACTORY WORLKING TRIAL TO BE SHOWN TO SHIP STAFF. ENGINE SET 1.00 1.00 EA USD 1.00 0.00
I FOLLOWING MOUNTINGS AND V/VS TO BE OVERHAULED; PUT UP FOR SURVEY .ALL MOUNTINGS TO BE FITTED BACK.WATER TO BE TAKEN.BOILER TO BE FLASHED AND SAFETY VALVES TO BE FLOATED ON PREDETERMINED PRESSURE IN FRONT OF SURVEYORS AND SUPD/CEO ENGINE EA USD 1.00 0.00
E26028.3 A) FURNACE DRAIN V/V GATE(1 1/2") (16 BAR) ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26028.4 B) BOTTOM BLOW DOWN V/V'S DN 25 ENGINE NOS 4.00 4.00 EA USD 1.00 0.00
E26028.5 C) SCUM BLOW DOWN V/V DN 25 ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26028.6 D) SAMPLING V/V DN 8 ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26028.7 E) GAUGE GLASS V/V'S (COCKS) WCB DN 25 ENGINE NOS 4.00 4.00 EA USD 1.00 0.00
E26028.8 F) MAIN & AUX. FEED V/V DN 25 ENGINE NOS 4.00 4.00 EA USD 1.00 0.00
E26028.9 L) SAFETY V/V DN 32/50 ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26028.10 M) MAIN STEAM STOP V/V DN 100 ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26028.11 N) VENT V/V DN 8 ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26028.12 P) PR. GAUGE V/V M22*1.5 ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26028.13 Q) HIGH WATER LEVEL ALARM FLOT CONDENSOR V/V ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26028.14 R) LOW WATER LEVEL ALARM FLOT CONDENSOR V/V ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26028.15 S) PR.SWITCH V/V ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26028.16 T) EXHUAST GAS BOILER RAIN WATER DRAIN VALVE DN 50 ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26028.17 EXHAUST BOILER TUBE PLUGGING IF ANY LEAKAGE FOUND DURING PRESSURE TESTING QUOTE FOR PLUGGING OF 10 TUBE WITH YARD SUPPLIED SUITABLE PLUGS.QUOTE ALL INCLKUDING INCLUDING SUPPLY OF 20 NO PLUGS AS SPARE. ENGINE NOS 10.00 10.00 EA USD 1.00 0.00
E26028.18 ALL REMOTE GAUGES HAVE TO CHECK AND TO BE CALIBRATED. ENGINE LS 1.00 1.00 EA USD 1.00 0.00
i E26029: ATMOSPHERIC / DUMP CONDENSER ( SURVEY): ENGINE EA USD 1.00 0.00
I Maker : DONGHWA ENTEC HWA 11M2 ENGINE EA USD 1.00 0.00
I System Particulars : SHELL AND TUBE TYPE SURFACE AREA: 11M². SHELL SIDE:- FLUID - STEAM/DRAIN FLUID RATE: 1200/1200 KG/H OPERATING PRESSURE: ATM. KGF/CM2G TUBE SIDE:- FLUID - S.W FLUID RATE: 120 M³/H OPERATING PRESSURE: 2 KG/CM² ENGINE EA USD 1.00 0.00
E26029.1 REMOVAL & TRANSPORT: DISCONNECT STEAM AND WATER CONNECTIONS. REMOVE THE CONDENSER FROM ITS LOCATION AND TRANSPORT IT TO THE YARD WORKSHOP. DISMANTLING & CLEANING: OPEN END COVERS. CLEAN ALL TUBES THOROUGHLY. CLEAN SHELL SIDE OF THE CONDENSER. INSPECT END COVERS; REPAIR RUBBER COATING IF DAMAGED. COMPONENT RENEWAL & INSPECTION RENEW ALL ANODES. PRESENT ALL PARTS TO THE ATTENDING SURVEYOR FOR INSPECTION. REASSEMBLY & TESTING REASSEMBLE THE CONDENSER. CARRY OUT PRESSURE TESTING AT 7 BAR. REINSTALLATION TRANSPORT THE CONDENSER BACK TO THE VESSEL AND REFIT. RECONNECT ALL STEAM AND WATER INLET/OUTLET CONNECTIONS. OVERHAUL INLET AND OUTLET VALVES. USE YARD-SUPPLIED GASKETS, JOINTING MATERIALS, NUTS, AND BOLTS. SCOPE & COST INCLUSION QUOTATION TO INCLUDE ALL TOOLS, CONSUMABLES, GASKETS, NUTS & BOLTS, MANPOWER, TRANSPORTATION, AND ASSOCIATED WORKS. ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
i E26030: FRESH WATER GENERATOR: ENGINE EA USD 1.00 0.00
I TYPE /CAPACITY / DETAILS : DONGHWA ENTEC ENGINE EA USD 1.00 0.00
I TYPE - TUBE TYPE; CAPACITY OF DISTILLATE: 25 TON/DAY MAX. SALINITY: 5 PPM; COOLING S.W. TEMP.: INLET 32 DEG C; JACKET COOLING WATER TEMP.: INLET 80 DEG C ENGINE EA USD 1.00 0.00
I FOLLOWING WORKS TO BE CARRIED OUT ON FRESH WATER GENERATOR : ENGINE EA USD 1.00 0.00
E26030.1 CONDENSER & EVAPORATOR CLEANING: THOROUGHLY CLEAN ALL CONDENSER AND EVAPORATOR COILS CHEMICALLY TO REMOVE SCALE AND DEPOSITS. REASSEMBLE/BOX BACK AFTER CLEANING. DISTILLATE PUMP & RELIEF VALVE: OVERHAUL THE DISTILLATE PUMP. PRESSURE TEST THE DISTILLATE LINE RELIEF VALVE TO ENSURE PROPER OPERATION. INSTRUMENTATION & UNITS RENEWAL: REPLACE THE SALINOMETER (YARD SUPPLY). REPLACE THE CHEMICAL DOSING UNIT WITH YARD-SUPPLIED EQUIPMENT. SCOPE & COST INCLUSION: QUOTATION TO INCLUDE ALL CHEMICAL CLEANING AGENTS, CONSUMABLES, TOOLS, YARD-SUPPLIED INSTRUMENTS, MANPOWER, AND AS-SOCIATED WORKS. ENGINE LS 1.00 1.00 EA USD 1.00 0.00
E26030.2 AFTER COMPLETION OF ALL REPAIRS; SYSTEM TO BE TESTED FOR VACUUM. IF ANY DEFECT ARISES , SAME TO BE RECTIFIED BY YARD. ENGINE SET 1.00 1.00 EA USD 1.00 0.00
i E26031: ACCOMODATION BLOWER (AIR HANDLING UNIT OF ACCOMODATION AIR CONDITIONING):HI AIR,KOREA ENGINE EA USD 1.00 0.00
I TYPE /CAPACITY / DETAILS: AHU-HKA-06SO ENGINE EA USD 1.00 0.00
I AIR VOLUME:11833M3/H TOTAL PRESSURE:2062 Pa,FAN MOTOR CAPACITY: 12.7KW HEATING CAPACITY:167.4 KW,COOLING CAPAITY:99.3 KW *2 HUMIDIFIER:56.6 KG/H ENGINE EA USD 1.00 0.00
E26031.1 TWO NO. OF EVAPORATOR COILS TO FABRICATE AND INSTALL AS PER SAMPLE AS FINS ARE DAMAGED.SPECIFICATION.TRIAL TO BE GIVEN AFTER COMMISSIONING. ENGINE PCS 2.00 2.00 EA USD 1.00 0.00
E26031.2 BOTH BLOWER FWD & AFT TO OVERHAUL, DYNAMIC BALANCING TO CARRY OUT, PEDASTAL BEARING TO RENEW AND FITTED BACK. SATISFACTORY TRIALS TO BE TO WHOWN TO SHIP STAFF. ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26031.3 AIR FILTER FRAMES OF BOTH THE BLOERS DAMAGED SAME TO BE RENEWED AND SUPPLY 1 SET SPARE.MESH SIZE: 1000 MICRON (CHECKED FROM MANUAL) HOUSING HEIGHT: 152 MM HOUSING DIAMETER: 100 MM FLANGE DIAMETER: 128 MM ENGINE SET 12.00 12.00 EA USD 1.00 0.00
E26031.4 ALL BLOWER FLAPS TO BE OVERHAULED ENGINE SET 4.00 4.00 EA USD 1.00 0.00
i E26032: WINDLASS & MOORING WINCH: ENGINE EA USD 1.00 0.00
I TYPE /CAPACITY / DETAILS: MAKE - FLUTEK,LTD MARINE MACHINERY WORKS . ENGINE EA USD 1.00 0.00
I CAPACITY:269.5KN X9M/MIN (WINDLASS) ENGINE EA USD 1.00 0.00
I CAPACITY:147KN X 15M/MIN (MOORING WINCH) ENGINE EA USD 1.00 0.00
E26032 SCOPE OF WORK: REPLACE BRAKE LININGS ON THE WINDLASS: FORWARD WINDLASS (PORT & STARBOARD – 2 NOS.) INSPECTION & RENEWAL: INSPECT BRAKE BAND LINK PINS AND BUSHES; RENEW IF REQUIRED (YARD SUPPLY). REMOVE OLD BRAKE LININGS AND FIT NEW ONES. BRAKE LINING DETAILS: LENGTH:2235 X2 MM(TOTAL-EACH HALVES OF 2235 MM ) X WIDTH:160 MM X THICKNESS:12.5 MM . SUPPLY & FITTING: SUPPLY AND FIT ALL BRAKE LININGS AND ACCESSORIES USING YARD-SUPPLIED MATERIALS. ENSURE PROPER ALIGNMENT, SECURE FASTENING, AND FUNCTIONAL TESTING OF BRAKES. ENGINE SET 2.00 2.00 EA USD 1.00 0.00
E26032.1 HYDRAULIC OIL TANK COOLER AND FILETRS TO BE CLEANED AND FITTED BACK.ALL GASKETS OF COOLER TO BE RENEWED. (ALL CONSUMABLES- YARD SUPPLY). ENGINE SET 4.00 4.00 EA USD 1.00 0.00
E26032.2 ALL CONNECTING PIPE LEAKAGES TO HYDRAULIC MOTORS TO BE RECTIFIED BY REPLACING HS BOLTS. ENGINE SET 4.00 4.00 EA USD 1.00 0.00
E26032.3 OIL PRESSURE GAUGES TO BE TO BE RENEWED WITH GOOD QUALITY & ROBHUST PRESSURE GAUGES. ENGINE PCS 12.00 12.00 EA USD 1.00 0.00
E26032.4 ALL GREASE POINT NIPPLES TO BE RENEWED. ENGINE PCS 12.00 12.00 EA USD 1.00 0.00
E26032.5 SCOPE OF WORK: REPLACE BRAKE LININGS ON THE FOLLOWING WINCHES: FORWARD MOORING WINCHES (PORT & STARBOARD – 2 NOS.) AFT MOORING WINCHES (2 NOS.) SPRING WINCHES (2 NOS.) INSPECTION & RENEWAL: INSPECT BRAKE BAND LINK PINS AND BUSHES; RENEW IF REQUIRED (YARD SUPPLY). REMOVE OLD BRAKE LININGS AND FIT NEW ONES. BRAKE LINING DETAILS: FORWARD & AFT MOORING WINCHES: LENGTH:2235 X2 MM(TOTAL-EACH HALVES OF 2235 MM ) X WIDTH:160 MM X THICKNESS:12.5 MM . SPRING WINCHES: LENGHT:1735 X2 MM(TOTAL- EACH HALVES OF 1735 )X WIDTH:100 MM X THICKNESS:8 MM SUPPLY & FITTING: SUPPLY AND FIT ALL BRAKE LININGS AND OTHER ACESSORIES USING YARD-SUPPLIED MATERIALS. ENSURE PROPER ALIGNMENT, SECURE FASTENING, AND FUNCTIONAL TESTING OF BRAKES. ENGINE SET 6.00 6.00 EA USD 1.00 0.00
E26032.6 WINDLASS BUSHES OF THE BRAKE BAND LINK PINS TO CHECK FOR BOTH WINDLASS & RENEW IF NECESSARY. ENGINE PCS 4.00 4.00 EA USD 1.00 0.00
E26032.7 BRAKE TIGHTING HANDLE ALONG WITH PIN BUSHING TO BE RENEWED (4NOS) FOR DEFECTIVE WINCHES AND SUPPLY 2NOS. AS SPARE . ENGINE PCS 6.00 6.00 EA USD 1.00 0.00
E26032.8 HYDRAULIC MOTOR MOTOR TO BE DISMANTLED AND OVERHAULRED WITH SHAFT SEALS AND ACCESSOREIS( YARD SUPLY). ENGINE SET 2.00 2.00 EA USD 1.00 0.00
E26032.9 WINDLASS PEDESTAL BEARINGS TO CHECK AND RENEW (BEARING SHIP SUPPLY) . ENGINE SET 2.00 2.00 EA USD 1.00 0.00
E26032.10 BOTH WINDLASS WORN OUT GYPSY TEETH TO BE REBUILD USING HIGH GRADE , FULLY COMPATIABLE MATERIALS. FIANL GRINDING AND FINISHING TO BE CARRIED OUT TO ENSURE SMOOTHNESS OF THE TOOTH AREA. THE JOB TO BE CARRIED OUT IN FULL COMPLIANCE WITH RECOGNIZED INDUSTRY BEST PRACTICES. ENGINE SET 2.00 2.00 EA USD 1.00 0.00
E26032.11 UPON COMPLETION OF THE REPAIR , BRAKE HOLDING AND BRAKE RENDERING TESTS TO BE CARRIED OUT AND RELEVANT CERTIFICATES TO ISSUE. ENGINE SET 8.00 8.00 EA USD 1.00 0.00
i E26033: ENGINE ROOM BILGES: ENGINE EA USD 1.00 0.00
I TYPE / CAPACITY / DETAILS : ENGINE EA USD 1.00 0.00
E26033.1 ENGINE ROOM BILGES TO BE PUMPED ASHORE USING YARD FACILITIES DURING REPAIR PERIOD AND CERTIFICATE REGARDING SAME TO BE ISSUED.YARD TO QUOTE FOR ALL INCLUSIVE BILGE PUMPING WITH CERTIFICATE ISSUE FROM CONCERN AUTHORITY.ENGINE ROOM BILGE WELL TO BE PROPERLY CLEANED OIL STAINS AND TRACES TO BE COMPLETELY REMOVED.ASSUME 100 MT OF OILY WATER FROM BILGES AND BILGE HOLDING TANK. ENGINE TON 100.00 100.00 EA USD 1.00 0.00
i E26034:ENGINE ROOM BILGES (SCRAPPING & PAINTING) ENGINE EA USD 1.00 0.00
I TYPE / CAPACITY / DETAILS : ENGINE EA USD 1.00 0.00
E26034.1 ALL PIPELINES FRAMES BULK HEADS STOOLS STRUCTURES & TANK TOP BELOW THE FLOOR PLATE OF BOTTOM PLATFORM TO BE CLEANED OF ANY OIL STAINS AND SCRAPPED & TO BE APPLIED WITH PRIMER & THEN FINALLY TO APPLY ONE COAT OF PAINT(GREY COLOUR). COLOUR CODE PAINTING OF PIPE FLANGES FOR FRESH WATER, SEA WATER, F.O, LUB OIL, D.O. ETC TO BE CARRIED OUT. ENGINE M3 1500.00 1500.00 EA USD 1.00 0.00
i E26035: SEWAGE TREATMENT PLANT (SURVEY): ENGINE EA USD 1.00 0.00
I TYPE / CAPACITY / DETAILS : IL SEUNG ENGINE EA USD 1.00 0.00
I TYPE -ISS 35N, CAPACITY: 2450L/DAY ENGINE EA USD 1.00 0.00
E26035.1 PREPARATION & ENTRY OPEN TANK MANHOLE DOORS. ENSURE TANKS ARE VENTILATED AND SAFE FOR MAN ENTRY. CLEANING CLEAN HOLDING, AERATION, SETTLING, AND CHLORINATION COMPARTMENTS, INCLUDING INTERNAL STRAINERS AND SURFACE SKIMMERS. CLEAN AIR DIFFUSERS AND ASSOCIATED PIPELINES. INSPECTION & COATING INSPECT INTERNAL COATINGS OF TANKS. RECOAT WITH TAR EPOXY (YARD SUPPLY) WHERE REQUIRED. TANK CAPACITY: 23.1 M³ EACH. INSTRUMENTATION FIT A 5 M LEVEL GAUGE IN EACH TANK. ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26035.2 SEWAGE HOLDING TANKS TO BE CLEANED.,CPACITY:6 M3. ENGINE LS 1.00 1.00 EA USD 1.00 0.00
E26035.3 STP DISCHARGE PUMP TO BE OVERHAULED.AIR BLOWER TO BE OVERHAULED. CONSUMABLES- YARD SUPPLY. ENGINE SET 1.00 1.00 EA USD 1.00 0.00
E26035.4 TANKS LEVEL SWITCH HAVE TO BE SERVICED. LOW LEVEL SWITCH TO BE INSTALLED; AND DICH P/P OPERATION (CUT IN/ CUT OFF) TO BE CONTROLLED BY RESPECTIVE SWITCHES. SATIS FACTORY TRIALS TO BE SHOWN TO SHIP STAFF. ENGINE LS 1.00 1.00 EA USD 1.00 0.00
E26035.5 STP ALL VALVES TO BE OVERHAULED.SEWAGE HOLDING TANK 5K 65 FC GATE V/V’S: 5 NOS. BOLT DIA: 20MM, PCD: 130MM, F-F: 190MM, NO. OF BOLTS: 4 STP V/V’S (2 NOS.) GATE V/V (5K 150): PCD: 230MM, NO. OF BOLTS: 8, PIPE DIA: 165MM, BOLT DIA: 25MM, F.T: 45MM STP V/V (1 NO.) GATE V/V (5K 100): PCD: 165MM, PIPE DIA: 115MM, F.T: 40MM, NO. OF BOLTS: 8, BOLT DIA: 25MM STP P/P SUCTION V/V’S (4 NOS.) 10K 40 BUTTERFLY V/V’S: F-F: 70MM, F.T: 10MM, BOLT DIA: 20MM, NO. OF BOLTS: 4, PCD: 95MM, FLANGE OD: 120MM, PIPE DIA: 50MM STP P/P DISCHARGE V/V’S (2 NOS.) 5K 40 GLOBE V/V: FLANGE OD: 120MM, F.T: 10MM, PCD: 95MM, BOLT DIA: 20MM, NO. OF BOLTS: 4, PIPE DIA: 50MM ENGINE NOS 14.00 14.00 EA USD 1.00 0.00
E26035.6 DEFECTIVE PORTION OF TANK PLATE TO CROP AND RENEW APPROX STEEL REQUIREMENT -0.5MT AFTER EMPTYING BY FRESH WATER FLUSHING AND GAS FREEING . ENGINE MT 0.50 0.50 EA USD 1.00 0.00
i E26036: FIRE AND SMOKE DETCTION SYSTEMS: ENGINE EA USD 1.00 0.00
I Maker : CONSILIUM, TYPE :CS4000. ENGINE EA USD 1.00 0.00
I TO CAARY OUT THE FOLLOWING JOBS ON FIRE & GENERAL ALARM SYSTEM IN PRESENCE OF COMPETENT ENGR/ MAKER SERVICE ENGINEER: ENGINE EA USD 1.00 0.00
E26036.1 CHECK ALL SENSORS AND, IF REQUIRED, REMOVE THEM FROM THEIR LOCATIONS FOR CLEANING, INSPECTION, AND CALIBRATION. REFIT THE SENSORS IN PLACE AND CALIBRATE THE SYSTEM. THE SYSTEM SHALL BE COMMISSIONED AND PUT INTO SERVICE, WITH TRIALS CARRIED OUT IN THE PRESENCE OF THE SURVEYOR/SUPERINTENDENT. ENGINE LS 1.00 1.00 EA USD 1.00 0.00
i E26037: CO2 SYSTEMS: ENGINE EA USD 1.00 0.00
I Maker :NK CO.LTD , FIXED CO2 FIRE FIGHTING SYSTEM ENGINE EA USD 1.00 0.00
E26037.1 15 YEARLY SURVEY ITEMS ROUTINE TO BE CARRIED OUT. ALL CO2 CYLINDER TO BE WEIGHED. PIPING TO BE BLOWN THROUGH.ALL ALRMS AND CUT OUTS TO BE CHECKED. 10% BOTTLES TO BE PRESSURE TESTED . CO2 LINES MASTER VALVE TO BE PRESSURE TESTED. ENGINE LS 1.00 1.00 EA USD 1.00 0.00
E26037.2 ENTIRE CO2 TOTAL FLOODING SYSTEM 15 YEARLY ROUTINES & CHECKS TO BE CARRIED OUT BY DGS/IRS APPROVED SERVICE STATION AND CERTIFICATE TO BE ISSUED.LINES FROM BOTTLES TO THE MASTER VALVES TO BE TESTED AT 180 BAR.ALL LOW PRESSURE LINES FROM MAIN ISOLATING VALVES TO NOZZLES TO BE PRESSURE TESTED AT 25 BAR ENGINE SET 1.00 1.00 EA USD 1.00 0.00
E26037.3 SPRING LOAD RELIEF V/V TO BE PR.TESTED AND ADJUESTED AT 180 BAR. ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26037.4 ENGINE ROOM AND HOLD MASTER V/VS TO BE CHECKED FOR OPERATION.ALL HOSE CONNECTIONS/UNIONS COPPER LOOPS OF CO2 CYLINDERS TO BE CHECKED AND COPPER LOOPS TO BE PR.TESTED.ENGINE ROOM AND HOLD LINES ARE TO BE BLOWN THROUGH AND ALL ALARMS AND CUT-OUTS TO BE CHECKED FOR PROPER OPERATION. ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26037.5 ENTIRE ALARM SYSTEM & CUT OUTS TO CHECK FOR PROPER FUNCTIONING. ENGINE SET 2.00 2.00 EA USD 1.00 0.00
E26037.6 MAIN P.O.D VALVES TO E.R. & PURIFIER ROOM TO BE SERVICED. ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26037.7 AFTER COMPLETION OF ALL WORK SYSTEM TO BE BLOWN THROUGH WITH COMPRESSED AIR & CHECKED FOR LEAKAGE. ENGINE SET 1.00 1.00 EA USD 1.00 0.00
i E26038: FUEL TANKS/ OTHER TANKS (SURVEY): ENGINE EA USD 1.00 0.00
I TYPE / CAPACITY / DETAILS: ENGINE EA USD 1.00 0.00
I PREPARATION & ENTRY: OPEN MANHOLE COVERS AND FORCE-VENTILATE TANKS UNTIL SAFE FOR MAN ENTRY. OBTAIN ALL NECESSARY MAN ENTRY CERTIFICATES PRIOR TO COMMENCING WORK. CLEANING & INSPECTION: REMOVE SLUDGE AND THOROUGHLY CLEAN TANKS. SURVEY TANKS INTERNALLY FOR CONDITION, CORROSION, OR DEFECTS. CARRY OUT REPAIR, RENEW PLATE & FITTING AS REQUIRED. MANHOLE COVER & FITTINGS: REFIT MANHOLE COVERS WITH NEW GASKETS (YARD SUPPLY). RENEW PACKING FOR ANY LEAKING GAUGE GLASS VALVES. ENGINE EA USD 1.00 0.00
I HEAVY FUEL OIL TANKS-10NOS: SUBTOTAL=1994.7 M3 ENGINE EA USD 1.00 0.00
E26038.1 NO.1 H.F.0.TK.P ENGINE CBM 368.00 368.00 EA USD 1.00 0.00
E26038.2 NO.1 H.F.0.TK.S ENGINE CBM 368.00 368.00 EA USD 1.00 0.00
E26038.3 NO.2 H.F.0.TK.S ENGINE CBM 368.00 368.00 EA USD 1.00 0.00
E26038.4 H.F.O LS STOR. TK. ENGINE CBM 368.00 368.00 EA USD 1.00 0.00
E26038.5 H.F.O STOR. TK. P ENGINE CBM 278.90 278.90 EA USD 1.00 0.00
E26038.6 H.F.O STOR. TK. S ENGINE CBM 111.30 111.30 EA USD 1.00 0.00
E26038.7 H.F.O SETT. TK. ENGINE CBM 34.40 34.40 EA USD 1.00 0.00
E26038.8 H.F.O. SERV.TK ENGINE CBM 34.40 34.40 EA USD 1.00 0.00
E26038.9 H.F.O. LS SETT.TK. ENGINE CBM 31.60 31.60 EA USD 1.00 0.00
E26038.10 H.F.O. LS SERV.TK. ENGINE CBM 32.00 32.00 EA USD 1.00 0.00
i DIESEL OIL TANKS DIESEL OIL TANKS-4 NOS: SUBTOTAL=160.2 M3 ENGINE EA USD 1.00 0.00
E26038.11 M.D.0.TK. P ENGINE CBM 31.90 31.90 EA USD 1.00 0.00
E26038.12 M.D.0.TK. S ENGINE CBM 57.30 57.30 EA USD 1.00 0.00
E26038.13 M.D.0.SETT.TK. ENGINE CBM 35.50 35.50 EA USD 1.00 0.00
E26038.14 M.D.0.SERV.TK. ENGINE CBM 35.50 35.50 EA USD 1.00 0.00
I LUBRICATION OIL TANKS LUBRICATION OIL TANKS-7 NOS: SUBTOTAL= 124.5 M3 ENGINE EA USD 1.00 0.00
E26038.15 M/E L.O. SUMP TK. ENGINE CBM 18.00 18.00 EA USD 1.00 0.00
E26038.16 M/E L.O STOR. TK ENGINE CBM 22.10 22.10 EA USD 1.00 0.00
E26038.17 CYL.O STOR. TK ENGINE CBM 31.60 31.60 EA USD 1.00 0.00
I ENGINE ROOM DB TANKS ENGINE ROOM DB TANKS- 5 NOS: SUBTOTAL=72.2 ENGINE EA USD 1.00 0.00
E26038.18 SLUDGE TK. ENGINE CBM 11.60 11.60 EA USD 1.00 0.00
E26038.19 OILY BILGE TK ENGINE CBM 17.30 17.30 EA USD 1.00 0.00
E26038.20 BILGE HOLD. TK. ENGINE CBM 29.80 29.80 EA USD 1.00 0.00
E26038.21 F.O. OVERF. TK. ENGINE CBM 11.40 11.40 EA USD 1.00 0.00
E26038.22 S/T LO DRAIN TK. ENGINE CBM 2.00 2.00 EA USD 1.00 0.00
i MISC. TANKS ENGINE EA USD 1.00 0.00
E26038.23 WASTE OIL TK. ENGINE CBM 2.00 2.00 EA USD 1.00 0.00
E26038.24 SEWAGE TK. ENGINE CBM 6.00 6.00 EA USD 1.00 0.00
E26038.25 S/T C.W TK ENGINE CBM 13.70 13.70 EA USD 1.00 0.00
E26038.26 SC. DRAIN TK ENGINE CBM 0.50 0.50 EA USD 1.00 0.00
i E26039: ELECTRIC MOTORS: ENGINE EA USD 1.00 0.00
I 1. PRE-REMOVAL CHECKS: ALL MOTORS TO HAVE INSULATION RESISTANCE AND CABLE CONTINUITY CHECKED AND RECORDED. VERIFY AND MARK THE DIRECTION OF ROTATION BEFORE DISCONNECTION. DISCONNECT ALL POWER CABLES AND SECURE THEM WITH INSULATION TAPE. 2. REMOVAL & TRANSPORT: REMOVE MOTORS FROM THEIR INSTALLED LOCATIONS. TRANSPORT MOTORS TO THE YARD WORKSHOP ALONG WITH ASSOCIATED MOTOR-PUMP COUPLINGS. 3. DISMANTLING & CLEANING: COMPLETELY DISMANTLE ALL MOTORS. THOROUGHLY CLEAN AND DEGREASE ALL PARTS USING APPROVED ELECTRICAL CLEANER (YARD SUPPLY). INSPECT STATOR COILS AND ARMATURE WINDINGS. 4. WINDING & BALANCING: APPLY VARNISH TO STATOR COILS AND ARMATURE WINDINGS, BAKE IN OVEN, AND DRY THOROUGHLY. DYNAMICALLY BALANCE ALL ROTORS. CHECK CONDITION OF MOTOR TERMINAL CONNECTION BLOCKS (EBONITE); RENEW IF REQUIRED. 5. MECHANICAL INSPECTION & MACHINING: ERECT MOTOR ROTATING ELEMENTS ON LATHE AND CHECK TRUENESS. THOROUGHLY INSPECT MOTOR BEARING HOUSINGS; RESLEEVE TO CORRECT BEARING SIZE IF REQUIRED. INSPECT BEARING JOURNALS; BUILD UP AND MACHINE TO CORRECT SIZE WHERE REQUIRED. RENEW ALL MOTOR BEARINGS (YARD SUPPLY). 6. TERMINAL BOXES & COOLING FANS: PROVIDE FOR 10 NOS. TERMINAL BOXES AND INSULATORS. RENEW 10 NOS. COOLING FAN BLADES. 7. REASSEMBLY & TESTING: REASSEMBLE MOTORS IN ACCORDANCE WITH MANUFACTURER GUIDELINES. ENSURE PROPER ALIGNMENT OF ROTATING ELEMENTS AND CONNECTIONS. 8. SCOPE & COST INCLUSION QUOTATION FOR MOTOR OVERHAULING TO BE INCLUSIVE OF: ALL REPAIR TOOLS, CONSUMABLES, NEW JOINTS AND PACKINGS, MANPOWER, TRANSPORTATION, BEARINGS, AND ASSOCIATED WORKS. ENGINE INSTRUCTION EA USD 1.00 0.00
E26039.1 F.O. SUPPLY P/P MOTOR 440 V; 60 Hz; 3 PHASE;2.5 KW 4.6 AMP ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26039.2 MSW WATER COOLING MOTOR 440 V; 60 Hz; 3 PHASE;50 KW ,83.8 AMP ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26039.3 BALLAST P/P MOTOR 440 V; 60 Hz; 3 PHASE;95 KW,163.1 AMP ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26039.4 BILGE; FIRE & G.S. P/P MOTOR 440 V;60 Hz; 3 PHASE; 70 KW,114.2 AMP ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26039.5 AHU (AIR HANDLING UNIT) FAN MOTOR 440 V;60 Hz; 3 PHASE; 12.7 KW,21.7 AMP ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26039.6 GALLEY SUPPLY FAN 1 NOS. 440 V; 60 Hz; 3 PHASE 1.27 KW,2.65 AMP ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26039.7 GALLEY EXH. BLOWERS1 NOS. 440 V; 60 Hz; 3 PHASE;1.73 KW,3.54 AMP ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26039.8 TOILET EXH. FAN 1 NOS. 440 V; 60 Hz;3 PHASE; 6.3KW,11.23 ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26039.9 ACC.LADDER WINCH MOTOR 440 V; 60 Hz; 3 PHASE; 5.5 KW ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26039.10 BOILER WATER FEED PUMP MOTOR 440v; 60hz; 3phase;11 KW,19.3 AMP ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26039.11 M/E LUBE OIL PUMP MOTOR 440V;60HZ ;3PHASE;60 KW,100.4 AMP ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26039.12 RESCUE BOAT MOTOR(WINCH HYDRAULIC PUMP MOTOR) ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26039.13 FREE FALL LIFE BOAT DEBIT MOTOR 440VAC;60HZ;3PHASE;15 KW,29.3 AMP ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26039.14 FORWARD DECK MACHINERY HYD.PUMP MOTOR(1;2;3) 440V;60HZ;3 PHASE;75 KW, ENGINE NOS 3.00 3.00 EA USD 1.00 0.00
E26039.15 AFT DECK MACHINERY HYD.PUMP MOTOR(1;2;3) 440V;60HZ;3 PHASE;75 KW ENGINE NOS 3.00 3.00 EA USD 1.00 0.00
E26039.16 EJECTOR PUMP MOTOR 440V;60HZ; 3 PH;22 KW ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26039.17 STEERING GEAR ROOM VENT FAN MOTOR 440 V; 60 Hz; 3 PHASE;2.53 KW,4.74 ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26039.18 ENGINE ROOM VENT FAN MOTOR 440 V; 60 Hz; 3 PHASE;15 KW ENGINE NOS 4.00 4.00 EA USD 1.00 0.00
E26039.19 SEWAGE DISCHARGE P/P MOTOR 440 V; 60 Hz; 3 PHASE;1.5 KW,3.9 AMPS ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26039.20 ME AUX. BLOWER MOTORS MOTOR 440 V; 60 Hz; 3 PHASE;30 KW ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26039.21 DECK CRANE HYD.POWER PACK MOTOR 440 V; 60 Hz; 3 PHASE;152 KW ENGINE NOS 4.00 4.00 EA USD 1.00 0.00
E26039.22 PROVISION CRANE HOISTING MOTOR 440 V; 60 Hz; 3 PHASE;7.5 KW ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26039.23 PROVISION CRANE SLEWING MOTOR 440 V; 60 Hz; 3 PHASE;5.5 KW ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26039.24 PROVISION CRANE LUFFING MOTOR 440 V; 60 Hz; 3 PHASE;11 KW ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26039.25 F.O. CIRCULATION P/P MOTOR 440 V; 60 Hz; 3 PHASE;4.6 KW,7.4 AMPS ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26039.26 PURIFIER ROOM EXHAUST FAN MOTOR 440 V; 60 Hz; 3 PHASE;4 KW,7.7 AMPS ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26039.27 CO2 ROOM EXHAUST FAN MOTOR 440 V; 60 Hz; 3 PHASE;0.63 KW,1.48 AMP ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26039.28 BOILER F.O. PUMP 440 V; 60 Hz; 3 PHASE;1.75 KW,3.4 AMP( HFO) AND 1.8 KW,3.26 AMP(MGO) ENGINE NOS 4.00 4.00 EA USD 1.00 0.00
E26039.29 BOSUN STORE EXHAUST FAN 440 V; 60 Hz; 3 PHASE; 1.73 KW,3.3 AMP ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26039.30 PAINT STORE EXHAUST FAN 440 V; 60 Hz; 3 PHASE; 0.63 KW,1.48 AMP ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26039.31 CARGO HOLD EXHAUST FAN 440 V; 60 Hz; 3 PHASE; 8.6 KW,15.23 AMP EACH ENGINE NOS 20.00 20.00 EA USD 1.00 0.00
i E26040: ENGINE ROOM BLOWERS: ENGINE EA USD 1.00 0.00
I TYPE / CAPACITY / DETAILS : 18.5 KW 1440 RPM FLOW RATE:37000M3/Hr E.R. BLOWER: ENGINE EA USD 1.00 0.00
I 4KW PURIFIER ROOM EXH.FAN ENGINE EA USD 1.00 0.00
I REMOVAL & TRANSPORT: REMOVE THE BLOWER MOTOR ALONG WITH THE FAN FROM ITS INSTALLED LOCATION. TRANSPORT THE ASSEMBLY TO THE YARD WORKSHOP. DISMANTLING & CLEANING: DISMANTLE THE BLOWER AND MOTOR COMPLETELY. CLEAN THE FAN IMPELLER THOROUGHLY USING HIGH-PRESSURE JET WASHING. CLEAN THE FLAP AND ENSURE 100% CLOSING OPERATION. MOTOR OVERHAUL: OVERHAUL THE MOTOR, RENEWING BEARINGS AS REQUIRED (YARD SUPPLY). REASSEMBLE THE MOTOR WITH NEW BEARINGS. REASSEMBLY & INSTALLATION: REASSEMBLE THE BLOWER AND MOTOR. TRANSPORT BACK AND REINSTALL AT ITS ORIGINAL LOCATION. TESTING & TRIAL: CARRY OUT A SATISFACTORY OPERATIONAL TRIAL TO ENSURE PROPER FUNCTIONING OF BLOWER, FAN, AND FLAP. SCOPE & COST INCLUSION: QUOTATION FOR OVERHAULING TO INCLUDE ALL REPAIR TOOLS, CONSUMABLES, NEW JOINTS AND PACKINGS, MANPOWER, TRANSPORTA-TION, BEARINGS, AND ALL ASSOCIATED WORKS. ENGINE INCLUSIVE EA USD 1.00 0.00
E26040.1 E/R BLOWER CASING 1 MTR.DIA HEIGHT 1.5 MTR IMPELLER AND DIFFUSER VANES TO CHIP CLEAN AND PAINTED INTERNALLY AND EXTERNALLY WITH TWO COATS OF PAINT. ENGINE NOS 5.00 5.00 EA USD 1.00 0.00
E26040.2 MOTOR AND IMPELLER TO BALANCE DYNAMICALLY. ENGINE NOS 5.00 5.00 EA USD 1.00 0.00
E26040.3 BLOWER DUCT TO OPEN BROKEN HINGE TO WELD ALIGNED WITH PROPER SEALING. ENGINE NOS 5.00 5.00 EA USD 1.00 0.00
E26040.4 HINGE BUSH OF ALL E.R BLOWERS TO RENEW. ENGINE NOS 5.00 5.00 EA USD 1.00 0.00
E26040.5 REMOVE ALL BLOWER ROOM FLAPS.DERUST, CLEAN, AND PAINT FLAP SURFACES.RENEW BUSHES TO ENSURE FREE OPENING AND 100% CLOSING OF FLAPS.OVERHAUL FLAP OPENING AND CLOSING MECHANISMS.RENEW BEARINGS IF REQUIRED.INSPECT AND RENEW DEFECTIVE LINKAGES AND SUPPORTING BEAMS TO ENSURE PROPER OPERATION.OVERHAUL ALL AIR CYLINDERS; DEFECTIVE PARTS TO BE RENEWED (YARD SUPPLY). RENEW ALL ACTUATOR FLEXIBLE PIPES USING YARD-SUPPLIED MATERIALS. AFTER OVERHAUL, ENSURE ALL FLAPS OPERATE SMOOTHLY AND ACHIEVE FULL OPENING AND CLOSING. VERIFY PROPER FUNCTIONING OF LINKAGES, ACTUATORS, AND SUPPORTING STRUCTURES. ENGINE NOS 4.00 4.00 EA USD 1.00 0.00
i E26041: MAIN SWITCHBOARD AND EMERGENCY SWITCH BOARD: MAKE : KTE CO. LTD,BUSAN KOREA ENGINE EA USD 1.00 0.00
I TYPE / CAPACITY / DETAILS : TYPE: DEAD FRONT SELF SUPPORTING; MACH. NO : M0291-09 ENGINE EA USD 1.00 0.00
E26041.1 BOTH MAIN SWITCH BOARDS TO BE THOROUGHLY CLEANED USING DRY AIR AND ELECTRIC CLEANER (YARD SUPPLY). ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26041.2 INSULATION OF MSB & ESB TO BE CHECKED BEFORE AND AFTER THE CLEANING TO BE RECORDED AND SUBMIT. ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26041.3 IF ANY OF THE PANEL/CIRCUIT INSULATION FOUND POOR INSULATOR TO BE REMOVED BY SPARES(SHIP SUPPLY) ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
I E26041.4 TO CARRY OUT SERVICING AND CALIBRATION OF FOLLOWING MSB METERS; AS FOLLOWS : ENGINE EA USD 1.00 0.00
E26041.5 a) AMMETER . ENGINE NOS 6.00 6.00 EA USD 1.00 0.00
E26041.6 b) VOLTMETER. ENGINE NOS 6.00 6.00 EA USD 1.00 0.00
E26041.7 c) WATTMETER. ENGINE NOS 4.00 4.00 EA USD 1.00 0.00
E26041.8 d) INSULATION METER. ENGINE NOS 4.00 4.00 EA USD 1.00 0.00
E26041.9 e) FREQUENCY METER. ENGINE NOS 4.00 4.00 EA USD 1.00 0.00
E26041.10 TIGHTNESS OF ELECTRICAL CONNECTIONS & ALL NUTS & BOLTS IN M.S.B TO CHECK & TIGHTEN. ENGINE LS 2.00 2.00 EA USD 1.00 0.00
E26041.11 ALL SWITCHBOARD SAFETIES TO BE TESTED AND SHOWN IN OPERATION AFTER CLEANING OF SWITCHBOARD.--REVERSE POWER TRIP;UNDERVOLTAGE; OVERCURRENT; SHORT CURCUIT;PREFERENTIAL TRIP;LOW INSULATION. ENGINE LS 2.00 2.00 EA USD 1.00 0.00
E26041.12 ALL ALTERNATORS AUTO STARTING SYSTEM/STANDBY STARTING SYSTEM TO BE CHECKED AND REPAIRED. ENGINE LS 3.00 3.00 EA USD 1.00 0.00
E26041.13 THE LIGHTING TRANSFORMERS IN ENGINE ROOM AND IN EMERGENCY GEN. ROOM TO BE CLEANED AND IMPROVE THE INUSLATION IF LOW AND TIGHTNESS OF THE CABLES TO BE CHECKED. ENGINE NOS 4.00 4.00 EA USD 1.00 0.00
E26041.14 ALL THREE GENERATORS PARALLEL OPERATION TO BE CHECKED IF NECESSARY AND ANY ADJUSTMENT ON AVR TO BE CORRECTED IF REQUIRED. ENGINE NOS 3.00 3.00 EA USD 1.00 0.00
E26041.15 EMERGENCY GENERATOR AUTO OPERATION TO BE CHECKED AND RECTIFY THE SAME. ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26041.16 BOTH 440 V AND 220 V INSULATION TO IMPROVE. ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
i E26042: CALIBERATION OF TEMPERATURE GAUGES: ENGINE EA USD 1.00 0.00
I FOLLOWING TEMPERATURE GAUGES OF VARIOUS MACHINERIES IN ENGINE ROOM ARE TO BE TAKEN OUT FROM PLACE TO CHECK CALIBERATION WITH STANDARD GAUGES AND DEFECTIVE ONES TO RENEW WITH NEW ONES WITH CERTIFICATE OF STANDARDISATION.ALL OTHER GOOD ONES TO BE FITTED BACK IN PLACE & CERTIFICATE TO BE ISSUED FOR ALL TEMPERATURE GAUGES THAT ARE TESTED.YARD TO QUOTE FOR SUPPLY OF EACH TYPE OF TEMP.GAUGE FOR RENEWAL. ENGINE EA USD 1.00 0.00
I PYROMETERS/THERMOMETERS ENGINE INSTRUCTION EA USD 1.00 0.00
I SYSTEM RANGE( 0C) QTY. ENGINE INSTRUCTION EA USD 1.00 0.00
E26042.1 M/E EXHAUST GAS OULET 0-600 6 ENGINE PCS 6.00 6.00 EA USD 1.00 0.00
E26042.2 M/E PCO OUTLET TEMP 0-100 6 ENGINE PCS 6.00 6.00 EA USD 1.00 0.00
E26042.3 M/E JACKET WATER OUTLET TEMP 0-100 6 ENGINE PCS 6.00 6.00 EA USD 1.00 0.00
E26042.4 M/E TURBOCHARGER IN/OULET 0-600 2 ENGINE PCS 2.00 2.00 EA USD 1.00 0.00
E26042.5 M/E AIR COOLER AIR IN/OULET 0-100/0-160 2 ENGINE PCS 2.00 2.00 EA USD 1.00 0.00
E26042.6 A/E EXH GAS OULLET(3 AES) 0-500 18 ENGINE PCS 18.00 18.00 EA USD 1.00 0.00
E26042.7 A/E TURBOCHARGER INLET(3 AES) 0-600 6 ENGINE PCS 6.00 6.00 EA USD 1.00 0.00
E26042.8 A/E TURBOCHARGER OULET(3 AES) 0-600 6 ENGINE PCS 6.00 6.00 EA USD 1.00 0.00
E26042.9 A/ES C.W. INLET 0-100 3 ENGINE PCS 3.00 3.00 EA USD 1.00 0.00
E26042.10 A/ES C.W. OULET 0-100 18 ENGINE PCS 18.00 18.00 EA USD 1.00 0.00
E26042.11 A/ES AIR COOLER AIR INLET 0-200 3 ENGINE PCS 3.00 3.00 EA USD 1.00 0.00
E26042.12 A/ES AIR COOLER AIR OULT 0-100 3 ENGINE PCS 3.00 3.00 EA USD 1.00 0.00
E26042.13 A/ES ALTERNATOR BEARING 0-100 3 ENGINE PCS 3.00 3.00 EA USD 1.00 0.00
E26042.14 BOILER F.O HEATER IN/OULET 0-160 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26042.15 ME VISCOTHERM 0-200 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26042.16 ME LUB OIL COOLER L.O IN/OUT 0-100 2 ENGINE PCS 2.00 2.00 EA USD 1.00 0.00
E26042.17 ME JACKET COOLER L.O IN/OUT 0-100 3 ENGINE PCS 2.00 2.00 EA USD 1.00 0.00
E26042.18 BOTH LT COOLER S.W& F.W IN/OUT 0-100 8 ENGINE PCS 8.00 8.00 EA USD 1.00 0.00
E26042.19 ME THRUST BEARING LUB OIL 0-100 2 ENGINE PCS 2.00 2.00 EA USD 1.00 0.00
E26042.20 ME L.O INLET TEMP 0-100 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26042.21 ME T/C BEARING OIL TEMP 0-150 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26042.22 ME F.O. TEMP 0-200 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26042.23 ME FRESH COOL WATER INLET 0-150 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26042.24 FWD S/T BRG L.O.TEMP 0-100 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26042.25 AFT S/T BRG L.O.TEMP 0-100 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26042.26 A/E PUF UNIT OUTLET TEMP 0-100 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
i ARRANGE SUPPLY OF HIGH QUALITY SUITABLE PYROMETER/THERMOMETER APS: ENGINE INSTRUCTION EA USD 1.00 0.00
E26042.27 SUPPLY PYROMETER/THERMOMETER APS 0-100. ENGINE PCS 6.00 6.00 EA USD 1.00 0.00
E26042.28 SUPPLY PYROMETER/THERMOMETER APS 0-200. ENGINE PCS 6.00 6.00 EA USD 1.00 0.00
E26042.29 SUPPLY PYROMETER APS 0-600. ENGINE PCS 6.00 6.00 EA USD 1.00 0.00
E26042.30 SUPPLY DIAL TYPE PYROMETER APS 0-600. ENGINE PCS 6.00 6.00 EA USD 1.00 0.00
i E26043: CALIBERATION OF PRESSURE GAUGES: ENGINE EA USD 1.00 0.00
I FOLLOWING PRESSURE GAUGES OF VARIOUS MACHINERIES IN ENGINE ROOM ARE TO BE TAKEN OUT FROM PLACE TO CHECK CALIBERATION WITH STANDARD GAUGES AND DEFECTIVE ONES TO RENEW WITH NEW ONES WITH CERTIFICATE OF STANDARDISATION.ALL OTHER GOOD ONES TO BE FITTED BACK IN PLACE & CERTIFICATE TO BE ISSUED FOR ALL PRESSURE GAUGES THAT ARE TESTED.YARD TO QUOTE FOR SUPPLY OF EACH TYPE OF PRESSURE GAUGE FOR RENEWAL. ENGINE EA USD 1.00 0.00
I PRESSURE GAUGES ENGINE INSTRUCTION EA USD 1.00 0.00
I SYSTEM RANGE( BAR) QTY ENGINE INSTRUCTION EA USD 1.00 0.00
E26043.1 STEERING GEAR 0-250 3 ENGINE PCS 3.00 3.00 EA USD 1.00 0.00
E26043.2 AIR COMPRESSORS 0-10 4 ENGINE PCS 4.00 4.00 EA USD 1.00 0.00
E26043.3 AIR RECEIVER(MAIN) 0-50 4 ENGINE PCS 4.00 4.00 EA USD 1.00 0.00
E26043.4 AIR RECEIVER(CONTROL) 0-15 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26043.5 AUX.ENGINE 0-10 6 ENGINE PCS 6.00 6.00 EA USD 1.00 0.00
E26043.6 AUX.ENGINE 0-16 2 ENGINE PCS 2.00 2.00 EA USD 1.00 0.00
E26043.7 ME L.O.P/P DEL. 0-10 2 ENGINE PCS 2.00 2.00 EA USD 1.00 0.00
E26043.8 ME ST.BY CONT AND SAFETY AIR 0-16 2 ENGINE PCS 2.00 2.00 EA USD 1.00 0.00
E26043.9 ME EXH V/V SPRING(ECR & LOCAL) 0-10 2 ENGINE PCS 2.00 2.00 EA USD 1.00 0.00
E26043.10 ME F.O.& L.O. AT EM STAND 0-25 2 ENGINE PCS 2.00 2.00 EA USD 1.00 0.00
E26043.11 ME FUEL V/V TESTING UNIT 0-600 2 ENGINE PCS 2.00 2.00 EA USD 1.00 0.00
E26043.12 VIBRATION DAMPER 0-250 4 ENGINE PCS 4.00 4.00 EA USD 1.00 0.00
E26043.13 EXH.GAS ECONOMIZER 0-16 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26043.14 AE FUEL V/V TESTING UNIT P/P 0-500 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26043.15 HYD P/P FOR MAINTENANCE 0-1000 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26043.16 BUNKER LINE PRESSURE GAUGES 0-16 4 ENGINE PCS 4.00 4.00 EA USD 1.00 0.00
i ECR PRESSURE GAUGES:- ENGINE EA USD 1.00 0.00
E26043.17 ME COOL S.W.DISCH.PR 0-4 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26043.18 ME JCW COOLING PR 0-6 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26043.19 ME LO INLET PR 0-6 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26043.20 ME SCAVENGE AIR PR 0-6 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26043.21 STARTING AIR BEFORE V/V PR 0-40 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26043.22 CONTROL AIR PR 0-6 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26043.23 STARTING AIR AFTER V/V PR 0-40 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26043.24 CHARGE AIR 0-4 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26043.25 ME AIR RECEIVER 0-40 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26043.26 CONTROL AIR RECEIVER 0-10 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26043.27 EXH V/V AIR SPRING 0-10 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26043.28 BLR DRUM PR 0-10 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
i MANOEUVRING PLATFORM ENGINE EA USD 1.00 0.00
E26043.29 AIR SPRING 0-10 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26043.30 CYL/COOLING WATER 0-6 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26043.31 STARTING AIR 0-40 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26043.32 SUPERCHARGE AIR 0-4 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26043.33 COOLING WATER AIR COOLER 0-10 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26043.34 MAIN S.W. P/P SUC -1-5 3 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26043.35 MAIN S.W. P/P DISCH 0-10 3 ENGINE PCS 3.00 3.00 EA USD 1.00 0.00
E26043.36 BALLAST P/P SUC -1-7 2 ENGINE PCS 3.00 3.00 EA USD 1.00 0.00
E26043.37 BALLAST P/P DISCH 1-9 2 ENGINE PCS 2.00 2.00 EA USD 1.00 0.00
E26043.38 FIRE & G.S. P/P SUC -1-5 1 ENGINE PCS 2.00 2.00 EA USD 1.00 0.00
E26043.39 FIRE & G.S. P/P DISCH 0-10 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26043.40 BILGE & G.S. P/P SUC -1-5 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26043.41 BILGE & G.S. P/P DISCH 0-10 1 ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
i ARRANGE SUPPLY OF HIGH QUALITY SUITABLE PYROMETER/THERMOMETER( APS); ENGINE PCS EA USD 1.00 0.00
E26043.42 SUPPLY OF PRESSURE GAUGE APS 0 TO 1000 BAR. ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26043.43 SUPPLY OF PRESSURE GAUGE APS 0 TO 600 BA.R. ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26043.44 SUPPLY OF PRESSURE GAUGE APS 0 TO 250 BAR. ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
E26043.45 SUPPLY OF PRESSURE GAUGE APS 0 TO 100 BAR ENGINE PCS 2.00 2.00 EA USD 1.00 0.00
E26043.46 SUPPLY OF PRESSURE GAUGE APS 0 TO 10 BAR. ENGINE PCS 6.00 6.00 EA USD 1.00 0.00
E26043.47 SUPPLY OF VACUUM GAUGE . ENGINE PCS 1.00 1.00 EA USD 1.00 0.00
i E26044: ICCP,MAKE:HWASEUNG R&A WILSON WALTON (AQUAMATIC) ENGINE EA USD 1.00 0.00
E26044.1 GOUGE OUT EXISTING PLATE, FABRICATE AND WELD NEW BACK PLATE AS PER EXISTING SYSTEM (MILD STEEL PLATE - 1290X250X30MM) - 4 NOS. ENGINE SET 2.00 2.00 EA USD 1.00 0.00
E26044.2 OPEN COFFERDAM, ARRANGED LIGHT AND VENTILATION, ISOLATE THE ICCP SYSTEM, REMOVE ALL OLD ANODES 06 NOS AND REF CELLS 04 NOS.INSTALLED ALL NEW ANODES, REF CELLS AND FUSES, CONNECT ,TEST AND FILL GREASE 4 LOCATION .PERFORM WET CONDITION INSPECTION & CONFIRM ALL SYSTEM WORKING NORMAL.CLOSE COFFERDAMS AFTER COMPLETION OF JOB USING YARD SUPPLIED GASKETS & CONSUMABLES. ENGINE NOS 4.00 4.00 EA USD 1.00 0.00
E26044.3 REMOTE MONITOR PANEL OF ICCP IN ECR SHOWING COMMUNICATION FAIL ERROR. SAME FAULT TO TRACE AND RECTIFY.SYSTEM TO COMMISSION AND HANDED OVER TO SHIPSTAFF. ENGINE NOS 4.00 4.00 EA USD 1.00 0.00
i E26045: MGPS,HWASEUNG R&A WILSON WALTON ENGINE EA USD 1.00 0.00
E26045.1 MGPS CHAMBER TO BE CLEANED AND PAINTED INTERNALLY. ALL CHECKS TO BE CARRIED OUT FOR PROPER OPERATION AND ANODES TO BE CHANGED AS FOUND NECESSARY. ANODES SHIP SUPPLY. JOINTS & OTHER CONSUMABLES YARD SUPPLY. ENGINE SETS 2.00 2.00 EA USD 1.00 0.00
E26045.2 ALL ANODE FLANGES BOLTS FOUND RUSTY, SAME TO REPLACE ALONG WITH NEW GASKETS,SILICONE SELANT ETC (CONSUMABLES- YARD SUPPLY). ENGINE SETS 2.00 2.00 EA USD 1.00 0.00
E26045.3 ALL REQUIRED CONNECTION TO BE MADE AND SYSTEM TO BE MADE OPERATIONAL.ANY WATER LEAKAGES NOTED DURING FLOODING TO BE ATTENDED PRIOR HANDOVER THE SYSTEM FOR FURTHER OPERATION. ENGINE SETS 2.00 2.00 EA USD 1.00 0.00
i E26046: MISCELLANEOUS (MECHANICAL): ENGINE EA USD 1.00 0.00
E26046.1 LAGGING ON FUEL LINES; STEAM LINES; CONDENSATE LINES; EXHAUST LINES; MANIFOLDS; ETC TO BE RENEWED; ASSUME 100 MTR LENGTH & CONSIDER PIPE DIA 100MM. QUOTE FOR ASBESTOS FREE LAGGING ALL INCLUSIVE. ENGINE MTR 100.00 100.00 EA USD 1.00 0.00
E26046.2 CALORIFIER STEAM IN AND OUT VALVES TO RENEW. VALVE SHIP SUPPLY ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26046.3 ME & AE VISCOSITY CONTROLLER IS NOT WORKING TO CHECK & MAKE IT OPERATIONAL .QUOTE FOR SUPPLY AND INSTALLATION OF CLASS APPROVE TYPE. ENGINE LS 1.00 1.00 EA USD 1.00 0.00
E26046.4 HFO PURIFIER AND LO PURIFIER M/E F.O HEATER STEAM CONTROLLER V/V TO RENEW (SHIP SUPPLY). ENGINE NOS 6.00 6.00 EA USD 1.00 0.00
E26046.5 BUNKER MANIFOLD BOTH F.O & DO & L.O TO RENEW ON BOTH (S & P) SIDE, & PRESSURE TEST .PRESSURE GAUGE POINT TO FABRICATE AND FIT. MANIFOLD PIPE LINE SUPPORT TO CHANGE. ENGINE NOS 10.00 10.00 EA USD 1.00 0.00
E26046.6 MAIN ENGINES; EXHAUST TRUNKING AND TURBOCHARGER LAGGING/INSULATION TO RENEW. ENGINE MTR 25.00 25.00 EA USD 1.00 0.00
E26046.7 STEAM COIL OF BUNKER TANKS, DB TANKS, WOT TO BE PRESSURE TESTED AND DEFECTIVE TO BE RENEW. ENGINE NOS 16.00 16.00 EA USD 1.00 0.00
E26046.8 AFU FILTER CASING FOR BOTH PORT AND STARBOARD BWTS TO BE REPAIRED. FILTER ELEMENTS TO BE REMOVED, CASINGS CLEANED, AND NEW FILTER ELEMENTS INSTALLED. SYSTEM TO BE RESTARTED AND CHECKED FOR LEAKS AND PROPER OPERATION. ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
E26046.9 ENGINE CONTROL ROOM 2NOS FIRE DOORS TO BE RENEWED WITH YARD SUPPLIED APPROVED DOORS. ENGINE NOS 2.00 2.00 EA USD 1.00 0.00
i E26047: MISC PIPE LINES & VALVES : ENGINE EA USD 1.00 0.00
I TYPE / CAPACITY / DETAILS : ENGINE EA USD 1.00 0.00
I REMOVE THE FOLLOWING PIPELINES FROM THEIR INSTALLED LOCATIONS. FABRICATE NEW PIPELINES ALONG WITH FLANGES, AS PER APPROVED SAMPLES OR DRAWINGS. REFIT PIPELINES IN ORIGINAL LOCATIONS, USING NEW GASKETS AND JOINTS (YARD SUPPLY). EXISTING FLANGES MAY BE REUSED IF FOUND IN GOOD CONDITION. ENSURE PROPER ALIGNMENT, SUPPORT, AND CONNECTION OF ALL PIPELINES AFTER INSTALLATION. ENGINE INSTRUCTIONS EA USD 1.00 0.00
E26047.1 SEA WATER PIPE FROM EJECTOR PUMP SUCTION V/V TO EJECTOR PUMP OVER BOARD V/V TO BE RENEW ( MATERIAL MS SCH80) AS PER LENGTH : 5000MM , DIA: 115MM, 90 DEG BEND: 6, 45 DEG BEND: 3 (MS SCH 80) LENGTH: 5000 MM, DIA: 90MM, 90 DEG BEND: 2, 45 DEG BEND: 5(MS SCH 80) LENGTH : 5000MM , DIA: 115MM, 90 DEG BEND:7, 45 DEG BEND: 2 ENGINE MTR 15.00 15.00 EA USD 1.00 0.00
i SEA WATER PIPE FROM BALLAST P/P SUCTION TO DISCHAGRE V/V TO BE RENEW AS PER BELOW: ENGINE EA USD 1.00 0.00
E26047.2 STP SEA WATER LINE TO RENEW.(MS SCH 40) LENGTH: 3000 MM , DIA : 50MM, 90 DEG BEND: 3 ENGINE MTR 3.00 3.00 EA USD 1.00 0.00
E26047.3 ATMOSPHERIC CONDENSER SW LINE TO RENEW. (MS SCH 80) LENGTH: 2000 MM, DIA: 140MM, 90 DEG BEND: 4 ENGINE MTR 2.00 2.00 EA USD 1.00 0.00
E26047.4 CONDENSATE LINE RETURN TO DUMP CONDENSOR (MS SCH 40) LENGTH: 5000MM, DIA: 140 MM, 90 DEG BEND: 1, 45 DEG BEND: 1 ENGINE MTR 5.00 5.00 EA USD 1.00 0.00
E26047.5 LTFW COOLER SW LINES TO RENEW WITH 2 90 DEG BENDS(MS SCH 80) LENGTH: 3000MM, DIA: 230 MM, 90 DEG BEND: 2 ENGINE MTR 3.00 3.00 EA USD 1.00 0.00
E26047.6 BUNKER MANIFOLD A TO RENEW FOR L.O, DO & FO. & PRESSURE TEST LENGTH: 1000MM, 90 DEG BEND:1, DIA: 70MM, MS SCH 40 (2NOS.) LENGTH: 1000MM, 90 DEG BEND:1, DIA: 70MM, MS SCH 40 (2NOS.) LENGTH: 1100MM, DIA.90MM, 90 DEG BEND: 1, MS SCH 40 (2 NOS) LENGTH: 2000 MM, DIA: 220MM, 90 DEG BEND: 1, 45 DEG BEND: 1, MS SCH 40(2 NOS.) LENGTH: 1400 MM, DIA: 190MM, 90 DEG BEND: 1, MS SCH 40 (02 NOS) ENGINE MTR 6.50 6.50 EA USD 1.00 0.00
E26047.7 TESTING LINE FOR OWS TO BE FABRICATED , LENGTH: 2500MM, DIA: 50MM, 90 DEG BEND: 3 MS SCH 40 ENGINE MTR 2.50 2.50 EA USD 1.00 0.00
i E26048: MISCELLANEOUS ENGINE EA USD 1.00 0.00
E26048.1 COMPLETE OVERHAULING OF ALL FOUR ER BLOWERS. • INTERNAL AND EXTERNAL DERUSTING OF BLOWER BODIES. • RENEWAL OF FLAPS FOR ALL FOUR BLOWERS. • RENEWAL OF ACTUATORS, FLEXIBLE HOSES, AND MANUAL VALVES FOR ALL UNITS. ENGINE NOS. 4.00 4.00 EA USD 1.00 0.00
E26048.2 FABRICATION AND INSTALLATION OF A CLOSED/COVERED CHEMICAL LOCKER WITH DOOR IN THE S/G ROOM. ENGINE LS 1.00 1.00 EA USD 1.00 0.00
I FOLLOWING PNEUMATIC CONTROLLERS NEED OVERHAULING. DISMANTLING OF ACTUATORS AND CONTROLLERS.CLEANING AND INSPECTION OF ALL INTERNAL PARTS REPLACEMENT OF DEFECTIVE COMPONENTS.RENEWAL OF SEALS, DIAPHRAGMS, AND O-RINGS .CALIBRATION OF PID CONTROLLERS.FUNCTIONAL TESTING OF ACTUATORS REASSEMBLY AND INSTALLATION SETTING AND TESTING WITH 4–20 MA SIGNAL .AIR LEAK TEST AND STROKE CHECK.FINAL COMMISSIONING AND PERFORMANCE TEST.ALL CONSUMABLES REQUIRED FOR OVERHAULING SHOULD BE YARD SUPPLY. ENGINE EA USD 1.00 0.00
E26048.3 M/E L.T. COOLER MODEL NO: EPR-FA2SN3NTF INPUT SIGNAL: 4–20 MA DC SUPPLY AIR PRESSURE: 1.4 – 7 BAR AMBIENT TEMPERATURE: -20°C TO +70°C ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26048.4 M/E L.O. COOLER MODEL NO: EPR-FA2SN3NTF INPUT SIGNAL: 4–20 MA DC SUPPLY AIR PRESSURE: 1.4 – 7 BAR AMBIENT TEMPERATURE: -20°C TO +70°C ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26048.5 EXCESS STEAM DUMP CONTROLLER MODEL NO: YT-1000 INPUT SIGNAL: 4–20 MA DC SUPPLY AIR PRESSURE: 1.4 – 7 BAR AMBIENT TEMPERATURE: 0°C TO 50°C ENGINE NOS 1.00 1.00 EA USD 1.00 0.00
E26048.6 AUX. ENGINE PREHEATER TO BE DISMATLED FOR CLEANING AND PRESSURE TESTED TO RATED VALUE AS PER MAKER RECOMMENDED VALUE MODEL: SSE24000 CAPACITY: 24 KW ENGINE SET 3.00 3.00 EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
EA USD 1.00 0.00
THE SHIPPING CORPORATION OF INDIA LTD. THE SHIPPING CORPORATION OF INDIA LTD.
(A Government of IndIa EnterprIse) (A Government of India Enterprise)
TENDER DRYDOCK / REPAIRS SPECIFICATIONS ITEM DISPOSAL : SPECIFICATION
ZTR_TYPE ZBID_ID ZTDR_ID ZBIDDER ZBID_DESC OVERALL_DISCOUNT EXCHANGE_RATE ZQUOTED_DAYS ZCURRENCY ZDISPDESC ZDISPUOM ZDISPQUA ZDISPTT ZDISPFINIMP
RFx Type (Mandatory) RFx Response No (char 10 - Mandatory) RFx No (char 10 - Mandatory) Vendor No (char 10 - Mandatory) Vendor Name (char 40 - Mandatory) Percentage(%) EXCHANGE RATE Quoted Days Bid Currency (char 5) DESCRIPTION (char 100) UNIT OF MEASUREMENT (char 20) QUANTITY TYPE OF TRANSACTION (char 30) NET PRICE QUOTED BY VENDOR (LUMPSUM)
DryDockIng-Qty&Rate 0.00% 0.000 0
ZINFLAG ZBDITEM ZMATERIAL ZMATDESC ZGROUP1 ZGROUP2 ZGROUP3 Z_PCODE ZPCODEDESC ZVOLUME ZUNIT ZRATE ZRATEPU ZCURRENCY ZDISPER ZDISVAL ZFINIMP ZVAT ZST ZCST ZEXCISETAX ZFINIMPLD
InformatIon lIne (char 1) RFx Line Item No (char 10 - Mandatory) Material/Service ID (char 18) Material/Service Description (char 60 - Mandatory) REPAIR CATEGORY UNIT OF MEASUREMENT QUANTITY Port Code (char 5) Port Description (char 60) Qty/Volume (9999999999999.99) UOM (char 3) Bid Price/Rate (9999999999999.99) Price per Unit ((9999999999999) Bid Currency (char 5) Discount/Qty (%) (999) Discount on Gross (val) (9999999999999.99) Financial Implication (9999999999999.99) VAT (%) (999) ST (%) (999) CST (%) (999) Excise (%) (999) FIN IMPLICATION AFTER LUMPSUM DICOUNT
I MV VISHVA EKTA/MV VISHVA VIKAS DRY-DOCK /REPAIRS SPECIFICATIONS 2026-27 DECK EA 1 USD 0.00 0.00 INR
I YARDS TO QUOTE THEIR COST/ RATES AS GIVEN IN THIS FORMAT ONLY -AGAINST ALL THE ITEMS SPECIFIED HEREWITH (IN BID PRICE / RATE - COLUMN "L") DECK EA 1 USD 0.00 0.00 USD
I DECK SIDE DECK EA 1 USD 0.00 0.00 EUR
I ITEM: GENERAL INSTRUCTION TO YARD DECK EA 1 USD 0.00 0.00 Bidder shall pay to SCI
I AS FAR AS POSSIBLE, VESSEL TO BE PROGRAMMED TO ENTER DRY-DOCK IMMEDIATELY ON ARRIVAL AT THE YARD. DECK EA 1 USD 0.00 0.00 Bidder shall charge to SCI
I WHEN VESSEL IS NOT DOCKED FOR DRY-DOCKING REPAIR THEN, VESSEL TO BE SAFELY BERTHED AT A SUITABLE REPAIR BERTH FOR THE DURATION OF REPAIR PERIOD. NORMAL SERVICES AS REQUIRED TO BE PROVIDED DURING REPAIR PERIOD. IN CASE, VESSEL IS DOUBLE BANKED THEN THE YARD TO ENSURE ADEQUATE CRAINAGE FACILITIES AVAILABLE SO THAT THE WORK IS NOT HAMPERED. DECK EA 1 USD 0.00 0.00
I VESSEL TO BE SAFELY DOCKED IN SUITABLE DRYDOCK ON BLOCK OF ADEQUATE HEIGHT.MINIMUM CLEARANCE AVAILABLE ON SIDE FOR GRIT/HYDRO BLASTING AND PAINTING TO BE INDICATED BY YARD. DECK EA 1 USD 0.00 0.00
I ADEQUATE LIGHTING TO BE PROVIDED DURING HOURS OF DARKNESS AND WORK SHOULD BE CONTINUED ON WEEK ENDS AND HOLIDAYS ON ROUND THE CLOCK BASIS. DECK EA 1 USD 0.00 0.00
I YARD TO ARRANGE TUGS PILOTS RIGGERS BOATMEN FOR MOORING, UNMOORING, SHIFTING AND DOCKING OF VESSEL. IF VESSEL IS SHIFTED FOR YARDS CONVENIENCE, NO CHARGES TO BE LEVIED TO THE VESSEL. YARD TO QUOTE LUMPSUM CHARGES FOR EACH SHIFTING OR MOVEMENT. DECK EA 1 USD 0.00 0.00
I YARD TO DISPLAY SUITABLE PRECAUTIONARY WARNING NOTICES AT VARIOUS LOCATIONS TO AVOID ACCIDENTS & ALSO ENSURE SUFFICIENT SAFETY MEASURES DURING VESSELS STAY IN YARD. DECK EA 1 USD 0.00 0.00
I FIREMEN TO WEAR DISTINCTIVE UNIFORM WHICH TO BE MADE KNOWN TO SHIPS OFFICERS/CREW ON ARRIVAL. THE FIREMAN WOULD REPORT TO MASTER & CHIEF ENGINEER TWICE EVERY DAY. DECK EA 1 USD 0.00 0.00
I YARD SHALL PROVIDE CRANE FACILITIES ON WRITTEN REQUEST FROM SHIPS STAFF AS AND WHEN REQUIRED TO LIFT SHIFT PROVISION , STORES, SPARES ETC. TOTAL TIME CRANE USED SHOULD BE CERTIFIED BY SHIPS STAFF. DECK EA 1 USD 0.00 0.00
I YARD WOULD ARRANGE GAS FREE/HOT WORK CERTIFICATE FOR ALL SPACES ON BOARD AS REQUIRED DURING THE REPAIR PERIOD.COPY OF GAS FREE/HOT WORK CERTIFICATES IS TO BE HANDED OVER TO THE MASTER/CHIEF ENGINEER OFFICER WHENEVER ANY CHECK HAS BEEN MADE. IN CASE ANY SPACE IS FOUND TO BE UNSUITABLE FOR MAN ENTRY OR HOT WORK SAME TO BE BROUGHT TO THE NOTICE OF SHIPS STAFF. DECK EA 1 USD 0.00 0.00
I IF COOLING WATER FOR DOM. FRIDGE/AC IS THROUGH SAME LINE AS FIRE LINE YARD TO ENSURE SUFFICIENT PRESSURE IN THE FIRE LINE. DECK EA 1 USD 0.00 0.00
I ALL ITEMS IN THE SPECIFICATIONS REPAIRED BY THE YARD SHOULD BE TESTED TO THE SATISFACTION OF ATTENDING SUPERINTENDENT & SHIPS STAFF. TESTING, PURGING, PICKLING, HOSE TESTING SHOULD BE INCLUDED IN THE QUOTED COST ITEM WISE. DECK EA 1 USD 0.00 0.00
I QUOTATION FOR EACH ITEM SHOULD INCLUDE ALL REQUIRED STAGING, TEMPORARY LIGHTING, VENTILATION AND FIRE PRECAUTIONS (IF REQUIRED) FOR THE USE OF YARD PERSONNEL ACCOMPLISHING EACH JOB. DECK EA 1 USD 0.00 0.00
I ALL PAINTS WILL BE SUPPLIED BY OWNERS AND ARE TO BE APPLIED BY AIRLESS SPRAY MACHINES HAVING SUFFICIENT PRESSURE TO FULLY ATOMIZE THE HEAVY COATINGS. NO PAINTS TO BE APPLIED ON DAMP SURFACE. DECK EA 1 USD 0.00 0.00
I DEFICIENCIES IN FILM THICKNESS TO BE MADE GOOD BEFORE APPLYING FINAL COATS TO AVOID PATCH APPEARANCE. DRYING/CURING TIME TO BE ALLOWED AS PER RECOMMENDATIONS OF PAINT MAKERS TECHNICIAN AND IN CONSULTATION WITH ATTENDING SUPERINTENDENT. DECK EA 1 USD 0.00 0.00
I QUOTATION FOR VARIOUS SERVICES BE BASED ON TIME IN DRY-DOCK OR AT REPAIR BERTH QUOTED BY THE YARD. QUOTATIONS FOR EACH SERVICE SHALL BE ALL INCLUSIVE, I.E; INCLUDING CONNECTION/DISCONNECTION INSTALLATION/REMOVAL AND ANY OTHER ACTIVITIES CONNECTED WITH THE SERVICES. DECK EA 1 USD 0.00 0.00
I ON IDENTIFICATION OF REPAIR ITEMS TO YARD PERSONNEL A DETAILED BAR CHART DISPLAYING WORK SCHEDULE AND COMPLETION OF REPAIR ITEMS TO BE ENDORSED AND SUBMITTED TO ATTENDING SUPERINTENDENT. DECK EA 1 USD 0.00 0.00
I IF DURING VESSEL'S STAY IN SHIPYARD, ANY ITEM OF MACHINERY/ EQUIPMENT OR PIPING SYSTEM OR ELECTRICAL SYSTEM IS OBSERVED NOT FUNCTIONING NORMALLY OR HAS BEEN WRONGLY ASSEMBLED / FITTED, IT WOULD BE THE DUTY OF SHIPYARD PERSONNEL TO BRING IT TO THE NOTICE OF ATTENDING SUPERINTENDENT AND REMEDIAL ACTION TAKEN IN CONSULTATION WITH CONCERNED SUPERINTENDENT. DECK EA 1 USD 0.00 0.00
I AT THE TIME OF COMMISSIONING AND TRIALS OF EQUIPMENT, IT IS NECESSARY THAT, REPRESENTATIVES OF SHIPYARD FROM VARIOUS DEPT ARE PRESENT TO ENABLE COMMISSIONING AND TESTING DEFECTS TO BE RESOLVED IMMEDIATELY. DECK EA 1 USD 0.00 0.00
I ALL WORKS TO BE CARRIED OUT AS PER THE INTERNATIONAL STANDARDS AND CONSISTENT WITH SAFE MARINE PRACTICES ON ROUND THE CLOCK BASIS. DECK EA 1 USD 0.00 0.00
I DUE CONSIDERATION TO BE GIVEN TO INSTRUCTIONS AND GUIDELINES OF THE OWNERS AND THEIR SAFETY MANAGEMENT SYSTEM. DECK EA 1 USD 0.00 0.00
I ALL CONCUMABLES ARE BE TO SUPPLIED BY THE YARD UNLESS MENTIONED FOR OWNER’S SUPPLY. YARD TO QUOTE ACCORDINGLY. DECK EA 1 USD 0.00 0.00
I ON COMPLETION OF ALL REPAIR WORK (PRIOR DEPARTURE), ENTIRE VESSEL TO FRESH WATER WASH. DECK EA 1 USD 0.00 0.00
I ALL NEW PIPES FITTED ON MAIN DECK AS PER VARIOUS SPECIFICATIONS SHOULD BE PROVIDED WITH LEAD STRIP BETWEEN PIPE AND CLAMP AND PIPE BOTTOM SUPPORT AT PLACE OF BOLTING.ALL NEW PIPES CLAMPS FITTED NEED TO BE COATED BY YARD. ALL PAINTS OWNER'S SUPPLY. ALL PIPELINES TO BE COATED INTERNALLY PRIOR FITTMENT. YARD TO QUOTE ACCORDINGLY. DECK EA 1 USD 0.00 0.00
I YARD TO USE SUITABLE ELECTRODES AS REQUIRED FOR RESPECTIVE JOB INVOLVING MILD STEEL, ALUMINIUM, STAINLESS STEEL ETC. DECK EA 1 USD 0.00 0.00
I YARD TO EFFECTIVELY COVER THE DOPPLER AND ECHO SOUNDER TRANSDUCERS DURING HULL TREATMENT TO AVOID ANY DAMAGE.SAME TO UNCOVER AFTER HULL TREATMENT IS COMPLETED/BEFORE REFLOATING. DECK EA 1 USD 0.00 0.00
I BALLAST TANKS PLUGS TO BE REMOVED AFTER VESSEL IS SITTING ON THE BLOCKS AND DOCK IS COMPLETELY DRY TO FACILITATE DRAINING OF BALLAST TANKS.ALL PLUGS TO BE PUT BACK BEFORE COMMENCEMENT OF OF BALLASTING & VACUUM TEST TO BE CARRIED OUT IN PRESENCE OF MASTER/CHIEF OFFICER OR ANY OTHER RESPONSIBLE OFFICER DEPUTED BY MASTER/CO. DECK EA 1 USD 0.00 0.00
I ANY JOB SCOPE NOT MENTIONED IN THE ORIGINAL JOB SCOPE TO BE ATTENDED AFTER THE INSTRUCTION / PERMISSION FROM THE ATTENDING SUPDT. DECK EA 1 USD 0.00 0.00
I ALL DAMAGED AND BURNT PAINT AREAS TO BE MADE FAIR AND APPLY WITH ONE COAT OF PRIMER AND FINISH PAINT AS PER THE PAINTING SPECIFICATION. DECK EA 1 USD 0.00 0.00
I VESSEL IS ISPS COMPLIANT,YARD TO ENSURE THEIR ISPS COMPLIANCE. ONCE VESSEL ENTERS THE YARD, YARD TO TAKE FULL RESPONSIBILTY FOR THE SAFETY AND SECUIRTY OF THE VESSEL. HOT WORK AND ENCLOSED SPACE ENTRY , PROPER APPROVED WORK PERMITS TO BE EXECUTED WITH THE KNOWLEDGE OF SHIP'S STAFF. DECK EA 1 USD 0.00 0.00
I WHILE CARRY OUT O'HAULING OF VALVES, PRESSURE TESTING OF PIPELINES, MAINTENANCE OF AIR PIPE VENT HEADS ETC, YARD TO CONSIDER ISOLATION BY BLANKING AND OTHER FIRE HAZARD/SAFTY ISSUES AND QUOTE ACCORDINGLY. DECK EA 1 USD 0.00 0.00
I ENGINE/PUMP ROOM BILGES VALVES PIPE LINES, FLOOR PLATES AND BULKHEADS SHALL BE CLEANED AFTER REPAIRS TO BRING TO ORIGNAL CONDITION ON YARD ACCOUNT. DECK EA 1 USD 0.00 0.00
I YARD TO PROVIDE SAFE ACCESS TO THE VESSEL AT REPAIR BERTH AND IN DOCK. ALL YARD ARRANGEMENT. DECK EA 1 USD 0.00 0.00
I YARD TO ALLOW OWNER ARRANGED SERVICE ENGINEER/COMPETENT ENGINEER DURING ENTIRE STAY OF VESSEL AT REPAIR YARD AT NO COST TO OWNER. DECK EA 1 USD 0.00 0.00
I SAFETY GUARDS PLACEMENT FOR VARIOUS OPENINGS AND CARGO TANK ENTRY TILL 1ST PLATFORM AS PER YARD SAFETY STANDARD TO CARRY OUT. NO ADDITIONAL JOB SCOPE/COST TO BE CHARGED SEPARATELY. DECK EA 1 USD 0.00 0.00
I ALL NEW /RENEWED STEEL VIZ; PIPE PLATE CLAMP RAILING ETC AND THE DAMAGED PAINT COATING DURING HOT WORK ARE TO BE CURED AND COATED WITH PAINTS AS PER ON BOARD PAINTING SPECIFICATION. YARD TO QUOTE FOR SAME ACCORDINGLY. IT IS APPLICABLE FOR ALL THE REPAIR/RENEWAL JOB ON BOARD DURING THE DRY DOCKING/REPAIR PERIOD. DECK EA 1 USD 0.00 0.00
i QUOTE SHOULD BE ALL INCLUSIVE. ANY ADDITIONAL COST WILL NOT BE ENTERTAINED AND IN CASE OF ANY DEVIATION IN QUANTITY, SAME WILL BE SETTLED STRICTLY ON PRORATA BASIS. DECK EA 1 USD 0.00 0.00
i YARD TO ISSUE ALL REQUIRED CERTIFCATES IN LINE WITH APPLICABLE REGULATIONS. DECK EA 1 USD 0.00 0.00
I REMOVE DEBRIS AND DIRT ARISING OUT OF REPAIRS AT REGULAR INTERVALS THROUGHOUT THE REPAIR PERIOD ON YARD ACCOUNT AND SHOULD BE CLEAR OF DEBRIS AND DIRT PRIOR DEPARTURE.EVERY ENDEAVOUR SHOULD BE MADE TO REMOVE DEBRIS AND DIRT ARISING OUT OF REPAIRS AT REGULAR INTERVALS THROUGHOUT THE REPAIR PERIOD ON YARD ACCOUNT. DECK EA 1 USD 0.00 0.00
I D26001-MOORING/UN-MOORING/DOCKING/UN-DOCKING/WHARFAGE/GENERAL SERVICES DECK EA 1 USD 0.00 0.00
I VESSEL TO BE SAFELY BERTHED AT SUITABLE REPAIR BERTH FOR THE DURATION OF REPAIR PERIOD ON ARRIVAL. NOTE: IN CASE THE VESSEL IS DOUBLE/TRIPPLE BANKED, THEN YARD TO ENSURE THAT ADEQUATE CRANE FACILITIES ARE AVAILABLE SO THAT WORK IS NOT HAMPERED. QUOTE ALL INCLUSIVE. DECK INSTRUCTION EA 1 USD 0.00 0.00
D26001.1 YARD TO QUOTE LUMSUMP WHARFAGE DUES FOR ENTIRE PERIOD OF REPAIR AT REPAIR BERTH. DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26001.2 LUMPSUM COST FOR UNBERTHING TO ENTER DRY-DOCK FROM REPAIR BERTH. DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26001.3 QUOTE LUMPSUM COST FOR BERTHING AT REPAIR BERTH AFTER UNDOCKING FROM DRY-DOCK DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26001.4 QUOTE LUMPSUM COST FOR UNBERTHING FROM REPAIR BERTH FOR SAILING,QUOTE ALL INCLUSIVE DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26001.5 VESSEL TO BE SAFELY DOCKED ON BLOCKS ENSURING SUFFICIENT HEIGHT AND CLERANCE ARE BEING MAINTAINED FOR EFFECTIVE DOCKING REPAIR. QUOTE SHOULD INCLUDES DOCKING CHARGES,UNDOCKING CHARGES AND DOCK CHARGES FOR ENTIRE PERIOD OF STAY IN DOCK. DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
I IF THE VESSEL IS SHIFTED FOR YARD'S CONVENIENCE NO CHARGES FOR SAME WOULD BE APPLICABLE. DECK INSTRUCTION EA 1 USD 0.00 0.00
I VESSEL TO BE SAFELY DOCKED IN SUITABLE DRYDOCK ON BLOCKS OF ADEQUATE HEIGHT. MINIMUM CLEARANCE AVAILABLE ON THE SIDES FOR GRIT BLASTING AND PAINTING TO BE INDICATED BY YARD. WORK SHOULD BE CONTINUED ON WEEK ENDS AND HOLIDAYS. NOTE: THE ABOVE PRICE SHOULD INCLUDE CHARGES FOR ALL REQUIRED SHORING AND DIVER. THERE SHOULD BE NO SEPARATE CHARGES FOR EXTRA SHORING. WHILE ESTIMATING, TOTAL TIME FOR ALL WORKS AS SPECIFIED IN OUR REPAIR SPECIFICATION SHOULD BE TAKEN INTO CONSIDERATION. DECK INSTRUCTION EA 1 USD 0.00 0.00
I YARD TO QUOTE MOOR/UNMOOR AND SHIFT THE VESSEL WITH ASSISTANCE OF PILOT, TUGS ( CONSIDER 4 TUGS FOR EACH MOVEMENTS), RIGGERS AND BOATMEN. QUOTE ALL INCLUSIVE. DECK INSTRUCTION EA 1 USD 0.00 0.00
D26001.6 TO SUPPLY SEA WATER FOR SHIP’S FIRE MAIN LINES AT ALL TIMES. PRESSURE IN THE FIRE MAIN LINE ON DECK TO BE MAINTAINED AT LEAST 5.0 KG/CM2 SO THAT THE MINIMUM OF 2 FIRE HOSES CAN BE USED SIMULTANEOUSLY IN CASE REQUIRED. YARD TO QUOTE LUMPSUM PRICE ASSUMING SUPPLY THROUGH TWO LINES. PRICE INCLUSIVE OF CONNECTION/DISCONNECTION AND ATTENDANT. YARD TO PROVIDE CHARGED FIRE HOSE WITH DUAL TYPE NOZZLE AT LOCATION OF ALL HOT WORK. DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26001.7 PROVIDE 02 FIRE WATCHMEN DURING ENTIRE PERIOD OF VESSEL'S STAY IN YARD PREMISES. YARD TO QUOTE LUMPSUM PRICE AS PER YARD REQUIREMENT. DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
I NOTE: FIRE WATCHMEN SHOULD WEAR DISTINCTIVE UNIFORM WHICH SHOULD BE MADE KNOWN TO THE SHIP’S OFFICERS/CREW ON ARRIVAL. FIRE WATCHMAN WOULD BE REQUIRED TO REPORT TO THE MASTER AND THE CHIEF ENGR. OFFICER ONCE EVERY SHIFT. DECK INSTRUCTION EA 1 USD 0.00 0.00
I ANY ADDITIONAL ITEM OR SAFETY SERVICES TO BE SPECIFIED INCLUDED AND ACCORDINGLY QUOTED FOR IF YARD OR LOCAL REGULATIONS DEMAND. DECK INSTRUCTION EA 1 USD 0.00 0.00
I IN CASE ANY REPAIRS ARE TO BE CARRIED OUT ON FIRE MAIN LINE YARD IS REQUIRED TO ENSURE THAT THE SECTION OF THE PIPELINE UNDER REPAIR IS ISOLATED FROM THE SHIPS FIRE MAIN. DECK INSTRUCTION EA 1 USD 0.00 0.00
I THE PERIOD REQUIRED FOR ISOLATING THE LINE WHEN NO WATER PRESSURE WILL BE AVAILABLE IN THE FIRE MAIN IS TO BE KEPT TO THE MINIMUM AND THE DUTY OFFICER AND DUTY ENGINEER SUITABLY INFORMED WHEN THIS WORK IS BEING DONE. DECK INSTRUCTION EA 1 USD 0.00 0.00
I DURING THE PERIOD REPAIRS ARE BEING CARRIED OUT TO THE FIRE MAIN AN ALTERNATIVE ARRANGEMENT SHOULD BE MADE IN THE AREA WHERE WATER HAS BEEN CUT OFF. DECK INSTRUCTION EA 1 USD 0.00 0.00
D26001.8 YARD TO QUOTE LUMPSUM CHARGES INCLUSIVE OF CONNECTION/DISCONNECTION OF CABLES ASSESSING SHIPS TOTAL CONSUMPTION AS 50000 KWH. VESSELS POWER REQUIREMENT WOULD BE 440 VOLTS 60 HERTZ; 400 AMP AND 3 PHASES.ANY DEVIATION IN CONSUMPTION WILL BE SETTLED AS PER PRORATA BASIS. NOTE: VESSELELECTRICAL OFFICER/RESPONSIBLE OFFICER TO SIGHT AND RECORD RECORD SUPPLY METER READINGS. DECK KWH 50000.00 50000.00 EA 1 USD 0.00 0.00
D26001.9 YARD TO ARRANGE REMOVAL OF GALLEY REFUSE DOMESTIC WASTE AND PLASTIC REFUSE PER DAY AND PROVIDE CERT AS PER REQUIREMENTS. QUOTE FOR ENTIRE PERIOD OF DRYDOCK AND REPAIR DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26001.10 SHIP SANITARY SYSTEM WILL BE USED AS FAR AS POSSIBLE. YARD TO QUOTE FOR CONNECTING/DISCONNECTING PIPE FOR SEWAGE DISPOSAL WHILE VESSEL IS AT YARD . NOTE : DURING THE COURSE OF REPAIR OF SEWAGE PLANT AND SURVEY, SANITATION FACILITIES TO BE PROVIDED FOR SHIPS STAFF. DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26001.11 TO BE PROVIDED AS AND WHEN REQUIRED ON WRITTEN REQUEST OF SHIP’S STAFF TO TAKE STORES, PROVISIONS, SPARES, LANDING OF MACHINERY COMPONENTS FOR REPAIRS BY OWNER ARRANGED SERVICE PROVIDERS; ETC.TOTAL TIME CRANE USED SHOULD BE CERTIFIED BY SHIP’S STAFF INDICATING DATE AND HOURS OF EVERY CRANE USE. QUOTE FOR THROUGH OUT PERIOD OF DRYDOCK/ REPAIR PER HOURLY BASIS.APPROX 100HRS.MINIMUM CHARGES SHOULD NOT BE APPLICABLE. YARD TO QUOTE LUMP SUM CHARGES PRICE INCLUSIVE OF SLINGS AND RIGGERS ASSUMING CARNE REQUIRED FOR 2HRS EVERY DAY.ANY DEVIATION WILL BE SETTLED IN PRORATA BASIS DECK HRS 100.00 100.00 EA 1 USD 0.00 0.00
D26001.12 TO ARRANGE GAS FREE/HOT WORK CERTIFICATES FOR ALL SPACES ON BOARD INCLUDING TANKS AS REQUIRED DURING THE REPAIR PERIOD. COPIES OF GAS FREE/HOT WORK CERTIFICATES ARE TO BE HANDED OVER TO THE MASTER AND CEO WHENEVER ANY CHECK HAS BEEN MADE. IN CASE ANY SPACE IS FOUND TO BE UNSUITABLE FOR MAN ENTRY OR FOR HOT WORK SAME TO BE IMMEDIATELY BROUGHT TO THEIR NOTICE. ASSUME 20 COMPARTMENTS TO BE CERTIFIED PERIODICALLY YARD TO QUOTE LUMPSUM PRICEPER DAY.ANY ADDITION/DELETION WILL BE SETTLED ON PRORATA BASIS. DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26001.13 FRESH WATER SUPPLY FOR SHIPS DOMESTIC USE TO BE SUPPLIED AS AND WHEN REQUIRED. QUOTE LUMP SUM CHARGES OF CONNECTION /DISCONNECTION OF HOSES .WATER PURITY CERTIFICATE FOR DOMESTIC WATER USE TO BE PROVIDED.ANY ADDITION/DELETION WILL BE SETTLED ON PRORATA BASIS. DECK MT 500.00 500.00 EA 1 USD 0.00 0.00
D26001.14 TO SUPPLY COOLING WATER FOR FRIDGE AND/AIR CONDITIONING UNITS / MAIN AIR COMPRESSOR/LT COOLER DURING THE TIME WHEN VESSEL IS IN DRYDOCK.YARD TO QUOTE LUMPSUM CHARGES ASSUMING SUPPLY THROUGH ONE/TWO LINES PRICE INCLUSIVE OF CONNECTION / DISCONNECTION THROUGH OUT REPAIR PERIOD. DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
I NOTE: IN CASE SUPPLY OF COOLING WATER FOR DOMESTIC FRIDGE AND OR AIR CONDITIONING UNITS IS COMMON WITH THE FIRE MAIN LINE. YARD TO TAKE STEPS TO ENSURE THAT ADEQUATE PRESSURE IS MAINTAINED IN THE FIRE MAIN LINE AT ALL TIMES. DECK EA 1 USD 0.00 0.00
D26001.15 TO SUPPLY COMPRESSED AIR FOR SHIP’S STAFF; BOTH DECK AND MACHINERY SPACE; USE OF PNEUMATIC TOOLS EQUIPMENTS DURING THE ENTIRE REPAIR PERIOD .AIR PRESSURE TO BE MAINTAINED 6 BAR.YARD TO QUOTE LUMPSUM CHARGES PRICE FOR 02 LINES PER DAY INCLUSIVE OF CONNECTION/ DISCONNECTION DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26001.16 TO FILL BALLAST WATER IN 4 CARGOS/BALLAST TANKS AS REQUIRED IN 12 HOURS. TO QUOTE FILLING 15000 MTONS OF BALLAST WATER (S.W). THE COST SHOULD PRICE INCLUDE RIGGING/ UNRIGGING OF YARDS PUMPS AND ATTENDANCE DURING OPERATION.ANY DEVIATION IN QTY WILL BE SETTLED ON PRORATA BASIS. DECK MT 15000.00 15000.00 EA 1 USD 0.00 0.00
D26001.17 TO DE-BALLAST ABOVE CARGO/BALLAST TANKS (AS REQUIRED) IN 12 HOURS. QUOTE FOR PUMPING OUT 15000 MTONS BALLAST WATER USING YARD’S PUMPS. THE COST SHOULD INCLUDE RIGGING / UNRIGGING OF PUMPS AND ATTENDANCE DURING OPERATION.ANY DEVIATION IN QTY WILL BE SETTLED ON PRORATA BASIS. DECK MT 5000.00 5000.00 EA 1 USD 0.00 0.00
D26001.18 TO FIT & REMOVE 16 WOODEN PLUG WITH SPOUTS TO SCUPPERS AND PIPES IN DRYDOCK AND AT WET BERTH. YARD TO QUOTE LUMPSUM PRICE. DECK PCS 6.00 6.00 EA 1 USD 0.00 0.00
D26001.19 YARD TO QUOTE LUMPSUM PRICE FOR REMOVAL 200 MTONS DIRTY WATER FROM CARGO HOLDS( ALL INCLUSIVE). ANY DEVIATION IN QTY WILL BE SETTLED ON PRORATA BASIS. DECK MT 200.00 200.00 EA 1 USD 0.00 0.00
D26001.20 ENGINE ROOM BILGES TO BE REMOVED ON DAILY BASIS DURING ENTIRE REPAIR PERIOD AND REQUIRED CERTIFICATES TO BE ISSUED FOR ENDORSEMENT IN OLB. YARD TO QUOTE LUMPSUM PRICE ALL INCLUSIVE. QUANTITY = 100 TONS DIRTY WATER/OILY WATER.ANY DEVIATION IN QTY WILL BE SETTLED ON PRORATA BASIS. DECK MT 100.00 100.00 EA 1 USD 0.00 0.00
i TO PROVIDE TRIAL BERTH AND ARRANGEMENTS FOR SEA TRIAL; IF CONSIDERED NECESSARY BY ATTENDING SUPERINTENDENT AND SURVEYORS. DECK INSTRUCTION EA 1 USD 0.00 0.00
D26001.21 YARD TO QUOTE CHARGES ON THE BASIS OF BERTH TRIAL OF 3 HOURS DURATION AND SEA TRIAL FOR 6 HOURS DURATION INCLUSIVE OF NECESSARY ASSISTANCE OF 6 YARD PERSONNEL; DURING THE TRIAL. DECK HRS 9.00 9.00 EA 1 USD 0.00 0.00
D26001.22 TO PROVIDE 15 VENTILATING FANS OF SUFFICIENT CAPACITY TO PROVIDE VENTILATION FOR CARGO HOLDS/BALLAST TANKS/BALLAST TANKS/STEERING ROOM/ENGINE ROOM FOR EXCLUSIVE USE TO FULFILL OWNERS REQUIREMENT( ALL INCLUICIVE) DURING ENTIRE STAY AT REPAIR BERTH/INSIDE THE DOCK THE QUOTE SHOULD BE ALL INCLUSIVE. VENTILATORS USED BY YARD TO CARRY OUT VARIOUS JOBS IN CARGO/BALLAST TANKS/ENGINE ROOM/ PUMP ROOM ETC TO BE INCLUDED IN QUOTE FOR THE JOBS DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26001.23 TO PROVIDE AND LAY THICK POLYTHENE SHEET COVERING FOR 6 CABINS (MASTER; CEO; CO; 2EO; OWNER; OFFICE; CCR; CONFERENCE ROOM); 3 DINING SPACES; 3 LOUNGE AREAS; 6 STAIRWAYS CHAIRS IN OFFICERS/CREW LOUNGE AND 300 RUNNING METRES OF ALLEYWAYS IN ACCOMMODATION. TOTAL APPROX AREA 300 SQ MTRS TWO TIMES. ANY DEVIATION WILL BE SETTLED PRORATA BASIS. DECK M2 300.00 300.00 EA 1 USD 0.00 0.00
D26001.24 YARD TO ALLOW FOR RENEWAL OF 12 NOS. BOTTOM PLUGS (SS) ALONG WITH HOUSING WITH ALL TEST AS PER CLASS.QUOTE ALL INCLUSIVE ANY DEVIATION WILL BE SETTLED PRORATA BASIS. DECK NOS 12.00 12.00 EA 1 USD 0.00 0.00
I YARD TO QUOTE UNIT RATES FOR THE FOLLOWING : SAME RATES MAY BE APPLIED ACROSS THE QUOTATION.SERVICE WILL BE TAKEN AS REQUIRED AND BILL WILL BE SETTLED AS PER BELOW QUOTED RATE. DECK Inclusive EA 1 USD 0.00 0.00
D26001.25 I. SKILLED LABOUR DECK Man Day 1.00 1.00 EA 1 USD 0.00 0.00
D26001.26 II. SEMI SKILLED LABOUR DECK Man Day 1.00 1.00 EA 1 USD 0.00 0.00
D26001.27 III. UNSKILLED LABOUR DECK Man Day 1.00 1.00 EA 1 USD 0.00 0.00
D26001.28 IV. VENTILATION FAN OF 12 HP PER DAY DECK Set per day 1.00 1.00 EA 1 USD 0.00 0.00
D26001.29 V. QUOTE UNIT RATE OF STAGING IN OPEN AREA I.E ; ON DECK ETC DECK M3 10.00 10.00 EA 1 USD 0.00 0.00
D26001.30 VI. QUOTE UNIT RATE OF STAGING IN CLOSED AREA I.E; INSIDE TANKS;ENGINE ROOM ETC DECK M3 10.00 10.00 EA 1 USD 0.00 0.00
D26001.31 VII. QUOTE UNIT RATE FOR TRANSPORTATION OF ITEMS FROM SHIP TO WORKSHOP AND BACK PER TRIP LUMPSUMP DECK TRIP 10.00 10.00 EA 1 USD 0.00 0.00
D26001.32 VIII.QUOTE UNIT RATE FOR LIGHTING IN BALLAST TANK DB AS WELL AS TST IF REQUIRED DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
D26001.33 IX. QUOTE UNIT RATE FOR LIGHTING IN CARGO HOLD HIGH POWERED IF REQUIRED DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
D26001.34 X. REMOVAL OF SLUDGE/DIRTY OIL DECK CBM 10.00 10.00 EA 1 USD 0.00 0.00
D26001.35 Xi.REMOVAL OF OILY WATER DECK CBM 10.00 10.00 EA 1 USD 0.00 0.00
D26001.36 XII.REMOVAL OF MUD/MOCH DECK CBM 100.00 100.00 EA 1 USD 0.00 0.00
D26001.37 XIII. TRANSFER OF HFO/DO/L.O DECK CBM 100.00 100.00 EA 1 USD 0.00 0.00
D26001.38 XIV.CLEANING WITH RAG( YARD SUPPLY) DECK M2 200.00 200.00 EA 1 USD 0.00 0.00
D26001.39 XV. CHEMICAL( YARD SUPPLY) CLEANING OF BULK HEADS PIPES DECK ETC. DECK M2 50.00 50.00 EA 1 USD 0.00 0.00
I D26002: HULL TREATMENT AND PAINTING DECK EA 1 USD 0.00 0.00
I WORK SPECIFICATIONS: DECK EA 1 USD 0.00 0.00
i HIGH PRESSURE WASHING: DECK EA 1 USD 0.00 0.00
D26002.1 ALL EXTERNAL SURFACES SHOULD BE HOSED WITH FRESH WATER AT HIGH PRESSURE TO REMOVE FOULING AND SALT DEPOSITS. WATER USED SHOULD NOT BE A PRESSURE BELOW 250 KG/CM2. TOTAL HULL SURFACE AREA 12500 M2. DECK M2 12500.00 12500.00 EA 1 USD 0.00 0.00
D26002.2 HAND SCRAPPING TO BE CARRIED OUT TO REMOVE BARNACLES & MARINE GROWTH FROM UNDER WATER HULL. TO BE DONE AFTER WASHING. DECK M2 500.00 500.00 EA 1 USD 0.00 0.00
i STAIN REMOVAL: DECK INSTRUCTION EA 1 USD 0.00 0.00
D26002.3 OIL AND GREASE STAINS ON SHIPSIDE SHOULD BE REMOVED BEFORE COMMENCING PAINTING. CHEMICALS IF ANY; REQUIRED WILL BE SUPPLIED BY THE YARD. QUOTE PER M2 ASSUMING STAINED AREA OF 100 M2. DECK M2 100.00 100.00 EA 1 USD 0.00 0.00
I GRIT/HYDRO BLASTING AND PAINTING SPECIFICATIONS: DECK EA 1 USD 0.00 0.00
I ALL PAINTS WILL BE SUPPLIED BY OWNERS AND WILL BE APPLIED BY AIR LESS SPRAY. DECK EA 1 USD 0.00 0.00
I i. GRIT/HYDRO BLASTING TO BE OF SA 2.0/SA 1.0 STANDARD AND EDGES OF GRIT/HYDRO/ BLASTED AREAS TO BE SMOOTHENED BACK TO A FIRM EDGE. OWNERS REPRESENTATIVES WILL INSPECT ALL BLASTED AREA BEFORE APPLICATION OF ANY PAINT. DECK INSTRUCTION EA 1 USD 0.00 0.00
I ii. BLASTING/SURFACE PREPARATION TO BE AS PER APPROVED PAINTING SCHEME DECK EA 1 USD 0.00 0.00
I BLASTING AND COATING TO BE DONE DECK EA 1 USD 0.00 0.00
I A. TOPSIDE AREA: 2500 M2 DECK EA 1 USD 0.00 0.00
D26002.4 BLASTING AS PER INSTRUCTION i) SA2.0 DECK M2 500.00 500.00 EA 1 USD 0.00 0.00
D26002.5 BLASTING AS PER INSTRUCTION ii) SA1.0 DECK M2 600.00 600.00 EA 1 USD 0.00 0.00
D26002.6 2x125m DFT EPOXY PRIME DECK M2 1200.00 1200.00 EA 1 USD 0.00 0.00
D26002.7 1x50m DFT POLYURETHANE FINISH BLACK DECK M2 2500.00 2500.00 EA 1 USD 0.00 0.00
I B. VERTICAL BOTTOM AREA: 5700 DECK EA 1 USD 0.00 0.00
i B1. BOOT TOPPING : 2700 DECK EA 1 USD 0.00 0.00
D26002.08 BLASTING AS PER INSTRUCTION i) SA2.0 DECK M2 500.00 500.00 EA 1 USD 0.00 0.00
D26002.09 BLASTING AS PER INSTRUCTION ii) SA1.0 DECK M2 600.00 600.00 EA 1 USD 0.00 0.00
i TOUCH UP COAT DFT DECK EA 1 USD 0.00 0.00
D26002.10 1ST COAT 125m DFT EH EPOXY-SHADE BROWN DECK M2 1200.00 1200.00 EA 1 USD 0.00 0.00
D26002.11 2ND COAT 125m DFT EH EPOXY- SHADE BLACK DECK M2 1200.00 1200.00 EA 1 USD 0.00 0.00
D26002.12 3RD COAT 125m DFT SPC ANTIFOULING -SHADE PLUM DECK M2 1200.00 1200.00 EA 1 USD 0.00 0.00
i FULL COAT DFT DECK EA 1 USD 0.00 0.00
D26002.13 1ST FULL COAT 125m DFT SPC ANTIFOULING-SHADE PINK- 2000 M2 (SILICONE PAINT/LOW FRICTION PAINT) DECK M2 2700.00 2700.00 EA 1 USD 0.00 0.00
D26002.14 2ND FULL COAT 125m DFT SPC ANTIFOULING-SHADE RED BROWN FINAL COAT- 2000 M2 (SILICONE PAINT/LOW FRICTION PAINT) DECK M2 2700.00 2700.00 EA 1 USD 0.00 0.00
I B.2 VERTICAL BOTTOM AREA: 3000 M2 DECK EA 1 USD 0.00 0.00
D26002.15 BLASTING AS PER INSTRUCTION i) SA2.0 DECK M2 500.00 500.00 EA 1 USD 0.00 0.00
D26002.16 BLASTING AS PER INSTRUCTION ii) SA1.0 DECK M2 600.00 600.00 EA 1 USD 0.00 0.00
I TOUCH UP COAT DFT DECK EA 1 USD 0.00 0.00
D26002.17 1ST COAT 125m DFT EH EPOXY-SHADE BROWN DECK M2 1200.00 1200.00 EA 1 USD 0.00 0.00
D26002.18 2ND COAT 125m DFT EH EPOXY- SHADE BLACK DECK M2 1200.00 1200.00 EA 1 USD 0.00 0.00
D26002.19 3RD COAT 125m DFT SPC ANTIFOULING -SHADE PLUM DECK M2 1200.00 1200.00 EA 1 USD 0.00 0.00
I FULL COAT DFT DECK EA 1 USD 0.00 0.00
D26002.20 1ST FULL COAT 125m DFT SPC ANTIFOULING-SHADE PINK- (LOW FRICTION PAINT) DECK M2 3000.00 3000.00 EA 1 USD 0.00 0.00
D26002.21 2ND FULL COAT 125m DFT SPC ANTIFOULING-SHADE RED BROWN FINAL COAT- 1966 M2((LOW FRICTION PAINT) DECK M2 3000.00 3000.00 EA 1 USD 0.00 0.00
I C. FLAT BOTTOM AREA: 4300 M2 DECK EA 1 USD 0.00 0.00
D26002.22 BLASTING AS PER INSTRUCTION i) SA2.0 DECK M2 1250.00 1250.00 EA 1 USD 0.00 0.00
D26002.23 BLASTING AS PER INSTRUCTION ii) SA1.0 DECK M2 1500.00 1500.00 EA 1 USD 0.00 0.00
I TOUCH UP COAT DFT DECK EA 1 USD 0.00 0.00
D26002.24 1ST COAT 125m DFT EH EPOXY-SHADE BROWN DECK M2 2500.00 2500.00 EA 1 USD 0.00 0.00
D26002.25 2ND COAT 125m DFT EH EPOXY- SHADE BLACK DECK M2 2500.00 2500.00 EA 1 USD 0.00 0.00
D26002.26 3RD COAT 100m DFT SPC ANTIFOULING -SHADE PLUM DECK M2 2500.00 2500.00 EA 1 USD 0.00 0.00
I FULL COAT DECK EA 1 USD 0.00 0.00
D26002.27 i.1ST FULL COAT 125m DFT SPC ANTIFOULING-SHADE PINK- 5000 M2 (SILICONE PAINT/LOW FRICTION PAINT) DECK M2 4300.00 4300.00 EA 1 USD 0.00 0.00
D26002.28 ii.2ND FULL COAT 125m DFT SPC ANTIFOULING-SHADE RED BROWN FINAL COAT- 5000 M2 (SILICONE PAINT /LOW FRICTION PAINT) DECK M2 4300.00 4300.00 EA 1 USD 0.00 0.00
D26002.29 TO PAINT WITH 2 COATS ON VARIOUS HULL MARKLINGS WHICH INCLUDES FOLLOWING MARKINGS: DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
I A. FORWARD; MIDSHIP AND AFT DRAFT MARKS ON BOTH PORT AND STARBOARD SIDE PAINT DECK INCLUSIVE EA 1 USD 0.00 0.00
I B. PLIMSOL MARKS PORT AND STARBOARD;DECKLINE DECK INCLUSIVE EA 1 USD 0.00 0.00
I C. INTERTANK BULKHEAD AND TANK MARKINGS DECK INCLUSIVE EA 1 USD 0.00 0.00
I D. "T" MARKS FOR TUGS PORT AND STARBOARD DECK AND SHIPSIDE. DECK INCLUSIVE EA 1 USD 0.00 0.00
I E. BOW MARK AND EMBLEM & BULBOS BOW MARK ON BOW P&S DECK INCLUSIVE EA 1 USD 0.00 0.00
I F. SHIPS NAME IN HINDI AND ENGLISH PORT AND STARBOARD FORWARD DECK INCLUSIVE EA 1 USD 0.00 0.00
i G. SHIP'S NAME PORT OF REGISTRY & IMO NUMBER MARKING ON AFT IN HINDI AND ENGLISH DECK INCLUSIVE EA 1 USD 0.00 0.00
I H. SHIP’S NAME AND PORT OF REGISTRY AFT IN HINDI AND ENGLISH DECK INCLUSIVE EA 1 USD 0.00 0.00
i I. PILOT BOARDING MARKING DECK INCLUSIVE EA 1 USD 0.00 0.00
I J. MULTIPLE LOADLINES MIDSHIP DECK INCLUSIVE EA 1 USD 0.00 0.00
I K. CAUTION BOARD ON THE POOP DECK. DECK INCLUSIVE EA 1 USD 0.00 0.00
I L. RECOMMENDED 9 M FREEBOARD MARK WHITE OVER RED ON P&S SIDES DECK INCLUSIVE EA 1 USD 0.00 0.00
I M. UNDER WATER PROBE/FITTINGS DECK INCLUSIVE EA 1 USD 0.00 0.00
D26002.30 ALL SEA CHESTS INCLUDING EMERGENCY SEA CHEST GRATINGS TO BE OPENED; INSIDE CLEANED , REQUIRED CHIPPING TO BE CARRIED OUT FOLLOWED BY PAINTING AS PER PAINTING SCHEME WASTED ANAODES TO RENEW (OWNER SUPPLIED) & GRATINGS TO BE SECURED AS PER ORIGINAL ARRANGEMENTS. ALL THE GRATINGS TO BE FITTED AND SECURED WITH LOCKING NUTS AND BOLTS.ADDITIONAL SECURING TO BE DONE BY SEIZING WIRE. DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
I A. ALL PAINTS OWNERS SUPPLY. ALL PAINTS PRICE INCLUDING ANTI FOULING ARE TO BE APPLIED BY AIRLESS SPRAY. AIRLESS SPRAY MACHINES SHALL BE CAPABLE ON GENERATING SUFFICIENT PRESSURE TO FULLY ATOMISE THE HEAVY COATINGS. DECK INCLUSIVE EA 1 USD 0.00 0.00
I B. NO PAINT IS TO BE APPLIED ON DAMP SURFACES. ONLY CLEAN; STAIN / RUST FREE AND DRY SURFACES ARE TO BE PAINTED. DECK INCLUSIVE EA 1 USD 0.00 0.00
I C. OWNER REPRESENTATIVE WILL ADVICE THE CONTRACTOR OF HIS REQUIREMENT WITH REGARD TO ALLOWABLE TEMPERATURE AND HUMIDITY CONDITIONS AND THESE ARE TO BE STRICTLY ADHERED TO. DECK INCLUSIVE EA 1 USD 0.00 0.00
I D. ALL COATINGS ARE TO BE SMOOTHLY APPLIED FREE FROM SAGS AND RUNS DECK INCLUSIVE EA 1 USD 0.00 0.00
I E. DEFECIENCIES IN FILM THICKNESS AND OR UNEVENNESS OF SURFACES ARE TO BE MADE UP/LEVELED PRIOR TO THE APPLICATION TO THE FINAL COAT. DECK INCLUSIVE EA 1 USD 0.00 0.00
I F. MINIMUM OVERCOATING INTERVALS AS PER PAINT MANUFACTURERS TO BE ADHERED TO. DECK INCLUSIVE EA 1 USD 0.00 0.00
I G. ALL ECHO SOUNDER; DOPPLER LOG AND ANODES TO BE COVERED WITH PROTECTIVE COATING AGAINST PAINT AND TO BE REMOVED BEFORE FLOODING DECK INCLUSIVE EA 1 USD 0.00 0.00
I H. SURFACE PREPARATION TO BE VERIFIED BY SUPERINTENDENT/OWNER'S REPRESENTATIVE. REQUIRED SURFACE PREPARATION (AIR BLOW/ FRESH WATER WASHING) TO BE CARRIED OUT PRIOR APPLICATION OF EACH COAT. DECK INCLUSIVE EA 1 USD 0.00 0.00
I I) ENTIRE HULL SURFACES SHOULD BE HOSED WITH FRESH WATER AT LOW PRESSURE TO REMOVE ALL GRIT/HYDRO AND SALT DEPOSITS PRIOR APPLYING FINAL COAT. DECK INCLUSIVE EA 1 USD 0.00 0.00
I J) ENTIRE HULL SURFACES IF REQUIRED TO BE BLOWN THROUGH WITH COMPRESSED AIR PRIOR APPLYING PAINT SHOULD BE INCLUDED IN ABOVE COST. DECK INCLUSIVE EA 1 USD 0.00 0.00
I K) BARNACLES AND MARINE GROWTH ON THE SURFACE OF TRANSDUCER UNITS/UNDER WATER PROBES TO BE CLEANED THOROUGHLY AND TO BE COVERED WHILE PAINT COATING. DECK INCLUSIVE EA 1 USD 0.00 0.00
I L) TO EXECUTE ABOVE JOB NECESSARY CHERRY PICKER STAGING AS CONVENEIENT TO BE UTILISED (ALL INCLUSIVE). DECK INCLUSIVE EA 1 USD 0.00 0.00
I M) ALL SEA CHESTS AND EMERGENCY SEA CHEST GRATINGS TO BE REMOVED INSIDE TO BE CLEANED AND PAINT COAT TO BE APPLIED AS PER PAINTING SCHEME. DECK INCLUSIVE EA 1 USD 0.00 0.00
I N) LP WASHING OF UNDERWATER HULL AREA AND TOPSIDE AREA AFTER APPLICATION OF 1ST COAST OF PAINT AT 1000PSI TO BE CARRIED OUT. DECK INCLUSIVE EA 1 USD 0.00 0.00
D26002.31 12 NOS. BOTTOM PLUGS TO BE OPENED AND CLOSED USING THREAD SEAL TAPE; LEAD WASHER AND VACCUM TESTED AND FINALLY CEMENTED.MATERIAL OF BOTTOM PLUGS IS STEEL SUS 316. OPENING AND CLOSING OF BOTTOM PLUGS IS TO BE DONE IN THE PRESENCE OF NOMINATED OFFICER FROM THE VESSEL. QUOTE ALL INCLUSIVE ANY DEVIATION WILL BE SETTLED PRORATA BASIS. DECK PCS 12.00 12.00 EA 1 USD 0.00 0.00
I D26003: COATING OF DECK PIPELINES AND STRUCTURES ON MAIN DECK DECK INCLUSIVE EA 1 USD 0.00 0.00
I RUSTED AREAS OF MAIN DECK, ASSOCIATED STRUCTURES, DECK PIPELINES/PIPE CLAMPS, SHIPSIDE/WALKWAY RAILINGS ON EXPOSED DECKS (MAIN DECK , POOP DECKS AND MAST HOUSES, FWD AND MAIN MAST, ALL 05 HATCH COAMINGS AND SUPPORTINGS) TO BE POWER TOOLED ST2 STD, CLEANED AND APPLIED 3 COATS OF OWNER SUPPLIED PAINTS AS PER PAINTING SCHEME. (AREA OF EXPOSED DECKS AND STRUCTURES - 3600 SQ MTR AND PIPELINES - 1000 SQ MTRS) PAINTS SUPPLY BY OWNER. QUOTE ALL INCLUSIVE PRICE ANY DEVIATION WILL BE SETTLED STRCTLY AS PER PRORATA BASIS. DECK INSTRUCTION EA 1 USD 0.00 0.00
D26003.1 HP WASHING; MIN 250 BAR - TO THE SATISFACTION OF OWNER'S REPRESENTATIVE. DECK M2 3600.00 3600.00 EA 1 USD 0.00 0.00
D26003.2 CHEMICAL CLEANING DECK M2 300.00 300.00 EA 1 USD 0.00 0.00
D26003.3 POWER TOOLING TO ST2 STANDARD DECK M2 1000.00 1000.00 EA 1 USD 0.00 0.00
D26003.4 1ST COAT PRIMER 75 m DFT DECK M2 1000.00 1000.00 EA 1 USD 0.00 0.00
D26003.5 2ND COAT PRIMER 100 m DFT DECK M2 1000.00 1000.00 EA 1 USD 0.00 0.00
D26003.6 3RD COAT FINISH DECK RED BROWN 100 m DFT DECK M2 3600.00 3600.00 EA 1 USD 0.00 0.00
I JOB TO CARRY OUT WITH EFFECTIVE SURFACE PREPARATION AS PER PAINTING SCHEME UNDER THE SUPERVISION OF PAINT SUPPLY REP AND OWNER'S REPRESENTATIVE. DECK EA 1 USD 0.00 0.00
I PRECAUTIONS TO TAKE TO AVOID DAMAGE TO ADJACENT EQUIPMENT , CABLES SENSOR. NECESSARY PROTECTION TO CARRY OUT (YARD ACCOUNT). DECK EA 1 USD 0.00 0.00
I STRIP COAT OF ALL DECK PROJECTIONS TO ENSURE COMPLETE DECK AREA IS COVERED. DECK EA 1 USD 0.00 0.00
I DRYING AND OVER COATING TIME TO BE ALLOWED AS PER RECOMMENDATIONS OF PAINT MANUFACTURERS. DECK EA 1 USD 0.00 0.00
I ALL PAINTS TO BE APPLIED BY AIRLESS SPRAY. SPRAY MACHINE SHOULD BE CAPABLE OF GENERATING SUFFICIENT PRESSURE TO FULLY ATOMISE THE HEAVY COATING. DECK EA 1 USD 0.00 0.00
I PIPELINES ARE LOCATED ABOUT 3 MTR ABOVE MAIN DECK. WHILE APPLYING PAINT UNDER PIPELINES PORTABLE PLANKS MAY BE PLACED ON TOP OF DECK FRAMES TO REACH. DECK EA 1 USD 0.00 0.00
I D26004: PAINTING OF ACCOMODATION, SUPERSTRUCTURE BULKHEAD, UPPERDECK AND FUNNEL AREA DECK EA 1 USD 0.00 0.00
I WORK SPECIFICATIONS: DECK EA 1 USD 0.00 0.00
I RUSTED AREAS OF ACCOMMODATION SUPERSTRUCTURE BULKHEADS ,ACCOMODATION DECKS TO SPOT POWER TOOLED, PORT HOLE LIP AREAS TO BE NEEDLE GUN CHIPPED AND EDGE OF CHIPPED AREA TO BE SMOOTHED BACK TO A FIRM EDGE AND PITTINGS TO BE BUILT UP WITH EPOXY. OWNERS REPRESENTATIVE/ PAINT MANUFACTURERS WILL INSPECT AND POWER TOOLED AREAS BEFORE APPLICATION OF PAINT. PAINTS SUPPLY BY OWNER.QUOTE ALL INCLUSIVE PRICE ANY DEVIATION WILL BE SETTLED STRCTLY AS PER PRORATA BASIS. DECK INSTRUCTION EA 1 USD 0.00 0.00
D26004.1 HP WASHING MINIMUM 250 BAR DECK M2 1900.00 1900.00 EA 1 USD 0.00 0.00
D26004.2 CHEMICAL CLEANING DECK M2 100.00 100.00 EA 1 USD 0.00 0.00
D26004.3 POWER TOOLING TO ST 2.0 DECK M2 300.00 300.00 EA 1 USD 0.00 0.00
D26004.4 1 COAT OF TOUCH UP EPOXY PRIMER 75 m DFT DECK M2 500.00 500.00 EA 1 USD 0.00 0.00
D26004.5 1 COAT OF TOUCH UP EPOXY MIOCOAT 100 m DFT DECK M2 500.00 500.00 EA 1 USD 0.00 0.00
D26004.6 1 COAT OF POLYURETHANE FINISH WHITE 75 m DFT DECK M2 1900.00 1900.00 EA 1 USD 0.00 0.00
D26004.7 TO CARRY OUT SURFACE PREPARATION AND COATING OF BRIDGE FRONT (APPROX AREA 20M X 20 M) YARD TO ARRANGE SHORE CRANE WITH BASKET AND QUOTE ACCORDINGLY. DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26004.8 RUSTED AREAS OF FUNNELTO GRIT/HYDRO BLAST CLEANED AND APPLIED 3 COATS OF OWNER SUPPLY PAINTS AS PER PAINTING SCHEME BELOW. TOTAL AREA 200 M2 DECK M2 200.00 200.00 EA 1 USD 0.00 0.00
D26004.9 POWER TOOLING TO ST 2.0 DECK M2 70.00 70.00 EA 1 USD 0.00 0.00
D26004.10 1ST COAT PRIMER 75 m DFT DECK M2 40.00 40.00 EA 1 USD 0.00 0.00
D26004.11 2ND COAT PRIMER 100 m DFT DECK M2 40.00 40.00 EA 1 USD 0.00 0.00
D26004.12 ENTIRE FUNNEL (AREA 200 M2) TO BE HIGH PRESSURE WASHED AND COATED WITH 1 COAT OWNER SUPPLY PAINT (HR PAINT). ALLOW FOR USE OF SHORE CRANE WITH BASKET TO UNDERTAKE ABOVE JOB. DECK M2 200.00 200.00 EA 1 USD 0.00 0.00
D26004.13 BOTHSIDE COMPANY EMBLEM (ASHOKA CHAKRA) TO PAINT DECK NOS 2.00 2.00 EA 1 USD 0.00 0.00
I ALL PAINTS OWNERS SUPPLY. ALL PAINTS ARE TO BE APPLIED BY AIRLESS SPRAY. DECK EA 1 USD 0.00 0.00
I MOVABLE TROLLEY STAGE WOULD BE REQUIRED AT 3 LOCATIONS L :3M . B: 2M X 2 M HEIGHT; SO AS TO DO THE ENTIRE ACCOMDATION UNDER DECK AREAS. DECK EA 1 USD 0.00 0.00
I PRECAUTIONS TO BE TAKEN TO ENSURE THAT ALL ACOMMODATION DOORS; PORTHOLES AND SENSITIVE EQUIPMENT ETC. WELL PROTECTED/COVERED DURING ABOVE JOB. DECK EA 1 USD 0.00 0.00
I IN CASE OF UNAVAIBALITY OF MOVING TROLLEY STAGING TO BE USED. DECK EA 1 USD 0.00 0.00
I D26005: CLEANING AND EPOXY COATING IN BALLAST TANKS AND FRESH WATER TANKS: DECK EA 1 USD 0.00 0.00
I WORK SPECIFICATIONS: DECK EA 1 USD 0.00 0.00
D26005.1 TO CARRY OUT EPOXY COATING QUOTE FOR REMOVAL OF APPROX. 05 TONS OF MUD FROM EACH BALLAST TANK. (FROM 12 TANKS) INCLUDING DISPOSAL OF MUD. DECK TON 10.00 10.00 EA 1 USD 0.00 0.00
D26005.2 TANK BOTTOM AREA TO BE HOSED DOWN TO CLEAR MUD DECK M2 500.00 500.00 EA 1 USD 0.00 0.00
D26005.3 DAMAGED EPOXY COATED AREA (APPROXIMATELY 50 M2 IN EACH WBT/COFFER DAM) TOP PLATFORM AND BOTTOM PLATFORM TO BE POWER TOOLED TO ST3 STANDARD; POWER TOOLING BRUSHED; SAND DISCED AND CLEANED WITH THINNER; DECK M2 100.00 100.00 EA 1 USD 0.00 0.00
D26005.4 AFTER SURFACE TREARTMENT TOUCHED UP WITH 2 COATS OF PAINT 75m DFT; DECK M2 500.00 500.00 EA 1 USD 0.00 0.00
I ALL PAINT OWNER’S SUPPLY. DURING PAINTING; HUMIDITY WILL BE REQUIRED TO BE CONTROLLED INSIDE THE TANKS. DECK EA 1 USD 0.00 0.00
I D26006: TANK CLEANING DECK EA 1 USD 0.00 0.00
I FOLLOWING TANKS BOTTOM AREA TO BE CLEANED, GAS FREED AND TO BE OFFERED FOR INSPECTION TO CALSS SURVEYOR. VESSEL UNDERGOING 15 YEARLY RENEWAL SURVEY. YARD TO USE PORTABLE LADDERS AND ANY OTHER SUITABLE GEARS FOR CARRYING OUT TANK CLEANING.VENTILATION LIGHTING AND ALL REQUIRED ARRANGEMENTS TO BE ARRANGED BY YARD. ASSOCIATED MANHOLES TO OPEN AND SAME TO BOX BACK USING YARD SUPPLIED CONSUMABLES ( PACKING/RUBBER PACKING/ NUT BOLTS- CONSIDER OPENING OF 60 MANHOLE DOORS & RENEWAL OF 240 NUTS/STUDS). ANY DEVIATION WILL BE SETTLED ON PRORATA BASIS. QUOTE ALL INCLUSIVE. NOTE: QUOTED COST SHOULD ACCOUNT FOR REMOVAL OF SLUDGE OILY WATER MUD MUCK ETC AND SAME WILL BE DISPOSED AS PER MARPOL REGULATIONS. BALLAST TANKS IS INCLUSIVE OF WING TANK AND DB TANKS DECK Instruction EA 1 USD 0.00 0.00
D26006.2 NO.1 B.S.W.B.TK.P DECK CBM 322.50 322.50 EA 1 USD 0.00 0.00
D26006.3 NO.1 B.S.W.B.TK.S DECK CBM 322.50 322.50 EA 1 USD 0.00 0.00
D26006.4 NO.2 B.S.W.B.TK.P DECK CBM 366.20 366.20 EA 1 USD 0.00 0.00
D26006.5 NO.2 B.S.W.B.TK.S DECK CBM 366.20 366.20 EA 1 USD 0.00 0.00
D26006.6 NO.3 B.S.W.B.TK.P DECK CBM 366.20 366.20 EA 1 USD 0.00 0.00
D26006.7 NO.3 B.S.W.B.TK.S DECK CBM 366.20 366.20 EA 1 USD 0.00 0.00
D26006.8 NO.4 B.S.W.B.TK.P DECK CBM 366.20 366.20 EA 1 USD 0.00 0.00
D26006.9 NO.4 B.S.W.B.TK.S DECK CBM 366.20 366.20 EA 1 USD 0.00 0.00
D26006.10 NO.5 B.S.W.B.TK.P DECK CBM 270.30 270.30 EA 1 USD 0.00 0.00
D26006.11 NO.5 B.S.W.B.TK.S DECK CBM 270.30 270.30 EA 1 USD 0.00 0.00
D26006.19 VARIOUS TANKS TO BE INTERNALLY COATED AFTER PROPER SURFACE PREPARATION OF EFFECTED AREAS. COATING TO BE CARRIED OUT WITH APPROVED PAINT ( SHIP SUPPLIED), QUOTE ALL INCLUSIVE CONSIDERING TOTAL AREA 2000 M2. DECK M2 2000.00 2000.00 EA 1 USD 0.00 0.00
I D26007: TREATMENT IN CARGO HOLDS AND BILGE WELL TOTAL 5 CARGO HOLD TANKS DECK EA 1 USD 0.00 0.00
I WORK SPECIFICATIONS: DECK EA 1 USD 0.00 0.00
I WATER WASHING TO BE CARRIED OUT.RUSTED AREAS OF CARGO HOLDS BILGE WELL AND ASSOCIATED STRUCTURES TO GRIT/HYDRO BLAST CLEANED PAINTED WITH 3 COATS OF OWNER SUPPLIED PAINTS AS PER PAINTING SCHEME. (AREA OF CARGO HOLDS , TANK TOP & BILGE HOLDING TANK = 19500 M2).QUOTE ALL ALL INCLUSINVE. COST SHOULD INCLUDE COST OF ALL NECESSARY FACILITIES SUCH AS STAGING COST, CHERRY PICKER , TRANSPORTATION, CONSUMMABLES ETC. DECK Instruction EA 1 USD 0.00 0.00
D26007.1 ALL CARGO HOLDS TO BE THOROUGHLY WASHED WITH HP FRESHWATER AT 200 KG/CM2 UPON DOCKING. PRIOR SAND BLASTING AND GENERATED MOCK/MUD/DIRTY WATER TO BE REMOVED TO SHORE .PRIOR TO APPLICATION OF PAINT, LP WATER WASH TO BE CARRIED OUT . THE WATER WASH SHALL INCLUDE ALL SHADOW AREAS BEHIND ANGLE BARS OF FRAMES GIRDERS ETC .AFTER COMPLETION OF JOB,ENTIRE HOLD AREAS TO BE THORUGHLY CLEANED.TOTAL AREA OF CARGO HOLDS AND ITS BILGES INCLUDING TANK TOP= 19500 M2. QUOTE ALL ALL INCLUSIVE. DECK M2 19500.00 19500.00 EA 1 USD 0.00 0.00
D26007.2 CHEMICAL CLEANING DECK M2 500.00 500.00 EA 1 USD 0.00 0.00
D26007.3 GRIT/HYDRO BLAST TO SA 2.0 DECK M2 2000.00 2000.00 EA 1 USD 0.00 0.00
D26007.4 GRIT/HYDRO BLAST TO SA 1.0 DECK M2 3000.00 3000.00 EA 1 USD 0.00 0.00
D26007.5 1x 125 m DFT EPOXY Coating DECK M2 12000.00 12000.00 EA 1 USD 0.00 0.00
D26007.6 1x 125 m DFT Epoxy Final Coat DECK M2 19500.00 19500.00 EA 1 USD 0.00 0.00
D26007.7 REPAINTING OF CARGO HOLD MARKINGS DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26007.8 HANDTOOLING OF CARGOHOLD BEHIND ANGLE BARS DECK M2 500.00 500.00 EA 1 USD 0.00 0.00
I QUOTATION MUST INCLUDE ALL STAGING AND CHERRY PICKER FOR CARRYING OUT CLEANING AND PAINTING DECK INCLUSIVE EA 1 USD 0.00 0.00
I D26008: COATING IN CARGO HOLDS HATCH COVERS OUTSIDE AND INSIDE DECK EA 1 USD 0.00 0.00
I RUSTED AREAS OF CARGO HOLDS HATCH COVERS INSIDE ,OUTSIDE COAMING AND ASSOCIATED STRUCTURES ( INCLUDING TRACKWAYAND COMPRESSION BARS) TO GRIT/HYDRO BLAST/ CLEANED AND APPLIED 3 COATS OF OWNER SUPPLIED PAINTS AS PER PAINTING SCHEME (TOTAL AREA 4500 M2). QUOTE ALL INCLUSIVE INCLUDING STAGING COST. DECK Instruction EA 1 USD 0.00 0.00
D26008.1 ALL CARGO HOLDS HATCH COVERS TO BE THOROUGHLY WASHED WITH FRESHWATER AT 200 KG/CM2 BEFORE PAINTING INCLUDING ALL SHADOW AREAS. DECK M2 4500.00 4500.00 EA 1 USD 0.00 0.00
D26008.2 GRIT/HYDRO BLAST TO SA 2.0 DECK M2 500.00 500.00 EA 1 USD 0.00 0.00
D26008.3 GRIT/HYDRO BLAST TO SA 1.0 DECK M2 1000.00 1000.00 EA 1 USD 0.00 0.00
D26008.4 1x 125 m DFT EPOXY Coating DECK M2 2000.00 2000.00 EA 1 USD 0.00 0.00
D26008.5 1x 125 m DFT Epoxy Final Coat DECK M2 4500.00 4500.00 EA 1 USD 0.00 0.00
I D26009: ANCHOR CABLES AND CHAIN LOCKERS DECK EA 1 USD 0.00 0.00
I INSPECT ANCHOR CHAINS AND CABLES FOR WEAR,CORROSSION,PITTING,ELONGATION,CRACKS,DEFORMATION,BROKENOR MISSING LINK,DAMAGED AND SEIZED CONNECTING SHACKLES. INSPECT CHAIN LOCKERS FOR CORROSION ,STRUCTURAL DAMAGE,LOOSE OR DAMAGED SECURING POINTS. PORT AND STARBOARD CABLE ORIGINAL DIAMETER 76 MM,PORT 12 SHAKCLES, STBD-12 SHACKLES. DECK INSTRUCTION EA 1 USD 0.00 0.00
D26009.1 PORT AND STARBOARD ANCHORS AND CABLES TO BE RANGED IN DRYDOCK (BITTER ENDS TO BE REMOVED) AND DESRUSTING TO BE CARRIED OUT BY CHIPPING & CLEANED WITH HIGH PRESSURE FRESH WATER JET PRIOR TO EXAMINATION. DECK SET 2.00 2.00 EA 1 USD 0.00 0.00
D26009.2 BOTH ANCHORS CHAINS TO BE RANGED; CALIBRATED AND REPORT TO BE FURNISHED. DECK SET 2.00 2.00 EA 1 USD 0.00 0.00
D26009.3 ONE COMPLETE LENGTH TO BE MADE READY USING GOOD CHAIN LENGTH OF BOTH THE CHAINS AND SAME TO BE FITTED IN PORT/STBD SIDE USING NEW SHORT LENGTH/SWIVEL/D -SHAKLE. DECK SET 1.00 1.00 EA 1 USD 0.00 0.00
D26009.4 STBD SIDE / PORT ANCHOR CABLE TO BE CHANGED COMPLETELY ALONG WITH NEW SHORT LENGTH FROM SHIP SUPPLIED SPARE CHAIN & ACCESORIES. DECK SET 1.00 1.00 EA 1 USD 0.00 0.00
D26009.5 LOOSE STUDS ON CHAIN LINK TO BE WELDED ON ONE SIDE USING LOW HYDROGEN ELECTRODES. DECK PCS 60.00 60.00 EA 1 USD 0.00 0.00
D26009.6 FULL LENGTH OF CABLES (FROM BITTER END) TO BE PAINTED WITH OWNER SUPPLY BITUMASTIC PAINT. DECK MTR 330.00 330.00 EA 1 USD 0.00 0.00
D26009.7 PORT AND STARBOARD CHAIN LOCKERS BOTTOM AREA TO BE CLEANED THOROUGHLY(APPROXIMATE 70M2) WITH HIGH PRESSURE FRESH WATER. WASHINGS ARE TO BE PUMPED OUT USING YARD'S PUMP. DECK SET 2.00 2.00 EA 1 USD 0.00 0.00
D26009.8 ALLOW FOR REMOVAL OF MUD FROM BOTH CHAIN LOCKER DURING CLEANING. TWO NUMBERS FLOOR PLATES ARE TO BE REMOVED AND REFITTED. CONSIDER REMOVAL OF MUD= 10CBM. DECK CBM 10.00 10.00 EA 1 USD 0.00 0.00
I AFTER DRYING OUT CHAIN LOCKERS (P & S). PAINT DAMAGED AREAS TO BE POWER TOOLED AND POWER BRUSHED TO ST 2 STANDARD AND TWO COATS OF COALTAR EPOXY (OWNERS SUPPLY) PAINT TO BE APPLIED. (ALLOW FOR 60 M2 AREAS TO BE POWER TOOLED/BRUSHED AND 150 M2 AREA TO BE PAINTED;). ALLOW FOR STAGING TO A HEIGHT OF 10 MTR. PAINT OWNER SUPPLY DECK INSTRUCTION EA 1 USD 0.00 0.00
D26009.9 HP WASHING DECK M2 150.00 150.00 EA 1 USD 0.00 0.00
D26009.10 POWER TOOLING DECK M2 60.00 60.00 EA 1 USD 0.00 0.00
D26009.11 COATING DECK M2 150.00 150.00 EA 1 USD 0.00 0.00
D26009.12 STAGING; HEIGHT 10 M; CIRCULAR1.0 MTRS EACH SIDE DECK M3 80.00 80.00 EA 1 USD 0.00 0.00
D26009.13 BOW STOPPER SECURING PIN TO BE STREIGHTENED / RENEWED (SHIP SUPPLY) DECK LS 2.00 2.00 EA 1 USD 0.00 0.00
D26009.14 ALL JOINING SHACKLES TO BE OPENED (24+2 NOS) INCLUDING ANCHOR JOINING SHACKLES OF BOTH ANCHORS AND REFITTED. RETAINING PIN OF ALL JOINING SHACKLES TO BE RENEWED IF REQUIRE WITH NEW STAINLESS STEEL PINS. DECK NOS 25.00 25.00 EA 1 USD 0.00 0.00
D26009.15 SPURLING PIPE COVER TO BE MADE DECK NOS 2.00 2.00 EA 1 USD 0.00 0.00
D26009.16 HAWSE PIPE COVERS FOR ISPS ON BOTH SIDES TO BE CROPPED AND RENEWED. (8MM MS PLATE 1.0 M X 0.8 M) DECK NOS 2.00 2.00 EA 1 USD 0.00 0.00
D26009.17 PORT AND STBD ANCHOR CABLE SHORT LENGTH ALONG WITH SWIVEL AND D SHACKLE TO RENEW(SHORT LENGTH & ACCESSORIES OWNER SUPPLY). DECK NOS 2.00 2.00 EA 1 USD 0.00 0.00
D26009.18 BOTH PORT AND STBD SIDE ANCHOR ROLLERS( POWELL) TO BE COMPLETELY OVERHAULED. GREASE NIPPLES TO BE RENEWED. BUSH TO BE RENEWED. (BUSH AND CONSUMABLES YARD SUPPLY). DECK LS 2.00 2.00 EA 1 USD 0.00 0.00
I D26010: SACRIFICIAL ANODES (HULL & SEA CHESTS) & BALLAST TANKS DECK EA 1 USD 0.00 0.00
I WORK SPECIFICATIONS: DECK EA 1 USD 0.00 0.00
D26010.1 SEA CHEST ANODES TO RENEW WITH OWNER'S SUPPLIED ANODES DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
D26010.2 TO RENEW (ZN-AL-CD) WEIGHT-7.8KG ANODES (300X100X40MM) IN WBT SECURED WITH WEKDING/U-BOLT & NUT AT BOTH ENDS. (OWNER SUPPLIED ANODE). DECK NOS 200.00 200.00 EA 1 USD 0.00 0.00
I D26011: THICKNESS GAUGING DECK EA 1 USD 0.00 0.00
I WORK SPECIFICATIONS: DECK EA 1 USD 0.00 0.00
D26011.1 VESSEL WILL UNDERGO 3RD SPECIAL SURVEY/REPAIRS AND DRY DOCKING. TO CARRY OUT THICKNESS GAUGING OF VESSELS VARIOUS AREAS VIZ. CARGO HOLDS/BALLAST TANKS /VOID SPACES/STOOL SPACES/ OPEN DECKS STUB E/R DB TANKS DB BALLAST TANKS BILGE WELL SEACHEST MAIN SEA LINE CONNECTING LOW & HIGH SEACHEST STUB PIECES ETC & AS PER CLASS/SUPERINTENDENT REQUIREMENT. ON COMPLETION OF GAUGING REPORTS (4 HARD COPIES & SOFT COPIES: FOR VESSEL'S BOTH CLASSES HO AND VESSEL) TO BE SUBMITTED. GAUGING TEAM TO HAVE IRS AND DNV APPROVAL. ESTIMATE 4000 POINTS FOR GAUGING.CERTFIED FOR REMAINING AREA TECHNICIAN WILL BE ARRANGED BY OWNER.THICKNESS GAUGING TEAM TO BE APPROVED BY IRS AND BV DECK POINTS 2000.00 2000.00 EA 1 USD 0.00 0.00
D26011.2 TO ARRANGE 2 NOS. CHERRY PECKER FOR THICKNESS GAUGING OF SHELL PLATE DECK DAY 10.00 10.00 EA 1 USD 0.00 0.00
I D26012: STORM VALVES DECK EA 1 USD 0.00 0.00
I FOLLOWING STORM VALVES ARE TO BE OPENED UP; FOR OVERHAULING IN WORKSHOP. VALVES SEATS TO BE GROUND; LAPPED AND INTERNAL CASING TO BE CLEANED AND PAINTED WITH APEXIOR NO.3 (YARD SUPPLY). VALVES TO BE PRESENTED FOR SURVEY. NEOPRENE LEATHER PADS AND BRASS RETAINER RINGS ARE TO BE RENEWED. ON COMPLETION OF OVERHAULING VALVES TO BE FITTED BACK WITH YARDS SUPPLIED CONSUMABLES ( NUTS/BOLTS AND PACKING ETC). ALL SPARES/CONSUMABLES YARD SUPPLY. DECK INCLUSIVE EA 1 USD 0.00 0.00
D26012.1 GREY WATER O'BOARD (P & S) STORM V/V 10K ,VALVE SIZE:DN 125A(02 NOS STRAIGHT+02 NOS ANGLE STORM VALVE) DECK PCS 4.00 4.00 EA 1 USD 0.00 0.00
D26012.2 SEWAGE DIRECT O'BOARD STORM V/V 10K ,VALVE SIZE:DN 150(01 NOS STRAIGHT+01 NOS ANGLE STORM VALVE) DECK PCS 2.00 2.00 EA 1 USD 0.00 0.00
I D26013: STEEL RENEWAL ON SHIPSIDE / INNER SHELL PLATING / BALLAST TANKS/CARGO HOLDS DECK EA 1 USD 0.00 0.00
I WORK SPECIFICATIONS: THE VESSEL IS UNDERGOING SPECIAL SURVEY/DRY DOCKING SURVEY.STEEL RENEWAL WORK SHALL BE CARRIED OUT IN ACCORDANCE WITH CLASS RULES.RENEWAL STEEL TO BE OF APPROVED GRADE,THICKNESS, MATERIALS AS PER CLASS REQUIREMENT.WELDING TO BE CARRIED OUT BY CLASS APPROVED WELDERS USING APPROVED WELDING PROCEDURES AND APPROVED CONSUMABLES. QUOTE ALL INCLUSIVE. DECK INSTRUCTIONS EA 1 USD 0.00 0.00
D26013.1 RENEWAL OF WASTED / DAMAGED / DEFORMED SHELL PLATING AS IDENTIFIED DURING SURVEY AND INSPECTION. DECK TON 10.00 10.00 EA 1 USD 0.00 0.00
D26013.2 RENEWAL OF WASTED / DAMAGED / DEFORMED SHELL PLATING ON CARGO HOLD AS IDENTIFIED DURING SURVEY AND INSPECTION. DECK TON 15.00 15.00 EA 1 USD 0.00 0.00
D26013.3 RENEWAL OF WASTED / DAMAGED / DEFORMED SHELL PLATING ON BALLAST TANK AS IDENTIFIED DURING SURVEY AND INSPECTION. DECK TON 25.00 25.00 EA 1 USD 0.00 0.00
D26013.4 RENEWAL OF HATCH COAMING CHANNEL DENTED SAME TO BE HEATED AND STRAIGHTENED. DECK MTR 100.00 100.00 EA 1 USD 0.00 0.00
D26013.5 PARTIAL RENEWAL OF HATCH COMING CHANNEL TO CARRY OUT. DECK MTR 400.00 400.00 EA 1 USD 0.00 0.00
I ALSO CONSIDER FOLLOWING FOR RENEWAL IN HULL AREA DECK INSTRUCTIONS EA 1 USD 0.00 0.00
D26013.6 PIECE OF 15 KG OR LESS DECK PCS 50.00 50.00 EA 1 USD 0.00 0.00
D26013.7 PIECE OF 15 KG TO 20 KG DECK PCS 50.00 50.00 EA 1 USD 0.00 0.00
D26013.8 PIECE OF 20 KG TO 25 KG DECK PCS 50.00 50.00 EA 1 USD 0.00 0.00
D26013.9 FUNNEL BULKHEAD HOLED AT VARIOUS LOCATION, SAME TO BE RENEWED WITH CLASS APPROVED STEEL, THICHNESS 12MM. DECK MT 4.00 4.00 EA 1 USD 0.00 0.00
I NOTE: DECK EA 1 USD 0.00 0.00
I § ATTENDING SUPERINTENDENT WILL EXAMINE AND FINALISE QUANTUM OF STEEL RENEWAL DECK INCLUSIVE EA 1 USD 0.00 0.00
I § IN CASE STEEL RENEWAL IS LESS THAN QUANTITY INDICATED HEREIN; ANY ADDITIONAL TIME/COST IN DRYDOCK FOR THE PURPOSE OF THIS STEEL RENEWAL IS TO BE PROPORTIONALLY REDUCED. DECK INCLUSIVE EA 1 USD 0.00 0.00
I § ALLOW FOR; CLASS IRS APPROVED AH32 AND AH 36 GRADE STEEL PLATE DECK INCLUSIVE EA 1 USD 0.00 0.00
I § STEEL RENEWAL ARE TO BE COMMENCED ONLY AFTER THE TANK AND LOCATION ARE OIL FREE AND AREA IS CERTIFIED FIT FOR HOT WORK. YARD TO CARRY OUT NECESSARY CLEANING TO PREPARE FOR HOT WORK AT ALL LOCATIONS. DECK INCLUSIVE EA 1 USD 0.00 0.00
I § STEEL RENEWAL COST SHOULD BE ALL INCLUSIVE INCLUDING RESTORING OF DISTURBED PAINT, LOCAL CLEANING OF AREAS IWO AND STEEL RENEWAL VACUUM TESTING AND XRAY TO THE SATISFACTION OF CLASS SURVEYOR AND ATTENDING SUPERINTENDENT DECK INCLUSIVE EA 1 USD 0.00 0.00
I D26014: WORN OUT WELD SEAMS DECK EA 1 USD 0.00 0.00
I WORK SPECIFICATIONS: DECK EA 1 USD 0.00 0.00
D26014.1 TO BUILD UP WORN OUT WELD SEAMS WITH REQUIRED RUNS WELDING ON HULL / DECK ON STARBOARD AND PORTSIDE AS PER SURVEY REPORT USING LOW HYDROGEN BAKED ELECTRODES. DECK MTR 1000.00 1000.00 EA 1 USD 0.00 0.00
D26014.2 PITTED SPOTS ON RUDDER TO BE BUILT UP BY WELDING AND GROUND SMOOTH (ASSUME 10 PITS; EACH 4 CM X 2 CM X 6 MM DEEP). PIT FILLING WORK ON RUDDER TO BE CARRIED OUT USING NORMAL STAGING RIGGED FOR RUDDER AND PROPELLER WORK. DECK POINTS 50.00 50.00 EA 1 USD 0.00 0.00
D26014.3 ABOUT 20 RUNNING METRES OF WORN OUT WELD SEAMS ON VERTICAL BOTTOM ABOVE TURN OF BILGE ON PORT AND STARBOARD SIDE TO BE GOUGED OUT AND REWELDED WITH REQUIRED RUNS OF WELDING. DECK MTR 20.00 20.00 EA 1 USD 0.00 0.00
D26014.4 ABOUT 10 RUNNING METRES OF WORN OUT WELD SEAMS ON POOP DECK / CARGO HOLDS/BALLAST TANKS TO BE BUILT UP WITH REQUIRED RUNS OF WELDING USING LOW HYDROGEN BAKED ELECTRODES. DECK MTR 10.00 10.00 EA 1 USD 0.00 0.00
D26014.5 TO BUILD UP WORN OUT WELD SEAMS DUE TO ANCHOR RANGING WITH REQUIRED RUNS OF WELDING ON BOW AREA (ON STARBOARD AND PORTSIDE) AS PER SURVEY REPORT USING LOW HYDROGEN BAKED ELECTRODES. DECK MTR 10.00 10.00 EA 1 USD 0.00 0.00
D26014.6 PORT AND STARBOARD HAWSE PIPE LIP AREA PARTLY WORN OUT SECTIONS TO BE BUILT UP. ALLOW FOR TOTAL BUILD UP OF 10 RUNNING METRES WITH 10 RUNS OF WELDING (AREA : 2X30MM X 100MM X 500MM ). DECK MTR 10.00 10.00 EA 1 USD 0.00 0.00
D26014.7 PITTED SPOTS ON THE HAWSE PIPE LIP AREA TO BE BUILT UP AND GRINDING TO BE DONE FOR SMOTTHENING OF SURFACE. (ASSUME 15 PITS OF 50 MM RADIUS TO A DEPTH OF 10 MM). DECK POINTS 50.00 50.00 EA 1 USD 0.00 0.00
I CONSIDER USE OF CHERRY PICKER FOR 2 SHIFTS FOR ABOVE JOB. DECK INCLUSIVE EA 1 USD 0.00 0.00
I JOBS TO CARRY OUT IMMEDIATELY WHEN IN DOCK TO FACILITAE PAITING ALONG WITH HULL COATING AFTER WELDING. DECK INSTRUCTION EA 1 USD 0.00 0.00
I ATTENDING SUPERINTENDENT WILL EXAMINE AND FINALISE THE QUANTUM OF WORK. DECK INSTRUCTION EA 1 USD 0.00 0.00
I ALL JOB TO BE COMPLETED BEFORE HULL BLASTING AND COATING. DECK INSTRUCTION EA 1 USD 0.00 0.00
I D26015: WINDLASS AND MOORING WINCHES MOORING EQUIPMENT MAKER FLUTEK-KAWASAKI, MODEL ELECTRIC-HYDRAULIC TYPE DECK EA 1 USD 0.00 0.00
I WORK SPECIFICATIONS: DECK EA 1 USD 0.00 0.00
D26015.1 TO BUILD UP PANAMA LEAD GROOVED BOTTOM AREA (20MM WIDTH 50MM LENGTH GROOVEING HEIGHT 4MM) DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
D26015.2 TO POWER TOOL AND PAINT ALL MOORING WINCHES' WARPING DRUMS AND WINDLASSES AS PER PAINTING SCHEME. PAINT OWNER'S SUPPLY. DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
D26015.3 ALL BRAKE HINGES TO BE FREED AND LUBRICATED DECK NOS 8.00 8.00 EA 1 USD 0.00 0.00
D26015.4 ALL OPERATING LEVER OF WINCHES 8 NOS. WINDLASSES 2 NOS AND BRAKES TOTAL 10 NOS. HAS BEEN WASTED FROM THE TOP. SAME TO BE RENEWED.(LEVER & ACCESSORIES YARD SUPPLY) DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
D26015.5 GREASE POINT TO BE FABRICATED & FITTED WITH GREASING NIPPLES MADE ON WINCH BREAK ARRANGEMENT. DECK NOS 50.00 50.00 EA 1 USD 0.00 0.00
D26015.6 20 NOS OF ROLLER / OLD MAN / FAIR LEAD / HORIZONTAL ROLLERS GETTING JAMMED. SAME TO BE OPENED OVERHAULED AND FITTED BACK USING YARD SUPPLIED CONSUMABLES. DECK NOS 20.00 20.00 EA 1 USD 0.00 0.00
D26015.7 ALL FAIRLEAD ROLLER COVERS TO BE RENEWED AND ALL COVERS TO PROVIDE WITH GREASING CAPS. DECK NOS 20.00 20.00 EA 1 USD 0.00 0.00
D26015.8 NUT BOLTS OF CAPS - 300 PIECES TO RENEW ( YARD SUPPLY ) DECK NOS 300.00 300.00 EA 1 USD 0.00 0.00
D26015.9 GYPSY GEAR/TEETH TO BE CHECKED FOR WORN OUT , TO BUILD UP WITH SUITABLE ELECTRODES,GRIND,POLISH AND LUBRICATED AS REQUIRED BY CLASS SURVEYORS DECK NOS 2.00 2.00 EA 1 USD 0.00 0.00
I D26016: WATER INGRESS DETECTION SYSTEM MAKER :PANASIA MODEL:HR-665261 AND PR-30EX-1 DECK EA 1 USD 0.00 0.00
D26016.1 WATER INGRESS DETECTION SYSTEM FOR CARGO HOLDS NO 1 2 3 4 AND 5, BOSUN STORES ,PAINT STORE, WINDLASS CNTRL RM, CARPENTER RM ,VOID SPACE INCLUDING DEWATERING SYSTEM TO CHECKED THOROUGHLY FOR PROPER FUNCTIONING AND TO BE CALIBRATED AS REQUIRED. AS PER SOLAS XII/12 INCLUDING ALARM MONITORING PANEL IN NAVIGATION BRIDGE IS BARRIER/BOX AND LEVEL SENSOR IN CARGO HOLDS AND OTHER SPACES AS REQUIRED BY SOLAS XII/REG 12 MSC145(77) IACS UI SC 180 TO BE OVERHAULED AND TESTED BY COMPETENT ENGINEER/MAKER SERVICE ENGINEER TO THE SATISFACTION OF CLASS IRS AND BV.ALL WIRING CABLES OF MASTER PANEL AND ALARM MONITOR TO BE CHECKED. MAINTENANCE AND TEST TO BE CARRIED OUT AS PER IMO RES MSC(145)77 2.2.4. DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26016.2 COST FOR SUPPLY AND FITTING OF SENSORS SHIP SUPPLY INCLUSIVE OF ALL. DECK NOS 3.00 3.00 EA 1 USD 0.00 0.00
D26016.3 COST FOR SUPPLY AND FITTING OF CONVERTER SHIP SUPPLY. DECK NOS 3.00 3.00 EA 1 USD 0.00 0.00
D26016.4 COST FOR FINE FILTERS FITTING AND SUPPLY YARD SUPPLY. DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
D26016.5 DEWATERING SYSTEM FULL SYSTEM FOR BOSUN STORES VOID SPACES AND FOREPEAK TO BE OVERHAULED AND TESTED TO THE SATISFACTION OF IRS AND DNV SURVEYORS. DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26016.6 ALL DEWATERING HYDRAULIC VALVES, NR V/VS & ACTUATORS TO BE OVERHAULED. DECK NOS 11.00 11.00 EA 1 USD 0.00 0.00
I FPK STORES- 04 NOS. DECK INCLUSIVE EA 1 USD 0.00 0.00
I OVERBOARD VALVE-01 NOS. DECK INCLUSIVE EA 1 USD 0.00 0.00
I EDUCTOR DRIVES – 1 NOS. DECK INCLUSIVE EA 1 USD 0.00 0.00
I CARGO HOLD BILGES- 05 NOS. DECK INCLUSIVE EA 1 USD 0.00 0.00
i D26017: CARGO HOLDS HATCH COVERS FOLDING TYPE HYDRAULIC SYSTEM MAKE: SEOHAE MARINE SYSTEM: DECK EA 1 USD 0.00 0.00
i YARD TO ARRANGE COMPETENT TEAM TO CARRY OUT VARIOUS REAPIR ON HATCH COVER AND UTMOST PRECAUTIONS TO BE EXERCISED THRORUGH OUT THE REPAIR PERIOD TO AVOID, ANY ACCIDENT/INCIDENT, DAMAGE DUE TO HEAVY NATURE OF JOB.YARD TO QUOTE ALL INCLUSIVE. DECK EA 1 USD 0.00 0.00
D26017.1 HYDRAULIC SYSTEM TANK OIL TO BE DRAINED IN A CLEAN DRUM AND TANK TO BE CLEANED THOROGHLY AND CLEAN OIL TO FILL TANK CAPACITY 1200 L OIL SHIPS SUPPLY. DECK NOS. 1.00 1.00 EA 1 USD 0.00 0.00
i TO RENEW EXISTING DAMAGED MS HYDRULIC PIPE LINE TO SEAMLESS SS 316 ( ASTM A312,316 ERW ) SHEDULE 80 AS PER BELOW DETAILS .ON COMPLETION OF THE ABOVE REPAIRS HYD. LINES TO BE PRESSURE TESTED FOR LEAKAGES. ALL LEAKAGES MUST BE ARRESTED. DECK INSTRUCTION EA 1 USD 0.00 0.00
D26017.2 MAIN HYDR. PRESSURE LINE ,DIA - 35 MM, PRESSURE - 280 BAR ,SCH 80 S.S.- PIPE CONNECTION TYPE -FLANGE IN EVERY 6 MTRS. RENEW U-CLAMPS 100 NOS FOR THE ENTIRE LENGTH. DECK MTR 20.00 20.00 EA 1 USD 0.00 0.00
D26017.3 MAIN HYD. RETURN LINE ,DIA - 42 MM,SCH- 80 S.S., PIPE CONNECTION TYPE -FLANGE IN EVERY 6 MTRS, RENEW U-CLAMPS 100 NOS FOR THE ENTIRE LENGTH. DECK MTR 20.00 20.00 EA 1 USD 0.00 0.00
D26017.4 HYD. BRANCH LINE ,DIA - 25 MM, SCH-80 S. S. , PIPE CONNECTION TYPE -FLANGE, EVERY 6 MTRS, U-CLAMPS 100 NOS FOR THE ENTIRE LENGTH. DECK MTR 20.00 20.00 EA 1 USD 0.00 0.00
D26017.5 HYDRAULIC RAMS – 4 IN EACH HATCH (TOTAL 20 NOS) TO BE TESTED AT DESIGNED PRESSURE FOR LEAKS ON BOARD IN PRESENCE OF THE SHIP’S STAFF . DECK NOS 20.00 20.00 EA 1 USD 0.00 0.00
D26017.6 TO OVERHAUL HATCH COVERS HYDRAULIC RAMS INCLUSIVE OF CROME PLATING OF PISTON AND RENEW SEALS. SEALS & CONSUMABLES YARD SUPPLY. DETAILS/SPECIFICATION: 2500MM ,WP=200BAR. DECK NOS 5.00 5.00 EA 1 USD 0.00 0.00
D26017.7 TO OPEN AND OVERHAUL 4 NOS EACH HATCH ROLLERS ON ALL 5 HATCH COVERS. BEARINGS TO BE RENEWED(BEARINGS & CONSUMABLES YARD SUPPLY) .TOTAL 20 NOS TRACKS FOR ALL 05 NOS HATCH PONTOONS' ROLLERS TO BE INSPECTED FOR UNEVEN -NESS . DECK NOS 20.00 20.00 EA 1 USD 0.00 0.00
D26017.8 HATCH COVER SECURING HINGE PIN BUSH BEARING REQUIRE TO BE REPLACED . BOTH HATCH COVER #1 & #5 TO BE TAKEN OUT AND THRORUGH , REPAIR, CHIPPING & PAINTING TO BE CARRIED OUT. AFTER REPAIR/MAINTENACE , BOTH THE HATCH COVER TO BE , ALIGNED & FITTED BACK AND OPERATIONAL TRIALS TO BE GIVEN. DECK SETS 2.00 2.00 EA 1 USD 0.00 0.00
D26017.9 HATCH COVER SECURING HINGE PIN BUSH BEARING REQUIRE TO BE REPLACED INSITU. THRORUGH , REPAIR, CHIPPING & PAINTING TO BE CARRIED OUT (3 SETS HATCH COVER-#2,#3 & #4). AFTER REPAIR/MAINTENACE ,THE HATCH COVERS TO BE , ALIGNED & FITTED BACK AND OPERATIONAL TRIALS TO BE GIVEN. DECK SETS 3.00 3.00 EA 1 USD 0.00 0.00
D26017.10 FLEXIBLE HYDRAULIC HOSES TO BE RENEWED. (HOSES YARD SUPPLY) . SIZE- FEMALE- 300K 20S- 1/2"- 1.2 M (15 NOS) FEMALE- 300K 20S- 3/4"- 1.2 M (5 NOS) FEMALE- 300K 20S- 3/4"- 1.1 M (10 NOS) DECK NOS 30.00 30.00 EA 1 USD 0.00 0.00
D26017.11 SOCKET FITTINGS (JIS PIPE CONNECTION) FOR FEXIBLE HYDRAULIC HOSE OF HATCH OPERATING LEVER. BADLY CORRODED SAME TO BE RENEWED. SIZE- G 3/4" -20A (40 NOS) AND G 3/4" -25A (30 NOS) - YARD SUPPLY DECK NOS 30.00 30.00 EA 1 USD 0.00 0.00
D26017.12 CONTROL PANEL VALVES FOR OPENING AND CLOSING HATCH COVERS TO BE OPENED ,OVERHAULED AND FITTED BACK.5NOS- SPARE KITS & CONSUMABLES YARD SUPPLY. DECK NOS 5.00 5.00 EA 1 USD 0.00 0.00
D26017.13 NO. 1 SEGREGATION VALVE ON MAIN LINE DIA - 42 MM TO BE OPENED , OVERHAULED AND FITTED BACK . DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
D26017.14 DAMAGE RESTING PADS TE BE RENEWED APPROX SIZE 400X150x100 ALONG WITH YARD SUPPLIED RESTING PAD AS PER SAMPLE ALONG WITH NUTS & BOLTS: DECK NOS 75.00 75.00 EA 1 USD 0.00 0.00
D26017.15 HATCH COVER DRAIN PLUG TOTAL 20 NO. TO BE OPENED AND INSPECTED. BALL VALVES (NRV TYPE) BALLS TO BE RENEWED. YARD SUPPLY DECK NOS 20.00 20.00 EA 1 USD 0.00 0.00
D26017.16 WATSED DRAIN CHANNELS ALONG WITH ASSOCIATED HATCH COVER STRUCTURES TO BE CROPPED AND RENEWED WITH FLAT BARS DECK MTRS 250.00 250.00 EA 1 USD 0.00 0.00
D26017.17 HATCH COVER RESTING PADS DAMAGED AT VARIOUS LOCATIONS, SAME TO BE REPLACED BY YARD SUPPLIED PADSS AS PER SAMPLE DECK NOS 50.00 50.00 EA 1 USD 0.00 0.00
D26017.18 UPON COMPLETION OF REPAIR, CHALK TEST & HOSE TEST TO CARRY OUT ON ALL HACTH COVERS OF ALL HOLDS TO ENSURE WEATHER TIGHTNESS OF HATCH COVERS. DECK SETS 5.00 5.00 EA 1 USD 0.00 0.00
I D26018: BALLAST AND CARGO HOLD BILGES VALVE HYDRAULIC REMOTE CONTROL SYSTEM MAKE:DAMCOS: DECK EA 1 USD 0.00 0.00
I YARD SHOULD ARRANGE COMPETENT TEAM AND WORK SHOULD BE CARRIED OUT UNDER SUPERVIOSN OF COMPETENT ENGR. QUOTE SHOULD BE ALL INCLUSIVE . DECK EA 1 USD 0.00 0.00
I WORK SPECIFICATIONS: DECK EA 1 USD 0.00 0.00
D26018.1 HYDRAULIC SYSTEM TANK OIL TO BE DRAINED IN A CLEAN DRUM .TANK TO BE CLEANED THOROGHLY ALONG WITH CLEANING OF FILTERS AND AIR BREATHER AND CLEAN OIL TO FILL UP. OIL SHIP SUPPLY DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26018.2 HYDRAULIC SYSTEM ALL VALVES ACTUATOR TO BE OVERHAULED INCLUDING ISOLATING VALVES, NR VALVES ,RELIEF VALVES, TC AND PRESSURE TESTED FOR LEAKAGES-REPAIR KIT AND CONSUMABLES FOR ACTUATORS YARD SUPPLY . TOTAL VALVES 30 NOS. CONSUMABLES YARD SUPPLY. DECK NOS 30.00 30.00 EA 1 USD 0.00 0.00
D26018.3 VRC HYDRAULIC SYSTEM NITROGEN ACCUMULATOR TO BE OVERHAULED AND REFILLED WITH GAS SUPPLIED BY YARD DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26018.5 ALL CONTROL IN BCR FOR VALVE REMOTE CONTROL SYSTEM TO BE CHECKED INCLUDING ALL INDICATORES IN THE PANEL IN THE BCR, E/R AND FORE PEAK AND RECTIFIED FAULT IF ANY ALL CONSUMABLES YARD SUPPLY. CONSIDER RNEWAL OF 20 NOS INDICATORS& ACCESSORIES.SATISFACTORY TRIAL TO BE SHOWN TO SHIPSTAFF WHILE VESSEL IN FLOATING CONDITION. DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
I D26019: BALLAST TANK BELL MOUTH DECK EA 1 USD 0.00 0.00
I WORK SPECIFICATIONS DECK EA 1 USD 0.00 0.00
D26019.1 THE SUCTION BELL MOUTHS OF ALL BALLAST TANKS TO DISMANTLE AFTER REMOVING THE PIPE CLAMPS AND NUTS / BOLTS. ON COMPLETION OF INSPECTION/REPAIR; THE BELL MOUTHS TO BE FITTED IN PLACE WITH YARD SUPPLIED CONSUMABLES (NEW PIPE CLAMP; NUTS/BOLTS AND PACKING). DECK NOS 12.00 12.00 EA 1 USD 0.00 0.00
I ON COMPLETION OF INSPECTION/REPAIR; THE BELL MOUTHS TO BE FITTED IN PLACE WITH YARD SUPPLY NEW PIPE CLAMP; NUTS/BOLTS AND PACKING. DECK INCLUSIVE EA 1 USD 0.00 0.00
I D26020: EDUCTORS FOR BALLAST CARGO HOLDS BILGE BOSUN STORES CHAIN LOCKER DECK EA 1 USD 0.00 0.00
I WORK SPECIFICATIONS: DECK EA 1 USD 0.00 0.00
I FOLLOWING EDUCTORS TO BE OPENED FOR INSPECTION AND BOXED BACK AFTER CHECK FOR EDUCTOR INTERNAL CONDITION; NOZZLE LOCKED FIT IN POSITION. EDUCTOR TO BE BOXED BACK WITH YARD SUPPLY NUTS; BOLTS AND PACKING AND TO BE TRIED OUT TO THE SATISFACTION OF MASTER/ATTENDING SUPERINTENDENT/SURVEYOR DECK INSTRUCTION EA 1 USD 0.00 0.00
D26020.1 BALLAST EDUCTOR DECK SET 1.00 1.00 EA 1 USD 0.00 0.00
D26020.2 CARGO HOLD BILGE EDUCTOR DECK SET 1.00 1.00 EA 1 USD 0.00 0.00
D26020.3 FORE PEAK STORE/BOSUN STORE/CHAIN LOCKER EDUCTOR DECK SET 1.00 1.00 EA 1 USD 0.00 0.00
D26020.4 OVERHAULING OF EDUCTOR VALVE DECK SET 1.00 1.00 EA 1 USD 0.00 0.00
D26020.5 CARGO HOLD BILGE EDUCTOR SUCTION PRESSURE & DRIVE PRESSURE GAUGES TO BE FITTED NO GAUGES PROVIDED SPARES YARD SUPPLY DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26020.6 BALLAST TANK EDUCTOR SUCTION AND DRIVE PRESSURE GAUGES TO BE FITTED NO GAUGES PROVIDED SPARES YARD SUPPLY DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
I D26021: BUTTERFLY VALVES IN BALLAST TANKS AND CARGO HOLDS BILGE HOLDING VALVE MAKE: KEYSTONE/TYCO ACTUATOR MAKE:DAMCOS MAKE: NORDIC DECK EA 1 USD 0.00 0.00
I WORK SPECIFICATIONS: DECK EA 1 USD 0.00 0.00
I THE VALVE SYSTEM TO BE PRESSURE TESTED FOR IDENTIFICATION OF LEAKY VALVES. FOLLOWING VALVES TO BE REMOVED FROM PLACE HIGH QUALITY SEAT RING (YARD'S SUPPLY) TO REPLACE VALVES TO BE TESTED AND BOXED BACK WITH NEW CONSUMABLES (NEW NUTS/BOLTS/PACKING AS REQUIRED). HYDRAULIC ACTUATORS TO BE DISCONNECTED AND BOTH PORTS BLANKED AND FITTED BACK AFTER BOXING BACK THE VALVE. ON COMPLETION OF JOB VALVES TO BE TESTED/PR TESTED & TRY OUT FOR SATISFACTORY OPERATION IN PRESENCE OF SUPTDS/RESPONSIBLE OFFICER. VALVES TO BE SECURED IN PLACE WITH NEW JOINT, NUTS/BOLTS.QUOTE SHOULD INCLUDE ALL INCLUSIVE, REPAIR KIT AND CONSUMABLES YARD SUPPLY. DECK INSTRUCTION EA 1 USD 0.00 0.00
D26021.1 NO.1 TO 5 P & S WB DB TANKS MAIN VALVE -DN 250 DECK PC 10.00 10.00 EA 1 USD 0.00 0.00
D26021.2 NO 1 TO 5 CARGO HOLDS BILGE SUCTION VALVES INCLUDING N/R V/V -DN 125 DECK PC 10.00 10.00 EA 1 USD 0.00 0.00
D26021.3 BALLAST LINE V/V FOR NO 3 CARGO HOLD BALLASTING -DN 125 DECK PC 2.00 2.00 EA 1 USD 0.00 0.00
D26021.4 NO.1 & 2 WB PUMP SUCTION VALVES-DN 350 DECK PC 4.00 4.00 EA 1 USD 0.00 0.00
D26021.5 NO.1 & 2 WB PUMP DISCH V/V-DN 350,BUTTERFLY DECK PC 4.00 4.00 EA 1 USD 0.00 0.00
D26021.6 FPK TANK VALVE AND ISOLATION VALVE-SIZE & TYPE- DN150 BUTTERFLY TO RENEW WITH YARD SUPPLIED V/VS. DECK PC 2.00 2.00 EA 1 USD 0.00 0.00
D26021.7 BALLAST EDUCTOR SUCTION & DRIVE VALVE -SIZE-DN150 BUTTERFLY. DECK PC 4.00 4.00 EA 1 USD 0.00 0.00
D26021.8 CARGO HOLD BILGE EDUCTOR VALVES -DN 125,BUTTERFLY DECK PC 2.00 2.00 EA 1 USD 0.00 0.00
D26021.9 HYDRAULIC ACTUATOR FOR BALLAST REMOTE VALVES TO OVER HAUL (SPARES & REPAIR KIT YARD SUPPLY) DECK PC 20.00 20.00 EA 1 USD 0.00 0.00
I TO FACILITATE THE JOB, ADJACENT PIPELINES/SUPPORTS TO CUT AND FIT BACK IN PLACE ON COMPLETEION.LINES WITH VALVES TO BE TESTED ON COMPLETION. NECESSARY COATING TO THE DAMAGED PAINTS TO ATTEND AS PER COATING SPECIFICATION. PAINT OWNWER SUPPLY.JOB TO BE CARRIED OUT IN DOCK ONLY. YARD TO QUOTE FOR DOCKING DAYS ACCORDINGLY. DECK INSTRUCTION EA 1 USD 0.00 0.00
I FOLLOWING NON RETURN VALVES TO BE TRANSPORTED TO WORKSHOP; OVERHAULED AND TO BE FITTED BACKWITH NEW NUTS/BOLTS/PACKING (YARD SUPPLY). DECK INDTRUCTION EA 1 USD 0.00 0.00
D26021.10 NO. 1 AND 2 WB PUMP DISCH NR DIA 350 MM DECK PC 2.00 2.00 EA 1 USD 0.00 0.00
D26021.11 TO FABRICATE AND RENEW THE NR FLAP OF MATERIAL SS-SIZE DIA APPROX- 350MM. DECK PC 2.00 2.00 EA 1 USD 0.00 0.00
D26021.12 HIGH AND LOW SEA SUCTION V/V (HYDRAULIC) TO BE REMOVED, OVERHAULED AND PRESSURE TESTED 8 KG/CM2 FITTED BACK. DECK NO. 2.00 2.00 EA 1 USD 0.00 0.00
D26021.13 AFT PEAK BUTERFLY WAFER V/V TO BE REMOVED SERVICED PRESSURE TESTED 8 KG/SQ CM AND FITTED BACK. IF REQUIRED SEAT RING TO BE RENEWED. DN 250,BUTTERFLY. DECK NO 1.00 1.00 EA 1 USD 0.00 0.00
D26021.14 NO.3 HOLD BALLAST LINE, V/V S AND BLANK TO BE OPENED INSPECTED AND FITTED BACK. DECK NO 2.00 2.00 EA 1 USD 0.00 0.00
D26021.15 N/R VALVE IN HOLD BILGES 14 NOS. TO BE DISMANTLED, REMOVED TO THE WORKSHOP, CLEAN/OVERHAULED, RUBBER RINGS RENEWED, DESHAPED/FACE PLATE POLISHED/ RENEWED TO ACHIEVE WATER TIGHTNESS AND PRESSURE TESTED AT 5KG/CM2 BEFORE FITTING BACK. DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
D26021.16 QUOTE FOR PRESSURE TESTING OF EACH BILGE LINE FROM DUCT KEEL TO BELL MOUTH 10 NOS. ON COMPLETION OF REPAIRS PRESSURE TESTING (5KG) OF BILGE LINES TO BE CARRIED OUT FOR RECTIFYING ANY LEAKAGES AND CHECKING PROPER FUNCTIONING OF THE ENTIRE SYSTEM. (QUOTE LUMP SUM) DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26021.17 TOTAL 4 NOS GLOBE V/V FOR DRAFT GAUGE SYSTEM TO BE REMOVED OVERHAULED AND PRESSURE TESTED SIZE 8 KG/CM2 FITTED BACK. SAME TO BE SHOWN TO CLASS SURVEYOR BEFORE FITTING BACK IN PLACE. DN 25 DECK NO 4.00 4.00 EA 1 USD 0.00 0.00
D26021.18 21 NO. OF BALLAST VALVE IN E/R TO BE OPENED AND OVERHAULED TO CHECK WEAR AND TEAR. , O/HAULED, IF REQUIRED RENEWED AND FITTED BACK. SIZE DECK NOS. 21.00 21.00 EA 1 USD 0.00 0.00
D26021.19 AFTER FITTING ALL THE DB’S VALVE BALLAST LINE(TST ABD DB’S) , F.P.K , NO.3 HOLD TO BE PRESSURE TESTED TO THE SATISFACTION OF ATTENDING SURVEYORS (QUOTE LUMPSUM) DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
I VALVES : ACCOMMODATION/DECK PIPE LINES AND VALVES O/HAULING DECK INSTRUCTION EA 1 USD 0.00 0.00
D26021.20 TO OVERHAUL AND PRESSURE TEST ISOLATION VALVES FOR DECK AND ACCOMMODATION ON FIRE LINE GATE VALVE SIZE 125 MM . DECK NO 2.00 2.00 EA 1 USD 0.00 0.00
D26021.21 MANUAL GLOBE VALVES 8 NOS IN FOREPEAK STORE TO BE OPENED , OVERHAULED AND FITTED BACK WINCH COOLING WATER LINE . QUOTE SHOULD BE ALL INCLUSIVE.DN25 DECK NOS 8.00 8.00 EA 1 USD 0.00 0.00
D26021.22 SUPPLY AND FIT THE ANCHOR WASH GLOBE VALVE ON FOCASTLE DECK YARD SUPPLY-SZIE-? DECK NOS 2.00 2.00 EA 1 USD 0.00 0.00
D26021.23 PORT HOLES OF ACCOMMODATION RUBBER PACKING TO RENEW, RUBBER PACKING YARD SUPPLY DECK NOS 20.00 20.00 EA 1 USD 0.00 0.00
D26021.24 ALL RUBBER PACKING OF WHEEL HOUSE GLASS TO RENEW. RUBBER PACKING YARD SUPPLY DECK NOS 17.00 17.00 EA 1 USD 0.00 0.00
I D26022: LIFE SAVING APPLIANCES DECK EA 1 USD 0.00 0.00
I WORK SPECIFICATIONS: DECK EA 1 USD 0.00 0.00
I FREE FALL LIFEBOAT MAKE: QINGDAO BEIHAI TYPE: BH-F750 , PERSONS-30 , 7500X2850X3100X1200 GRP HULL DECK EA 1 USD 0.00 0.00
I YARD TO ARRANGE FOR SHORE CRANE REQUIRED WEIGHT (ANODE/WATER GALLON ETC) FOR LOAD TEST OF FREE LIFE BOATS IN PRESENCE OF CLASS SURVEYORS. DECK INSTRUCTION EA 1 USD 0.00 0.00
I JOBS SPECS AS PER RECOMMENDATION OF OEM 15 YEARLY ROUTINE DECK INSTRUCTION EA 1 USD 0.00 0.00
D26022.1 TO CARRY OUT ANNUAL AND 15 YEARLY INSPECTION AND SERVICING BY OEM/ CLASS APPROVED FIRM AND CERTIFICATE TO ISSUE UPON COMPLETION OF JOB . TO TAKE FREE FALL ENCLOSED LIFE BOAT ASHORE AND PLACED ON SUITABLE PLATFORM FOR THE NECESSARY REPPAIRS.AFTER INSPECTION AND REPAIR SAME TO BE FITTED BACK IN PLACE. QUOTE SHALL BE INCLUSIVE OF ALL THE ASPECTS RELATED TO ANNUAL/ 15 YEARLY SERVICING. ANY SPARES REQUIREMENTS SUPPLIED BY OWNERS.INCLUDING LOAD TEST AS PER TEH REQUIREMENT. DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26022.4 FREE FALL LIFE BOAT TO BE HIGH PRESSURE WASHED AND SURFACE PREPARED THEREAFTER. FREE FALL LIFE BOATS TO BE PAINTED (L/B PAINTS YARD SUPPLY).ALL STENCILLING TO BE CARRIED OUT FOR IDENTIFICATION AS PER SOLAS REQUIREMENT. DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26022.5 RETRO-REFLECTIVE TAPES (WHITE) TO BE RENEWED (YARD SUPPLY). DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26022.6 L/B ALL SEATS INCLUDING BELT AND HEADREST TO BE RENEWED (YARD SUPPLY). DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
D26022.8 BILGE HAND PUMP NO. 1 WITH CONNECTING HOSE TO BE RENEWED YARD SUPPLY DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26022.9 RELEASE HOOK TO BE OVERHAULED DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26022.10 AFT SHACKLE - 1 NO. TO BE RENEWED (YARD SUPPLY) DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26022.11 FWD SHACKLE - 1 NO. TO BE RENEWED (YARD SUPPLY) DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26022.12 AFT LIFTING RIG - 1 NO. TO BE RENEWED (YARD SUPPLY) DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26022.13 FWD LIFTING RIG - 1 NOS. TO BE RENEWED (YARD SUPPLY) DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26022.14 RELEASE LEVER -01 NO. TO BE OVERHAULED DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26022.15 DEVIT TO O'HAUL PIPING AND HYDRAULIC RAM AND CYLINDER DEFECTIVE PIECE TO BE EXAMINED AND RENEW IF REQUIRED(YARD SUPPLY) HYDRAULIC OIL TO RENEW(SHIP SUPPLY) DECK SET 2.00 2.00 EA 1 USD 0.00 0.00
D26022.16 ACCUMULATORS TO BE CHARGED WITH NITROGEN 230 BAR NEW OIL TO BE TAKEN(SHIP SUPPLY).IF ANY DROP IN PRESSURE SAME TO BE RECTIFIED BY YARD SUPPLIED MATERIAL. DECK SET 1.00 1.00 EA 1 USD 0.00 0.00
D26022.17 TO RECTIFY/RENEW ANY HYDRAULIC LINE LEKAGES NON RETURN V/VS IN LINE TO RENEW. DECK PCS 1.00 1.00 EA 1 USD 0.00 0.00
D26022.18 DAMAGED FRP TO REPAIRED WITH YARD SUPPLIED MATERIAL & CONSUMABLES DECK SQR MTR 3.00 3.00 EA 1 USD 0.00 0.00
I D26023: RESCUE BOAT MAKE: QINGDAO BEIHAI MODEL: BH-R4 DECK EA 1 USD 0.00 0.00
D26023.1 TO CARRY OUT ANNUAL AND FIFTEEN YEARLY INSPECTION AND SERVICING BY OEM/AUTHORISE FIRM INCLUDING LOAD TEST AND CERTIFICATE TO ISSUE UPON COMPLETION OF JOB. TO TAKE OPEN RESCUE BOAT ASHORE AND PLACED TO BE ON SUITABLE PLATFORM.AFTER INSPECTION AND REPAIR SAME TO BE FITTED BACK IN PLACE.QUOTE SHALL BE INCLUSIVE OF ALL THE ASPECTS RELATED TO ANNUAL/ 15 YEARLY SERVICING. ANY SPARES REQUIREMENTS SUPPLIED BY OWNERS. DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26023.2 YARD TO ARRANGE FOR SHORE CRANE REQUIRED WEIGHT (ANODE/WATER GALLON ETC) FOR LOAD TEST OF RESCUE BOATS IN PRESENCE OF CLASS SURVEYORS. YARD TO ARRANGE MAKER'S SERVICE ENGINEER FOR LSA OVERHAULING AND RESCUE BOAT ENGINE OVERHAULING . LUMPSUMP QUOTE TO BE INCLUSIVE OF ALL CHRGES DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26023.3 OPEN RESCUE BOAT TO BE HIGH PRESSURE WASHED AND SURFACE PREPARED THEREAFTER. RESCUE BOATS TO BE PAINTED (PAINTS YARD SUPPLY).ALL STENCILLING TO BE CARRIED OUT FOR IDENTIFICATION AS PER SOLAS REQUIREMENT DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26023.4 RETRO-REFLECTIVE TAPES (WHITE) TO BE RENEWED (YARD SUPPLY). DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26023.6 3 POINT LIFTING SLINGS TO BE RENEWED (YARD SUPPLY). DECK NOS 3.00 3.00 EA 1 USD 0.00 0.00
D26023.7 BILGE PUMP WITH CONNECTING HOSE TO BE RENEWED . DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26023.8 RELEASE HOOK TO BE OVERHAULED DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26023.9 RESCUE BOAT TO BE LOWERED AND PLACED ON JETTY WITH PROPER SUPPORTS.DEVIT TO BE O'HAUL. HYDRAULIC PIPES TO BE EXAMINED AND RENEW IF REQUIRED (YARD SUPPLY).HYDRAULIC OIL TO RENEW(SHIP SUPPLY) DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26023.10 INDICATION LIGHT OF RESCUE BOAT TO BE RENEWED( COMPLETE SET) YARD SUPPLY DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26023.11 LASHING ARRANGEMENT OF RESCUE BOAT TO BE RENEWED.(YARD SUPPLY) DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26023.12 HYDRAULIC TANK TO BE CLEANED.HYDRAULIC TANK OIL FILLING CAP FOUND DAMAGED SAME TO BE RECTIFIED. DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26023.13 BOTTOM PLUG FLOATING BALL OF RESCUE BOAT TO BE RENEWED YARD SUPPLY DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26023.14 DAMAGED FRP TO REPAIRED WITH YARD SUPPLIED MATERIAL & CONSUMABLES DECK SQR MTR 1.00 1.00 EA 1 USD 0.00 0.00
D26023.15 HYDRAULIC SHUTTLE V/VS, DIRECTION CONTROL V/V TO BE OVERHAULED/RENEWED. DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
I D26024: FREE FALL LIFE BOAT LAUNCHING DAVIT MAKE:QINGDAO BEIHAI TYPE: BD-FF80B DECK EA 1 USD 0.00 0.00
D26024.1 TO CARRY OUT ANNUAL AND 15 YEARLY INSPECTION AND SERVICING BY OEM .. DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
I RECOVERY TEST DECK Inclusive EA 1 USD 0.00 0.00
I APPEARANCE TEST AND CHECKING OF OPERATIONS DECK Inclusive EA 1 USD 0.00 0.00
I FULL LOAD DAVIT LAUNCHING TEST DECK Inclusive EA 1 USD 0.00 0.00
I FULL LOAD FREE FALL LAUNCHING TEST DECK Inclusive EA 1 USD 0.00 0.00
D26024.2 DAVIT FALLS TO REMOVE AND NEW WIRE (SHIP SUPPLY) TO RIG. DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26024.3 ALL SHEAVES FLOATING BLOCK ASSEMBLY OPENED OVERHAULED CLEANED THIN DOWN REPLACED IF ANY GRIT/HYDRO BLAST PAINTED AND FITTED BACK IN POSITION DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26024.4 DAVIT TO BE GRIT/HYDRO BLASTED AND PAINTED PAINT SHIP SUPPLY DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26024.5 AFTER LOWERING OF LB ON JETTY, DEVIT LIFTING HYDRAULIC RAM AND CYLINDER 2NOS. TO BE REMOVED OVERHAULLED AND FITTED BACK . HYDRAULIC OIL AND SEAL AND CONSUMABLES YARD SUPPLY. DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26024.6 HOISTING WINCH FOUNDATION SECURING NUTS/BOLTS TO RENEW SS NUTS/BOLTS 100NOS OF SPANNER SIZE 36MM LENGTH 100MM WITH LOCK NUT (YARD SUPPLY) DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26024.7 YARD TO PROVIDE REQUIRED CRANE SERVICE AND WEIGHTS FOR THE 5 YEARLY LOAD TEST OF THE DAVITS/WINCHES PREFERABLY DURING DOCKING (AFTER THE OVERHAULING OF SHEAVES/WINCHES AND INSPECTION BY MAKER'S SERVICE ENGINEER) DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26024.8 TO SUPPLY AND FIT DAVIT/WINCH LIMIT SWITCHES DECK NOS 2.00 2.00 EA 1 USD 0.00 0.00
D26024.9 ALL PULLEY TOTAL 4 NOS TO BE OVERHAULED DECK NOS 4.00 4.00 EA 1 USD 0.00 0.00
D26024.10 LOAD TEST TO BE CARRIED OUT LIFE BOAT WEIGHT 7716 KGS ( TOTAL - FULL LADEN ) MAX. HOISTING LOAD - 50KN MAX. WORKING LOAD - 75KN DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26024.11 FLOATING BLOCK ASSEMBLY 1 NO TO BE OPENED,OVERHAULED AND FITTED BACK SPARES YARD IF REQUIRES DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26024.12 DAVIT HYDRAULIC SYSTEM TO BE CHECKED OIL REPLACED AND HYDRAULIC PIPES TO BE CHECKED AND RENEWED IF REQUIRES YARD SUPPLY OIL SHIP SUPPLY DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26024.13 TO SUPPLY AND RENEW GREASE NIPPLES FOR ALL SHEAVES AND HEEL PINS DECK NOS 30.00 30.00 EA 1 USD 0.00 0.00
D26024.14 LIFE BOAT LASHING AND SECURING ARRANGEMENTS INCLUDING BRACKETS, WIRE ,D SHACKLES AND BOTTLE SCREWS TO RENEW DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
I D26025: RESCUE BOAT AND LIFE RAFT DAVIT MAKE:QINGDAO BEIHAI TYPE: BD-SA21A DECK EA 1 USD 0.00 0.00
D26025.1 TO CARRY OUT ANNUAL AND FIFTEEN YEARLY INSPECTION AND SERVICING BY OEM AND CERTIFICATION TO BE ISSUED AFTER COMPLETION OF JOB. DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26025.2 LOAD TEST TO BE CARRIED OUT RESCUE BOAT WEIGHT 1143 ( TOTAL - FULL LADEN ) MAX. WORKING LOAD - 21KN DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26025.3 FALLS TO BE RENEWED, WIRE SHIP SUPPLY DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26025.4 TO GRIT/HYDRO BLAST / POWER TOOL AND PAINT DAVITS WINCHES,WARPING DRUMS AS PER PAINTING SCHEME. PAINT OWNER'S SUPPLY. SA 2 ZINC EPOXY PAINT DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26025.5 HYDRAULIC SYSTEM TO BE OVERHAULED INCLUDING MANUAL VALVE , HAND PUMP, ACCUMULATOR. SYSTEM TO BE CHARGED WITH OIL AND NITROGEN. SPARES IF REQUIRES YARD SUPPLY. HYDRAULIC OIL TO BE REPLACED WITH SHIP SUPPLY DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26025.6 HOISTING WINCH FOUNDATION SECURING ALL NUTS/BOLTS AND DEVIT COLUMN NUT/BOLTS 100 NOS TO RENEW WITH SS NUTS/BOLTS OF SPANNER SIZE 36MM LENGTH 100MM WITH LOCK NUT (YARD SUPPLY) DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26025.7 20 NOS GREASE NIPPLES TO RENEW AND ON COMPLETION ALL GREASE POINT TO BE GREASED.(YARD SUPPLY) DECK NOS 20.00 20.00 EA 1 USD 0.00 0.00
D26025.8 LIFE BUOY STAND FOR MOB MARKER (P&S) TO BE CROPPED & RENEWED DECK NOS 2.00 2.00 EA 1 USD 0.00 0.00
D26025.9 TO RENEW AND FIT CRADLE FOR LIFE RAFT DECK NOS 5.00 5.00 EA 1 USD 0.00 0.00
D26025.10 TO RENEW SAFETY CHAINS ON LIFE RAFT DECK DECK MTRS 30.00 30.00 EA 1 USD 0.00 0.00
D26025.11 LIFE BUOY STANDS TO BE CROPPED & RENEWED DECK NOS 5.00 5.00 EA 1 USD 0.00 0.00
i D26026: FIRE EXTINGUISHERS/ FIRE DAMPERS/ FIRE HOSE BOXES/ FIRE PLAN BOX / LIFERAFT DECK EA 1 USD 0.00 0.00
D26026.1 GALLEY CO2 & WET CHEMICAL FIRE EXTINGUISHER SYSTEM TO SERVICE BY AUTHORISED SERVICE ENGINEER DECK SET 1.00 1.00 EA 1 USD 0.00 0.00
D26026.2 TO FABRICATE AND FIT FREE FALL LIFEBOAT AND RESCUE BOAT LAUNCHING INSTRUCTION (LETTER OF SIZE 12MM HEIGHT, GROOVE DEPTH 1MM IN RED COLOUR) TO BE ENGRAVED ON (500 x 600 MM, 3MM THICK SS) YARD SUPPLY PLATE AND TO SECURE ON LUGS WELDED ON BULKHEAD EMBARKATION DECK. DECK NO. 2.00 2.00 EA 1 USD 0.00 0.00
D26026.3 TO FABRICATE AND FIT LIFERAFT LAUNCHING INSTRICTION (LETTER OF SIZE 12MM HEIGHT, GROOVE DEPTH 1MM IN RED COLOUR) TO BE ENGRAVED ON (400 x 700MM, 3MM THICK SS) YARD SUPPLY PLATE AND TO SECURE ON LUGS WELDED ON BULKHEAD EMBARKATION DECK. DECK NO. 2.00 2.00 EA 1 USD 0.00 0.00
D26026.4 TO RENEW FIXING SUPPORT FOR 6KG FOAM FIRE EXTINGUISHERS DECK PCS 10.00 10.00 EA 1 USD 0.00 0.00
D26026.5 TO RENEW/OVERHAUL CO2 VALVES OF NO 3 CARGO HOLDS DECK NOS 4.00 4.00 EA 1 USD 0.00 0.00
I D26027: ACCOMMODATION LADDER: MAKE-SAMGONG CO. PILOT COMBINATION: MAKE-DALIAN GLORY MARINE TECHNOLOGY CO. LTD. AND MOT LADDER DECK EA 1 USD 0.00 0.00
I WORK SPECIFICATIONS: DECK EA 1 USD 0.00 0.00
D26027.1 ALL FOURS ACCOMMODATION LADDERS /GANGWAYS WIRES TO DISCONNECT REMOVE FROM LOCATION AND TO BE TAKEN ASHORE FOR INSPECTION AND REPAIR. ON COMPLETION OF REPAIRS, GANGWAYS TO FIT BACK IN LOCATION WITH NEW OWNER SUPPLY WIRES. ALL FOUR GANGWAYS TO BE CLEANED; BUFFED (WIRE BRUSH); HP FW WASH AND PAINTED WITH ONE COAT ALUMINUM PAINT (PAINT OWNER SUPPLY) . QUOTE SHOULD BE INCLUSIVE (INCLUDING CONSUMABLES) ALL CHARGES. DECK SET 4.00 4.00 EA 1 USD 0.00 0.00
I TEFLON PACKING OF 4MM THICKNESS TO BE PLACED BETWEEN THE LADDER SIDE BEAM AND MS SECURING PLATE TO AVOID BIMETALLIC CORROSION. DECK INCLUSIVE EA 1 USD 0.00 0.00
I ALL FOUR GANGWAYS/ACCOMMODATION LADDER BOTTOM PLATFORM TO BE FAIRED UP AND SECURED WITH PROPER SPRING TENSION PINS IF REQUIRED RENEW THE SAME (4SETS). DECK INCLUSIVE EA 1 USD 0.00 0.00
I TO CHECK SIDE ROLLERS OF 4 GANGWAYS/ACCOMMODATION LADDER FOR CRACKS IN WELDING IF REQUIRED TO BE REWELDED 4SETS DECK INCLUSIVE EA 1 USD 0.00 0.00
I TOP PLATFORM PINS AND ROLLERS TO DISMANTLE FROM POSITION AND CHECKED FOR ANY WEAR DOWN PINS BETWEEN UPPER TWO PLATFORMS. PRESENTLY GANGWAY PLATFORM DOES NOT HAVE ANY SUPPORT WHEN SPREAD OUT. TO MAKE SUPPORTING ARRANGEMENT FOR GANGWAYS/ACCOMMODATION LADDER 4NOS. DECK INCLUSIVE EA 1 USD 0.00 0.00
D26027.2 TO RENEW AXIS / SWINGING OUT PIPE OF GANGWAY DIA: 140 MM; LENGTH: 9700 MM TOTAL 04 DECK NOS 4.00 4.00 EA 1 USD 0.00 0.00
D26027.3 BOTH GANGWAYS BOTTOM ROLLERS TO BE OPENED SAME TO BE FITTED BACK WITH NEW RUBBERIZED ROLLERS 2 NOS. DECK NOS 2.00 2.00 EA 1 USD 0.00 0.00
D26027.4 TO OVERHAUL 20 NOS PULLEY BLOCKS IF REQUIRED RENEW AND PROVIDE TEST CERTIFICATE. CONSIDER RENEWAL OF 6 NOS PULLEYS. DECK NOS 20.00 20.00 EA 1 USD 0.00 0.00
I CONSIDER FOLLOWING MATERIAL FOR RENEWAL (YARD SUPPLY) DECK INCLUSIVE EA 1 USD 0.00 0.00
D26027.5 ALUMINUM BEAM (460 X 50 X 45 MM) THICKNESS 10MM DECK MTR 4.00 4.00 EA 1 USD 0.00 0.00
D26027.6 ALUMINUM STEMS (CORUGATED) 60 X 30X 04 MM DECK NOS 4.00 4.00 EA 1 USD 0.00 0.00
D26027.7 GANGWAY TOP PLATFORM/TURN TABLE TO BE DISMANTLED AND GRIT/HYDRO BLASTED ASHORE AND BOXED BACK WITH YARD SUPPLIED CONSUMABLES (NEW NUTS/BOLTS/PACKING). PAINT SHIP SUPPLY (TRANSPORTATION INCLUSIVE). DECK NOS 4.00 4.00 EA 1 USD 0.00 0.00
D26027.8 GANGWAY SUSPENSION BEAM TO POWER TOOL AND COATED WITH 3 COATS OF OWNER SUPPLY PAINTS. DECK NOS 4.00 4.00 EA 1 USD 0.00 0.00
D26027.9 ALL SHEAVES DIA. 150 MM WITH BRASS BUSH TO DISMANTLE; CHECK AND FITBACK IN PLACE. DECK NOS 30.00 30.00 EA 1 USD 0.00 0.00
D26027.10 WIRE GUIDE ROLLER DIA.: 80 MM TO DISMANTLE AND FIT BACK. MATERIAL: 4MM TEFLON DECK NOS 8.00 8.00 EA 1 USD 0.00 0.00
D26027.11 CONSIDER RENEWAL OF SHEAVE OF DIA. 150 MM (YARD SUPPLY) DECK NOS 4.00 4.00 EA 1 USD 0.00 0.00
D26027.12 CONSIDER RENEWAL OF GUIDE ROLLER DIA. 80 MM (YARD SUPPLY) MATERIAL: 4MM TEFLON DECK NOS 6.00 6.00 EA 1 USD 0.00 0.00
D26027.13 GANGWAY MOTOR FOUNDATION TO REMOVE TO CARRY OUT CLOSE UP CHECK UP ; IF NECESSARY FOUNDATION / SUPPORTING BRACKETS TO BE RENEWED AND ALL NUTS/BOLTS TO BE RENEWED; AS PER SHIP DWG. DECK NOS 4.00 4.00 EA 1 USD 0.00 0.00
D26027.14 ALL FOUR AIR FILTERS TO RENEW WITH NECESSARY MODIFICATION YARD SUPPLY DECK PCS 4.00 4.00 EA 1 USD 0.00 0.00
D26027.15 DETACHED WELD / CRACKS TO BUILD UP BY ALUMINUM WELDING. DECK MTR 10.00 10.00 EA 1 USD 0.00 0.00
D26027.16 BEND ALUMINUM HANDRAILS TO STRAIGHNED UP DECK MTR 20.00 20.00 EA 1 USD 0.00 0.00
D26027.17 TO RENEW LADDERS STANCHIONS (L 1.2 M; DIA 40MM) WITH EYES ON TOP AND SIDE (YARD SUPPLY) DECK NOS 20.00 20.00 EA 1 USD 0.00 0.00
D26027.18 TO RENEW ALUMINUM HANDRAIL OF DIA 40 MM(YARD SUPPLY) DECK MTR 30.00 30.00 EA 1 USD 0.00 0.00
D26027.19 GANGWAY WIRE SHEAVE HOUSING BRACKET FITTED IN GANGWAY BASE TO REMOVE; GRIT/HYDRO BLAST AND PAINTED AND FITTED WITH NEW YARD SUPPLY 4MM TEFLON PACKING; SS NUTS/BOLTS DECK SET 4.00 4.00 EA 1 USD 0.00 0.00
D26027.20 SECURING CLEATS FOR GANGWAY TO RENEW (MATERIAL MS) WITH NEW SS NUTS/BOLTS AND TEFLCON PACKING.S/S 01 NOS ANGLE BAR OF SECURING COMBINATION TO BE STRAIGHTENED DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
D26027.21 YARD TO QUOTE FOR THE FABRICATION AND FITMENT OF BOTTOM PLATFORM ROLLER (100 MM DIA; LENGTH 700 MM) WITH 10 MM RUBBER LINING (YARD SUPPLY) DECK NOS 2.00 2.00 EA 1 USD 0.00 0.00
D26027.23 15 YRLY LOAD TESTING OF GANGWAYS/ACCOMMODATION LADDER AFTER ALL REPAIRS (IF ANY) TO BE DONE AND CERT TO ISSUE. JOB TO BE DONE WITH LOADS ON GANWAY AND OPERATED AFTER RIGGING NEW WIRE AND OVERHAULING OF ALL SHEAVES AND MOTORS. DECK NOS 4.00 4.00 EA 1 USD 0.00 0.00
D26027.24 TO FABRICATE AND FIT NEW SWITCH BOX OF STBD GANGAWAY/PORT GANGWAY DECK NOS 2.00 2.00 EA 1 USD 0.00 0.00
D26027.25 TOP PLATFORM PIN AND ROLLER OF ALL FOUR ACCOMMODATION LADDER TO BE DISMANTLED INSPECTED AND RENEWED IF REQUIRED. 4 NOS. YARD SUPPLY DECK NOS 4.00 4.00 EA 1 USD 0.00 0.00
D26027.26 TO PROVIDE SAFETY/ PREVENTOR WIRE ARRANGEMENT FOR ALL ACCOMMODATION LADDERS. 4 NOS. DECK NOS 4.00 4.00 EA 1 USD 0.00 0.00
D26027.27 WIRES OF TWO NOS GANGWAYS AND TWO NOS COMBINATION LADDERS TO BE RENEWED (WIRE SHIP SUPPLY). DECK NOS 4.00 4.00 EA 1 USD 0.00 0.00
D26027.28 TO CARRY OUT MODIFICATION ON PILOT TRANSFER ARRANGEMENT AS PER SOLAS REGULATION 05/2023 AND IMO GUIDELINE 1045(27) AND ISO 799. DECK NOS 4.00 4.00 EA 1 USD 0.00 0.00
I NOTE:- ON COMPLETION OF ALL THE REPAIR TRIALS ON BOTH THE GANGWAYS AND PILOT LADDER TO BE GIVEN FOR HOISTING AND LOWERING IN PRESENCE OF CLASS SURVEYORS SUPDT & SHIP’S STAFF. ALSO GANGWAYS TO BE LOAD TESTED AS PER INSTRUCTIONS FROM CLASS SUREVYORS. DECK INCLUSIVE EA 1 USD 0.00 0.00
I D26028: CRANES: DECK EA 1 USD 0.00 0.00
i DECK CRANES: TYPE /CAPACITY / DETAILS: MAC GREGOR (SWE), ELECTRO HYDRUALIC CRANES TYPE: GLB3628-2/282GR: CAPACITY 36 TONS REACH 28 MTRS. DECK EA 1 USD 0.00 0.00
I YARD TO ARRANGE COMPETENT HYDRAULIC, MECHANICAL & AUTOMATION TEAM TO CARRY OUT INSPECTION AND SERVICING OF ALL DECK CRANE. UPON SATISFACTORY COMPLETION OF REPAIR, RUNNING TRIAL TO BE SHOWN TO SHIPSTAFF INCLUDING TESTING OF ALL THE CRANE IN LINE WITH MAKER GUIDELINES. DECK INSTRUCTION EA 1 USD 0.00 0.00
D26028.1 HYDRAULIC TANK OIL OF ALL FOUR CRANES TO BE REMOVED FROM CRANE MAST. TANKS TO BE CLEANED UP TO STAISFACTION OF SHIP's STAFF AND ALL FILTERS FOR EACH TANK TO RENEW(SHIP SUPPLY) & SAME OIL IF FOUND OK TO BE PUT BACK IN TANKS.TANK LEVEL INDICATOR TO BE CLEANED. QUOTE TO BE INCLUSIVE OF ALL CONSUMABLES MATERIAL LABOUR TRANSPORTATION STAGGING IF ANY ETC DECK SET 4.00 4.00 EA 1 USD 0.00 0.00
D26028.2 JIB OF ALL FOUR CRANES TO BE REMOVED FROM PLACE TAKEN ASHORE CAREFULLY AND TO BE KEPT AT SUITABLE PLACE FOR OVERHAULING/ REPAIR/ CLEANING /BLASTING/ PAINTING HAVING ADEQUATE FACILITY.AFTER THOROUGH REPAIR JIB TO INSTALLED BACK ON CRANE WITH NEW/OLD USUABLE WIRE ROPES .FITTED WIRE TO BE ADEQUATELY GREASED .WIRE ROPE OWNER SUPPLY. DECK NOS 4.00 4.00 EA 1 USD 0.00 0.00
D26028.3 JIB FOOT BEARING ARRANGEENTS/ HOUSING/PINS (ON CRANE & ON JIBS) TO BE THRORUGHLY CHECKED TRUENESS TO BE CHECKED AND REPAIRED/RECONDITIOINED/RENEWED PRIOR TO PUTTING THE JIBS BACK IN PLACE. DECK NOS 8.00 8.00 EA 1 USD 0.00 0.00
D26028.4 ALL FOUR JIBS THICKNESS TO BE GAUGED BUILD UP AND THIN DOWN PLATES TO BE RENEWED WITH SUITABLE GRADE OF PLATE. ALL WASTED SUPPORTS AND BRACKETS TO BE RENEWED. CONSIDER RENEWAL OF APPROX 0.75 MT STEEL ON EACH CRANE. DECK MT 3.00 3.00 EA 1 USD 0.00 0.00
D26028.5 ALL JIB HEAD SHEAVES TO BE COMPLETELY STRIPPED OVERHAULED AND FITTED IN PLACE WITH NEW CONSUMABLES/LOG REINFORCEMENT KITS TO BE INSTALLED IN PRESENCE OF OEM'S ENGR.CONSUMABLE SHIP SUPPLY. DECK SET 4.00 4.00 EA 1 USD 0.00 0.00
D26028.6 ALL SHEAVES/PULLEYS TO BE DISMANTLED OVERHAULED AND FITTED BACK WITH SHIP SUPPLIED BEARINGS. DECK SET 4.00 4.00 EA 1 USD 0.00 0.00
D26028.7 GREASE LINES (COMPLETE)AND ALL GREASE NIPPLES TO BE RENEWED WITH YARD SUPPLIED PIPES AND NIPPLES. DECK SET 4.00 4.00 EA 1 USD 0.00 0.00
D26028.8 CONSIDER RENEWAL OF YARD'S SUPPLIED 2 SHEAVE SHAFT & ACCESSORIES . QUOTE FOR SUPPLY OF GOOD QUALITY PULLY SHAFT( DIMENSION=) & ACCESSORIES. DECK NOS 2.00 2.00 EA 1 USD 0.00 0.00
D26028.9 HYDRAULIC OIL COOLERS COMPLETE WITH MOTORS AND ACCESSORIES TO BE REMOVED FROM PLACE TO BE SHIFTED TO YARD TO BE THOROUGHLY CLEANED( ULTRASONIC/CHEMICAL CLEANING) TO BE PR TESTED AND FITTED BACK WITH YARD SUPPLIED CONSUMABLES. DECK NOS 4.00 4.00 EA 1 USD 0.00 0.00
D26028.10 ALL HYDRAULIC HOSES OF CRANE NO.1 & 4 TO BE RENEWED WITH SHIP SUPPLIED HOSES DECK SET 2.00 2.00 EA 1 USD 0.00 0.00
D26028.11 HOISTING WINCH GEAR BOX WITH BRAKE ASSEMBLY TO BE COMPLETELY OVERHAULED( GEAR BOX PUMP BRAKE ASSEMBLY ETC) WITH SHIP SUPPLIED SPARES. OTHER CONSUMABLES( GASKETS BOLTS NUTS CLAMPS ETC- YARD SUPLY). DECK SET 2.00 2.00 EA 1 USD 0.00 0.00
D26028.12 LUFFING WINCH GEAR BOX WITH BRAKE ASSEMBLY TO BE COMPLETELY OVERHAULED( GEAR BOX PUMP BRAKE ASSEMBLY ETC) WITH SHIP SUPPLIED SPARES. OTHER CONSUMABLES( GASKETS BOLTS NUTS CLAMPS ETC- YARD SUPLY). DECK SET 2.00 2.00 EA 1 USD 0.00 0.00
D26028.13 ALL FOUR CRANES LIMIT SWITCHES TO OVERHAUL WITH SHIP SUPPLIED SPARES AND SATISFACTORY TRIALS TO BE GIVEN IN PRESENCE OF SHIP STAFF/SUPTDS. DECK SET 4.00 4.00 EA 1 USD 0.00 0.00
D26028.14 FLOATING BLOCK SHEAVES OF ALL CRANE TO BE GRIT/HYDRO BLASTED INSPECTED FOR THINNED DOWN SHEAVES BUILD UP IF REQUIRED OVERHAULED AND FITTED BACK BY RENEWING THE SHIP SUPPLIED BEARINGS. DECK SET 4.00 4.00 EA 1 USD 0.00 0.00
D26028.15 JIB HEAD SHEAVES(7x4=28) TO BE GRIT/HYDROBLASTED INSPECTED BUILT UP AS REQUIRED OVERHAULED AND FITTED BACK WITH SHIP SUPPLIED BEARINGS. DECK SET 4.00 4.00 EA 1 USD 0.00 0.00
D26028.16 RUBBER PACKING OF OPERATORS CABIN DOOR SIDE ACCESS DOOR TO BE RENEWED AS PER EXISTING SAMPLE OF ALL 4 CRANES YARD SUPPLY RUBBER PACKINGS ESTIMATION: 40MTRS DECK MTR 40.00 40.00 EA 1 USD 0.00 0.00
D26028.17 TO RENEW DAMAGED OPERATORS CABIN DOOR LOCKING ARRANGEMENT IN ALL 4 CRANES. DECK NOS 4.00 4.00 EA 1 USD 0.00 0.00
D26028.18 CRANE CABIN TOUGHENED GLASSES TO BE RENEWED ALONG WITH CLOSING LEVERS. DECK SET 4.00 4.00 EA 1 USD 0.00 0.00
D26028.19 CRANE SAFETY CAGE TO BE RENEWED FOR ALL FOUR CRANES SEMI CIRCLE DIA-0.5 MTR BREADTH-50MM T-4MM LENGTH-1.8 MTR DECK MTR 50.00 50.00 EA 1 USD 0.00 0.00
D26028.20 TO RENEW GREASE NIPPLES OF CRANES & JIBS. YARD SUPPLY DECK NOS 70.00 70.00 EA 1 USD 0.00 0.00
D26028.21 CORRODED AND THINNED DOWN RAILINGS GIVEN ON ALL FOUR CRANE COLUMN INNER AND OUTER TO BE CROPPED AND RENEWED APPROX DIA 10 MM DECK MTR 50.00 50.00 EA 1 USD 0.00 0.00
D26028.22 ONE PLATFORM TO BE WELDED WITH SUITABLE STIFFNERS NEAR JIB FOOT BEARING TO ACCESS BEARING FOR REPAIR/MAINTAINANCE( 1MTRX1MTR) DECK SET 4.00 4.00 EA 1 USD 0.00 0.00
D26028.23 SUITABLE STAGING TO BE ERECTED ON ALL FOUR CRANES MAST CRANES TO BE THORUGHLY CLEANED FROM INSIDE AND OUTSIDE CRANE MAST TO BE DERUSTED FROM BOTH SIDES CLEANED/ CHEMICALLY CLEANED AND PAINTED. ALL GRAESING POINT TO BE THROLUGHLY CLEANED FLUSHED THROIUGH AND FRESH GREASED TO BE APPLIED. SPOT DERUSTING (APPROX. 40 SQ. MTR); CHEMICAL CLEANING (ABOUT 20 SQ MTR) AND HP FW WASH TO CARRY OUT. THE CRANE COLUMN AND ENTIRE BOOM TO BE PAINTED . TOTAL AREA 100 SQ MTR APPROX EACH CRANE PAINT SHIPS SUPPLY DECK SET 4.00 4.00 EA 1 USD 0.00 0.00
D26028.24 ALL LUBRICATING POINTS TO MAKE FREE AND LUBRICATE USING YARD PUMP TO THE SATISFACTION OF SHIP'S STAFF/SUPERINTENDENT. GREASE OWNER'S SUPPLY. DECK SET 4.00 4.00 EA 1 USD 0.00 0.00
D26028.25 ALL 4 NOS DECK CRANE OPERATION CONTROL SWITCHES IN BAD CONDITION SAME TO BE RENEWED. DECK PCS 4.00 4.00 EA 1 USD 0.00 0.00
D26028.26 ALL DECK CRANE EMERGENCY STOP SWITCHES TO BE RENEWED.3 NOS IN EACH CRANE. DECK PCS 12.00 12.00 EA 1 USD 0.00 0.00
D26028.27 ALL 4 CRANES BRAKE CONTROL HYDRAULIC V/VS TO OVERHAUL. DECK PCS 24.00 24.00 EA 1 USD 0.00 0.00
D26028.28 ALL DECK CRANE ELECTRONIC CONTROL TO BE CHECKED FAULTS TO BE RECTIFIED.LIMIT SWITCH TO BE ADJUSTED.SPARE SHIP SUPPLIED DECK SET 4.00 4.00 EA 1 USD 0.00 0.00
D26028.29 LUFFING AND HOISTING SHEAVES LOCATED ON TOP MAST TO BE DISMANTLED AND BEARING TO REPLACE FROM SHIP SUPPLY. DECK SET 4.00 4.00 EA 1 USD 0.00 0.00
D26028.30 JIB HEAD LIGHTING ARRANGEMENT TO BE SUPPLIED AND FITTED WITH SHIPS VOLTAGE ( TWO ON EACH CRANE) DECK SET 4.00 4.00 EA 1 USD 0.00 0.00
i PROVISION CRANES - ER OVERHEAD CRANE DAVITS : DONGNAM MARINE CRANE CO. LTD DECK EA 1 USD 0.00 0.00
i YARD TO ARRANGE COMPETENT HYDRAULIC, MECHANICAL & AUTOMATION TEAM TO CARRY OUT INSPECTION AND SERVICING OF ALL DECK CRANE. UPON SATISFACTORY COMPLETION OF REPAIR, RUNNING TRIAL TO BE SHOWN TO SHIPSTAFF INCLUDING TESTING OF ALL THE CRANE IN LINE WITH MAKER GUIDELINES. DECK EA 1 USD 0.00 0.00
D26028.32 EXISTING WIRES TO REMOVE AND OWNER SUPPLY NEW WIRES TO RIG IN PROVISISON CRANE AND E/R OVERHEAD CRANES. DECK NOS 2.00 2.00 EA 1 USD 0.00 0.00
D26028.33 ENGINE ROOM OVERHEAD CRANE AND PROVISION CRANE HOISTING BRAKE ASSEMBLY TO OVERHAULED, BRAKE LINING BUSHES & BEARING CONDITIONS TO BE EXAMINED.IF REQUIRED BRAKE LINING (YARD SUPPLY) TO BE RENEWED.FLOATING BLOCK TO BE O'HAULED.BEARINGS(YARD SUPPLY) TO BE RENEWED.DAMAGED CONTROL CABLES TO CUT AND CONNECTED TO PENDANT.SUCCESFUL TRIAL OF CRANE TO BE SHOWN TO CEO. DECK SET 2.00 2.00 EA 1 USD 0.00 0.00
D26028.34 OVER HEAD CRANE'S GEAR BOXES(2 NOS.) FOR PORT-STBD AND FWD-AFT MOVEMENT TO TAKE OUT FROM PLACE DISMANTLE AND PARTS TO CHECK RENEW IF NECESSARY AND TO FIT BACK WITH NEW SHAFT SEALS.FRESH GEAR OIL TO TAKE IN THE GEAR BOXES SAME TO FIT BACK IN PLACE. DECK PCS 1.00 1.00 EA 1 USD 0.00 0.00
D26028.35 TO FIT EMEREGENCY STOP SWITCHES AND MAKE OPERATIONAL(YARD SUPPLY). DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26028.36 SUEZ CANAL LIGHT(SINGLE ARM DAVIT) DAVIT ALL FITTINGS CEASED AND DAVIT INOPERATIONAL.DAVIT TO CROP AND RENEW.CAPACITY:01 TON. DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26028.37 BUNKER DAVIT(SINGLE ARM DAVIT) P&S TO BE COMPLETELY DISMANTLED, ALL FITTING TO BE OVERHAULED AND FITTED BACK IN PLACE. REPAIR MATERIAL (BEARINGS & CONSUMABLES) YARD SUPPLY. DECK NOS 2.00 2.00 EA 1 USD 0.00 0.00
I PERIODICAL LOAD TEST OF FOLLOWING LIFTING GEAR TO BE CARRIED OUT INLINE WITH REQUIREMENTS /MAKER'S GUIDE LINES/STANDARD PROCEDURE AND REGISTER OF MACHINERY AND CHAINS TO BE ENDORSED BY COMPETENT AUTHORITY/ DNV/IRS SURVEYOR DECK INSTRUCTION EA 1 USD 0.00 0.00
D26028.38 CARGO HANDLING CRANES - SWL 36 T DECK LS 4.00 4.00 EA 1 USD 0.00 0.00
D26028.39 PROVISION CRANES - SWL 3.0 T DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26028.40 E/R OVERHEAD CRANE; SWL 3 T; DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26028.41 SUEZ SEARCH LIGHT DAVIT; SWL 0.5 T; HEAD SHEAVE TO OVER HAUL. LOAD TEST TO DO AFTER COMPLETION OF ALL REPAIRS. ALL ITEMS YARD SUPPLY DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26028.42 BUNKER HOSE LIFTING DAVIT,SWL0.99 T DECK SET 2.00 2.00 EA 1 USD 0.00 0.00
D26028.43 LOOSE GEARS TO LOAD TEST AND CERTIFICATE TO ISSUE. DECK SET 2.00 2.00 EA 1 USD 0.00 0.00
D26028.44 CHAIN BLOCK (1T; 2T; 3T; 5T) DECK NOS 12.00 12.00 EA 1 USD 0.00 0.00
D26028.45 EYE BOLTS DECK NOS. 10.00 10.00 EA 1 USD 0.00 0.00
D26028.46 WIRE SLING (1T; 2T; 3T ETC) DECK NOS. 18.00 18.00 EA 1 USD 0.00 0.00
D26028.47 CHAIN SLING (ASSORTED SWL) DECK NOS. 10.00 10.00 EA 1 USD 0.00 0.00
I D26029:MAGNETIC COMPASS: MAKE-KEIKI MODEL-5549 DECK EA 1 USD 0.00 0.00
I WORK SPECIFICATIONS: DECK EA 1 USD 0.00 0.00
D26029.1 MAGNETIC COMPASS ADJUSTMENT TO CARRY OUT AFTER COMPLETION OF ALL REPAIRS AND CERTIFICATE TO ISSUE DURING SEA TRIAL. DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
I D26030: DOPPLER SPEED LOG MAKE CONSILIUM-SAL SD4-3 DECK EA 1 USD 0.00 0.00
I WORK SPECIFICATIONS: DECK EA 1 USD 0.00 0.00
D26030.1 TO CHECK TRANSDUCER IN DRY DOCK. REMOVE IF NECESSARY; CLEAN AND EXAMINE TRANSDUCER /TANK. TO CHECK FOR WATER TIGHTNES & PAINT; IF REQUIRED CHANGE GASKET OF MANHOLE. THE ZINC RING SHOULD BE CHECKED AND CHANGED IF CORRODED BADLY. VALVE TO OVERHAUL. RENEW TRANDUCER IF NECESSARY,TRANSDUCER SHIP SUPPLY. DECK SET 1.00 1.00 EA 1 USD 0.00 0.00
D26030.2 REPEATERS IN ENGINE ROOM; BRIDGE NAVIGATION CONSOLE TO BE COMPARED AND SYNCHORONIZED. DECK SET 2.00 2.00 EA 1 USD 0.00 0.00
I YARD TO ARRANGE COMPETENT TEAM TO CARRY OUT REPAIR/ RENEWAL JOB.AFTER COMPLETION OF CHECKS/REPAIR/RENEWAL/COMMISIONING, SATISFACTORY TRIALS/SIMULATION TRIALS TO BE SHOWN. QUOTE ALL INCLUSIVE. DECK INCLUSIVE EA 1 USD 0.00 0.00
I D26031: ECHO SOUNDER MAKE SKIPPER MODEL-GDS 101 DECK EA 1 USD 0.00 0.00
I WORK SPECIFICATIONS: DECK EA 1 USD 0.00 0.00
D26031.1 TO CHECK TRANSDUCER IN DRY DOCK. REMOVE, CLEAN THE CHAMBER AND REPLACE THE DEFECTIVE TRANSDUCER. REQUIRED CHANGE GASKET OF MANHOLE. THE ZINC RING SHOULD BE CHECKED AND CHANGED. DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26031.2 PRINTER TO BE FITTED .PRINTER YARD SUPPLY APS. DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
I YARD TO ARRANGE COMPETENT TEAM TO CARRY OUT REPAIR/ RENEWAL JOB.AFTER COMPLETION OF CHECKS/REPAIR/RENEWAL/COMMISIONING, SATISFACTORY TRIALS/SIMULATION TRIALS TO BE SHOWN. QUOTE ALL INCLUSIVE. DECK INCLUSIVE EA 1 USD 0.00 0.00
I D26032: DRAFT GAUGE AND WATER BALLAST TANKS LEVEL GAUGING SYSTEM: MAKE- AKSHTRONICA WAGO, MODEL-PAN INDIA 3000 DECK EA 1 USD 0.00 0.00
I BALLAST TANKS GAUGING SYSTEM DECK EA 1 USD 0.00 0.00
D26032.1 INSPECT ALL LEVEL SENSORS/TRANSMITTERS FITTED IN BALLAST TANKS. CHECK SENSOR MOUNTING, PROTECTION PIPES, FLANGES, AND BRACKETS. INSPECT SIGNAL AND POWER CABLES FOR DAMAGE, CORROSION, OR INSULATION BREAKDOWN. INSPECT JUNCTION BOXES FOR WATER INGRESS AND CORROSION. VERIFY CONDITION AND OPERATION OF LOCAL AND REMOTE DISPLAY UNITS. DECK SET 12.00 12.00 EA 1 USD 0.00 0.00
D26032.2 CLEAN SENSORS AND PROTECTION PIPES OF SCALE, MUD, AND MARINE GROWTH.RENEW DEFECTIVE OR INACCURATE LEVEL SENSORS/TRANSMITTERS AS REQUIRED. REPLACE DAMAGED CABLES, GLANDS, CONNECTORS, OR TERMINAL BLOCKS. RENEW GASKETS, SEALS, AND O-RINGS TO ENSURE WATERTIGHT INTEGRITY.SECURE AND RE-ALIGN SENSORS AS PER NORDIC FLOW INSTALLATION GUIDELINES. DECK SET 12.00 12.00 EA 1 USD 0.00 0.00
D26032.3 CALIBRATE EACH BALLAST TANK LEVEL SENSOR IN ACCORDANCE WITH APPROVED PROCEDURES.VERIFY ZERO, SPAN, AND ALARM SET POINTS.TEST HIGH-LEVEL AND OVERFLOW ALARMS WHERE FITTED.CROSS-CHECK READINGS AGAINST MANUAL SOUNDING OR ULLAGE MEASUREMENTS.DEMONSTRATE ACCURATE AND STABLE READINGS ON ALL DISPLAYS. DECK SET 12.00 12.00 EA 1 USD 0.00 0.00
I DRAFT GAUGING SYSTEM DECK EA 1 USD 0.00 0.00
D26032.4 INSPECT FORWARD, MIDSHIP, AND AFT DRAFT SENSORS/TRANSDUCERS (AS FITTED).CHECK SENSOR HOUSINGS, ISOLATION VALVES, PROTECTIVE PIPING, AND MOUNTING ARRANGEMENTS.INSPECT CABLING, JUNCTION BOXES, AND DECK PENETRATIONS.VERIFY OPERATION OF BRIDGE AND REPEATER DISPLAY UNITS. CLEAN DRAFT SENSORS AND PROTECTION PIPES.RENEW DAMAGED OR MALFUNCTIONING DRAFT SENSORS/TRANSDUCERS. REPAIR OR REPLACE DEFECTIVE CABLING, GLANDS, AND CONNECTORS.ENSURE WATERTIGHT SEALING OF ALL HULL PENETRATIONS.SECURE SENSORS IN CORRECT POSITION AND ORIENTATION. CALIBRATE DRAFT GAUGE SYSTEM AFLOAT OR ALONGSIDE AS PER MANUFACTURER’S PROCEDURE.COMPARE ELECTRONIC READINGS WITH PHYSICAL DRAFT MARKS. ALL CONSUMABELS YARD SUPPLY. ADJUST SYSTEM TO ACHIEVE CORRECT FORWARD, AFT, AND MEAN DRAFT VALUES CARRY OUT OPERATIONAL TEST OVER FULL MEASURING RANGE.DEMONSTRATE SYSTEM ACCURACY TO OWNER/CLASS. DECK SETS 4.00 4.00 EA 1 USD 0.00 0.00
I NAV (MISC) DECK EA 1 USD 0.00 0.00
D26033.6 WHISTLE TIME CONTROLLER (AUTO MODE) IS NOT WORKING. FAULT TO BE RECTIFIED. DECK SET 1.00 1.00 EA 1 USD 0.00 0.00
D26033.7 BAROMETER CALIBARATION TO BE CARRIED OUT. DECK SET 1.00 1.00 EA 1 USD 0.00 0.00
D26033.8 FWD AND AFT HORN TO BE REMOVED FROM PLACE , DISMANTLED AND COMPLETELY OVERHAULED. PACKING,NEW PACKING, NUTBOLTS & CONSUMABLES YARD SUPPLY. DECK SET 2.00 2.00 EA 1 USD 0.00 0.00
D26033.9 AFT AIR HORN MANUALLY OPERATE WIRE,SOLENOID VALVE AND PIPE NEED TO BE RENEWED . 10MM PIPE/5 MTR. DECK SET 1.00 1.00 EA 1 USD 0.00 0.00
D26033.10 SIDE LIGHTS BASE PLATE AND LIGHT STRUCTURAL PLATE TO BE RENEWED. DECK NO.S 2.00 2.00 EA 1 USD 0.00 0.00
D26033.11 MAIN MAST BASE PLATE, DECK PLATE THINNED DOWN. SAME TO CROP AND RENEW., LXBXT 3M X 3M X 10MM, MATERIAL GRADE A IE MILD STEEL DECK NO.S 1.00 1.00 EA 1 USD 0.00 0.00
D26033.12 MAIN MAST LADDER SIDE GUARD RAILING TO BE RENEWED 15 MTR LENGTH. DECK NO.S 1.00 1.00 EA 1 USD 0.00 0.00
D26033.14 FWD MAIN MAST LIGHT TO BE RENEWED. DECK SET 1.00 1.00 EA 1 USD 0.00 0.00
I D26034: PIPELINE RENEWAL ON DECK CARGO HOLDS BILGE LINE BALLAST TANKS PIPE LINE DECK EA 1 USD 0.00 0.00
I TO QUOTE FOR RENEWAL OF PIPELINES ON DECK/ BALLAST TKS AND DUCT KEEL AS FOLLOWS: COST TO BE QUOTED FOR UNIT LENGTH FOR EACH ) MEASURMENT SHALL BE ON AS PER ACTUALS. PIPELINES TO BE FITTED WITH NEW JOINTS/NUTS/BOLTS AND U-CLAMPS (YARD SUPPLY) DECK INSTRUCTION EA 1 USD 0.00 0.00
D26034.1 CO2 LINE ON DECK : OD 28 MM/ SCH 80 SEAMLESS PIPE : 200 MTRS DECK MTR 200.00 200.00 EA 1 USD 0.00 0.00
D26034.2 FE LINE ON DECK OD-40MM/LENGTH-80MTR -SCH80 DECK MTR 80.00 80.00 EA 1 USD 0.00 0.00
D26034.3 AIR LINE ON DECK TO RENEW BY YARD SUPPLIED MATERIAL : OD : 23 MM LENGTH: 80 MTRS SCH 40 , YARD SUPPLY DECK MTR 80.00 80.00 EA 1 USD 0.00 0.00
D26034.4 FIRE LINE ON DECK TO BE RENEW YARD SUPPLIED MATERIAL: OD :- 76 MM DECK MTR 20.00 20.00 EA 1 USD 0.00 0.00
D26034.5 FIRE LINE ON MAIN DECK -OD 100MM -SCH 80-50MTR DECK MTR 50.00 50.00 EA 1 USD 0.00 0.00
I RENEWAL OF VARIOUS FOLLOWING MS SUPPORTS ON DECK (YARD SUPPLY). DECK INSTRUCTION EA 1 USD 0.00 0.00
D26034.6 CONDUIT LINE SUPPORTS-74MM,75MM,50MM DECK MTRS 50.00 50.00 EA 1 USD 0.00 0.00
D26034.7 CROSS DECK SUPPORT HAND RAIL-44MM DECK MTRS 50.00 50.00 EA 1 USD 0.00 0.00
D26034.8 CROSS DECK STAIRWAY SUPPORT- 66MM THICKNESS- 18MM DECK MTR 50.00 50.00 EA 1 USD 0.00 0.00
D26034.9 CROSS DECK BELOW HAND RAIL SOLID ROD- 21MM DECK MTR 50.00 50.00 EA 1 USD 0.00 0.00
D26034.10 HATCH INSPECTION SUPPORT/ PLATFORM AREA -830X520MMX10 NOS DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
D26034.11 HATCH INSPECTION ANGLE BAR-75MMX75MM DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
i D26035: PRESSURE TEST OF PIPE LINE DECK EA 1 USD 0.00 0.00
I FOLLOWING PIPE LINES TO PRESSURE TEST (HYDROTEST) AFTER COMPLETION OF REPAIRS. QUOTEALL INCLUSIVE. ALL ASSOCIATED JOB VIZ; BLANKING FILLING/DRAINING/ FW REMOVAL/REFIT OF ANY DISTANCE PIECE TO BE CONSIDERED WHILE CARRYING OUT BELOW JOB AND YARD TO QUOTE ACCORDINGLY. DECK INSTRUCTION EA 1 USD 0.00 0.00
D26035.1 BALLAST LINES DECK SET 1.00 1.00 EA 1 USD 0.00 0.00
D26035.2 FIRE LINE DECK SET 1.00 1.00 EA 1 USD 0.00 0.00
D26035.3 DO LINE DECK SET 1.00 1.00 EA 1 USD 0.00 0.00
D26035.4 HO LINE DECK SET 1.00 1.00 EA 1 USD 0.00 0.00
D26035.5 ER BILGE LINE DECK SET 1.00 1.00 EA 1 USD 0.00 0.00
D26035.6 CARGO HOLD BILGE EDUCTION LINE DECK SET 2.00 2.00 EA 1 USD 0.00 0.00
I D26036: MISCLLENEOUS STEEL WORK DECK EA 1 USD 0.00 0.00
D26036.1 SOUNDING PIPE OF WBT TANKS TO BE RENEWDED ALONG WITH SOUNDING CAPS. CAPS TO BE SECURED WITH SECURING CHAIN.(DIA 78 MM SCH80) LENGTH 20 MTRS EACH .FPK(21 MTRS), AFT PK(10 MTRS) .,NO3 STBD SOUNDING PIPE COMPLTELY RENEWED DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
D26036.2 STRIKER PLATES BELOW SOUNDING PIPES OF ALL BALLAST TANKS TO BE CHECKED FOR WEAR- DOWN AND IF REQUIRED TO BE RENEWED. STRIKER BELOW BELMOUTH OF ALL WBTS (THICKNESS 10 MM) TO BE RENEWED DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
D26036.3 SOUNDING PIPE OF BILGES 10 NOS TO BE RENEWDED ALONG WITH SOUNDING CAPS. CAPS TO BE SECURED WITH SECURING CHAIN.(DIA 78MM SCH80) LENGTH 20 MTRS EACH IF REQUIRES AFTER INSPECTION DECK Nos 10.00 10.00 EA 1 USD 0.00 0.00
D26036.4 STRIKER PLATES OF ALL CARGO HOLD BILGE SOUNDING PIPES TO BE CHECKED FOR WEAR DOWN/ABSENCE AND IF REQUIRED TO BE RENEWED. DECK Nos 10.00 10.00 EA 1 USD 0.00 0.00
D26036.5 TEMPERATURE PIPE IN CARGO HOLDS TO BE RENEWED ALONG WITH CAPS .CAPS TO BE SECURED WITH SECURING CHAIN.(DIA 78MM SCH80) LENGTH 12 MTRS EACH IF REQUIRES DECK Nos 5.00 5.00 EA 1 USD 0.00 0.00
D26036.6 STRIKER PLATES OF CHAIN LOCKERS SOUNDING PIPES TO BE CHECKED FOR WEAR DOWN/ABSENCE AND IF REQUIRED TO BE RENEWED. DECK Nos 2.00 2.00 EA 1 USD 0.00 0.00
D26036.7 MISSING/ BROKEN HANDLES OF MANHOLE COVERS TO BE RENEWED IN VARIOUS HOLDS-20 NOS. DECK NOS 20.00 20.00 EA 1 USD 0.00 0.00
D26036.8 SIDE PROTECTION CHAIN IN WAY OF RAILINGS,AT A DECK PORT AND STBD,NEAR GANGWAY PORT AND STBD,FWD NEAR EMBARKATION LADDER PORT AND STBDDIA 10 MM TO FABRICATE AND FIT DECK MTR 50.00 50.00 EA 1 USD 0.00 0.00
D26036.9 LIGHT STANDS INCLUDING EMG LIGHT ON MAIN DECK FOR, PILOT LADDER, GANGWAY, FWD LIFE RAFT TO BE CROPPED AND RENEWED DECK NOS 4.00 4.00 EA 1 USD 0.00 0.00
D26036.10 HATCH CONTROLER STANDING PLATFORMS SIZE (600MM X 500MM )+ ( 600MMX220MM) TO BE RENEWED DECK NOS 5.00 5.00 EA 1 USD 0.00 0.00
D26036.11 LIFE BOAT BOARDING CHEQURED PLATE & SUPPORTING BRACKET TO BE RENEWED 2.5 MTR X 2.5 MTR DECK M2 7.50 7.50 EA 1 USD 0.00 0.00
D26036.12 HATCH DRAIN PIPES TO BE RENEWED SIZE (50 CM ) DIA 42MMMM DECK NOS 8.00 8.00 EA 1 USD 0.00 0.00
D26036.13 WARNING PLATE FOR "BEWARE OF PROPPLER" WITH SUPPORT 'P' AND 'S' TO BE MADE ( SIZE 1.2 M X 0.8 M) DECK NOS 2.00 2.00 EA 1 USD 0.00 0.00
D26036.14 ALL BOOBY HATCHES LOCKING HANDLE & CLEATS TO BE FABRICATED AND FITTED DECK NOS 50.00 50.00 EA 1 USD 0.00 0.00
D26036.15 SAVE OIL TRAYS DRAIN AND DRAIN PLUGS TO BE RENEWED UPPER DECK PORT AND STBD SIDE BOTH DECK NOS 20.00 20.00 EA 1 USD 0.00 0.00
D26036.16 STOPPER PINS OF HOLD ENTRANCE BOOBY HATCHES TO BE FITTED WHERE MISSING AND SECURED WITH SECURING CHAIN. DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
D26036.17 HATCH COVER STOPPER PINS TO BE OPENED OVERHAULED AND FITTED BACK DECK NOS 20.00 20.00 EA 1 USD 0.00 0.00
D26036.18 QUOTE FOR PROVIDING BOTH ANCHOR EXTRA LASHING . DECK NOS 2.00 2.00 EA 1 USD 0.00 0.00
D26036.19 LIFE BOAT OPERATING LEVER BOX FOR LIFE BOAT TO BE RENEWED ( SIZE 40 CM X 40 CM X 45 CM ) DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26036.20 STANCHIONS WITH TWO SPIRAL EYES FOR LIFE LINE TO FABRICATE AND FIT ON MAIN DECK PORT AND STBD.(CONSUMABLES YARD SUPPLY) DECK NOS 24.00 24.00 EA 1 USD 0.00 0.00
D26036.21 FRESH WATER SOUNDING PIPE ON DECK TO BE RENEWED ALONG WITH SOUNDING CAPS. CAPS TO BE SECURED WITH SECURING CHAIN.(DIA 65A SCH80) LENGTH 10 MTRS EACH AND PAD LOCKING DECK SET 2.00 2.00 EA 1 USD 0.00 0.00
D26036.22 GREASING PLATFORMS OF LIFE BOATS TO BE RENEWED ( SIZE 1.5 MTR X 1 MTR ) DECK NO 1.00 1.00 EA 1 USD 0.00 0.00
D26036.23 SKY LIGHT OF ENGINE ROOM TO BE OPENED THINNED AREA IF REQUIRED , TO BE FABRICATED AND BUILD UP( SIZE 2MTRS X 1.5 MTRS) 46 NOS NUT BOLTS TO BE CHANGED.(SS NUT BOLTS, PACKING YARD SUPPLY) DECK NO 1.00 1.00 EA 1 USD 0.00 0.00
D26036.24 BASE STAND FOR ANTENNA ON MONKEY ISLAND TO BE RENEWED DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
D26036.25 FWD AND AFT MOORING WINCH HYDRAULIC PIPELINES( PR LINE & RETURN LINE)TO BE RENEWED WITH SCH 120, SEAMLESS PIPE, DIA50MM DECK MTRS 30.00 30.00 EA 1 USD 0.00 0.00
D26036.26 REBEWAL OF SCUPPER LINE IN GALLEY, DIA 60MM DECK MTRS 50.00 50.00 EA 1 USD 0.00 0.00
D26036.27 BALLAST FILING PIPES CONNECTING LOWER HOPPER TO UPPER HOPPER IN HOLD TO RENEW, DIA 250 MM SCH40 DECK MTRS 50.00 50.00 EA 1 USD 0.00 0.00
D26036.28 FRESH WATER PIPES IN OFFICER MESS ROOM TO RENEW, DIA 25MM. DECK MTRS 30.00 30.00 EA 1 USD 0.00 0.00
i D26037: MISCELLENEOUS DECK REPAIRS: DECK EA 1 USD 0.00 0.00
I DAMAGED ,CORRODED OR DEFORMED CONDUIT SECTION TO BE REMOVED.NEW CONDUIT PIPES OF APPROVED MATERIAL,SIZE AND SPECIFICATION (YARD SUPPLY) TO BE FABRICATED AND FITTED.BENDS,JUNCTION BOX,GLANDS,SUPPORTS TO BE RENEWED.AFTER COMPLETION OF JOB , ELECTRICAL WIRES TO BE PULL AND FITTED IN PLACE.DEFCETIVE PORTION OF FIRELINE TO CROP AND RENEW FROM FLANGE TO FLANGE. DECK INSTRUCTION EA 1 USD 0.00 0.00
D26037.1 FIRE LINE DRAIN VALVE TO BE OVERHAULED.(16K 25) DECK NOS 3.00 3.00 EA 1 USD 0.00 0.00
D26037.2 FIRE LINE FOC’SLE & BRIDGE WING PRESSURE GAUGES TO BE FITTED WITH NEW BALL VALVE. SIZE- 3/8”.PRESSURE GAUGE, V/V & CONSUMABLES YARD SUPPLY. DECK NO 3.00 3.00 EA 1 USD 0.00 0.00
D26037.3 PIPE SUPPORTING BRACKET AND CLAMPS TO BE CHANGED WITH YARD SUPPLY AS PER BELOW DETAILS i)CONDUIT -75 ii)FIRE LINE-40 III)CO2 LINE- 25 DECK NOS 140.00 140.00 EA 1 USD 0.00 0.00
D26037.4 THE CONDUIT PIPES ON DECK DIA- 70MM (APPX. 150 M) HAVING ELECTRICAL CABLES NEEDS TO BE CROPPED AND RENEWED WITH NEW FLANGES WITHOUT DISTURBING EXISTING CABLES USING S.S. BOLTS, NEW GI “U” CLAMPS WITH S.S. NUTS AND TO BE MOUNTED ON EXISTING BRACKET SUPPORTS USING SUITABLE NEOPRENE PACKINGS THE NEW PIPES NEED TO BE SCHEDULE 40, TO BE SHOP PRIMERED PRIOR FITMENT ENABLE GIVE 2 FINAL COATS MODIFIED EPOXY ALL PAINTS OWNERS TO SUPPLY EXCEPT SHOP PRIMER. THE NEW LINES NEED TO HAVE EARTHING CONDUCTORS IN WAY OF ALL THE FLANGES AND IN WAY OF THE JUNCTION BOXES. MATERIALS AND CONSUMABLES YARD SUPPLY. FITTING SHOULD BE WATER PROOF. DECK MTR 150.00 150.00 EA 1 USD 0.00 0.00
D26037.5 EIGHT NOS JUNCTION BOXES SIZE APPROX 1200MM X 1600MM X 900MM NEED TO BE CROPPED AND RENEWED USING 8 MM MS PLATES AND NEED TO BE FITTED WITH ONE NUMBER EACH DRAIN PLUG WITH GI CHAIN OF SUITABLE LENGTH . ALL THE BOXES NEED TO BE HAVING TOP LIDS WITH SS BOLTS / NUTS AND GASKETS. ALL THE BOXES NEED TO BE COATED INTERNALLY AND EXTERNALLY WITH MODIFIED EPOXY PAINT. FITTING SHOULD BE WATER PROOF. MATERIALS AND CONSUMABLES YARD SUPPLY. DECK NOS 8.00 8.00 EA 1 USD 0.00 0.00
D26037.6 CONDUIT LINE EXPANSION JOINTS BOLTS TO BE RENEWED ( SIZE: LENGTH-190MM, DIA-20MM, & LENGTH -155M, DIA- 12MM) DECK NOS 500.00 500.00 EA 1 USD 0.00 0.00
i D26038: MISCELLENOUS DECK REPAIRS: MANHOLE COVERS AND BOOBY HATCH OPENING / CLOSING WORK SPECS DECK EA 1 USD 0.00 0.00
I MANUAL COVERS AND BOOBY HATCH COVERS TO BE OPENED UP FOR INSPECTION. COVER COAMING AND SEATING FACE STUDS , HINGES TO BE THOROUGHLY CLEANED AND OVERHAULED. NEW GASKET NUT BOLTS TO BE RENEW( BOLTS NUTS & CONSUMABLES YARD SUPPLY). DECK INSTRUCTION EA 1 USD 0.00 0.00
D26038.1 TO OPEN 40 NOS. D.B/TST/FW/FPK/APK TANK MANHOLE COVERS AND TO BOX THEM BACK AFTER RENEWING PACKING AND FITTING NEW SS. NUTS/ BOLTS. RENEWAL OF 400 NUT/BOLT WITH SS NUT/ BOLTS OF SIZE 30 MM DIA X 65 MM. ENSURE - WATER TIGHTNESS OF ALL MANHOLE COVERS AFTER ABOVE JOB 40 IN NOS. PACKING , NUT, BOLTS YARD SUPPLY DECK NOS 40.00 40.00 EA 1 USD 0.00 0.00
D26038.2 VOID SPACES, MANHOLES 10 NOS. TO OPEN, MAN ENTRY TO BE MADE AND DRAIN COCKS/ VALVES OF VOID SPACES TO BILGES TO BE CLEARED, TRY OUT AND BOX BACK THE MANHOLE COVERS USING NEW PACKING. ALL VOID SPACES TO BE CLEANED AND DRIED, RUSTED AREA TO BE SCRAPPED /CHIPPED AND APPLY PRIMER AND FINISH COAT OF EPOXY PAINT. (OWNER’S SUPPLY) CONSIDER - 10M2 AREA IN EACH VOID SPACE TO BE PAINTED. PACKINGS AND NUT/BOLTS YARD SUPPLY. QUOTE TO BE INCLUSIVE OF ALL ACTIVITIES, SUPPLY MATERIAL, STAGGING ETC DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
D26038.3 10 NOS HATCH INSPECTION GRAIN LOADING MANHOLE COVERS TO BE OPENED NUT BOLTS TO BE RENEWED (500 NUT BOLTS) (SS) ,MANHOLE COVERS TO BE CHIPPED AND PAINTED PACKINGS TO RENEW ( PACKING, NUT BOLTS & CONSUMABLES- YARD SUPPLY, PAINT-SHIP SUPPLY). DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
D26038.4 ALL BOOBY HATCH COVER TO BE SCRAPPED /CHIPPED AND APPLY PRIMER AND FINISH COAT OF EPOXY PAINT. (PAINT OWNER’S SUPPLY) 15 NOS. (QUOTE FOR EACH) . LOCKING ARRANGEMENT TO BE MADE FOR ALL BOOBY HATCHES BY YARD SUPPLIED MATERIAL & CONSUMABLES). DECK NOS 15.00 15.00 EA 1 USD 0.00 0.00
D26038.5 BOOBY HATCH COVER SPRING ARRANGEMENT TO BE OVERHAULED AND MADE OPERATIONAL. NO 1 HATCH FWD,NO2 HATCH FWD AND STRG GEAR RM. DECK NOS 3.00 3.00 EA 1 USD 0.00 0.00
D26038.6 DAMAGE AND MISSING BILGE COVER BASE BOLTS TO BE RENEWED YARD SUPPLY DECK NOS 30.00 30.00 EA 1 USD 0.00 0.00
D26038.7 BUTTERFLY NUTS (SS) TO BE FITTED IN BOOBY HATCHES WHERE MISSING. (APPROX. 20 NOS) DECK NOS 20.00 20.00 EA 1 USD 0.00 0.00
D26038.8 QUOTE FOR RENEWAL OF NUT & STUDS - STAINLESS STEEL, FOR DB TANKS, TST TANKS AND VOID SPACE MANHOLE COVERS - 200 NOS. SIZE 30MM DECK NOS 200.00 200.00 EA 1 USD 0.00 0.00
D26038.9 MANHOLE COVER OF NO 3 HEAVY WEATHER BALLAST TO BE RENEWED. CONSIDER RENEWAL OF 2 NOS COVER. SIZE-DIA APPROX- 0.5MTR. DECK NOS 2.00 2.00 EA 1 USD 0.00 0.00
D26038.10 WARNING NOTICES ON SS PLATES ARE WASTED IN CARGO HOLDS BOOBY HATCHES. SAME TO BE REPLACED WITH NEW ONES ( SIZE 300MM X 200 MM) DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
D26038.11 MANHOLES IN THE LANDING AREA (HOLD INSPECTION UPPER PLATE FORM) OF UPPER STOOLS CORRODED AND THINNED DOWN AT VARIOUS HOLDS SAME TO BE CROPPED AND RENEWED.( 760 MM X 760MM ) THICKNESS : - 12 MM TOTAL 30 NOS DECK NOS 30.00 30.00 EA 1 USD 0.00 0.00
D26038.12 MANHOLE COVER OF NO 3 HEAVY WEATHER BALLAST TO BE RENEWED(0.5X0.5 MTRS) DECK NOS 3.00 3.00 EA 1 USD 0.00 0.00
i D26039: MISCELLENOUS DECK REPAIRS -VENTILATORS/ AIR VENT HEAD FOR BALLAST TANKS, STOOL SPACES ,VOID SPACES AND FRESH WATER TANKS ,FO TANKS DECK EA 1 USD 0.00 0.00
I ALL ALL MUSHROOMVENTILATORS TO BE OPENED UP AND TRANSPORTDE TO YARD FOR OVERHAULING. COVERS,COMINGS AND SEATING FACE ,STUDS,NUTS,WIRE MESS TO THOROUGHLY CLEAN AND OVERHAUL. NEW GASKETS,NUTS,BOLTS/CONSUMABLES( YARD SUPPLY). DECK INSTRUCTION EA 1 USD 0.00 0.00
D26039.1 ALL MUSHROOM VENTILATORS FOR STEERING GEAR ROOM CO2 ROOM PAINT STORES GALLEY MUSHROOM VENT AND MUSHROOM VENT TO BE REMOVED FROM PLACE TAKEN TO SHIPYARD FOR GRIT/HYDRO BLASTING, PAINTING AND RENEWAL IF ANY AND BRING BACK ON BOARD RENEW NUTS BOLTS, REPLACE RUBBER PACKING AND WIRE MESH/NET AND FITTED BACK . QUOTE ALL INCLUSIVE INCLUDING ALL CONSUMABLES AND TRANSPORTATION . DECK NOS 8.00 8.00 EA 1 USD 0.00 0.00
D26039.2 STORE VENTS (WALL TYPE) SIZE 350MM X 350MM, LOUVER,RUBBER RETAINING CHANNEL AND RUBBER PACKING TO BE RENEWED,BUTTERFLY NUTS TO BE RENEWED. MATERIAL YARD SUPPLY. . DECK NOS 20.00 20.00 EA 1 USD 0.00 0.00
D26039.3 HOLD VENTILATORS WALL TYPE 40 NOS. SIZE- 710 MM X 520 MM TO BE REPAIRED , BUTTERFLY NUTS (160 NOS. ) TO BE RENEWED (YARD SUPPLY ) PACKING RETAINING CHANNEL AND LOUVERS TO BE FABRICATED AND RENEWED WHERE NECESSARY ( YARD SUPPLY)- ALL MATERIAL, PACKING, NUTS BOLTS YARD SUPPLY. DECK NOS 20.00 20.00 EA 1 USD 0.00 0.00
D26039.5 TO CROP AND RENEW ACCOMMODATION VENTS AT VARIOUS LOCATIONS AND RENEW RUBBER RETAINING CHANNEL & RUBBER PACKING OF SAME. TOTAL 25 NOS. RUBBER PACKING: 100 M YARD SUPPLY. DECK NOS 25.00 25.00 EA 1 USD 0.00 0.00
D26039.6 ALL AIR VENT HEAD OF BALLAST TANKS ,VOID SPACES, STOOL SPACES, FRESH WATER TANKS, S/T ,CWT ,FO ,DO TANKS ON MAIN DECK TO BE OPENED, TRANSPORT TO YARD WORKSHOP INSPECT, GRIT/HYDRO BLAST , APPLY PAINT , BRING BACK ON BOARD, FIT BACK WITH NEW PACKINGS AND WIRE MESH/NET NUTS AND BOLTS ALL YARD SUPPLY . QUIOTE ALL INCLUSIVE INCLUDING COST OF TRANSPORTION, (DIMENSION FROM 50A TO 450A) PERMANENT STENCIL OR MARKING OR PROVISION OF NAME PLATE. ALL CONSUMABLES YARD SUPPLIED. DECK NOS 30.00 30.00 EA 1 USD 0.00 0.00
D26039.6.1 REPLACEMENT OF VENT HEADS & CONSUMABLES WITH YARD SUPPLIED CLASS APPROVED WITH CERTIFICATES. CONSIDER 15 NOS. DECK NOS 15.00 15.00 EA 1 USD 0.00 0.00
D26039.7 LOCKING ARRANGEMENT TO BE MADE FOR WALL TYPE NAT VENTS YARD TO MAKE DECK NOS 40.00 40.00 EA 1 USD 0.00 0.00
D26039.8 TO CROP & RENEW WIRE MESH AND LOUVER OF SUCTION OF EMERGENCY GENERATOR SUPPLY VENT SIZE: (700 MM X 650 MM) DECK NOS 2.00 2.00 EA 1 USD 0.00 0.00
D26039.9 CROP & RENEW A/C INLET VENTS ALONG WITH LOUVER AND ALSO MAKE ARRANGEMENT FOR EASY REMOVAL BY PROVIDING BOLTS ON THE SIDES OF LOUVER.(SIZE 1400 MM X 500 MM) THICKNESS 8 MM QTY : 02 NOS. ON B DECK PORT SIDE. DECK NOS 2.00 2.00 EA 1 USD 0.00 0.00
D26039.10 TO RENEW THE SAFETY LINES ON BOTH PORT AND STBD SIDE. TO CHANGE THE COATED/INSULATED WIRE 220M- 05MM DIA (YARD SUPPLY) AND THE ASSOCIATED LOOSE GEARS LIKE BOTTLE SCREW( 1T- 06 NOS) AS PER APPROPRIATE SIZE. DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D26039.11 REPLACEMENT OF VENT HEADS WITH THE YARD SUPPLIED VENT HEADS WITH THE YARD GASKETS AND REDUCERS DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
i D26040: MISC DECK REPAIRS:TO CROP & RENEW FOLLOWING LADDERS/RAILINGS ON VARIOUS DECKS AT FOLLOWING LOCATIONS: (QUOTE IN EACH CASE SEPARATELY)TO CROP & RENEW FOLLOWING LADDERS/RAILINGS ON VARIOUS DECKS AT FOLLOWING LOCATIONS: (QUOTE IN EACH CASE SEPARATELY) DECK EA 1 USD 0.00 0.00
I A) MAIN DECK TO 1ST POOP DECK (P&S SIDE): DECK INSTRUCTION EA 1 USD 0.00 0.00
D26040.1 (i) STEPS OF 700MM X 220X43 MM ON EACH P & STBD QTY: 4 NOS. TO RENEW. DECK NOS 4.00 4.00 EA 1 USD 0.00 0.00
D26040.2 (ii) RAILING: DIA 40 MM X 10000 MM MS HOLLOW BAR TO RENEW ON PORT & STBD side DECK MTR 10.00 10.00 EA 1 USD 0.00 0.00
I B) 1ST POOP DECK TO 2ND POOP DECK: (P&S SIDE), DECK INSTRUCTION EA 1 USD 0.00 0.00
D26040.3 (i) STEPS OF 700MM X 220X43 MM . ON EACH P & STBD QTY: 4 NOS. TO RENEW. DECK NOS 3.00 3.00 EA 1 USD 0.00 0.00
D26040.4 (ii) RAILING: DIA 40 MM X 10000 MM MS HOLLOW BAR TO RENEW ON PORT & STBD side . DECK MTR 10.00 10.00 EA 1 USD 0.00 0.00
I C) 2ND POOP DECK TO 3RD POOP DECK. (P&S SIDE): DECK INSTRUCTION EA 1 USD 0.00 0.00
D26040.5 (i) STEPS OF 700MM X 220X43 MM ON EACH P & STBD QTY: 10 NOS. TO RENEW. DECK NOS 3.00 3.00 EA 1 USD 0.00 0.00
D26040.6 (ii) RAILING: DIA 40 MM X 10000 MM MS HOLLOW BAR TO RENEW ON PORT & STBD side . DECK MTR 5.00 5.00 EA 1 USD 0.00 0.00
I D) 3RD POOP DECK TO 4TH POOP DECK. (P&S SIDE): DECK INSTRUCTION EA 1 USD 0.00 0.00
D26040.7 (i) STEPS OF 700MM X 220X43 MM ON EACH P & STBD QTY: 10 NOS.. TO RENEW. DECK NOS 3.00 3.00 EA 1 USD 0.00 0.00
D26040.8 (ii) RAILING: DIA 40 MM X 10000 MM MS HOLLOW BAR TO RENEW ON PORT & STBD side DECK MTR 5.00 5.00 EA 1 USD 0.00 0.00
D26040.9 STEPS OF 700MM X 220X43 MM TO RENEW ON EACH PORT & STBD QTY: 10 NOS. TO RENEW. DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
D26040.10 ALL HOLDS TO BE FITTED WITH PERFORATED CIRCULAR GUARD PLATES FOR WATER INGRESS SYSTEM SENSORS WITH EXISTING NUT AND BOLTS THICKNESS: 10 MM MATERIAL: MS QTY: 5 NOS IN CARGO HOLDS NO.1, 2, 3, 4 & 5. DECK NOS 5.00 5.00 EA 1 USD 0.00 0.00
D26040.11 ISPS LIGHT SUPPORTS TO RENEW DECK MTR 10.00 10.00 EA 1 USD 0.00 0.00
D26040.12 FORWARD MAST,AFT MAIN MAST SAFETY CAGE WASTED. TO RENEW AS NECESSARY DECK MTR 30.00 30.00 EA 1 USD 0.00 0.00
D26040.13 TO RENEW DECK AIR LINE OF MAIN MAST, DIA 1 INCH DECK MTR 5.00 5.00 EA 1 USD 0.00 0.00
D26040.14 PLATFORM ON FWD AND MAIN MAST TO BE RENEWED PLATING AROUND 4 MTR2 TO BE RENEWED DECK MTR 2 4.00 4.00 EA 1 USD 0.00 0.00
D26040.15 TO RENEW SHIPSIDE RAILINGS ON VARIOUS LOCATION ON MAIN DECK, DIA 1 INCH DECK MTR 150.00 150.00 EA 1 USD 0.00 0.00
D26040.16 CHQUERED PLATFORM ON FWD AND MAIN MAST TO BE RENEWED PLATING AROUND 4 MTR TO BE RENEWED(2X2M2) DECK MTR 10.00 10.00 EA 1 USD 0.00 0.00
D26040.17 TO RENEW SHIPSIDE RAILINGS ON VARIOUS LOCATION ON MAIN DECK DIA 42MM SCHED 80 DECK MTR 10.00 10.00 EA 1 USD 0.00 0.00
D26040.18 TO CROP AND RENEW SUPPORTS OF BUNKER MANIFOLD(119MMX52MM) DECK MTR 10.00 10.00 EA 1 USD 0.00 0.00
i D26041: OPENING AND CLOSING APPLIANCES: HATCH COVERS, W/T DOORS,MAKE: TTS HATCH COVERS DECK EA 1 USD 0.00 0.00
I TO RENEW RUBBER PACKING INCLUDES ADHESIVES AND ANY OTHER SPARES REQUIRED FOR RENEWAL NOTE: ON COMPLETION OF REPAIRS, HATCH COVERS TO BE PRESENTED FOR SATISFACTORY OPERATION AND WEATHER TIGHTNESS TO OWNERS/ IRS /DNV SURVEYORS FOR ULTROSNIC LEAK TEST. CHALK TEST OF RUBBER PACKING WITH COMPRESSION BAR TO PROVE PERFECT BEFORE HIGH PRESSURE HOSE TEST BY WATER TO BE CARRIED OUT. DECK INSTRUCTION EA 1 USD 0.00 0.00
I FOLLOWING RUBBER PACKING TO BE RENEWED DECK INSTRUCTION EA 1 USD 0.00 0.00
D26041.1 1.TO RENEW RUBBER PACKING ALL FIVE HATCH COVERS RUBBER PACKINGS 94X55MM STRAIGHT SEAL OWNER SUPPLY DECK MTRS 500.00 500.00 EA 1 USD 0.00 0.00
D26041.2 2.FLAT CORNER SEAL - 20 OWNER SUPPLY DECK NOS 20.00 20.00 EA 1 USD 0.00 0.00
D26041.3 3.3 WAY VERTICAL CORNER (LEFT AND RIGHT)OWNER SUPPLY DECK NOS 20.00 20.00 EA 1 USD 0.00 0.00
D26041.4 4.END PIECE SEAL OWNER SUPPLY DECK NOS 20.00 20.00 EA 1 USD 0.00 0.00
D26041.5 5. 4 WAY CORNER PIECE REQUIRED LEFT AND RIGHT OWNER SUPPLY DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
D26041.6 6.30 DEG FLAT END JOINT SEAL OWNER SUPPLY DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
D26041.7 TO RENEW DRAIN CHANNEL OF ALL HATCH COVER. QUOTE ALL INCLUSIVE. DECK MTRS 50.00 50.00 EA 1 USD 0.00 0.00
D26041.8 HATCH COVER RUBBER RETAINING CHANNEL AND COAMING CHANNEL TO BE CROPPED AND RENEWED OF ALL 05 HATCHES. QUOTE ALL INCLUSIVE. DECK MTRS 500.00 500.00 EA 1 USD 0.00 0.00
D26041.9 TO INSPECT TRACKWAY,COMPRESSION BAR (SS) ,AND OTHER FTTINGS ON TOP OF HOLD COAMING OF ALL 05 CARGO HOLDS, AND IF REQUIRED REPAIR/RENEW. CONSIDER RENEWAL OF 100MTR OF SS COMPRESSION BAR.QUOTE ALL INCLUSIVE. DECK MTRS 100.00 100.00 EA 1 USD 0.00 0.00
D26041.10 WEATHER TIGHT DOORS : 26 NOS. WEATHER TIGHT DOORS ON MAIN DECK, F’CLE DECK, POOP DECKS - RUBBER PACKING RETAINING CHANNEL TO BE CHIPPED, CLEANED, REPAIRED OR RENEWED AS REQUIRED AND RUBBER PACKING TO BE RENEWED 42MM(B)X22MM(T). TOTAL RUNNING LENGTH 150 MTRS RUBBER PACKINGS YARD SUPPLY DECK NOS 26.00 26.00 EA 1 USD 0.00 0.00
D26041.11 20 NOS OF QUICK ACTING CLEATS OF HATCH COVERS TO BE OVERHAULED OR RENEWED IF REQUIRED. DECK NOS 20.00 20.00 EA 1 USD 0.00 0.00
D26041.12 BILGE INNER BAFFLE PLATE (PERFORATED) & STRUM BOXES TO CHECK IN ALL HOLDS.STRUM BOXES IN HOLD BILGES TO BE CHIPPED AND PAINTED(PAINT SHIP SUPPLY). HANDLE FOR 10 NOS. HOLD BILGE COVERS TO BE RENEWED. 10 NOS. BAFFLE PLATES SS BUTTERFLY NUTS TO BE RENEWED. DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
D26041.13 HATCH CLEATS SUPPORTS TO BE RENEWED . DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
D26041.14 TO RENEW RETAINING CHANNEL OF BOOBY HATCH ALONGWITH RUBBER PACKING DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
D26041.15 ALL 5 HATCH CONTROL PANEL BOXES TO BE RENEWED(450 MMX 450MM X 500MM). DECK NOS 5.00 5.00 EA 1 USD 0.00 0.00
D26041.16 CONTROL PANEL LEVER FOR HATCH OPENING/CLOSINGTO BE RENEWED. YARD SUPPLY ( MAKE TTS HUAHAI) DECK NOS 5.00 5.00 EA 1 USD 0.00 0.00
D26041.17 HATCH COAMING STAY ON MAIN DECK AND CROSS DECK , TOES OF STAY THINNED DOWN . SAME TO CROP AND RENEW SIZE LxBxT - 300mmx250mmx15mm . DECK NOS 140.00 140.00 EA 1 USD 0.00 0.00
D26041.18 TO CHECK AND INSPECT ALL 05 CARGO HOLDS FWD & AFT BOOBY HATCH RUBBER PACKING, AND TO INSPECT RETAINING CHANNEL,BUTTERFLY NUTS & RENEW, IF REQUIRED. CONSIDER RNEWAL OF 2.5 MTR CHANNEL & REBBER PACKING ON EACH HATCH. DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
D26041.19 ALL 05 CARGO HOLDS, BOTH FORWARD AND AFT HATCH COVER UNDERNEATH PORTION/PLATINGS AND SIDE HATCH COAMINGS ARE HAVING DEEP PITTING/ HOLES/PLATE THINNED DOWN EXCESSIVELY, SAME NEED TO BE CROP AND RENEWED. QUOTE ALL INCLUSI]VE INCLUDING STAGING/CHERRY PICKER. DECK TONS 10.00 10.00 EA 1 USD 0.00 0.00
D26041.20 AFTER RENEWAL OF SEALING PACKING , TO CARRY OUT HOSE DOWN TEST OF HATCH COVERS TO CHECK WATER INTEGRIT/HYDROY. ALL NECESSARY ARRANGMENTS TO BE MADE TO CARRY PRESSURE TESTING IN FRONT OF CLASS SURVEYOR/OWNER FOR ALL FIVE HATCH COVERS AND COAMINGS DECK LS 5.00 5.00 EA 1 USD 0.00 0.00
i D26042: ACCOMODATION UPHOLSTERY, PORT HOLES, WHEEL HOUSE , ACCOMMODATION DECK EA 1 USD 0.00 0.00
D 26042.1 04 NOS BRIDGE FRONT GLASSES TO BE FITTED WITH SUN SCREEN DECK NOS 4.00 4.00 EA 1 USD 0.00 0.00
D 26042.2 OLD BRIDGE WINDOW WIPERS TO BE REMOVED AND NEW BRIDGE WINDOW WIPER 04 NOS TO BE FITTED WITH FULL SET. NEW WIPER YARD SUPPLY. DECK NOS 4.00 4.00 EA 1 USD 0.00 0.00
D 26042.3 ROLLER BEARINGS OF BRIDGE SLIDING DOOR TO BE RENEWED/DOORS TO RENEW LOCKING ARRANGEMENT TO BE ATTENDED.(YARD SUPPLY) DECK NO 6.00 6.00 EA 1 USD 0.00 0.00
D 26042.4 TO PROCURE AND RENEW HEAVY DUTY HYDRAULIC DOOR CLOSERS IN ACCOMMODATION . SPECIAL ATTENTION TO BE GIVEN TO THOSE PERTAINING TO THE FIRE DOORS/ENGINE ROOM ENTRANCES.(YARD SUPPLY) DECK NO 12.00 12.00 EA 1 USD 0.00 0.00
D 26042.5 CREW CABIN PORT HOLE & CREW RECRATION ROOM (TOTAL 24 NOS) RUBER PACKING TO RENEW(YARD SUPPLY) DECK NOS 24.00 24.00 EA 1 USD 0.00 0.00
D 26042.6 BOTH MOB FRAMES CORRODED AND WASTED SAME TO BE CROPPED AND RENEWED. MS PLATE 50MM X 40 MM -L 02M DECK NOS 2.00 2.00 EA 1 USD 0.00 0.00
D 26042.7 UPPER DECK P & S ENTRANCE DOOR DAMAGED SAME TO BE RENEWED. DECK NOS 2.00 2.00 EA 1 USD 0.00 0.00
D 26042.8 DRAINS CHOCKED AT THE THE FOLLOWING LOCATIONS SAME TO BE CLEARED BATH ROOM DRAINS CHOCKED 3, GALLEY(05 NOS) ,GARBAGE ROOM(01 NOS) , WASH BASIN OFF PANTRY,B DECK PORT AND STBD,WHEELHOUSE. DECK LS 1.00 1.00 EA 1 USD 0.00 0.00
D 26042.9 CABIN PORT HOLE TOP EYE BROW FROM OUT SIDE TO BE RENEWED IF CORREDED OR HOLED. EXPECTING 25 NOS REEWAL , MATL YARD SUPPLY . DECK NOS 15.00 15.00 EA 1 USD 0.00 0.00
i D26043: FIRE FIGHTING APPLIANCES, FIBRE GLASS WORKS, FIRE EXTINGUISHER DECK EA 1 USD 0.00 0.00
I WORK SPECIFICATIONS DECK EA 1 USD 0.00 0.00
D26043.1 TO RENEW FIRE HOSE BOXES ALONG WITH SUPPORT BRACKETS YARD SUPPLY DECK NOS 6.00 6.00 EA 1 USD 0.00 0.00
D26043.2 TO OVERHAUL FIRE HYDRANTS ON MAIN DECK, MACHINERY SPACES AND IN ACCOMODATION IF REQ TO CHANGE WITH NEW(SHIP SUPPLY) DECK NOS 10.00 10.00 EA 1 USD 0.00 0.00
D26043.4 ANNUAL MAINTENANCE AND HYDRAULIC PRESSURE TESTING OF FIXED FIRE FIGHTING SYSTEM OF GALLEY AND PAINT ROOM EXTINGUISHER TO BE CARRIED OUT. 2 NOS DECK NOS 2.00 2.00 EA 1 USD 0.00 0.00
D26043.5 TO RENEW FOUR VJ COUPLING OF FIRE MAIN LINE YARD SUPPLY AND TO CHANGE RUBBER PACKINGS OF V J COUPLING OF FIRE LINE 2 NUMBERS YARD SUPPLY DECK LS 4.00 4.00 EA 1 USD 0.00 0.00
D26043.6 U-CLAMPS OF FIRE LINE TO BE RENEWED (YARD SUPPLY) DECK NOS 50.00 50.00 EA 1 USD 0.00 0.00
i D26044: ACCOMODATION LADDERS WALKWAYS, COMBINATION AND AUSTRALIAN LADDERS WALKWAYS DECK EA 1 USD 0.00 0.00
I WORK SPECIFICATION DECK EA 1 USD 0.00 0.00
D26044.1 ALL HOLD SPIRAL LADDER PLATFORM RAILING & FOOT STEP BAAR IF BROKEN / DENTED / COORODED / WASTED IN ANY LOCATION TO BE REPAIRED, CONSIDER DIA 40 MM, 20 MM SOLID BARS. DECK MTRS 100.00 100.00 EA 1 USD 0.00 0.00
D26044.2 TO RENEW RUNGS OF LADDERS IN VARIOUS HOLDS 25 MM SQUARE BAR 400 MM. DECK NOS 100.00 100.00 EA 1 USD 0.00 0.00
D26044.3 ALSO QUOTE FOR RENEWAL OF APPROX 75 MTRS OF RAILINGS ON HOLD LADDERS. 20 MM SOLID BARS & VERTICAL LADDERS’ STEP. DECK MTRS 100.00 100.00 EA 1 USD 0.00 0.00
D26044.4 PROTECTION GUARD RINGS: 25 MMX 25 MM SQUARE BAR DECK MTRS 70.00 70.00 EA 1 USD 0.00 0.00
D26044.5 PROTECTION GUARDS PLATES IN HOLDS ( FOR LADDER 5 M X 5M ) DECK NOS 6.00 6.00 EA 1 USD 0.00 0.00
D26044.6 SPIRAL LADDER SUPPORT BRACKETS TO BE RENEWED. DECK NOS 20.00 20.00 EA 1 USD 0.00 0.00
D26044.7 RENEWAL OF CARGO HOLD STRAIGHT LADDER PLATFORM .0.8MTRX0.6 MTR, 10MM THICK M.S. DECK NOS 5.00 5.00 EA 1 USD 0.00 0.00
D26044.8 RENEWAL OF CARGO HOLD STRAIGHT LADDER SUPPORT BRACKET. DECK NOS 40.00 40.00 EA 1 USD 0.00 0.00
D26044.9 RENEWAL OF CARGO HOLD VERTICAL LADDER IN EACH HOLD ARROUND 12 MTRS, RESPECTIVE THINED DOWN / CORRODED SIDE BAR & FOOT REST BAR DECK MTRS 60.00 60.00 EA 1 USD 0.00 0.00
D26044.10 PROTECTION GUARDS CAGE ARROUND BALLAST FILLING LINE IN HOLDS ( 800 MM X 1500M ) TO BE RENEWED 8 NOS IN EACH HOLD AND REQUIRED FOR FIVE HOLDS. DECK LS 5.00 5.00 EA 1 USD 0.00 0.00
i D26045: ACCOMODATION AND GANGWAY LADDER ELECTRICAL MOTOR AND SYSTEM DECK EA 1 USD 0.00 0.00
D26045.1 MOTOR TO BE TAKEN OUT FOR THOROUGH OVERHAULING AT YARD WORKSHOP AFTER DISMANTLING FROM CUOPLING. DECK NOS 4.00 4.00 EA 1 USD 0.00 0.00
D26045.2 INSPECT OVERLOAD RELAY,CONTACTORS,STARTER,OVERLOAD RELAY AND VALUES TO BE SET AS PER MANUAL.LOCAL AND REMOTE FUNCTIONS TO BE CHECKED FOR PROPER OPERATION. DECK NOS 4.00 4.00 EA 1 USD 0.00 0.00
D26045.3 NO LOAD TEST ,FULL LOAD TEST,TRIP AND PROPER OPERATION OF LIMIT SWITCHES TO BE CHECKED. DECK SET 4.00 4.00 EA 1 USD 0.00 0.00
i D26046: MISCELLANEOUS JOBS DECK EA 1 USD 0.00 0.00
I TO MAKE PERMANENT ADDITIONAL LIGHTING( HEAVY DUTY MARINE TYPE LED LIGHT FITTING) ARRANGEMENTS AT FOLLOWING LOCATIONS- DECK INSTRUCTIONS EA 1 USD 0.00 0.00
D26046.1 CRANE JIB HEAD 100 WATTS: 220 VOLTS: FREQUENCY:60HZ DECK LS 5.00 5.00 EA 1 USD 0.00 0.00
D26046.2 CRANE TOP 100 WATTS: 220 VOLTS: FREQUENCY:60HZ DECK LS 20.00 20.00 EA 1 USD 0.00 0.00
D26046.3 DUCT KEEL 60 WATTS: 220 VOLTS: FREQUENCY:60HZ DECK LS 24.00 24.00 EA 1 USD 0.00 0.00
D26046.4 BOTH BOW STOPPER PIVOT PIN SLOT AND LOCKING SLOT TO BE BUILT UP FOR ITS ORIGINAL SIZE. ALSO WEAR DOWN AREA ON THE CENTER OF BAR TO BE BUILT UP AS REQUIRED. DECK NOS 2.00 2.00 EA 1 USD 0.00 0.00
D26046.5 TO CROP AND RENEW PAINT STORE EXHAUST DUCTING PIPE. DIA :- 300 MM LENGTH :- 2.5 MTR DECK MTR 2.50 2.50 EA 1 USD 0.00 0.00
D26046.6 THE TANK TOP OF NO.2 CARGO HOLD BADLY DENTED-SAME TO BE INSPECTED CROPPED & RENEWED SIZE: 3Mx 3M THICKNESS 16MM BETWEEN FRAME 160 -175 DECK M2 2.00 2.00 EA 1 USD 0.00 0.00
D26046.7 RESCUE BOAT PAINTER SECURING ASSEMBLY TO BE RENEWED DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26046.8 RESCUE BOAT DAVIT HYDRULIC OIL TANK TO BE FABRICATED DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26046.9 BRIDGE WINGS BOTH PORT & STBD SEARCH LIGHT STANDS TO BE CROPPED AND RENEWED DECK NOS 2.00 2.00 EA 1 USD 0.00 0.00
D26046.10 FRESH WATER LINE & SPRAY NOZZLES ON BRIDGE FOR CLEANING THE FRONT GLASS TO BE RENEWED(YARD SUPPLY) DIA :32 MM LENGTH 18 MTRS DECK MTR 18.00 18.00 EA 1 USD 0.00 0.00
D26046.11 WHEEL HOUSE PA SYSTEM REMOTELY OPERATION IS NOT WORKING , FAULT TO CHECK AND RECTIFY DECK SET 1.00 1.00 EA 1 USD 0.00 0.00
D26046.12 BOTH DGPS PORT SIDE FREQUENTLY LOSE ALL DATA IN OPERARION MODE. FAULT TO CHECK AND RECTIFY DECK SET 2.00 2.00 EA 1 USD 0.00 0.00
D26046.13 WHEEL HOUSE CLOCK/CLINOMETER DIMMER IS NOT WORKING. SAME TO BE RECTIFIED DECK SET 1.00 1.00 EA 1 USD 0.00 0.00
D26046.14 WHEEL HOUSE MASTER CLOCK LED DIGITAL LIGHT NOT WORKING IN ORDER. SAME TO CHECK AND RECTIFY. DECK SET 1.00 1.00 EA 1 USD 0.00 0.00
D26046.15 CRANE CABIN WIPERS ASSEMBLY TO BE FITTED DECK SET 4.00 4.00 EA 1 USD 0.00 0.00
D26046.16 DUNNNAGE ON CRUTCHES FOR CRANE JIB HEAD PARKING TO BE RENEWED DECK NOS 4.00 4.00 EA 1 USD 0.00 0.00
D26046.17 MECHANICAL EXHAUST OF HOLD NO 5 BROKEN ,GARBAGE AND PAINT LOCKER NOT WORKING.SAME TO BE RECTIFIED DECK NOS 3.00 3.00 EA 1 USD 0.00 0.00
D26046.18 VENT PIPES IN BUNKER MANIFOLD TRAY TO BE FABRICATED AND RENEWED DECK MTR 40.00 40.00 EA 1 USD 0.00 0.00
D26046.19 WARPING DRUMS OF ALL MOORING WINCHES ARE WASTED & THINNED DOWN SAME TO BE RENWED DECK SET 4.00 4.00 EA 1 USD 0.00 0.00
D26046.20 CONTROL LEVER BOXES OF HATCH COVERS TO BE RENEWED DECK SET 5.00 5.00 EA 1 USD 0.00 0.00
D26046.21 MECHANICAL VENTILATION OF CARGO HOLDS TO BE OVERHAULED GIVING LOW INSULATION ALARMS DECK NOS 20.00 20.00 EA 1 USD 0.00 0.00
D26046.22 ELECTRIC PIPE NECK AT POOP DECK TO BE RENEWED CAUSING LEAKAGE OF WATER INTO STEERING GEAR ROOM DECK MTR 5.00 5.00 EA 1 USD 0.00 0.00
D26046.23 PORT HOLES IN VARIOUS CABINS AND GYMNASIUM HAVE LEAKAGE,SAME TO BE RECTIFIED DECK NOS. 10.00 10.00 EA 1 USD 0.00 0.00
D26046.24 PORT SIDE WINDLASS CHAIN GUIDING BAR FOUND BROKEN.SAME TO BE FABRICATED & RENEWED. DECK SET 1.00 1.00 EA 1 USD 0.00 0.00
D26046.25 STBD SIDE MOORING WINCH FWD BUSH DAMAGED-MAKING ABNORMAL NOISE DURING OPEARTION, SAME TO RENEW. BUSH & CONSUMABLES,YARD SUPPLIED. DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26046.26 RESCUE BOAT RESERVOIR TANK FOUND LEAKING TO BE RECTIFIED DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26046.27 RESCUE BOAT DAVIT WINCH CRANKING LEVER TO BE RENEWED-SLIP DURING OPERATION DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26046.28 SMOKE EXTRACTION LINE ALARM ON BRIDGE PANEL.SAME TO BE RECTIFIED DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
D26046.29 TO RENEW GOOSE NECK PIPES OF ELECTRICAL WIRES AT POOP DECK DECK NOS 20.00 20.00 EA 1 USD 0.00 0.00
D26046.30 TO CROPE AND RENEW PAINT STORE EXHAUST DUCTING PIPE. DIA :- 300 MM LENGTH :- 2.5 MTR DECK MTR 3.00 3.00 EA 1 USD 0.00 0.00
D26046.31 BOOBY HATCH COVER TO ENTER IN HATCHES TO BE REPAIRED NO.4 AFT,NO3 AFT, NO 1 FWD DECK NOS 3.00 3.00 EA 1 USD 0.00 0.00
D26046.32 STBD ANCHOR FLUKE HAS A SLIGHT BEND,SAME TO BE RECTIFIED DECK NOS 1.00 1.00 EA 1 USD 0.00 0.00
i ENGINE SIDE ENGINE EA 1 USD 0.00 0.00
I E26001: RUDDER AND SKEG (SURVEY):STOCK DIA 450 mm ENGINE EA 1 USD 0.00 0.00
I TYPE/CAPACITY/DETAILS: 7.2 M X 5.2 M X 0.72 M ENGINE EA 1 USD 0.00 0.00
I PREPARE VESSEL FOR RUDDER REMOVAL, INCLUDING SECURING RUDDER, MARKING OF COMPONENTS, AND SUPPORTING RUDDER WEIGHT. DISCONNECT STEERING GEAR RUDDER STOCK AND REMOVE LOCKING DEVICES AS APPLICABLE. REMOVE RUDDER CARRIER/BEARING ARRANGEMENT AND PINTLE NUTS/BOLTS AS REQUIRED. LOWER AND REMOVE RUDDER BY SUITABLE LIFTING EQUIPMENT WHILE VESSEL IS IN DRY DOCK. TRANSPORT RUDDER TO YARD WORKSHOP OR DESIGNATED STORAGE AREA. PROTECT RUDDER STOCK, BEARING SURFACES, PINTLES, AND MACHINED AREAS AGAINST DAMAGE AND CORROSION. ALL WORKS TO BE CARRIED OUT IN ACCORDANCE WITH MAKER’S INSTRUCTIONS AND CLASS REQUIREMENTS, UNDER ATTENDANCE OF SHIP’S REPRESENTATIVES AS REQUIRED. ENGINE INSTRUCTION EA 1 USD 0.00 0.00
E26001.1 DRAIN PLUGS (2 SETS) FOR RUDDER TO REMOVE IN PRESENCE OF CEO / SUPDT/SURVEYOR AND TO CHECK FOR WATER INGRESS; IF ANY. ENGINE PCS 2.00 2.00 EA 1 USD 0.00 0.00
E26001.2 RUDDER TO PRESSURE TEST TO 3 PSI IN CASE OF LEAKAGE OBSERVED IN RUDDER AND TO COAT INTERNALLY WITH FLOAT COAT A ( UNISERVICE 210) AFTER THOROUGH REPAIR. ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
E26001.3 RUDDER LEAKAGES IF OBSERVED; LEAKAGES TO BE RECTIFIED BY “V” GOUGING AND WELDING –QUOTE FOR 1 MTR LENGTH WELDING . ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
E26001.4 TRANSOM SPACE AND SKEG AREA TO BE CHECKED AND AFTER THOROUGH CLEANING ,PAINT TO BE APPLIED AS PER PAINTING SCHEME. PAINT YRD SUPPLY ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
E26001.5 JUMPING CLEARANCE TO BE CHECKED AND ADJUSTED IN LINE WITH MAKER'S GUIDELINES. ENGINE SET 1.00 1.00 EA 1 USD 0.00 0.00
E26001.6 REMOVE BOTH TOP AND BOTTOM PINTLE INSPECTION COVERS (FITTED WITH SCREWS). BOTH PINTLE BUSH CLEARANCES TO CHECK; RUDDER DROP IN STEERING FLAT TO BE RECORDED ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
E26001.7 BOTH RUDDER AND RUDDER STOCK TO BE TAKEN OUT AND LAND ASHORE AFTER LOOSENING THE RUDDER STOCK NUT AND BOTTOM PINTLE NUT.BOTH PINTLE TO BE CALIBRATED PRIOR FITTING.QUOTE ALL INCLUSIVE ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
E26001.8 BOTH TOP AND BOTTOM PINTLE BUSH TO BE RENEWED FROM SHIP SUPPLIED SPARES ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26001.9 BEFORE FITTING THE PINTLE CHROME LINER ON PINTLE TO POLISH OR SKIM TO REMOVE ECCENTRICITY IF ANY ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26001.10 RUDDER STOCK SEAL IN STEERING COMPARTMENT TO RENEW.SEAL SHIP SUPPLIED.QUOTE ALL INCLUSIVE ENGINE SET 1.00 1.00 EA 1 USD 0.00 0.00
E26001.11 CALIBRATION OF COMPLETE RUDDER STOCK TO CARRIED OUT AS PER CLASS REQUIREMENTS THE RADII OF THE ORING GROOVES TO SMOOTHENED TO REDUCE THE NOTCHING EFFECT. ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
E26001.12 SUPPLY, INSTALLATION AND COMMISSIONING OF AUTO GREASE PUMP FOR CARRY OUT AUTO GREASING OF RUDDER STOCK.PUMP, CONTROL PANEL, PIPES & ACCESSORIES YARD SUPPLIED. ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
E26001.13 AFTER COMPLETION OF THE WORK/ASSEMBLY OF COMPLETE SYSTEM,TEST / TRIALS TO BE SHOWN TO THE SATISFACTION OF CLASS/SUPTD. ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
i E26002: PROPELLER AND TAIL SHAFT (SURVEY): ENGINE EA 1 USD 0.00 0.00
I TYPE/CAPACITY/DETAILS - KEYLESS; PROPELLER - 4 BLADES; DIA- 6000 MM. MATERIAL : NI-AL-BRONZE CU3; SILA METAL CO.LTD. ENGINE EA 1 USD 0.00 0.00
I PREPARE VESSEL AND SHAFT LINE FOR SHAFT WITHDRAWAL, INCLUDING JACKING, SECURING, AND PROPER MARKING OF PROPELLER SHAFT AND INTERMEDIATE SHAFT FOR CORRECT REINSTALLATION. DRAIN STERN TUBE LUBRICATION OIL AND REMOVE STERN TUBE SEALS AS REQUIRED. DISCONNECT AND REMOVE COUPLING BOLTS, NUTS, LOCKING ARRANGEMENTS BETWEEN PROPELLER SHAFT, INTERMEDIATE SHAFT. REMOVE SHAFT BEARINGS, ROPE GUARD, AND ASSOCIATED FITTINGS AS REQUIRED TO FACILITATE SHAFT WITHDRAWAL. WITHDRAW PROPELLER SHAFT AFT AND INTERMEDIATE SHAFT FORWARD USING SUITABLE LIFTING, PULLING, AND HANDLING EQUIP-MENT. TRANSPORT REMOVED SHAFTS TO DESIGNATED STORAGE AREA. PROTECT SHAFT JOURNALS, COUPLING FACES AND LINERS AGAINST DAMAGE AND CORROSION DURING HANDLING AND STORAGE. ALL WORKS TO BE CARRIED OUT IN ACCORDANCE WITH MAKER’S INSTRUCTIONS AND CLASS REQUIREMENTS, UNDER ATTENDANCE OF SHIP’S REPRESENTATIVES AS REQUIRED. QUOTE ALL THE LINE ITEM INCLUSIVE INCLUDING STAGING. ENGINE INSTRUCTION EA 1 USD 0.00 0.00
E26002.1 REMOVE ROPE GUARDS; BLAST CLEAN & PAINT INTERNALLY & EXTERNALLY. BOTH TOP AND BOTTOM HALF OF ROPE GUARD WITH ANODE TO REPLACE BY YARD SUPPLIED MATERIAL. ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26002.2 MEASURE AND RECORD PROPELLER DROP KEEPING BLADE MARKED "A "ON TOP IN PRESENCE OF CEO & OWNERS REP (CONSIDER 2 READINGS INTIAL AND FINAL); ENGINE TIMES 2.00 2.00 EA 1 USD 0.00 0.00
E26002.3 PROPELLER AND BONNET TO BE SCRAPPED FREE FROM THE BARNACLES.BREAK PROPELLER CEMENT FAIRWEATHER CONE(BONNET) TO OPEN UP & OLD TALLOW TO REMOVE. AFTER REPAIR;NEW PROPELLER CONE (PBCF) TO BE FITTED BACK WITH FRESH TALLOW; 200 KG TALLOW (YARD SUPPLY). ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
E26002.4 PROPELLER TO BUFF / POLISH AND SURFACE FINISH OF BLADES SHALL HAVE A ROUGHNESS LESS THAN 6 MICRONS FROM 0.3 RADIUS TO TIP OF BLADES. BLADE ROOTS AND TIPS TO CHECK FOR PRESENCE OF CRACKS USING DYE PENETRANT. ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
E26002.5 ERODED PORTION OF THE PROPELLER BLADES TO REPAIR BY CLASS APPROVED METHEODS EITHER BY WELDING OR BLADE ATTACHMENTS.QUOTE FOR MINOR WELDING REPAIR. ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
E26002.6 PROPELLER NUT LOCKINGS TO REMOVE. PROPELLER NUT REMOVE AS PER MAKER'S INSTRUCTION HYD PRESSURE TO RECORD.NUT TRAVEL FROM ORIGINAL POSITION TO RECORD.REMOVE PROPELLER AS PER MAKER'S INSTRUCTIONS AFTER REPAIR AND SURVEY; PROPELLER TO BE PUSHED-IN HYDRAULICALLY ENGINE SET 1.00 1.00 EA 1 USD 0.00 0.00
E26002.7 MARK COUPLING NUTS AND BOLTS ON BOTH SIDE OF INTERMEDIATE SHAFT.SLACKEN AND REMOVE COUPLING NUTS & BOLTS. ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
E26002.8 FABRICATION COST OF 02 COUPLING BOLT WITH ALL MEATERIAL CERTIFCATE TO THE SATISFACTION CALSS SURVEYORS ENGINE SET 2.00 2.00 EA 1 USD 0.00 0.00
E26002.9 REMOVE TOP HALVES OF INT.SHAFT BEARINGS.LIFT THE INT.SHAFT ON CENTRE LINE USING CHAIN BLOCKS.SHIFT THE INT.SHAFT TO PORT SIDE AND HOLD THE SAME IN PLACE IN BY MEANS OF WIRE ROPE ARRANGEMENTS.PREPARE SHAFT FOR SURVEY ON COMPLETION CARRY OUT SURVEYORS RECOMMENDATION. ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26002.10 REMOVE INT.SHAFT BEARINGS BOTTOM HALFVES FOR THE SURVEY AS PER SURVEYOR INSTRUCTIONS. ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26002.11 WITHDRAW THE TAIL END SHAFT AS PER RECOMENDED PROCEDURE TAKING ALL SAFETY PRECAUTION.AFTER THE WITHDRAWAL OF TAIL END SHAFT THOROUGHLY CLEAN TAPPER AND THREADED PORTION OF TAILEND SHAFT.TAPER TO BE CHECKED FOR PRESENCE OF ANY CRACKS BY DYE PENERATION METHOD/MAGNAFLUX AND SHOWN TO CLASS SURVEYOR. ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
E26002.12 BOTH FWD AND AFT SIMPLEX SEALS TO REMOVE FROM PLACE AND TAKEN TO SHOP. BOTH SEAL BOXES TO BE ASSEMBLED WITH NEW SEALING RINGS(OWNER SUPPLY).BOTH SIMPLEX SEAL BOXES TO BE FITTED BACK IN PLACE WITH NEW/OLD CHROME LINER. ENGINE BOX 2.00 2.00 EA 1 USD 0.00 0.00
E26002.13 BOTH CHROME LINERS TO INSPECT & CALIBERATE . IF NEEDED THE INNER AND OUTER EDGES OF CHROME LINERS TO BE SKIMMED BY MAINTAING MANUFACTURER TOLERANCES IN CONCURRENCE WITH SURVEYORS. RECORDED READINGS TO SUBMIT.IF CHROME LINERS ARE WORN OUT BEYOND ACCEPTABLE LIMITS THEN SAME BE RENEWED WITH SHIP SUPPLIED CHROME LINER. ENGINE PCS 2.00 2.00 EA 1 USD 0.00 0.00
E26002.14 AFTER SUCCESFUL COMPLETION OF INSPECTION / 15 YEARLY SURVEY ON TAILEND SHAFT; INTERMEDIATE SHAFT; STERN TUBE BEARING /HOUSING TAIL END SHAFT TO BE REPOSITIONED / REFITTED IN REVERSE ORDER PROPELLER TO BE PUSHED-IN HYDRAULICALLY ON THE TAIL END SHAFT TAPPER AS PER MAKER'S INSTRUCTIONS.PROPELLER TRAVEL ON THE SHAFT AND TOTAL PRESSURE APPLIED TO BE RECODED . ENGINE SET 1.00 1.00 EA 1 USD 0.00 0.00
E26002.15 FWD AND AFT STERN TUBE BEARINGS TO BE CALIBRATED AND REPORTS TO BE SUBMITTED. ENGINE SET 1.00 1.00 EA 1 USD 0.00 0.00
E26002.16 QUOTE FOR RENEWAL OF AFT STERN TUBE BEARING( BEARING SHIP SUPPLY). ENGINE SET 1.00 1.00 EA 1 USD 0.00 0.00
E26002.17 INT.SHAFT BEARING BOTTOM HALVES WITH PORTABLE SEATS TO BE FITTED BACK IN PLACE. REMOVE ANY SHARP EDGES ON THE COUPLING BOLT HOLES.CONSIDER REAMING OF SIX NOS COUPLING BOLT HOLES. INT.SHAFT TO BE LOWERED BACK IN PLACE ON TOP OF BEARING BOTTOM HALVES.COUPLING BOLTS TO BE FITTED BACK AND BEARING TOP HALVES BOXED BACK IN PLACE.SHAFT BEARNING TO BE REALIGNED IN POSITION.COUPLING BOLTS LOCKING TO SECURE.ALL GAURDS AND FLOORING CUT FOR FACILITATING THE JOBS TO BE FITTED BACK ON COMPLITION OF JOB. ENGINE SET 1.00 1.00 EA 1 USD 0.00 0.00
E26002.18 LOAD TESTING OF INTERMEDIATE SHAFT BEARING TO BE CARRIED IN FLOATING CONDITION AND ADJUSTED IN LINE WITH MAKER RECOMMENDED VALUE. ENGINE SET 1.00 1.00 EA 1 USD 0.00 0.00
E26002.19 OIL TO BE TAKEN IN STERN TUBE (OIL SHIP SUPPLY). INTACTNESS OF SEALS TO BE CHECKED UNDER STATIC HEAD FOR ATLEAST 48 HRS. IF ANY ANAMOLIES TO BE ATTENDED WITHOUT ANY EXTRA COST TO OWNER5. ENGINE SET 1.00 1.00 EA 1 USD 0.00 0.00
E26002.20 POKER GAUGE READINGS TO CHECK & RECORD. ENGINE SET 2.00 2.00 EA 1 USD 0.00 0.00
i E26003: STEERING GEAR: ENGINE EA 1 USD 0.00 0.00
I TYPE / CAPACITY / DETAILS: ROTARY VANE TYPE :RV 1050-3 ROTARY VANE STEERING GEAR ENGINE EA 1 USD 0.00 0.00
I MAKE : KONGSBERG:RV 1050-3 ROTARY VANE; ENGINE EA 1 USD 0.00 0.00
I ISOLATE, DRAIN, DISMANTLE, CLEAN, AND INSPECT ROTARY VANE STEERING GEAR. INSPECT VANES, HOUSING, SEALS, BEARINGS, SHAFTS, AND COMPONENTS; RENEW WORN/DEFECTIVE PARTS WITH SHIP SUPPLIED SPARES. OVERHAUL HYDRAULIC POWER UNIT, VALVES, AND ASSOCIATED PIPING AS REQUIRED. REASSEMBLE WITH NEW SEALS AND GASKETS; REFILL, BLEED, AND ADJUST SYSTEM. CARRY OUT FUNCTIONAL, PRESSURE, AND OPERATIONAL TESTS IN ACCORDANCE WITH SOLAS/CLASS REQUIREMENTS. ENGINE INSTRUCTION EA 1 USD 0.00 0.00
E26003.1 COMPLETE OVERHAUL OF STEERING GEAR SYSTEM INCLUDING ALL CONSUMABLE SEALS RENEWAL ,BOTH TOP AND BOTTOM BUSH BEARING AND THRUST BEARING.OTHER ACCESORIES JOBS IN LINE WITH MAKER GUIDELINE.TO BE CARRIED OUT AS PER BY COMPETENT YARD TEAM .ALL CONSUMABLES REQUIRED FOR OVERHAULING WILL BE SHIP SUPPLY.QUOTE ALL INCLUSIVE ENGINE SET 1.00 1.00 EA 1 USD 0.00 0.00
E26003.2 HYDRAULIC POWER PACK TO BE DRAINED OFF LUB OIL. MANHOLE TO BE OPENED FOR STEERING GEAR PUMP INSPECTION AS REQUIRED .TWO NOS.HYD.AXIAL PISTON P/P TO TO REPLACE. RELIEF V/V'S TO BE SET AS PER MAKER'S INSTRUCTION. FILTERS TO BE RENEWED. ALL CONNECTION INSIDE THE TANKS AND OUTSIDE THE TANK TO BE CHECKED FOR TIGHNESS.LO TO BE TAKEN AFTER WORK. ENGINE SET 2.00 2.00 EA 1 USD 0.00 0.00
E26003.3 01 NO RELIEF VALVE BLOCK FITTED ON HYDRAULIC MOTOR BODY TO OVERHAUL AND PRESSURE TESTED TO MAKER RECOMMENDED VALUE. ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26003.4 02 NOS DIRECTION CONTROL VALVE BLOCK TO BE OVERHAULED AND PRESSURE TESTED TO MAKER RECOMMENDED VALUE ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26003.5 LO COOLERS TO BE CLEANED AFTER REMOVAL OF BOTH END COVER. ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26003.6 SKIMMING/POLISHING OF INSIDE SURFACE OF ROTOR HOUSING AND ROTOR TO BE CARRIED OUT .THRUST BEARINGS AND BOTH TOP AND BOTTOM BUSH BEARINGS TO RENEW.AFTER REPLACING THE SEALS ON ROTOR VANES,ROTOR HOUSING PRESSURE TESTING TO BE CARRIED OUT TO MAKER RECOMENDED VALUE OF 120 BAR TO ENSURE PROPER SEALING OF RUDDER VANE SEALING ARRANGEMENT. QUOTE ALL INCLISIVE ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26003.7 THRUST BEARING CLEARANCE TO BE CHECKED BETWEEN THE ROTOR VANE AND BOTTOM OF THE HOUSING. (MIN CLEARANCE AS PER MAKER.THIS CAN BE DONE WITHOUT DETTACHING ACTUATOR FROM THE RUDDER SHAFT. ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26003.8 IF CLEARANCE IS LESS THAN 0.1 MM THEN ACTUATOR TO BE TAKEN OFF FROM RUDDER STOCK OLD BEARING TO BE REMOVED AND NEW BEARING TO BE FITTED. BEARING SHIP SUPPLY ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26003.9 AFTER COMPLETION OF STEERING GEAR SYSTEM REPAIR,SATISFACTORY TRIAL TO BE SHOWN TO SHIP'S STAFF/SUPTD/CLASS SURVEYOR. ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
i E26004: SEACHEST GRID AND FILTER (SURVEY): ENGINE EA 1 USD 0.00 0.00
I TYPE / CAPACITY / DETAILS: ENGINE EA 1 USD 0.00 0.00
I 1. PREPARATION IDENTIFY FILTERS TO BE OPENED, CLEANED, AND BOXED BACK WITH NEW GASKETS. ARRANGE FOR PURGING OF VALVES OF FILTER COVERS (35 MM DIAMETER) PRIOR TO OVERHAUL. 2. FILTER ELEMENT RENEWAL INSPECT FILTER ELEMENT FOR DAMAGE. IF DAMAGED, REPLACE WITH A STAINLESS STEEL PERFORATED SHEET OF 6 MM THICKNESS. 3. FILTER CHAMBER TREATMENT THOROUGHLY CLEAN THE SURFACE OF THE FILTER CHAMBER. APPLY 3 COATS OF EPOXY PAINT AFTER CLEANING. 4. QUOTATION AND STAGING PROVIDE AN ALL-INCLUSIVE QUOTATION COVERING ALL WORK AND STAGING REQUIREMENTS. 5. SUPERVISION AND APPROVAL CONDUCT ALL IMPORTANT WORK UNDER THE SUPERVISION OF CEO/ SUPERINTENDENT. THE YARD MUST COORDINATE AND ARRANGE FOR SURVEYORS AS REQUIRED.BOX BACK ALL ITEMS ONLY AFTER RECEIVING SURVEYOR AP-PROVAL. ENGINE INSTRUCTION EA 1 USD 0.00 0.00
E26004.1 3 NO SEA CHEST GRATINGS TO OPEN(HINGED TYPE).GRIDS AND SEA CHESTS TO SCRAPE CLEAR OF BARNACLE GROWTH AND THEN TO BE CLEANED WITH FRESH HIGH PRESSURE JET.TO CLEAN THE CHEST OF WEEDS MARINE GROWTH ETC.CLEANING TO BE EXAMINED BY CEO/SUPDT.AFTER COMPLETION OF JOB ALL GRIDS TO FIT BACK WITH 3/4 INCH STAINLESS STEEL LOCK WAHSERS AND SECURING NUTS TO BE WIRE LASHED WITH STAINLESS STEEL WIRE. ENGINE NOS 3.00 3.00 EA 1 USD 0.00 0.00
E26004.2 ULTRASONIC THICKNESS TO BE DETERMINED FOR EACH CHEST INCLUDING COMMON PIPE BETWEEN HIGH AND LOW SEA CHEST-CONSIDER MINIMUM 20 POINTS EACH CHEST.REPORT TO BE SUBMITTED. ENGINE POINTS 100.00 100.00 EA 1 USD 0.00 0.00
E26004.3 SEA CHEST AND GRIDS TO BE PAINTED WITH 3 COATS AS PER THE HULL PAINTAING SCHEME.WATSED ANODES WITHIN CHESTS TO BE RENEWED.CONSIDER 6 NOS ANODES PER CHEST(ANODES: SHIP'S SUPPLY) WHICH IS TO BE SUITABLY PROTECTED PRIOR PAINTING. ENGINE NOS 6.00 6.00 EA 1 USD 0.00 0.00
E26004.4 4 NOS. CATHODIC ELECTRODES TO BE RENEWED (SHIP SUPPLY). ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
I ALL IMPORTANT WORK TO BE CARRIED OUT IN PRESENCE OF SUTDS/SURVEYORS . ALL ITEMS TO BE BOXED BACK ONLY AFTERAPPROVAL OF SUPTDS/ SURVEYORS. ENGINE EA 1 USD 0.00 0.00
E26004.5 LOW SEA SUC FILTER( 860 MM DIA*1100MM HEIGHT) TO RENEW-1 NO ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26004.6 HIGH SEA SUC FILTER( 860 MM DIA*1100MM HEIGHT) TO RENEW-1 NO ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26004.7 EMG.FIRE PUMP SUC FILTER (270 MM DIA* 370 MM HEIGHT) TO RENEW-1 NO. ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26004.8 FILTER FOR EJECTOR P/P SUCTION (222 MM DIA * 750 MM HEIGHT)(RENEW) ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
i E26005: SEA SUCTION VALVES IN E/R (SURVEY): ENGINE EA 1 USD 0.00 0.00
I TYPE / CAPACITY / DETAILS - ENGINE EA 1 USD 0.00 0.00
I OPEN UP SPECIFIED SEA INJECTION VALVES FOR OVERHAULING. CLEAN AND INSPECT ALL VALVE PARTS FOR CORROSION, WEAR, AND DAMAGE. RENEW WORN/DEFECTIVE PARTS & CONSUMABLES TO THE SATISFACTION OF CLASS/SUPTDS. NUT /BOLTS/DEFECTIVE PARTS & CONSUMABLES-YARD SUPPLY. PITTED VALVE SEAT AND LID GROOVES TO BE REMOVED, TRANSPORTED TO YARD WORKSHOP, LIGHTLY SKIMMED, AND RETURNED TO SHIP. GRIND VALVES ON SEATS; TAKE BLUE IMPRESSIONS OF VALVE SEATS AND LIDS AND PRESENT TO C/E, 2/E, AND SURVEYOR. VALVES TO BE PRESSURE TESTED AND PRESENT VALVES TO SURVEYOR AFTER APPROVAL, REASSEMBLE USING NEW JOINTS AND PACKINGS,CONSUMABLE DULY APPROVED BY C/E & 2/E (YARD SUPPLY). VALVE CASINGS TO BE INTERNALLY SCRAPED, CLEANED, AND EPOXY COATED. CLEAN INTERNALLY COMPLETE SEA INJECTION PIPE BETWEEN HIGH SEA CHEST AND LOW SEA CHEST BY SEPARATING FROM FLANGES. CARRY OUT ULTRASONIC THICKNESS GAUGING OF VALVE BODIES AND COVERS (MINIMUM 20 POINTS) AND SUBMIT REPORT. YARD TO ARRANGE VULCANIZATION OF BUTTERFLY SEA SUCTION VALVE SEATING AREA(MINOR DAMAGE). QUOTATION TO BE ALL INCLUSIVE (MANPOWER, TOOLS, CONSUMABLES, JOINTS, PACKINGS, TRANSPORTATION, AND INCIDENTAL WORKS). ENGINE INSTRUCTION EA 1 USD 0.00 0.00
I LOW SEA CHEST: ENGINE EA 1 USD 0.00 0.00
I VALVES DIMENSIONS TYPE ENGINE EA 1 USD 0.00 0.00
E26005.1 MAIN SEA SUCTION V/V BEFORE FILTER DN550 BUTTERFLY . ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26005.2 MAIN SEA SUCTION V/V AFTER FILTER DN 550 BUTTERFLY. ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26005.3 AIR VENT VALVE . DN 80 GATE ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26005.4 FILTER HOUSING DRAIN VALVE DN 30 ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26005.5 COMMON V/V FOR STEAM /COMPRESSED AIR BLOW OFF DN 40 GLOBE . ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26005.6 AIR VENT V/V FOR FILTER . 25 MM GLOBE ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
I HIGH SEA CHEST: ENGINE EA 1 USD 0.00 0.00
E26005.8 MAIN SEA SUCTION V/V BEFORE FILTER DN550 BUTTERFLY ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26005.9 MAIN SEA SUCTION V/V AFTER FILTER DN 550 BUTTERFLY ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26005.10 AIR VENT VALVE DN 80 GATE ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26005.11 COMMON V/V FOR STEAM /COMPRESSED AIR BLOW OFF DN 40 GLOBE ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26005.12 AIR VENT V/V FOR FILTER 25 MM GLOBE ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26005.13 MOULDING OF BUTTERFLY VALVES DN 550 BUTTERFLY VALVE DN550 BUTTERFLY ENGINE NOS 4.00 4.00 EA 1 USD 0.00 0.00
E26005.14 SEA SUCTION COMMON MANIFOLD BETWEEN HIGH SEA SUCTION CHEST AND LOW SEA SUCTION CHEST TO BE CLEANED INTERNALLY. CHECK INSIDE CONDITION OF RUBBER COATING . CHECK THICKNESS OF SUCTION COMMON MANIFOLD AND COATING ( 100 POINTS) TO ACERTAIN DAMAGE .VULCANIZATION OF RUBBER COATING TO BE CARRIED OUT IF FOUND DAMAGED. ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26005.15 QUOTE FOR RENEWAL OF DAMAGED RUBBER /PLASTIC COATING , L-05 MTR, ID 0.5MTR, THICKNESS=10MM ENGINE MTR 5.00 5.00 EA 1 USD 0.00 0.00
i EMERGENCY SEA CHEST: ENGINE EA 1 USD 0.00 0.00
E26005.16 SEA SUCTION VALVE (HYD. OPERATED BUTTERFLY VALVE) DN-100 MM BUTTERFLY VALVE) ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26005.17 EMERGENCY FIRE P/P DISCHARGE V/V DN100 GLOBE ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26005.18 QUOTE FOR RENEWAL OF DAMAGED RUBBER/PLASTIC COATING L= 10MTR ID 0.5 MTR THICKNESS = 10MM ENGINE M 10.00 10.00 EA 1 USD 0.00 0.00
E26005.19 QUOTE FOR RENEWAL OF DAMAGED SEA SUCTION MANIGOLD AS PER CLASS APPROVED STEEL MATERIAL L= 10MTR MATERIAL S.S SCH 80 ENGINE MTR 10.00 10.00 EA 1 USD 0.00 0.00
i E26006: OVERBOARD DISCHARGE VALVES (SURVEY): ENGINE EA 1 USD 0.00 0.00
i TYPE / CAPACITY / DETAILS : ENGINE EA 1 USD 0.00 0.00
i OPEN UP SPECIFIED OVERBOARD VALVES FOR OVERHAULING. CLEAN AND INSPECT ALL PARTS FOR CORROSION, WEAR, AND DAMAGE. RENEW WORN/DEFECTIVE PARTS & CONSUMABLES TO THE SATISFACTION OF CLASS/SUPTDS. NUT /BOLTS/DEFECTIVE PARTS & CONSUMABLES-YARD SUPPLY. PITTED GROOVES ON VALVE SEATS AND LIDS TO BE REMOVED, TRANSPORTED TO YARD WORKSHOP, SKIMMED, AND RETURNED TO SHIP. GRIND VALVES ON SEATS; TAKE BLUE IMPRESSIONS OF VALVE SEATS AND LIDS AND PRESENT TO C/E, 2/E, AND SURVEYOR. PRESENT VALVES TO SURVEYOR AFTER PRESSURE TEST; AFTER APPROVAL, REASSEMBLE USING NEW JOINTS AND PACKINGS ,CONSUMABLES (YARD SUPPLY), DULY APPROVED BY C/E & 2/E. INTERNALLY SCRAPE, CLEAN, AND EPOXY COAT ALL VALVE CASINGS. QUOTATION TO BE ALL INCLUSIVE (MANPOWER, TOOLS, CONSUMABLES, JOINTS, PACKINGS, TRANSPORTATION, AND INCIDENTAL WORKS). ENGINE EA 1 USD 0.00 0.00
i VALVES DIMENSIONS TYPE ENGINE INSTRUCTION EA 1 USD 0.00 0.00
E26006.1 MAIN SEA COOLING WATER OVERBOARD V/V STBD DN-300 MM BUTTERFLY ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26006.2 FIRE& BILGE G.S. OVERBOBARD DN- 200MM GLOBE ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26006.3 BALLAST OVBD(FOR STBD SIDE TANKS) DN-350 BUTTERFLY ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26006.4 BALLAST OVBD(FOR PORT SIDE TANKS) DN-350 BUTTERFLY ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26006.5 EJECTOR P/P DISCHAGRE OVBD V/V DN-80 BUTTERFLY ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26006.6 SEWAGE OVBD V/V DN 150 ANGLE STORM ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26006.7 SEWAGE OVBD V/V DN 150 STORM ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26006.8 BILGE WATER SEPARATOR OVERBOARD DISCH. V/V DN -40 MM GLOBE ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26006.9 BILGE & BALLAST EDUCTION DISCH OVBD STBD DN -350 MM BUTTERFLY ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26006.10 BOILER BLOW DOWN OVBD V/V DN 40 GLOBE ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26006.11 GREY WATER DISCH.OVBD V/V DN 125, STORM ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26006.12 GREY WATER DISCHARGE OVBD .V/V DN 125 , ANGLE STORM ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
i E26007: INTERMEDIATE SEA WATER VALVES: ENGINE EA 1 USD 0.00 0.00
i TYPE / DETAILS : ENGINE EA 1 USD 0.00 0.00
i REMOVE SPECIFIED INTERMEDIATE AND BUTTERFLY VALVES AND TRANSPORT TO YARD WORKSHOP. DISMANTLE ALL VALVES; CLEAN AND INSPECT ALL PARTS FOR CORROSION, WEAR, AND DAMAGE IN PRESENCE OF 2/E & C/E. RENEW WORN/DEFECTIVE PARTS & CONSUMABLES TO THE SATISFACTION OF CLASS/SUPTDS. NUT /BOLTS/DEFECTIVE PARTS & CONSUMABLES-YARD SUPPLY. THOROUGHLY CLEAN VALVE BODIES INTERNALLY. LIGHTLY SKIM GROOVES ON VALVE SEATS AND LIDS; GRIND VALVES ON SEATS. TAKE BLUE IMPRESSIONS OF VALVE SEATS AND LIDS; PRESENT TO 2/E & C/E. PAINT VALVE BODIES INTERNALLY WITH TWO COATS OF EPOXY OR EXTERNALLY AS APPLICABLE (YARD SUPPLY). CHECK VALVE SPINDLES FOR FREE OPERATION; INSPECT VALVE LOCKING ARRANGEMENTS. BUTTERFLY VALVES: CHECK SEAT RINGS, OPERATING GEAR, AND LOCKING ARRANGEMENTS; RENEW DAMAGED/DEFORMED PARTS (YARD SUP-PLY). REASSEMBLE ALL VALVES USING NEW JOINTS ,PACKINGS AND CONSUMABLES (YARD SUPPLY) AND ENSURE CORRECT ALIGNMENT. PRESSURE TEST ALL VALVES TO APPLICABLE STANDARDS. QUOTATION TO BE ALL INCLUSIVE (MANPOWER, TOOLS, CONSUMABLES, JOINTS, PACKINGS, TRANSPORTATION, AND INCIDENTAL WORKS). ENGINE EA 1 USD 0.00 0.00
i VALVE DESCRIPTION DIMENSION TYPE ENGINE EA 1 USD 0.00 0.00
E26007.1 MAIN SEA WATER P/P #1 & #2 INLET VALVE DN 300 BUTTERFLY VALVE ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26007.2 MAIN SEA WATER P/P #1 & #2 OUTLET VALVE DN 250 ANGLE GLOBE ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26007.3 LT COOLER BYPASS SEA WATER VALVE DN 300 BUTTERFLY VALVE ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.4 LI COOLERS S.W. IN/OUT V/V DN 200 BUTTERFLY V/V ENGINE NOS 4.00 4.00 EA 1 USD 0.00 0.00
E26007.5 EJECTOR PUMP SUCTION VALVE DN 100 BUTTERFLY ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.6 EJECTOR PUMP DELIVERY VALVE DN100 GLOBE ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.7 INTERMIDITAE V/V B/W EJECTOR P/P DIS LINE AND FIRE/GS P/P DN 100 GLOBE ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.8 FIRE & G.S P/P TO FIRE MAIN DN 150 GLOBE ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.9 FIRE & BILGE P/P TO FIRE MAIN DN 150 GLOBE ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.10 FIRE & GS P/P & FIRE & BILGE P/P TO OVERBOARD DN150 GLOBE ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26007.11 EMERGENCY FIRE PUMP OUTLET VALVE DN 100 MM GLOBE ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.12 M.C.S.W PUMP TO/FRM SLOPE & SEWAGE TAK V/V DN 40 GLOBE ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.13 FIRE & G.S. PUMP TO AFT PEAK TK DN150 BUTTERFLY ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.14 BILGE & G.S. PUMP TO AFT PEAK TK DN 150 BUTTERFLY ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.15 CARGO HOLD BILGE STRIPPING EDUCTOR DRIVE VALVE DN125 BUTTERFLY ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.16 CARGO HOLD BILGE STRIPPING EDUCTOR INLET VALVE DN 150 ANGLE GLOBE ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.17 CARGO HOLD BILGE STRIPPING EDUCTOR DISCHARGE VALVE DN200 BUTTERFLY ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.18 NO.1 BALLAST STRIPPING EDUCTOR DRIVE VALVE DN 125 BUTTERFLY ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.19 NO.1 BALLAST STRIPPING EDUCTOR INLET VALVE DN125 BUTTERFLY ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.20 NO.1 BALLAST STRIPPING EDUCTOR DISCHARGE VALVE DN200 BUTTERFLY ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.21 AFTER PEAK TANK BALLAST VALVE DN150 MM BUTTERFLY ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.22 FIRE & G.S. P/P SUC FROM SEA MAIN DN 200 BUTTERFLY ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.23 BILGE & G.S. P/P SUC FROM SEA MAIN DN 200 BUTTERFLY ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.24 FIRE & G.S. P/P SUC FROM BILGE MAIN DN 200 BUTTERFLY ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.25 BILGE & G.S. P/P SUC FROM BILGE MAIN DN 200 BUTTERFLY ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.26 FIRE & G.S. P/P SUC FROM F.W. WASHING TANK. DN 150 BUTTERFLY ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.27 FIRE & BILGE. P/P SUC FROM F.W. WASHING TANK DN 150 BUTTERFLY ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.28 MSW P/P DISCHARGE SIDE NRV DN250 NRV ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26007.29 NO.1 BALLAST STRIPPING EDUCTOR INLET SIDE NRV DN125 NRV ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.30 NO.2 BALLAST STRIPPING EDUCTOR INLET SIDE NRV DN125 NRV ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.31 FIRE & G.S PUMP DISCHAGRE SIDE NRV DN150 NRV ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.32 BILGE & G.S PUMP DISCHAGRE SIDE NRV DN150 NRV ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.33 BILGE & G.S PUMP DISCHAGRE TO AFT PEAK TANK. NRV DN200 NRV ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.34 FIRE & G.S PUMP DISCHAGRE TO AFT PEAK TANK NRV DN 150 NRV ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.35 FIRE & GS PUMP TO FIRE MAIN LINE NRV DN150 NRV ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.36 BILGE & GS PUMP TO FIRE MAIN LINE NRV DN150 NRV ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.37 QUOTE FOR SUPPLY OF HIGH GRADE NEOPRENE SEAT RING FOR 50 MM BUTTERFLY VALVE SIZE,QTY-02 EACH ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26007.39 QUOTE FOR SUPPLY OF HIGH GRADE NEOPRENE SEAT RING FOR 100 MM BUTTERFLY VALVE SIZE,QTY-02 EACH ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26007.40 QUOTE FOR SUPPLY OF HIGH GRADE NEOPRENE SEAT RING FOR 125 MM BUTTERFLY VALVE SIZE,QTY-02 EACH ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26007.41 QUOTE FOR SUPPLY OF HIGH GRADE NEOPRENE SEAT RING FOR 150 MM BUTTERFLY VALVE SIZE,QTY-02 EACH ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26007.42 QUOTE FOR SUPPLY OF HIGH GRADE NEOPRENE SEAT RING FOR 200 MM BUTTERFLY VALVE SIZE,QTY-02 EACH ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26007.43 QUOTE FOR SUPPLY OF HIGH GRADE NEOPRENE SEAT RING FOR 250 MM BUTTERFLY VALVE SIZE,QTY-02 EACH ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26007.44 QUOTE FOR SUPPLY OF HIGH GRADE NEOPRENE SEAT RING FOR 300 MM BUTTERFLY VALVE SIZE,QTY-02 EACH ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26007.45 QUOTE FOR SUPPLY OF HIGH GRADE NEOPRENE SEAT RING FOR 350 MM BUTTERFLY VALVE SIZE,QTY-02 EACH ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
i ATMOSPHERIC CONDENSOR:DONGHWA ENTEC ENGINE EA 1 USD 0.00 0.00
E26007.46 STEAM TO DUMP CONDENSER INLET & OUTLET V/VS DN 65 GLOBE ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26007.47 AUTO DUMP VALVE DN80 GLOBE ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.48 MANUAL DUMP VALVE DN65 GLOBE ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.49 ATM CONDENSOR INLET/OUTLET DN65 GLOBE ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.50 STEAM TO CONDENSOR DN32 GLOBE ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26007.51 SEA WATER INLET/OUTLET TO CONDENSOR DN 150 BUTTERFLY ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.52 LT COOLER FRESH WATER INLET/OUTLET DN200 BUTTERLFY ENGINE NOS 4.00 4.00 EA 1 USD 0.00 0.00
i FRESH WATER GENERATOR: MAKE-DONGHWA ENTEC (Dx-a-25) ENGINE EA 1 USD 0.00 0.00
E26007.53 FRESH WATER GENERATOR JACKET INLET DN100 GLOBE ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.54 FRESH WATER GENERATOR JACKET OUTLET DN 100 GLOBE ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.55 JACKET WATER BYPASS DN100 GLOBE ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
i BILGE (DAILY) TRANSFER PUMP: MAKE- SHIN SHIN HAMWORTHY P 102 ENGINE EA 1 USD 0.00 0.00
E26007.56 SUCTION FROM BILGE MAIN DN 40 GLOBE N/R ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.57 SUCTION FROM BILGE HOLDING TANK DN40 ANGULAR GLOBE N/R ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.58 DISCHARGE TO BILGE HOLDING TANK DN40 GLOBE N/R ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26007.59 BILGE WELL PORT/STBD/AFT SUCTION DN100 GLOBE NR ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
i STEAM V/VS: ENGINE EA 1 USD 0.00 0.00
E26007.60 H.F.O /LSFO SETTLING TANK STEAM INLET V/V & OUTLET V/V DN25 STOP V/V ENGINE NOS 8.00 8.00 EA 1 USD 0.00 0.00
E26007.61 H.F.O/LSFO SERVICE TANK STEAM INLET V/V & OULET V/V DN25 STOP V/V ENGINE NOS 8.00 8.00 EA 1 USD 0.00 0.00
E26007.62 NO.1 PORT/STBD,NO.2 PORT/STBD, PORT/STBD STORAGE TANK STEAM INLET V/V AND OUTLET VALVE WITH STEAM TRAP DN25 STOP V/V ENGINE NOS 12.00 12.00 EA 1 USD 0.00 0.00
E26007.63 H.F.O OVERFLOW TANK STEAM INLET V/V & OUTLET V/V DN25 STOP V/V ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26007.64 HO/LO PURIFIER HEATER STEAM INLET V/V & OUTLET V/V DN25 STOP V/V ENGINE NOS 6.00 6.00 EA 1 USD 0.00 0.00
E26007.65 INCINERATOR WASTE OIL SETTLING TK OBT, SLUDGE TK INLET & OUTLET V/V DN25 STOP V/V ENGINE NOS 6.00 6.00 EA 1 USD 0.00 0.00
i E26008:SEA WATER FILTERS: ENGINE EA 1 USD 0.00 0.00
i TYPE / CAPACITY / DETAILS: ENGINE EA 1 USD 0.00 0.00
i THE FOLLOWING FILTERS ARE TO BE OPENED, CLEANED, AND BOXED BACK WITH NEW GASKETS. PURGING VALVES OF THE FILTER COVERS (35 MM DIA) ARE TO BE OVERHAULED. FILTER ELEMENTS ARE TO BE RENEWED WITH STAINLESS STEEL PERFORATED SHEETS OF 6 MM THICK-NESS, IF FOUND DAMAGED. THE FILTER CHAMBERS ARE TO BE COATED WITH THREE (3) COATS OF EPOXY PAINT. ENGINE INSTRUCTION EA 1 USD 0.00 0.00
E26008.1 TO FABRICATE SEA CHEST FILTER BODY ALONG WITH COVER INCLUDING SUPPLY OF NUTS AND BOLTS APS:OD: 1100MM, TOP COVER THICKNESS: 30MM, HOUSING HEIGHT: 1120MM, BOLT DIA: 30MM, NO. OF BOLTS: 20, PCD: 1020MM,BOLT PITCH CIRCLE RADIUS: 510MM, BOLT ANGULAR SPACING: 18° ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26008.2 FILTER DRAIN COVERS TO OPEN; COVER HOLDING STUDS (6 NO. × 5/8 DIA) TO BE REPLACED WITH G.I. STUDS AND NUTS AND COVERS TO FIT BACK WITH NEW PACKINGS FOR ITEM NOS. 01 TO 06. ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26008.3 MAIN HIGH SEA & LOW SEA SUCTION LINE FILTERS × 2 NOS. ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26008.4 FILTERS FOR G.S. P/P & FIRE & BILGE PUMP SUCTION ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26008.5 EJECTOR PUMP SUCTION ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26008.6 FILTER FOR EMC'Y FIRE P/P ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26008.7 SEA SUCTION PIPE; BETWEEN HIGH SEA CHEST AND LOW SEA CHEST DN 550 TO BE CLEARED FROM SEA GROWTH MANUALY WITH SCRAPING.RENEW DAMAGED COATING. ENGINE MTR 10.00 10.00 EA 1 USD 0.00 0.00
i E26009: ENGINE ROOM PUMPS (SURVEY): ENGINE EA 1 USD 0.00 0.00
i TYPE / CAPACITY / DETAILS : ENGINE EA 1 USD 0.00 0.00
i ISOLATION & REMOVAL: ELECTRICALLY ISOLATE, DISCONNECT, AND REMOVE THE PUMP MOTOR. DISCONNECT INLET AND DISCHARGE PIPELINES AND REMOVE THE COMPLETE PUMP FROM ITS LOCATION. TRANSPORT THE PUMP TO THE YARD WORKSHOP. DISMANTLING & INSPECTION: DISMANTLE THE PUMP COMPLETELY. CLEAN ALL COMPONENTS THOROUGHLY AND PRESENT PARTS FOR INSPECTION TO THE ATTENDING CLASS SURVEYOR. CHECK MOUTH RING AND WEAR RING CLEARANCES. REPAIRS & RENEWALS: ADJUST MOUTH RING AND WEAR RING CLEARANCES BY MACHINING MOUTH RINGS AND MANUFACTURING/FITTING NEW WEAR RINGS (YARD SUPPLY), AS REQUIRED. INSPECT THE SHAFT AND CHECK FOR TRUENESS; BUILD UP THE SHAFT BY APPROVED METAL SPRAY METHOD IF REQUIRED. INSPECT THE IMPELLER AND BUILD UP WITH SUITABLE APPROVED MATERIAL IF REQUIRED. INSPECT PUMP CASING; BUILD UP AND MACHINE SEATING SURFACES IF REQUIRED. BEARINGS, MECHANICAL SEALS, BUSHES, SLEEVES, WEAR RINGS, AND OTHER DAMAGED PARTS TO BE RENEWED AS REQUIRED (YARD SUPPLY). ROTATING ASSEMBLY & BALANCING: ASSEMBLE THE ROTATING ASSEMBLY AND CARRY OUT DYNAMIC BALANCING TO MANUFACTURER/CLASS REQUIREMENTS. PRIMING UNIT: OVERHAUL ALL ASSOCIATED PRIMING UNITS. RENEW FLOATS, RUBBER RINGS, AND SEALS AS REQUIRED (YARD SUPPLY). REASSEMBLY & TRANSPORT: AFTER SATISFACTORY SURVEY, REASSEMBLE THE PUMP IN GOOD WORKING ORDER. TRANSPORT THE OVERHAULED PUMP BACK TO THE VESSEL. FOUNDATION & REINSTALLATION: INSPECT PUMP FOUNDATION AND DRESS/REPAIR IF REQUIRED. INSTALL THE PUMP ON THE FOUNDATION USING RENEWED BOLTS, NUTS, AND WASHERS (YARD SUPPLY). RECONNECT INLET AND DISCHARGE PIPELINES WITH NEW GASKETS/JOINTING. RENEW PRESSURE GAUGE, CAPILLARY TUBING, AND PRESSURE GAUGE CONNECTIONS. MOTOR REINSTALLATION & ELECTRICAL WORK REFIT THE MOTOR AND RESTORE ELECTRICAL SUPPLY. CHECK ALIGNMENT BETWEEN MOTOR AND PUMP AFTER INSTALLATION. TESTING & TRIALS CARRY OUT SATISFACTORY OPERATIONAL TRIALS OF THE PUMP TO THE SATISFACTION OF THE CHIEF ENGINEER / ATTENDING SUPERINTEN-DENT. DURING REPAIR AND AFTER COMPLETION, THE PUMP TO BE PRESENTED TO THE CLASS SURVEYOR FOR INSPECTION AND ACCEPTANCE PRIOR TO AND AFTER ONBOARD INSTALLATION. ACCESS & RESTORATION REMOVE PLATFORMS AND HANDRAILS AROUND THE PUMP AS REQUIRED FOR ACCESS AND REFIT THEM AFTER COMPLETION OF THE JOB. CONSUMABLES & COST INCLUSION ALL BOLTS, NUTS, WASHERS, GASKETS, JOINTING MATERIALS, PACKINGS, AND WASTED FASTENERS TO BE RENEWED (YARD SUPPLY). QUOTATION FOR PUMP OVERHAULING TO BE INCLUSIVE OF ALL TOOLS, CONSUMABLES, MANPOWER, TRANSPORTATION, MACHINING, BAL-ANCING, AND ASSOCIATED WORKS. ENGINE INSTRUCTION EA 1 USD 0.00 0.00
i DETAILS OF THE P/PS AS FOLLOWS: ENGINE EA 1 USD 0.00 0.00
E26009.1 BALLAST PUMPS Maker :SHIN SHIN MACHINERY CO., LTD; MODEL:DB350V1D CAPACITY:-1000M3/Hx25m MOTOR: 95 KWX 1200 RPM 440 V 60 Hz 3 PH ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26009.2 MAIN S.W PUMPS Maker ;SHIN SHIN MACHINERY CO; LTD; MODEL: DB250 V1D : VERTICAL CENTRIFUGAL PUMP :CAPACITY:-540M3/Hx20m MOTOR: 50 KWX 1800 RPM 440 V 60 Hz 3 PH ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26009.3 FIRE AND GS PUMP; FIRE & BILGE PUMP CENTRIFUGAL PUMP; SHIN SHIN MACHINERY CO; LTD; MODEL : SVF150 CAPACITY:- 120/240 M3/H X 80/30M MOTOR: 70KWX1800 RPM; 440V; 60 Hz; 3 PH ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26009.4 EMERGENCY FIRE PUMP SHIN SHIN MACHINERY CO; LTD; MODEL: SVS100;CAPACITY-72M3/HR X 80M;MOTOR:37KW X1800RPM;440V;60HZ;3PH ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26009.5 MAIN ENGINE L.O.PUMP NO 1 AND 2 TO BE OVERHAULED CENTRIFUGAL PUMP; MODEL : MLO 200A1 CAPACITY: 211 M3/HX M ; MOTOR: 60KWX1800 ; 440V 60 HZ 3PH ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26009.6 BILGE TRANSFER PUMP;Maker : SHIN-SHIN MACHINERY CO LTD; MODEL: P102 : PISTON PUMP; CAPACITY: 5 M3/H; MOTOR: 2.2 KWX 1800 RPM X 60HZ X 3PH ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26009.10 BOILER FEED PUMP MAKER SHIN SHIN MACHINERY CO LTD MODEL TSH 50A CAPACITY 3 M3/HR HEAD 120M MOTOR 440/3PH/60HZ/3600RPM ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26009.11 F.W.G. EJECTOR PUMP . MAKE:SHIN SHIN MACHINERY MODEL: MSC 100D; CAP: 61 m3/hr; HEAD: 48m; 1800 rpm. ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
i E26010: F.O. HEATERS / HEAT EXCHANGERS ENGINE EA 1 USD 0.00 0.00
I TYPE / CAPACITY / DETAILS : ENGINE EA 1 USD 0.00 0.00
I HEATER OVERHAULING: DISCONNECT THE HEATER BY REMOVING ALL CONNECTED PIPES AND VALVES. TRANSPORT THE HEATER TO THE YARD WORKSHOP. DISMANTLE THE HEATER COMPLETELY. CHEMICALLY CLEAN BOTH SHELL SIDE AND TUBE SIDE. OVERHAUL THE RELIEF VALVE AND SET THE PRESSURE AS PER MAKER’S RECOMMENDATIONS. BOX BACK THE HEATER USING NEW O-RINGS, GASKETS, AND VENT COCKS, AS REQUIRED. CARRY OUT PRESSURE TESTING; RECTIFY ANY LEAKAGE FOUND AND RETEST UNTIL SATISFACTORY. TRANSPORT THE HEATER BACK ONBOARD AND RECONNECT ALL PIPES AND VALVES. SCOPE & COST INCLUSION: QUOTATION FOR HEATER OVERHAULING TO BE INCLUSIVE OF ALL REPAIR TOOLS, RENEWAL OF TUBES (IF REQUIRED), CONSUMABLES, NEW JOINTS AND PACKINGS, TUBE PLUGGING MATERIALS, MANPOWER, TRANSPORTATION, AND ALL ASSOCIATED WORKS. ENGINE INSTRUCTION EA 1 USD 0.00 0.00
E26010.1 FCM FWD AND AFT F.O. HEATERS MODEL : MX 20 L =1400 SHELL AND TUBE TYPE HEAT EXCHANGRES(STEAM PRESS. 7 KG) ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26010.2 MAIN ENGINE JACKET COOLING PRE HEATER Maker :DONGHWA ENTEC SHELL AND TUBE TYPE(DIA-40 CM,L-75 CM) ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26010.3 D.O./H.O. PURIFIER HEATER Maker : DONGHWA ENTEC, SHELL AND TUBE TYPE (L= 972MM, WT. 140KG) ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26010.4 LO PURIFIER HEATER Maker :DONGHWA ENTEC SHELL AND TUBE TYPE (L= 962MM, WT= 110 KG) ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26010.5 M/E L.O. COOLER (PLATE TYPE HEAT EXCHANGER) TO OPEN UP; CHEMICALLY CLEANED; GASKETS TO BE RENEWED IF REQUIRED (YARD SUPPLY); ASSEMBLED AND SATISFACTORY TRIAL TO BE SHOWN TO SHIP'S STAFF. ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
i E26011: MAIN ENGINE : ENGINE EA 1 USD 0.00 0.00
I TYPE / CAPACITY / DETAILS : MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM ENGINE EA 1 USD 0.00 0.00
I SCOPE OF WORK: MAJOR OVERHAULING/DECARBONISATION OF THE MAIN ENGINE UNIT TO BE CARRIED OUT BY THE YARD’S COMPETENT TEAM. ALL WORK MUST STRICTLY FOLLOW THE MANUFACTURER’S MAINTENANCE INSTRUCTIONS, WITH ALL NECESSARY SAFETY PRECAUTIONS OBSERVED. CHARGES: YARD TO PROVIDE A LUMP-SUM QUOTATION PER MAIN ENGINE UNIT FOR THE COMPLETE DECARBONISATION. SUPPLIES AND TOOLS: ALL REQUIRED SPARES AND TOOLS TO BE SUPPLIED BY THE SHIP. COORDINATION AND APPROVALS: YARD TO COORDINATE WITH SURVEYORS AS AND WHEN REQUIRED. ALL SURVEYABLE ITEMS MUST BE PRESENTED TO SURVEYORS FOR APPROVAL PRIOR TO ASSEMBLY. ENGINE INSTRUCTION EA 1 USD 0.00 0.00
E26011.1 MAIN ENGINE CRANK SHAFT DEFLECTION TO BE TAKEN BEFORE DISMANTLING AND AFTER ASSEMBLING.ALL READINGS TO BE SUBMITTED. ENGINE PCS 2.00 2.00 EA 1 USD 0.00 0.00
E26011.2 ISOLATE ALL SIX UNITS DRAIN COOLING WATER FUEL OIL ETC. REMOVE ALL NECESSARY CYLINDER HEAD CONNECTIONS REMOVE CYLINDER HEADS WITH EXHAUST VALVES AND TRANSPORT SAME TO YARD WORKSHOP. ENGINE SET 6.00 6.00 EA 1 USD 0.00 0.00
E26011.3 COMPLETE OVERHAULING OF CYLINDER HEAD AND MOUNTINGS AS PER MAKER GUIDELINE-DISCONNECT AND REMOVE ALL CYLINDER HEAD MOUNTINGS. DISMANTLE CYLINDER HEADS AND SEPARATE THEM FROM COOLING JACKETS. THROUGHLY CLEAN CYLINDER HEADS AND COOLING JACKET SURFACES.RENEW ALL “O”RINGS & CONSUMABLES AND ASSEMBLE CYLINDER HEADS AND COOLING JACKETS.CYLINDER HEAD COOLING SURFACES TO BE PRESSURE TESTED TO 06 KG/CM2 AND SHOWN TO 2EO & CEO.ALL CYLINDER HEAD MOUNTINGS POCKETS AND SEATS TO BE THOROUGHLY CLEANED AND SEATS TO BE LAPPED.FUEL VALVE AREA TO BE CHECKED FOR CORROSION ATTACK AND IF SAME EXCEEDS THE LIMIT SPECIFIED BY MAKER THEN NECESSARY REPAIR TO BE CARRIED OUT AS PER MAKER RECOMENDATION.CYLINDER AIR STARTING V/VS RELIEF V/VS FUEL V/VS AND INDICATOR VALVES TO BE O'HAULED AND TESTED TO PROVE SATISFACTORY OPERATION AND SHOWN TO 2EO/CEO.CYLINDER HEAD RELIEF V/VS TO BE PRESSURE TESTED TO CORRECT OPENING PRESSURE AND SHOWN TO 2EO/CEO.INDICATOR V/VS LEAK TEST TO BE SHOWN TO 2EO / CEO.AFTER THE APPROVAL OF SURVEYORS & SUPDT ALL THE MOUNTINGS TO BE ASSEMEBLED AND FITTED BACK IN PLACE.QUOTE INCLUSIVE OF ALL ASSOCIATED JOBS. ENGINE SET 6.00 6.00 EA 1 USD 0.00 0.00
E26011.4 COMPLETE OVERHAULING OF EXHAUST VALVE AS PER MAKER GUIDELINE-DISMANTLE THE EXHAUST V/VS COMPLETELY. THOROUGHLY CLEAN ALL PARTS & SHOWN TO SURVEYORS & SUPTD. RENEW ALL WORN / DEFECTIVE PARTS AS REQUIRED & ALL SEAL RINGS FROM SHIP’S SPARES. CHECK THE VALVE & SEATS, IF REQUIRED GROUND THE VALVES & SEATS AS PER MAKER’S INSTRUCTIONS. THOROUGHLY CLEAN EXHAUST V/VS COOLING WATER SURFACES. ASSEMBLE THE EXHAUST VALVES AS THE ORIGINAL AND FIT THE EXHAUST VALVES IN PLACE ON CYLINDER HEADS. ALL CYLINDER HEAD ASSSEMBLIES TO BE TRANSPORTED BACK ONBOARD.QUOTE INCLUSIVE OF ALL ASSOCIATED JOB. ENGINE SET 6.00 6.00 EA 1 USD 0.00 0.00
E26011.5 LINERS TO BE REMOVED FROM PLACE AND THOROUGH CLEANING OF LINER AND JKT TO BE CARRIED OUT.ALL LINER SURFACES & SCAVENGE PORTS TO BE THROUGHLY CLEANED. L.O.QUILL PASSAGES TO BE THROUGHLY BLOWN THROUGH WITH COMPRESSED AIR & CLEARED. LINERS TO BE CALIBRATED AND READINGS TO BE RECORDED.CARRY OUT DYE CHECK ON ALL CYLINDER LINERS IN WAY OF L.O.GROOVES FOR DETECTING CRACKS, IF ANY AND SAME TO BE SHOWN TO SURVEYOR AND SUPDT. ALL L.O. QUILLS TO BE O'HAULED & FUNCTION TESTED IN PRESENCE OF 2EO/CEO.LINER PORTS EDGES TO BE SMOOTHENED IF REQUIRED.OLD/NEW LINERS TO BE BOXED BACK USING NEW O-RINGS AND CONSUMABLES.QUOTE ALL INCLUSIVE FOR LINER RENEWAL. ENGINE SET 6.00 6.00 EA 1 USD 0.00 0.00
E26011.6 COMPLETE OVERHAULING OF PISTON AND STUFFING BOX AS PER MAKER GUIDELINE-PISTON HOLDING NUTS TO BE OPENED. LINER TOP RIDGES TO CLEAN AND GRIND. PISTON TO BE WITHDRAWN ALONG WITH STUFFING BOXES AND SHIFTED/TRANSPORTED TO SHOP.PISTON RING & STUFFING BOX TO BE REMOVED STUFFING BOX TO BE DISMANTLED CLEANED INSPECTED AND ASSEMBLED WITH NEW SPARE SHIP SUPPLY CHECK THE PISTON CROWN WEAR DOWN BY WEARDOWN GAUGE. PISTON RING GROOVES TO BE THOROUGHLY CLEANED. GROOVES & PISTON RINGS TO BE CALIBRATED & READINGS TO BE RECORDED AND SHOWN TO CEO/SUPDT.IF PISTON RING GROOVE FOUND ENLARGED ,CROWN AND ACCESSORIES TO BE RENEWED FROM SHIP'S STOCK.ALL PARTS TO BE PRESENTED TO SURVEYORS & SUPTD & AFTER THEIR APPROVAL ASSEMBLE ALL PISTONS AS PER MAKER’S INSTRUCTIONS. ALL PISTONS TO BE PRESSURE TESTED WITH OIL TO 10 BARS/MAKER GUIDELINE IN PRESENCE OF SURVEYORS & SUPTD/CEO. PISTON ROD TO BE GAUGED. PISTONS TO BE ASSEMBLED WITH NEW PISTON RINGS. PISTON ROD STUFFING BOX ALL PARTS TO BE THOROUGHLY CLEANED. STUFFING BOX CALIBRATIONS TO CHECK AND RECORD THE READINGS. ALL WORNOUT / DAMAGED PARTS TO BE RENEWED FROM SHIP’S SPARES. STUFFING BOXES TO BE ASSEMBLED ON PISTON RODS USING NEW SEAL RINGS SCRAPER RINGS & SPRINGS. PISTON WITH RODS ALONG WITH STUFFING BOXES TO BE TRANSPORTED BACK ONBOARD AND FITTED BACK IN PLACE STRICTLY IN LINE WITH MAKER'S GUIDELINES.CROSS HEAD SURFACES TO BE CLEANED THOROUGHLY. LOWER THE PISTONS IN PLACE ALONG WITH THE STUFFING BOXES AND TIGHTEN THE NUTS AS PER MAKER’S INSTRUCTIONS.STUFFING BOX BOLTS TO BE TIGHTENED. ALL LASHINGS / LOCKINGS TO BE RESTORED. LOWER THE CYLINDER HEADS ALONG WITH EXHAUST V/VS AND TIGHTEN THE NUTS. ALL CYLINDER HEAD CONNECTIONS TO BE RESTORED BACK AS THE ORIGINAL. C.W. TO BE TRIED OUT AND ENSURE NO LEAKAGES. F.O. & L.O. TO BE TRIED OUT. F.O.LINES TO BE PRIMED. ALL LAGGINGS TO BE FIT BACK TO ITS ORIGINAL POSITION AND SECURE. ENGINE SET 6.00 6.00 EA 1 USD 0.00 0.00
E26011.7 PISTON CROWN TO BE DISMANTLED FROM THE ROD,TO BE THRORUGHLY CLEANED ,TO BE CALIBRATED & RECORDED, NEW/OLD CROWN TO BE FITTED BACK USING NEW D RINGS & ACCESORIES, PISTON TO BE PR TESTED IN LINE WITH MAKER'S GUIDELINES. PISTON TO BE FITTED BACK IN PLACE STRICTLY IN LINE WITH MAKER'S GUIDE LINES USING SHIP SUPPLIED SPARES.QUOTE ALL INCLUSIVE. ENGINE SET 6.00 6.00 EA 1 USD 0.00 0.00
E26011.8 SCAVENGE RELEIF DEVICES CRANKCASE DOORS AND RELIEF DEVICES TO OVERHAUL AND TO BE SHOWN TO THE CLASS SURVEYOR ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
E26011.9 HYDRAULIC ACTUATOR FOR EXH VALVES TO BE OVERHAULED. HOUSING AND PISTON TO BE LIFTED PARTS TO BE DISMANTLED INSPECTED AND SHOWN TO SURVEYOR.OIL CYLINDER LINER TO CALIBRATE.SAFETY V/VS AND NON RETURN V/VS TO BE OVERHAULED.AFTER SURVEY ACTUATOR TO BOXED BACK WITH NEW PISTON RING AND FITTED ON ITS PLACE WITH ALL CONNECTION. ENGINE NOS. 6.00 6.00 EA 1 USD 0.00 0.00
E26011.10 AUTOMATIC STARTING AIR SHUT OFF VALVE TO OVERHAUL.ALL SPARES SHIP SUPPLY. ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26011.11 ALL UNITS UNDER PISTON AND SCAVENGE SPACES TO BE THOROUGHLY CLEANED .EXH.MANFIFOLD INCPECTION DOORS TO BE OPENED UP FOR CLEANING.ENTIRE EXHAUST MANIFOLD TO BE THOROUGHLY DECARBONISED AND CLEANED USING WIRE BRUSHES AND SHOWN TO CEO/2EO.TURBOCHARGER INLET GRIDS TO BE THOROUGHLY CLEANED AND INSPECTED FOR WEAR DOWN/DAMGE.IF REQUIRED SAME TO BE REPAIRED OR RENEW.ALL UNDER PISTON AND SCAVENGE SAPCES TO BE INSPECTED.EXHAUST MANIFOLD INSPECTION DOORS & UNDER PISTON & SCAVENGE SPACE DOORS TO BE BOXED BACK AS THE ORIGINAL USING NEW JOINTS(YARD SUPPLY).CONSIDER RENEWAL OF 24 NOS BOLST/STUDS WITH NUT OF ASSORTED SIZES.C/CASE TO BE THOROUGHLY CLEANED & INSPECTED.C/CASE DOORS TO BE BOXED BACK WITH NEW JOINTS(YARD SUPPLY)AS THE ORIGINAL.SCAVENGE RELIEF DEVICES CRANK CASE DOORS AND RELIEF DEVICES TO OVERHAUL AS REQUIRED AND TO BE SHOWN TO THE CLASS SURVEYOR. ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
E26011.12 ME TO BE TURNED ON TURNING GEAR WITH L.O. PUMP RUNNING FOR SOME TIME.SATISFACTORY MAIN ENGINE RUNNING TRIAL(BASIN TRIALS) TO BE GIVEN TO THE SATISFICATION OF SHIP'S STAFF.MAIN ENGINE SEA TRIALS FOR ABOUT 4-6 HOURS ALSO TO BE GIVEN.CONSIDER 12 PERSONNEL FORM YARD ALONG WITH SHIP REPAIR MANAGER ACCOMAPNY THE SHIP FOR SEA TRIALS. ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
E26011.13 DRIVING GEAR & CHAIN TENSIONING TO BE CHECKED THRORUGHLY UNDER THE SUPERVISION OF COMPETENT/SERVICE ENGINEER AND PUT UP TO SURVEYOR FOR CHECKS AND VERIFICATION UNDER CSM SURVEY. CHAIN TENSION TO BE ADJUSTED, IF REQUIRED. ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
E26011.14 THOROUGH INSPECTION OF CRANSHAFT & ITS WEB, CAM CASE, ROLLER FOLLOWER , CAMS AND ENSURE ALL ARE IN ORDER. ENGINE SET 6.00 6.00 EA 1 USD 0.00 0.00
E26011.15 EXHAUST CAM ROLLER FOLLOWERS AND AND FUEL CAM ROLLER FOLLOWER TO BE DISMANTLED, CHECKED, OPVERHAULED USING SHIP SUPPLIED AND FITTED BACK STRICTLY INLINE WITH MAKER'S GUIDE LINES. ENGINE SET 6.00 6.00 EA 1 USD 0.00 0.00
i E26012: MAIN ENGINE FUEL INJECTION PUMPS: ENGINE EA 1 USD 0.00 0.00
I TYPE / CAPACITY / DETAILS :MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM ENGINE EA 1 USD 0.00 0.00
I FOLLOWING JOBS TO CARRY OUT UNDER THE SUPERVISION OF COMPETENT ENGINEER/ SERVICE ENGINEER. ISOLATE EMERGENCY STOP BUTTON AS LONG AS ANY WORK IS CARRIED ON FUEL PUMP BLOCKS. ENGINE INSTRUCTION EA 1 USD 0.00 0.00
E26012.1 ALL INLET AND OUTLET CONNECTIONS TO BE REMOVED AND FUEL P/P BLOCKS TO BE TAKEN OUT FROM PLACE TRANSPORTED TO YARD'S WORKSHOP. PUMPS TO BE COMPLETELY DISMANTLED FOR INSPECTION, PARTS TO BE CLEANED , OVERHAULED AND MADE READY FOR SURVEY.ALL UNIT PLUNGER BARREL TO OVERHAULED/RENEWED AND SEALING RING TO BE RENEWED.PUNCTURE VALVE AND SUCTION VALVE TO BE OVERHAULED. ALL FUEL INJECTION PUMPS TO PRESENT TO CLASS SURVEYORS & AFTER COMPLETION OF SURVEY TO BOX BACK AS ORIGINAL.INDIVIDUAL P/P TIMING TO CHECK & ADJUSTED AS NECESSARY & TO BE RECORDED. SHOCK ABSORBER TO BE CHECKED AND OVERHAULED . FUEL CAM TO BE CHECKED AND LEAD TO BE MEASURED.SATISFACTORY SEA TRIAL TO BE GIVEN DURING BASIN/SEA TRIAL. ENGINE NOS 6.00 6.00 EA 1 USD 0.00 0.00
E26012.3 VIT GEAR TO BE CHECKED AND OVERHAUL/ADJUSTED, IF REQUIRED ENGINE SET 6.00 6.00 EA 1 USD 0.00 0.00
i E26012: MAIN ENGINE FUEL INJECTION VALVES ENGINE EA 1 USD 0.00 0.00
i TYPE / CAPACITY / DETAILS :MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM ENGINE EA 1 USD 0.00 0.00
I FOLLOWING JOBS TO CARRY OUT UNDER THE SUPERVISION OF COMPETENT ENGINEER/ SERVICE ENGINEER. ENGINE EA 1 USD 0.00 0.00
E26014.1 FUEL INJECTION V/VS TO BE DISMANTLED, THRORUGHLY CLEANED, OBVERHAULED, BOXED BACK & PRESSURE TESTED STRICKTLY IN LINE WITH MAKER'S GUIDE LINES USING SHIP SUPPLIED SPARES/ REPAIR KITS. ENGINE NOS 12.00 12.00 EA 1 USD 0.00 0.00
i E26013: MAIN ENGINE MAIN BEARINGS, CRANK PIN BEARINGS & THRUST BEARINGS: ENGINE EA 1 USD 0.00 0.00
I TYPE / CAPACITY / DETAILS :MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM ENGINE EA 1 USD 0.00 0.00
E26014.2 MAIN BEARING AND JOURNAL TO BE OPENED UP FOR CSM SURVEY.CHECK AND RECORD ALL BRG CLEARANCES BEFORE AND AFTER INSPECTION.ALL PARTS TO CLEAN AND PRESENT TO CLASS SURVEYOR.AFTER SUCCESSFUL COMPLETION OF SURVEY BEARINGS TO BE BOXED BACK AS ORIGINAL. JOURNALS TO POLISH PRIOR TO BOXING UP.DYE PENETRANT TEST TO BE CARRIED OUT FOR CHECKING ANY CRACK. ENGINE PCS 2.00 2.00 EA 1 USD 0.00 0.00
E26014.3 CRANK PIN BEARING AND JOURNAL TO BE OPENED UP FOR CSM SURVEY.CHECK AND RECORD ALL BRG CLEARANCES BEFORE AND AFTER INSPECTION.ALL PARTS TO CLEAN AND PRESENT TO CLASS SURVEYOR.AFTER SUCCESSFUL COMPLETION OF SURVEY BEARINGS TO BE BOXED BACK AS ORIGINAL. JOURNALS TO POLISH PRIOR BOXING UP.DYE PENETRANT TEST TO BE CARRIED OUT FOR CHECKING ANY CRACK. ENGINE PCS 2.00 2.00 EA 1 USD 0.00 0.00
E26014.3.1 ALL AHEAD AND ASTERN THRUST BEARINGS PADS TO BE OPENED UP AS PER MANUAL AND SAME TO BE PUT UP FOR SURVEY UNDER CSM SURVEY.UPON COMPLETION OF SURVEY, SAME TO BE BOXED BACK. ENGINE PCS 2.00 2.00 EA 1 USD 0.00 0.00
E26014.4 ALL UNIT CLEARANCES MUST BE MEASURED BEFORE AND AFTER INSPECTION. ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
i E26015:MAIN ENGINE CROSS HEAD BEARINGS: ENGINE EA 1 USD 0.00 0.00
I TYPE / CAPACITY / DETAILS :MAN B & W 6S50MC-C8 TIER II POWER = 9480 KW @ 127 RPM ENGINE EA 1 USD 0.00 0.00
E26015.1 ME CROSS HEAD BRG TO BE OPENED UP FOR SURVEY. FOLLOWING JOBS TO BE CARRIED OUT AS PER MAKER'S INSTRUCTIONS.QUOTE FOR PER UNIT. NO OF UNIT WILL BE DECIDED AS PER SURVEYOR ADVICE. CHECK AND RECORD CROSSHEAD BRGS AND GUIDESHOE CLEARANCES BEFORE OPENING THE XHD BEARING AND AFTER ASSEMBLY OF XHD BRGS. DISMANTLE BRG AS PER MAKER'S INSTRUCTION.BOTH TOP AND BOTTOM BEARING TO BE TAKEN OUT. ALL PARTS TO BE CLEANED.BOTH TOP AND BOTTOM BRG SHELLS AND CROSSHEAD PINS TO BE EXAMINED. CROSSEHAD PIN TO CALIBRATE AND READINGS TO RECORD.DYE PENETRANT TEST TO BE CARRIED OUT. ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26015.4 TO MEASURE CLEARANCE BETWEEN ALL RECIPROCATING PARTS: 1. CENTERING OF THE LINER. 2. CLEARANCE BETWEEN GUIDE STRIP AND XHD. 3. CLEARANCE BETWEEN GUIDE SHOE AND XHD. ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
i E26016:MAIN ENGINE TURBOCHARGER: ENGINE EA 1 USD 0.00 0.00
I TYPE /CAPACITY / DETAILS : MAKE:MAKE:STX ENPACO TYPE-TCA66-2(TCA -21157) ENGINE EA 1 USD 0.00 0.00
I MAX. DESIGN VALUE: 16600 RPM TMAX. 500 DEG C. ENGINE EA 1 USD 0.00 0.00
E26016.1 THE MAIN ENGINE TURBOCHARGER TO BE THOROUGHLY OVERHAULED STRICTLY INLINE WITH MAKERS GUIDELINE BY A COMPETENT TEAM/AUTHORIZED SERVICE ENGINEER USING SHIP-SUPPLIED SPARES (BEARINGS & SEAL KITS). THE ROTOR TO BE REMOVED AND TRANSPORTED TO THE YARD WORKSHOP, ROTOR TO BE CLEANED, BLADES/NOZZLE TO BE SAND/ASH BLASTED AND DYNAMICALLY BALANCING OF ROTOR TO BE CARRIED OUT IN LINE WITH MAKER'S GUIDELINE. ASSEMBLING OF TURBOCHARGER TO CARRY OUT AFTER THOROUGH REPAIR IN LINE WITH MAKER GUIDELINE. QUOTATION FOR OVERHAULING TO BE ALL-INCLUSIVE, COVERING ALL REPAIR TOOLS, CONSUMABLES, NEW JOINTS AND PACKINGS, MANPOWER, TRANSPORTATION, AND ALL ASSOCIATED COSTS. SPECIAL TOOLS WILL BE PROVIDED BY SHIP.INSPECTION OF SEALING AIR CHANNEL AND VACCUM BREAKER TO BE CARRIED OUT.INSPECTION OF THRUST COLLAR AND GAS OULET GUIDE TO BE CARRIED OUT. SATISFACTORY TRIALS TO BE SHOWN DURING BASIN/SEA TRIAL. ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26016.2 INSPECTION CLEANING AND NDT OFTURBINE BLADES TO BE CARRIED OUT IF TURBINE BLADES ARE WORN OUT SAME TO BE REPLACED (BLADES SHIP SUPPLY). ENGINE SET 1.00 1.00 EA 1 USD 0.00 0.00
E26016.3 RECONDITIONING OF TURBINE BLADES TO BE CARRIED OUT BY COMPETENT FIRM/MAKER AUTHORISE WORKSHOP ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
i E26017: MAIN ENGINE AIR COOLER: ENGINE EA 1 USD 0.00 0.00
I TYPE / CAPACITY / DETAILS :MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM ENGINE EA 1 USD 0.00 0.00
E26017.1 AIR COOLER TO BE REMOVED FROM ITS LOCATION AFTER DISCONNECTING ALL ASSOCIATED CONNECTIONS AND TRANSPORTED TO THE YARD’S WORKSHOP. THE COOLER TO BE DISMANTLED, AND THE ELEMENT TO BE CHEMICALLY AND/OR ULTRASONICALLY CLEANED ON BOTH THE AIR AND WATER SIDES. THE END-COVER ZINC ANODE TO BE RENEWED, AND THE COVERS TO BE PAINTED WITH TEMPERATURE-RESISTANT PAINT (YARD SUPPLY). CLEANING NOZZLES TO BE CLEANED & CLEARED. THE COOLER TO BE PRESSURE TESTED TO 5 BAR AND DEMONSTRATED TO THE SHIP STAFF’S SATISFACTION. UPON SUCCESSFUL COMPLETION OF THE SURVEY, THE AIR COOLER TO BE FITTED BACK IN POSITION USING NEW YARD-SUPPLIED CONSUMA-BLES (GASKETS, NUTS, BOLTS, O-RINGS, ETC.), AND OPERATIONAL TRIALS TO BE DEMONSTRATED. THE QUOTATION FOR OVERHAULING TO BE INCLUSIVE OF ALL REPAIR TOOLS, CONSUMABLES, NEW JOINTS AND PACKINGS, MANPOWER, TRANSPORTATION, AND ALL ASSOCIATED COSTS. ENGINE SET 1.00 1.00 EA 1 USD 0.00 0.00
E26017.2 IF ANY TUBES ARE LEAKING PLUGGING TO BE DONE.QUOTE FOR PLUGGING OF 10 NOS TUBE USING YARD SUPPLIED SUITABLE PLUGS. ENGINE NOS 10.00 10.00 EA 1 USD 0.00 0.00
E26017.3 MANOMETER ASSEMBLY TO RENEW USING YARD SUPPLIED U-TUBE MANOMETETR . ENGINE SET 1.00 1.00 EA 1 USD 0.00 0.00
E26017.4 TWO NO.DRAIN COCKS TO RENEW USING YARD SUPPLIED COCKS. DIA-APPROX 25MM. ENGINE SET 2.00 2.00 EA 1 USD 0.00 0.00
E26017.5 AIR COOLER HOSUING TO BE THORUGHLY CLEANED FROM INSIDE/OUTSIDE AND TO BE COATED WITH WITH SUITABLE COATING/PAINT( YARD SUPPLY). ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
E26017.6 WATER MIST CATCHER IN FRONT OF AIR COOLER TO BE TAKEN OUT AND THOROUGH CLEANING TO BE CARRIED OUT.DRAIN PIPES TO BE CHECKED FOR ANY BLOCKAGE.SAME TO CLEAR AND SHOWN TO SHIPSTAFF PRIOR FIT BACK IN PLACE. ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
E26017.7 ALL UNIT UNDERPISTON SPACE AND SCAVENGE DRAIN VALVE TO TAKEN OUT FOR OVERHAULING AND PROPER OPERATION TO BE CHECKED.ANY DEFCETS SAME TO BE REPLACED. DIA 25MM. ENGINE NOS 8.00 8.00 EA 1 USD 0.00 0.00
i E26018:MAIN ENGINE AUXILIARY BLOWERS: ENGINE EA 1 USD 0.00 0.00
I TYPE / CAPACITY / DETAILS :MAN B & W 6S50 MC-C8 TIER II POWER= 9480 KW @ 127 RPM ENGINE EA 1 USD 0.00 0.00
E26018.1 2 NOS M/E AUXILIARY BLOWERS TO BE REMOVED,DISMANTLED,THOROUGHLY CLEANED, ALL PARTS TO BE SHOWN TO SURVEYORS & ROTOR TO BE DYNAMICALLY BALANCED. ONLY AFTER SUPTD/SURVEYORS APPROVAL BLOWERS TO BOX BACK WITH NEW GASKETS (YARD SUPPLY) & GAS LOCK SEALS (YARD SUPPLY). STUFFING BOXES TO OVERHAUL & DEFECTIVE PARTS INCLUDING BLOWER BEARINGS TO RENEW(YARD SUPPLY). SATIFACTORY TRIALS TO BE GIVEN TO CEO/SUPDT. ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
i E26019: PRE-TENSIONING STAY BOLTS; TIE BOLTS FOR M/E: ENGINE EA 1 USD 0.00 0.00
I TYPE / CAPACITY / DETAILS :MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM ENGINE EA 1 USD 0.00 0.00
E26019.1 28 NOS. TIE BOLTS TO BE CHECKED FOR PRETENSION. HYDRAULIC DISMANTLING PRESSURE 1500 BAR (TO CONFIRM).STAY BOLTS TO BE RETIGHTENED IN PAIRS WORKING FROM THE MIDDLE TOWARDS ONE END AND THEN AGAIN FROM THE MIDDLE TOWARDS THE OTHER END.HYDRAULIC PRESSURE TO BE MAINTAINED AT D1 AND STAY BOLT NUTS RETIGHTENED WITH A TOMMY BAR MAKING SURE NUTS BEARING AGAINST CONTACT FACE WITH A FEELER GUAGE. AFTER COMPLETING ALL BOLTS THE FIRST PAIR OF STAY BOLTS TO BE TIGHTENED TO 10% BELOW D1 AND NUT TO BE CHECKED FOR LOOSENESS. IF FOUND LOOSE ALL STAY BOLTS TO BE TIGHTENED ONCE AGAIN. IF NOT LOOSE THE FIRST PAIR TO BE TIGHTENED TO D1 . ENGINE NOS 28.00 28.00 EA 1 USD 0.00 0.00
i E26020: RE-TIGHTENING OF HOLDING DOWN BOLTS & END CHOCKS FOR M/E : ENGINE EA 1 USD 0.00 0.00
I TYPE / CAPACITY / DETAILS :MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM ENGINE EA 1 USD 0.00 0.00
E26020.1 ALL HOLDING DOWN BOLTS TIGHTNESS TO BE CHECKED (USING HYDRAULIC JACK MARKED WITH HOLDING DOWN BOLTS) BY RAISING THE HYDRAULIC PRESSURE SLOWLY WHILE CONSTANTLY ATTEMPTING TO LOOSEN THE NUT WITH THE TOMMY BAR. THE OIL PRESSURE INDICATED BY THE PRESSURE GAUGE WHEN THE NUT COMES TO LOOSE (LOOSENING PRESSURE) IS TO BE RECORDED IN THE CHECKING TABLE. THE BOLTS ARE TIGHTENED TO THE NORMAL TIGHTENINIG PRESSURE THEREAFTER. TIGHTENING PRESSURE – TO CONFIRM. ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
E26020.2 END CHOCK BOLTS TIGHTNESS TO BE CHECKED (USING HYDRAULIC JACK MARKED WITH EPOXY CHOCKS) BY RAISING THE HYDRAULIC PRESSURE SLOWLY WHILE CONSTANTLY ATTEMPTING TO LOOSEN THE NUT WITH THE TOMMY BAR. THE OIL PRESSURE INDICATED BY THE PRESSURE GAUGE WHEN THE NUT COMES TO LOOSE (LOOSENING PRESSURE) IS TO BE RECORDED IN THE CHECKING TABLE. THE BOLTS ARE TIGHTENED TO THE NORMAL TIGHTENINIG PRESSURE THEREAFTER. ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
I WARNING: ACCIDENTAL APPLICATION OF LARGER JACK (MEANT FOR THE END CHOCK BOLTS) ON THE HOLDING DOWN BOLTS WOULD CAUSE SERIOUS OVER-STRESSING OF EPOXY SUPPORTING CHOCKS. ENGINE INSTRUCTION EA 1 USD 0.00 0.00
I IMMEDIATELY AFTER FINISHING OF CHECKING OF THE LOOSENING PRESSURES OF THE HOLDING DOWN BOLTS AND THE RETIGHTENING OF THE HEIGHT OF THE EPOXY SUPPORTING CHOCKS ARE TO BE CHECKED. ENGINE INSTRUCTION EA 1 USD 0.00 0.00
I E26021:MAIN ENGINE CRANKCASE & SUMP: ENGINE EA 1 USD 0.00 0.00
I TYPE / CAPACITY / DETAILS : MAN B & W 6S50MC-C8 TIER II POWER = 9480 KW @ 127 RPM ENGINE EA 1 USD 0.00 0.00
E26021.1 MAIN ENGINE SUMP (CIRCULATING LUB OIL TK.) LUB OIL TO REMOVE FROM THE TANK & COLLECT IN ABSOLUTELY CLEANED TKS OR DRUMS (YARD SUPPLY); TANK TO BE VENTILATED; MAN ENTRY CERTIFICATE TO BE OBTAINED AND TANK TO BE THOROUGHLY CLEANED OFF SLUDGE.CAPACITY:18.0M3.MANHOLES FOR THE SUMP ENTRY TO BE OPENED AND BOXED BACK AFTER THE WORK. ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26021.2 ENTIRE CRANK CASE WITH GEARS TO BE CLEANED THOROUGHLY TO REMOVE DIRTY OIL STAINS FROM THE WALLS OF CRANK CASE & SURFACES OF THE RUNNING GEARS. ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26021.3 INSPECTION OF CRANKCASE DRAIN TANK STRUCTURE TO BE CARRIED OUT; IF ANY CRACK FOUND IN THE STRUCTURE IN BETWEEN COFFERDAM AND DRAIN TANK; SAME TO BE WELDED / REPAIRED AFTER OBTAINING NECESSARY HOTWORK PERMIT. ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
E26021.4 LOW OIL LEVEL ALARM TO BE TRIED OUT AND ANY DEFCETS NOTICE SAME TO RECTIFY PRIOR TAKING OIL INTO SYSTEM.TO PUT BACK IN SUMP AFTER COMPLETION OF CLEANING AND INSPECTION. ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
E26021.5 THE NEOPRENE JOINT /DIAPHRAGM BETWEEN THE SUMP AND CRANCASE TO RENEW ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
I ABOVE QUOTE TO BE INCLUSIVE OF CONSUMMABLES, GASKET, MANPOWER , TRANSPORTATION, EMPTY TANK FACILITY, PORTABLE PUMP HOSES ETC. ENGINE INSTRUCTION EA 1 USD 0.00 0.00
i E26022: MAIN ENGINE CYLINDER LUBRICATOR : ALFA LUBRICATOR ENGINE EA 1 USD 0.00 0.00
I TYPE / CAPACITY / DETAILS :MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM ENGINE EA 1 USD 0.00 0.00
I FOLLOWING THOROUGH MAINTENANCE TO BE UNDERTAKEN AS PER MAKER RECOMMENDATION MAINTENANCE SCHEDULE BY COMPETENT/OEM SERVICE ENGINEER. ENGINE EA 1 USD 0.00 0.00
E26022.1 THE FOLLOWING COMPONENTS MUST BE RENEWED FROM SHIP SUPPLIED SPARE AND NITROGEN GAS TO BE CHARGED IN ACCUMULATOR: ACCUMULATORS SOLENOID VALVES NON-RETURN VALVES FEEDBACK SENSORS SEALINGS AND O-RINGS ENGINE SET 6.00 6.00 EA 1 USD 0.00 0.00
E26022.2 PUMP STATION JOB SCOPE: TO CARRY OUT THORUGH CHECKS OF FILTER INSERTS, COULPING SPIDERS AND ALL RELATED COMPONENT. SYSTEM TO BE THOROUGHLY CLEANED AND OVERHAULED, TANK TO BE CLEANED AND ASSEMBLED BACK PROPERLY. ENGINE SET 2.00 2.00 EA 1 USD 0.00 0.00
E26022.3 LUBRICATION PERFORMANCE ENSURE CORRECT LUBRICATION DOSING AS PER SETPOINT CHECK FOR LOW OR MISSING ACCUMULATOR PRESSURE OR EXCESS LUBRICATION ENGINE SET 6.00 6.00 EA 1 USD 0.00 0.00
E26022.4 BOTH MCU AND BCU CARD TO CHECK & SIMULATION TEST TO BE SHOWN SUPTD/SHIP STAFF.LOAD SENSING UNIT TO CHECK FOR PROPER OPERATION AND SAME TO REPLACE IF FOUND DEFECTIVE ENGINE SET 2.00 2.00 EA 1 USD 0.00 0.00
E26022.5 QUOTE SEPARATELY FOR ARRANGEMENT OF COMPETENT SERVICE ENGR/OEM ENGR FOR ABOVE JOB.CONSIDER TWO DAYS OF ATTENADANCE AT THE END OF THE PROJECT. ENGINE DAYS 2.00 2.00 EA 1 USD 0.00 0.00
i E26023:ME VIBRATION DAMPER: ENGINE EA 1 USD 0.00 0.00
i TYPE / CAPACITY / DETAILS :MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM ENGINE EA 1 USD 0.00 0.00
E26023.1 ME VIBRATION DAMPERS TO BE OPEN UP, THOROUGH CHECKS TO CARRY OUT UNDER THE SUPERVISION OF COMPETENT/SERVICE ENGINEER AND PUT UP TO SURVEYOR FOR CHECKS AND VERIFICATION UNDER CSM SURVEY.AFTER COMPLETION OF INSPECTION & REPAIR, SAME TO BE BOXED BACK AS PER MAKER'S GUIDELINES .BOLT AND NUTS TO CHECK FOR TIGHTNESS. ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
i E26024:AUXILIARY ENGINE - 2 SETS YANMAR, 1 SET STX-MAN ENGINE EA 1 USD 0.00 0.00
i A: TYPE / CAPACITY / DETAILS : MAKE : YANMAR (AE#1 & #3) :TYPE:VERTICAL WATER COOLING DIRECT INJECTION TYPE 4 CYCLE DIESEL ENGINE, MODEL: 6EY18ALW, CYLINDER BORE X STROKE:180 X 280 MM, RATED OUT PUT:660 KW,RATED SPEED: 900 RPM ENGINE EA 1 USD 0.00 0.00
i ENGINE TO ISOLATE AND DRAINED, ALL CONNECTIONS, INLET MANIFOLED, OUTLET MANIFOLD, PIPES CONNECTORS, TAPPET ASSEMBLY ETC AND ACCESSORIES TO BE OPENED UP FOR FOLLOWING JOBS AND SAME TO BE FITTED BACK WITH YARD SUPPLIED CONSUMABLES( GASKET, O RINGS, BOLTS & NUTS). INVOICE WILL BE SETTLED ON PRORATA BASIS. ENGINE MAINTENANCE TO BE CARRIED OUT BY COMPETENT YARD TEAM. ENGINE INSTRUCTION EA 1 USD 0.00 0.00
E26024.1 CRANK SHAFT DEFLECTION TO BE TAKEN BEFORE DISMANTLING AND AFTER ASSEMBLING.ALL READINGS TO BE SUBMITTED. ENGINE SET 2.00 2.00 EA 1 USD 0.00 0.00
E26024.2 MAJOR OVERHAULING/12000 HRS ROUTINE & MAINTENANCE: ALL UNIT CYLINDER HEADS TO BE REMOVED.ALL MOUNTINGS INLET V/V EXH VALVE TO O'HAUL PRESSUE TEST AS PER MAKER GUIDELINES (SPARE SHIP SUPPLY) . ALL CYLINDER HEADS TO BE CHEMICALLY CLEANED THOROUGHLY. COOLING WATER SIDE SCALE TO REMOVE AND TO BE PRESSURE TESTED TO 4 BAR. CYLINDER HEAD & MOUNTINGS INCLUDING FUEL INJECTORS TO BE CAREFULLY OVERHAULED IN LINE WITH MAKERS GUIDELINES USING SHIP SUPPLIED SPARES. OVERHALED CYLINDER HEAD TO BE FITTED BACK ON ENGINE. ALL PISTONS WITH CONNECTING ROD ASSEMBLY TO BE WITHDRRAWN, CAREFULLY OVERHAULED, CALIBRATED AND PISTONS/NEW PISTONS AND CON ROD ASSEMBLY TO BE FITTED BACK IN THE ENGINE USING SHIP SUPPLIED SPARES (PISTON RINGS, BEARINGS, BUSHES ETC). PISTON AND LINER TO BE CLEANED AND TO BE CALIBERATED. LINERS TO BE WITHDRAWN, CAREFULLY OVERHAULED, COOLING SPACE TO THOROUGHLY CLEANED AND OLD/NEW LINERS TO BE FITTED BACK ON ENGINE. LINERS TO BE FITTED BACK WITH NEW O-RING(SHIP'S SUPPLY). ALL UNITS TO BE COMPLETELY BOXED BACK. ALL FUEL INJECTORS TO OVERHAUL AND ASSEMBLE BACK USING NEW OVERHAUL KIT( SHIP SUPPLY),PR TESTED, TO BE TRANSPORT TO SHIP , FIT BACK IN PLACE AND ALL CONNECTIONS TO BE MADE. SATISFACTORY ENGINE TRIALS TO BE GIVEN ON NO-LOAD AND ON MAXIMUM RATED LOAD TO SATISFACTION OF SUPTD/SURVEYOR. ENGINE SETS 2.00 2.00 EA 1 USD 0.00 0.00
E26024.3 ALL FUEL INJECTION PUMPS TO REMOVE FROM PLACE; TRANSPORT TO YARD'S WORKSHOP; DISMANTLE COMPLETELY AND TO BE OVERHAULED. ALL DAMAGED; WORNOUT PARTS TO REPLACE WITH NEW SPARES (SHIP'S SUPPLY). ALL FUEL PUMPS TO ASSEMBLE WITH NEW SEAL RINGS & GASKETS; TO BE TRANSPORTED TO SHIP FIT IN PLACE AND ALL CONNECTIONS TO BE MADE.AFTER FITTING IN PLACE INJECTION TIMINGS TO BE CHECKED AND ADJUSTED STRICTLY AS PER MAKER'S GUIDE LINES. ENGINE NOS 12.00 12.00 EA 1 USD 0.00 0.00
E26024.4 ALL FUEL; EXHAUST AND INLET CAMS TO EXAMIN. FOR REPLACING ONE OR MORE CAMS; COMPLETE CAM SHAFT WILL REQUIRE TO BE WITHDRAWN; AFTER REMOVING DRIVE GEAR AND BEARINGS. QUOTE FOR INSPECTION OF CAMS AND RENEWAL OF THREE CAMS ON ONE ENGINE (ONE UNIT SET) ENGINE SET 2.00 2.00 EA 1 USD 0.00 0.00
E26024.5 AUX. ENGINE LUB OIL COOLERS TO BE CHEMICALLY CLEANED( OIL SIDE & WATER SIDE), PRESSURE TESTED AND FITTED BACK USING YARD SUPPLIED CONSUMABLES( GASKETS, NUT, BOLTS ETC) . ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26024.6 AUX. ENGINE JACKET COOLERS TO BE CHEMICALLY CLEANED ( WATER SIDE & WATER SIDE), PRESSURE TESTED AND FITTED BACK USING YARD SUPPLIED CONSUMABLES (GASKETS, NUT, BOLTS ETC) . ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26024.7 AIR COOLERS TO REMOVE FROM PLACE; DISMANTLED BY OPENING COVERS; ELEMENT TO BE ULTRASONICALLY CLEANED /CHEMICALLY CLEANED FOR 24 HRS IN STEAMMED CHEMICAL BATH. AFTYER THOROUGH CLEANING ELEMENT TO BE FURTHER CLEANED WITH WATER. ELEMENT TO BE BOXED BACK & COMPLETE ASSEMBLY OF COOLER TO BE PRESSURE TESTED. ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26024.8 ALL CRANK PIN BEARING, MAIN BEARING & THRUST BEARING CLEARANCE TO BE RECORDED BEFORE OPENING AND AFTER BOXING BACK. BOTH THE AUX ENGINE CONNECTING ROD BOLTS AND CRANK PIN BOLTS TO BE RENEWED (SHIP SUPPLY).CRANK PIN BEARING TO PUT UP FOR SURVEY.CRANKS PINS AND CONNECTING ROD BIG END TO BE GAUGED FOR OVALITY.AFTER COMPLITION OF SURVEY BEARING( NEW/OLD) TO BE FITTED BACK IN PLACE. ENGINE SET 2.00 2.00 EA 1 USD 0.00 0.00
E26024.9 MAIN BEARING AND JOURNAL TO BE OPENED UP FOR CSM SURVEY.CHECK AND RECORD ALL BRG CLEARANCES BEFORE AND AFTER INSPECTION.ALL PARTS TO CLEAN AND PRESENT TO CLASS SURVEYOR.AFTER SUCCESSFUL COMPLETION OF SURVEY BEARINGS TO BE BOXED BACK AS ORIGINAL USING NEW/OLD SHELLS. ENGINE NOS 14.00 14.00 EA 1 USD 0.00 0.00
E26024.10 THRUST BEARING TO BE RENEWED USING SHIP SUPPLIED BEARING PLATES ENGINE SETS 2.00 2.00 EA 1 USD 0.00 0.00
E26024.11 AUX ENGINES ATTACH LO & HT PUMP TO OVERHAUL & FIT BACK (SPARES SHIP SUPPLY). ENGINE SET 2.00 2.00 EA 1 USD 0.00 0.00
E26024.12 THOROUGH OVERHAULING OF AUX ENGINE TURBOCHARGERS (MAKE : MITSUBISHI MET 18-22SRC) TO CARRY OUT INLINE WITH MAKER'S GUIDE LINES INCLUDING DYNAMIC BALANCING OF ROTOR ,ASH/SAND BLASTING OF ROTOR & NOZZLE, BEARING REPLACEMENT AND CONSUMABLE REPLACEMENT.CLEANING AND THICKNESS GAUGING OF GAS OUT LET CASING TO BE UNDERTAKEN.JOB TO BE UNDERTAKEN BY YARD COMPETENT TEAM/SERVICE ENGR INLINE WITH MAKER GUIDELINE. SPARE SHIP SUPPLY.QUOTE ALL INCLUSIVE. ENGINE SET 2.00 2.00 EA 1 USD 0.00 0.00
E26024.13 THOROUGH OVERHAULING OF AUX ENGINE GOVERNOR (WOODWORD- UG 25+) TO BE CARRIED OUT AND BENCH TEST TRIAL TO BE SHOWN TO CEO/SUPTD PRIOR TO INSTALLATION ON BOARD.SATISFACTORY LOAD TEST TRIAL TO BE SHOWN AT MAXIMUM LOAD.ALL CONSUMABLES REQUIRED FOR OVERHAILING OF GOVERNORS TO BE (YARD SUPPLY). JOB TO BE UNDERTAKEN MAKER'S AUTHORIZED TEAM/COMPETENT SERVICE ENGR INLINE WITH MAKER GUIDELINE. MAKE:WOODWARD UG 25+. QUOTE ALL INCLUSIVE INCLUDING SERVICE KIT. ENGINE SET 2.00 2.00 EA 1 USD 0.00 0.00
i B. TYPE / CAPACITY / DETAILS : MAKE : MAN B&W (AE#2) , TYPE:VERTICAL WATER COOLING DIRECT INJECTION TYPE 4 CYCLE DIESEL ENGINE , MODEL: 6L16/24 , CYLINDER BORE X STROKE: 160 X 240 MM, RATED OUT PUT:660 KW,RATED SPEED: 1200 RPM ENGINE EA 1 USD 0.00 0.00
i ENGINE TO ISOLATE AND DRAINED, ALL CONNECTIONS, INLET MANIFOLED, OUTLET MANIFOLD, PIPES CONNECTORS, TAPPET ASSEMBLY ETC AND ACCESSORIES TO BE OPENED UP FOR FOLLOWING JOBS AND SAME TO BE FITTED BACK WITH YARD SUPPLIED CONSUMABLES( GASKET, O RINGS, BOLTS & NUTS). INVOICE WILL BE SETTLED ON PRORATA BASIS.ENGINE MAINTENANCE TO BE CARRIED OUT BY COMPETENT YARD TEAM. ENGINE INSTRUCTION EA 1 USD 0.00 0.00
E26024.14 CRANK SHAFT DEFLECTION, CRANK PIN BEARINGS CLEARANCE, MAIN BEARING & THRUST BEARING CLEARANCES TO BE RECORDED BEFORE DISMANTLING AND AFTER ASSEMBLING.ALL READINGS TO BE SUBMITTED. ENGINE SET 1.00 1.00 EA 1 USD 0.00 0.00
E26024.15 MAJOR OVERHAULING/12000 HRS ROUTINE & MAINTENANCE: ALL UNIT CYLINDER HEADS TO BE REMOVED.ALL MOUNTINGS INLET V/V EXH VALVE TO O'HAUL, PRESSUE TEST AS PER MAKER GUIDELINES (SPARE SHIP SUPPLY) . ALL CYLINDER HEADS TO BE CHEMICALLY CLEANED THOROUGHLY. COOLING WATER SIDE SCALE TO REMOVE AND TO BE PRESSURE TESTED TO 4 BAR. CYLINDER HEAD & MOUNTINGS INCLUDING FUEL INJECTORS TO BE CAREFULLY OVERHAULED IN LINE WITH MAKERS GUIDELINES USING SHIP SUPPLIED SPARES. OVERHAULED CYLINDER HEAD TO BE FITTED BACK ON ENGINE. ALL PISTONS WITH CONNECTING ROD ASSEMBLY TO BE WITHDRRAWN, CAREFULLY OVERHAULED, CALIBRATED AND PISTONS/NEW PISTONS AND CON ROD ASSEMBLY TO BE FITTED BACK IN THE ENGINE USING SHIP SUPPLIED SPARES (PISTON RINGS, BOTTOM END BOLTS BEARINGS, BUSHES ETC). PISTON AND LINER TO BE CLEANED AND TO BE CALIBERATED. LINERS TO BE WITHDRAWN, CAREFULLY OVERHAULED, COOLING SPACE TO THOROUGHLY CLEANED AND OLD/NEW LINERS TO BE FITTED BACK ON ENGINE. LINERS TO BE FITTED BACK WITH NEW O-RING(SHIP'S SUPPLY). CRANKS PINS AND CONNECTING ROD BIG END TO BE GAUGED FOR OVALITY.AFTER COMPLITION OF SURVEY, BOTTOM END BOLTS, BOTTOM END BEARINGS SHELL, MAIN BEARINGS SHELL, PISTON PIN BUSHES , THRUST BEARING PLATES TO BE RENEWED WITH SHIP SUPPLIED SPARES.ALL UNITS TO BE COMPLETELY BOXED BACK. ALL FUEL INJECTORS TO OVERHAUL AND ASSEMBLE BACK USING NEW OVERHAUL KIT (SHIP SUPPLY),PR TESTED, TO BE TRANSPORT TO SHIP , FIT BACK IN PLACE AND ALL CONNECTIONS TO BE MADE. SATISFACTORY ENGINE TRIALS TO BE GIVEN ON NO-LOAD AND ON MAXIMUM RATED LOAD TO SATISFACTION OF SUPTD/SURVEYOR. THE JOB TO BE CARRIED OUT BY YARD'S COMPETENT TEAM STRICTLY IN LINE WITH MAKER'S GUIDE LINE. QUOTE ALL INCLUSIVE. ENGINE SETS 1.00 1.00 EA 1 USD 0.00 0.00
E26024.16 ALL FUEL INJECTION PUMPS TO REMOVE FROM PLACE; TRANSPORT TO YARD'S WORKSHOP; DISMANTLE COMPLETELY AND TO BE OVERHAULED. ALL DAMAGED; WORNOUT PARTS TO REPLACE WITH NEW SPARES (SHIP'S SUPPLY). ALL FUEL PUMPS TO ASSEMBLE WITH NEW SEAL RINGS & GASKETS; TO BE TRANSPORTED TO SHIP FIT IN PLACE AND ALL CONNECTIONS TO BE MADE. AFTER FITTING IN PLACE, INJECTION TIMINGS TO BE CHECKED AND ADJUSTED STRICTLY AS PER MAKER'S GUIDE LINES. ENGINE NOS 6.00 6.00 EA 1 USD 0.00 0.00
E26024.17 ALL UNIT CYLINDER HEADS TO BE REMOVED AND REPLACED WITH NEW CYLINDER HEADS SUPPLIED BY VESSELS USING NEW GASKETS & O RINGS (SPARE SHIP SUPPLIED). ENGINE NOS 6.00 6.00 EA 1 USD 0.00 0.00
E26024.18 ALL FUEL; EXHAUST AND INLET CAMS TO EXAMINE & CAM SHAFT BEARINGS TO RENEW (SPARE SHIP SUPPLIED) STRICTLY IN LINE WITH MAKERS GUIDE LINES. ENGINE ENGINE SET 1.00 1.00 EA 1 USD 0.00 0.00
E26024.19 AUX. ENGINE LUB OIL COOLERS TO BE CHEMICALLY CLEANED( OIL SIDE & WATER SIDE), PRESSURE TESTED AND FITTED BACK USING YARD SUPPLIED CONSUMABLES( GASKETS, NUT, BOLTS ETC) . ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26024.20 AUX. ENGINE JACKET COOLERS TO BE CHEMICALLY CLEANED ( WATER SIDE & WATER SIDE), PRESSURE TESTED AND FITTED BACK USING YARD SUPPLIED CONSUMABLES (GASKETS, NUT, BOLTS ETC) . ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26024.21 AIR COOLERS TO REMOVE FROM PLACE; DISMANTLED BY OPENING COVERS; ELEMENT TO BE ULTRASONICALLY CLEANED /CHEMICALLY CLEANED FOR 24 HRS IN STEAMMED CHEMICAL BATH. AFTYER THOROUGH CLEANING, ELEMENT TO BE FURTHER CLEANED WITH WATER. ELEMENT TO BE BOXED BACK & COMPLETE ASSEMBLY OF COOLER TO BE PRESSURE TESTED. ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26024.22 AUX ENGINES ATTACH LO & HT PUMP TO OVERHAUL & FIT BACK (SPARES SHIP SUPPLY). ENGINE SET 1.00 1.00 EA 1 USD 0.00 0.00
E26024.23 THOROUGH OVERHAULING OF AUX ENGINE TURBOCHARGERS (MAKE : MAKE STX- MAN TCR 12) TO CARRY OUT INLINE WITH MAKER'S GUIDE LINES INCLUDING DYNAMIC BALANCING OF ROTOR ,ASH/SAND BLASTING OF ROTOR & NOZZLE, BEARING REPLACEMENT AND CONSUMABLE REPLACEMENT.CLEANING AND THICKNESS GAUGING OF GAS OUT LET CASING TO BE UNDERTAKEN.JOB TO BE UNDERTAKEN BY YARD COMPETENT TEAM/SERVICE ENGR INLINE WITH MAKER GUIDELINE. SPARE SHIP SUPPLY.QUOTE ALL INCLUSIVE. ENGINE SET 1.00 1.00 EA 1 USD 0.00 0.00
E26024.24 THOROUGH OVERHAULING OF AUX ENGINE GOVERNOR (MODEL:EUROPA RE2800) TO BE CARRIED OUT AND BENCH TEST TRIAL TO BE SHOWN TO CEO/SUPTD PRIOR TO INSTALLATION ON BOARD.SATISFACTORY LOAD TEST TRIAL TO BE SHOWN AT MAXIMUM LOAD.ALL CONSUMABLES REQUIRED FOR OVERHAILING OF GOVERNORS TO BE (YARD SUPPLY). JOB TO BE UNDERTAKEN BY MAKER'S AUTHORIZED COMPETENT TEAM/SERVICE ENGR INLINE WITH MAKER GUIDELINE. QUOTE ALL INCLUSIVE INCLUDING SERVICE KIT FOR OVERHAUL. ENGINE SET 1.00 1.00 EA 1 USD 0.00 0.00
i E26025: ALTERNATOR: ENGINE EA 1 USD 0.00 0.00
I A. AE#1& 3 MAKER : TAIYO, CAPACITY : 450V; 781.25 KVA ; 60Hz ; 900RPM, MODEL : FE647B-8 => 2NOS B. AE#2 MAKER : HYUNDAI, CAPACITY : 450V; 781.25 KVA ; 60Hz ; 1200RPM, MODEL : HFC7 504 - 64K=> 1NO. ENGINE EA 1 USD 0.00 0.00
E26025.1 REMOVAL & PRE-INSPECTION: REMOVE ALTERNATOR END COVERS AND COOLING FANS. MEASURE AND RECORD AIR GAPS AND INSULATION RESISTANCE (MEGGER READINGS) OF ALL WINDINGS BEFORE CLEANING IN THE PRESENCE OF THE ELECTRICAL OFFICER. CLEANING CHEMICALLY CLEAN ALL WINDINGS, ROTOR, AND EXCITER ASSEMBLY USING APPROVED ELECTRICAL CLEANING SOLVENTS. DRY ALL COMPONENTS USING COMPRESSED AIR. CLEAN AIR FILTERS AND COOLING FANS. PRESENT ALL PARTS TO THE SURVEYOR FOR INSPECTION. IN-SITU MAINTENANCE ARRANGE IN-SITU CLEANING OR MAINTENANCE AS REQUIRED. POST-CLEANING TREATMENT BAKE ALL WINDINGS USING EXTERNAL HEATERS AND HOT AIR BLOWERS. EXCITOR COIL TO CLEAN AND BAKED PRIOR FITMENT. APPLY HIGH-QUALITY INSULATION VARNISH TO WINDINGS. CHECK AND RETIGHTEN ALL TERMINAL CONNECTIONS. ADJUSTMENT & ALIGNMENT IF AIR GAPS ARE FOUND TO BE NON-UNIFORM, ADJUST STATOR FEET TO ACHIEVE THE BEST POSSIBLE VALUES WITHOUT ALTERING ROTOR LOCATION OR CRANKSHAFT DEFLECTION. REASSEMBLY & APPROVAL REFIT END COVERS AND COOLING FANS. BOX BACK THE ALTERNATOR ONLY AFTER APPROVAL FROM THE ATTENDING SURVEYOR. ALL WORK TO BE CARRIED OUT BY A COMPETENT YARD TEAM IN ACCORDANCE WITH THE MANUFACTURER’S GUIDELINES. ENGINE SET 3.00 3.00 EA 1 USD 0.00 0.00
E26025.2 ALTERNATOR END BEARING(SHIP SUPPLY)TO REPLACE AND HOUSING TO BE PROPERLGREASED. ENGINE SET 3.00 3.00 EA 1 USD 0.00 0.00
E26025.3 CONSIDER RE-SLEEVING ONE NO ALTERNATOR SET TO BE CARRIED OUT AS PER NEW BEARING DIA. ENGINE SET 1.00 1.00 EA 1 USD 0.00 0.00
E26025.4 SATISFACTORY TRIAL TO BE SHOWN TO ELO/SUPDT. USING SHIPS LOAD DURING SEA TRIAL. ENGINE SETS 3.00 3.00 EA 1 USD 0.00 0.00
i E26026: AUXILIARY ENGINE AUTOMATION & INSTRUMENTATION: ENGINE EA 1 USD 0.00 0.00
i A. TYPE / CAPACITY / DETAILS : TYPE / CAPACITY / DETAILS : TYPE / CAPACITY / DETAILS : MAKE : YANMAR (AE#1 & #3), TYPE:VERTICAL WATER COOLING DIRECT INJECTION TYPE 4 CYCLE DIESEL ENGINE, MODEL: 6EY18ALW, CYLINDER BORE X STROKE:180 X 280 MM, RATED OUT PUT:660 KW,RATED SPEED: 900 RPM, => 2NOS. B. TYPE / CAPACITY / DETAILS : MAKE : MAN B&W (AE#2), TYPE:VERTICAL WATER COOLING DIRECT INJECTION TYPE 4 CYCLE DIESEL ENGINE, MODEL: 6L16/24, CYLINDER BORE X STROKE: 160 X 240 MM, RATED OUT PUT:660 KW,RATED SPEED: 1200 RPM=> 1NO. ENGINE EA 1 USD 0.00 0.00
i ALL THREE AUX.ENGINE ALARMS AND TRIPS TO CHECK AND ADUST AS PER OPERATORS MANUAL SETTINGS. QUOTE ALL INCLUSIVE FOR THE ARRANGEMENTS.JOB TO BE CARRIED OUT BY YARD COMPETENT INSTRUMENTAION & CONTROL TEAM IN LINE WITH MAKER GUIDELINE.QUOTE ALL INCLUSIVE. ENGINE EA 1 USD 0.00 0.00
E26026.1 TO CHECK & SERVICE AUXILIARY ENGINE CONTROL SYSTEM FOR AUTOMATION SEQUENCE OF AUTO STAND BY AUTO START AUTO LOADING & AUTO STOP.SYSTEM TO BE THROUGHLY CHECKED AND FAULTS NOTICED IF ANY TO BE RECTIFIED.DEFECTIVE/DAMAGED PARTS TO BE RENEWED (SPARE SHIP SUPPLY). ENGINE SET 3.00 3.00 EA 1 USD 0.00 0.00
E26026.2 TO O'HAUL MAIN STARTING VALVE, STARTING MOTOR, EMERGENCY STARTING VALVE, STOP CYLINDER AND OVER SPEED DEVICE.ALL CONSUMABLE SPARES SHIP SUPPLY ENGINE SET 3.00 3.00 EA 1 USD 0.00 0.00
E26026.3 CONTROL OF ALL THREE AES TO BE THROUGHLY CHECKED AND CALIBRATED.ALL IMPORTANT PRESSURE GAUGES, REMOTE TEMPERATURE GAUGES, PRESSURE TRANSMITTERS AND TACHOMETERS TO BE CALIBRATED.CALIBERATION CERTIFICATES TO ISSUE. ENGINE NOS 18.00 18.00 EA 1 USD 0.00 0.00
E26026.4 ARRANGE SUPPLY OF 18 NOS PYROMETERS/EQUIVALENT PYROMETERS( APS) ENGINE NOS 18.00 18.00 EA 1 USD 0.00 0.00
E26026.5 ARRANGE SUPPLY OF 12 NOS HIGH QUALITY PR GAUGES FOR ENGINES ( APS) ENGINE NOS 12.00 12.00 EA 1 USD 0.00 0.00
I ALL THREE AUX.ENGINE ALARMS AND TRIPS TO CHECK AND ADUST AS PER OPERATORS MANUAL SETTINGS. QUOTE ALL INCLUSIVE FOR THE ARRANGEMENTS.JOB TO BE CARRIED OUT BY YARD COMPETENT INSTRUMENTAION & CONTROL TEAM IN LINE WITH MAKER GUIDELINE.QUOTE ALL INCLUSIVE.TO CHECK AND SERVICE ALL ALARMS AND TRIP CONDITIONS.IF NECESSARY CALIBERATION AND SETTING OF SHUT DOWN POINTS TO BE DONE AS PER MAKER'S RECOMMENDATIONS.CHECK ALARM CONDITION OF ALL A.E'S AS FOLLOW: ENGINE INSTRUCTION EA 1 USD 0.00 0.00
E26026.6 a) C.W. INLET LOW PRESSURE ALARM ENGINE NOS 3.00 3.00 EA 1 USD 0.00 0.00
E26026.7 b) L.O.INLET LOW PRESS ENGINE NOS 3.00 3.00 EA 1 USD 0.00 0.00
E26026.8 c) C.W. HIGH TEMP.ALARM ENGINE NOS 3.00 3.00 EA 1 USD 0.00 0.00
E26026.9 d) L.O.INLET HIGH TEMP ENGINE NOS 3.00 3.00 EA 1 USD 0.00 0.00
E26026.10 e) EXHAUST GAS HIGH TEMP ENGINE NOS 3.00 3.00 EA 1 USD 0.00 0.00
E26026.11 f) OVER SPEED ENGINE NOS 3.00 3.00 EA 1 USD 0.00 0.00
i E26027: AIR RECEIVERS:MAKE: JIANGSU YONGTAI MODEL: A45-3 NO OF MANUFACTURE:C10-771 ENGINE EA 1 USD 0.00 0.00
E26027.1 BOTH AIR RECEIVERS SHALL BE OPENED UP AND INTERNALLY CLEANED, THEN COATED WITH EPOXY PAINT (YARD SUPPLY). ANY DAMAGE OR PITTING FOUND, IF ANY, SHALL BE SUITABLY BUILT UP. ALL MOUNTINGS AND VALVES ON BOTH AIR RECEIVERS SHALL BE DISMANTLED, LAPPED, PRESSURE TESTED, AND BLUE IMPRESSION TAKEN AND DEMONSTRATED TO THE SHIP STAFF’S SATISFACTION. VALVES FOUND BEYOND REPAIR SHALL BE RENEWED (SHIP SUPPLY). ALL JOINTS AND GASKETS SHALL BE RENEWED (YARD SUPPLY). THE AIR RECEIVERS SHALL BE PRESENTED TO THE SURVEYOR AND COMPLETED TO THE SURVEYOR’S SATISFACTION UNDER CSM SURVEY. THE QUOTATION FOR OVERHAULING SHALL BE INCLUSIVE OF ALL REPAIR TOOLS, CONSUMABLES, NEW JOINTS AND PACKINGS, MANPOWER, TRANSPORTATION, AND ALL OTHER ASSOCIATED COSTS. ENGINE LS 2.00 2.00 EA 1 USD 0.00 0.00
E26027.2 MANHOLES OF THE AUXILIARY AIR RECEIVER9 EMERGENCY AIR RECEIVER), SHALL BE OPENED. ALL MOUNTINGS SHALL BE OPENED, DISMANTLED, CLEANED, AND PRESENTED TO THE SURVEYOR FOR INSPECTION, THEN REASSEMBLED AND REFITTED TO THE RECEIVERS. INTERNAL SURFACES OF THE RECEIVERS SHALL BE CLEANED, AND THE COATING SHALL BE INSPECTED AND REPAIRED WHERE REQUIRED. AF-TER COMPLETION OF THE SURVEY, ALL MOUNTINGS SHALL BE REFITTED. THE QUOTATION FOR VALVE OVERHAULING SHALL BE INCLUSIVE OF ALL REPAIR TOOLS, CONSUMABLES, NEW JOINTS AND PACKINGS, MAN-POWER, TRANSPORTATION, AND ALL OTHER ASSOCIATED COSTS. ENGINE LS 3.00 3.00 EA 1 USD 0.00 0.00
i E26028: COMPOSITE BOILER (TO SURVEY): ENGINE EA 1 USD 0.00 0.00
I TYPE / CAPACITY / DETAILS : TYPE / CAPACITY / DETAILS : MAKE - AALBORG MISSION OC TYPE - COMPOSITE,CAPACITY-1200/1200 KG/HR WORKING PRESSURE: 7 BAR,DESIGN PR.:9 BAR ENGINE EA 1 USD 0.00 0.00
E26028.1 MANHOLE & HANDHOLE INSPECTION: OPEN ALL SMOKE AND WATER SIDE MANHOLE DOORS AND HANDHOLE COVERS. CHECK FOR SURFACE UNEVENNESS. SMOOTHEN LIP SURFACES OF MANHOLE DOORS, HANDHOLES, AND BOILER OPENINGS TO ENSURE PROPER SEALING WHEN BOXED BACK. CLEANING – WATER SIDE THOROUGHLY CLEAN THE WATERSIDE OF THE BOILER, REMOVING SCALE AND HEAVY OIL DEPOSITS. USE HIGH-PRESSURE WATER JET FOR INITIAL CLEANING. CIRCULATE CHEMICAL CLEANING AGENTS USING EXTERNAL PUMP ARRANGEMENTS FOR 48 HOURS. CIRCULATE WATER TO FLUSH OUT RESIDUAL CHEMICALS AFTER CLEANING. CLEANING – SMOKE / GAS SIDE THOROUGHLY CLEAN THE EXHAUST GAS SIDE SURFACES. SCOPE & COST INCLUSION CHEMICAL SUPPLY (PER KG) CONSUMABLES AND MATERIALS REQUIRED LABOUR, TOOLS, PUMPS, AND ALL ASSOCIATED WORKS CONSIDERATION FOR HEAVY OIL DEPOSITS ON WATER SIDE TUBES BOILER FURNACE DOOR TO BE OPENED UP AND ALL TUBES EXHAUST SIDE TO BE THOUROUGHLY CLEANED OFF ALL SOOT AND CARBON DEPOSITS. POST-CLEANING INSPECTION: AFTER CLEANING, INSPECT ALL SMOKE TUBES, WATERSIDE, AND SMOKE SIDE OF THE BOILER FOR PITTING, CORROSION, OR OTHER DEFECTS. PITTINGS ON THE SMOKE TUBE (PIN TUBE) TO BE GROUND AND WELDED AS PER RPOCEDURE AGREED BY SURVEYORS. INSPECT ALL MANHOLE AND HANDHOLE JOINTS. RENEWALS & PREPARATIONS RENEW ALL MANHOLE AND HANDHOLE JOINTS USING YARD-SUPPLIED MATERIALS. HYDRAULIC TESTING CARRY OUT HYDRAULIC TESTING OF THE BOILER IN ACCORDANCE WITH CLASS AND MANUFACTURER REQUIREMENTS. DOCUMENT TEST RESULTS FOR VERIFICATION. SURVEY PRESENTATION PRESENT THE BOILER FOR CLASS/OWNER SURVEY AFTER CLEANING AND HYDRAULIC TESTING. REASSEMBLY AFTER SURVEY APPROVAL, REFIT ALL MANHOLE AND HANDHOLE COVERS WITH NEW JOINTS, NUTS, BOLTS, AND PACKING (YARD SUPPLY). ENSURE PROPER SEALING AND TIGHTNESS FOR OPERATIONAL READINESS. ENGINE SET 1.00 1.00 EA 1 USD 0.00 0.00
E26028.2 BOILER FEED CONTROL & COMBUSTION CONTROL TO BE CHECKED. CONTROLLER TO BE SERVICED & CALIBRATED BY SERVICE ENGINEER. ; SAME TO SHOW TO SHIP STAFF; SATISFACTORY WORLKING TRIAL TO BE SHOWN TO SHIP STAFF. ENGINE SET 1.00 1.00 EA 1 USD 0.00 0.00
I FOLLOWING MOUNTINGS AND V/VS TO BE OVERHAULED; PUT UP FOR SURVEY .ALL MOUNTINGS TO BE FITTED BACK.WATER TO BE TAKEN.BOILER TO BE FLASHED AND SAFETY VALVES TO BE FLOATED ON PREDETERMINED PRESSURE IN FRONT OF SURVEYORS AND SUPD/CEO ENGINE EA 1 USD 0.00 0.00
E26028.3 A) FURNACE DRAIN V/V GATE(1 1/2") (16 BAR) ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26028.4 B) BOTTOM BLOW DOWN V/V'S DN 25 ENGINE NOS 4.00 4.00 EA 1 USD 0.00 0.00
E26028.5 C) SCUM BLOW DOWN V/V DN 25 ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26028.6 D) SAMPLING V/V DN 8 ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26028.7 E) GAUGE GLASS V/V'S (COCKS) WCB DN 25 ENGINE NOS 4.00 4.00 EA 1 USD 0.00 0.00
E26028.8 F) MAIN & AUX. FEED V/V DN 25 ENGINE NOS 4.00 4.00 EA 1 USD 0.00 0.00
E26028.9 L) SAFETY V/V DN 32/50 ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26028.10 M) MAIN STEAM STOP V/V DN 100 ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26028.11 N) VENT V/V DN 8 ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26028.12 P) PR. GAUGE V/V M22*1.5 ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26028.13 Q) HIGH WATER LEVEL ALARM FLOT CONDENSOR V/V ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26028.14 R) LOW WATER LEVEL ALARM FLOT CONDENSOR V/V ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26028.15 S) PR.SWITCH V/V ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26028.16 T) EXHUAST GAS BOILER RAIN WATER DRAIN VALVE DN 50 ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26028.17 EXHAUST BOILER TUBE PLUGGING IF ANY LEAKAGE FOUND DURING PRESSURE TESTING QUOTE FOR PLUGGING OF 10 TUBE WITH YARD SUPPLIED SUITABLE PLUGS.QUOTE ALL INCLKUDING INCLUDING SUPPLY OF 20 NO PLUGS AS SPARE. ENGINE NOS 10.00 10.00 EA 1 USD 0.00 0.00
E26028.18 ALL REMOTE GAUGES HAVE TO CHECK AND TO BE CALIBRATED. ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
i E26029: ATMOSPHERIC / DUMP CONDENSER ( SURVEY): ENGINE EA 1 USD 0.00 0.00
I Maker : DONGHWA ENTEC HWA 11M2 ENGINE EA 1 USD 0.00 0.00
I System Particulars : SHELL AND TUBE TYPE SURFACE AREA: 11M². SHELL SIDE:- FLUID - STEAM/DRAIN FLUID RATE: 1200/1200 KG/H OPERATING PRESSURE: ATM. KGF/CM2G TUBE SIDE:- FLUID - S.W FLUID RATE: 120 M³/H OPERATING PRESSURE: 2 KG/CM² ENGINE EA 1 USD 0.00 0.00
E26029.1 REMOVAL & TRANSPORT: DISCONNECT STEAM AND WATER CONNECTIONS. REMOVE THE CONDENSER FROM ITS LOCATION AND TRANSPORT IT TO THE YARD WORKSHOP. DISMANTLING & CLEANING: OPEN END COVERS. CLEAN ALL TUBES THOROUGHLY. CLEAN SHELL SIDE OF THE CONDENSER. INSPECT END COVERS; REPAIR RUBBER COATING IF DAMAGED. COMPONENT RENEWAL & INSPECTION RENEW ALL ANODES. PRESENT ALL PARTS TO THE ATTENDING SURVEYOR FOR INSPECTION. REASSEMBLY & TESTING REASSEMBLE THE CONDENSER. CARRY OUT PRESSURE TESTING AT 7 BAR. REINSTALLATION TRANSPORT THE CONDENSER BACK TO THE VESSEL AND REFIT. RECONNECT ALL STEAM AND WATER INLET/OUTLET CONNECTIONS. OVERHAUL INLET AND OUTLET VALVES. USE YARD-SUPPLIED GASKETS, JOINTING MATERIALS, NUTS, AND BOLTS. SCOPE & COST INCLUSION QUOTATION TO INCLUDE ALL TOOLS, CONSUMABLES, GASKETS, NUTS & BOLTS, MANPOWER, TRANSPORTATION, AND ASSOCIATED WORKS. ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
i E26030: FRESH WATER GENERATOR: ENGINE EA 1 USD 0.00 0.00
I TYPE /CAPACITY / DETAILS : DONGHWA ENTEC ENGINE EA 1 USD 0.00 0.00
I TYPE - TUBE TYPE; CAPACITY OF DISTILLATE: 25 TON/DAY MAX. SALINITY: 5 PPM; COOLING S.W. TEMP.: INLET 32 DEG C; JACKET COOLING WATER TEMP.: INLET 80 DEG C ENGINE EA 1 USD 0.00 0.00
I FOLLOWING WORKS TO BE CARRIED OUT ON FRESH WATER GENERATOR : ENGINE EA 1 USD 0.00 0.00
E26030.1 CONDENSER & EVAPORATOR CLEANING: THOROUGHLY CLEAN ALL CONDENSER AND EVAPORATOR COILS CHEMICALLY TO REMOVE SCALE AND DEPOSITS. REASSEMBLE/BOX BACK AFTER CLEANING. DISTILLATE PUMP & RELIEF VALVE: OVERHAUL THE DISTILLATE PUMP. PRESSURE TEST THE DISTILLATE LINE RELIEF VALVE TO ENSURE PROPER OPERATION. INSTRUMENTATION & UNITS RENEWAL: REPLACE THE SALINOMETER (YARD SUPPLY). REPLACE THE CHEMICAL DOSING UNIT WITH YARD-SUPPLIED EQUIPMENT. SCOPE & COST INCLUSION: QUOTATION TO INCLUDE ALL CHEMICAL CLEANING AGENTS, CONSUMABLES, TOOLS, YARD-SUPPLIED INSTRUMENTS, MANPOWER, AND AS-SOCIATED WORKS. ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
E26030.2 AFTER COMPLETION OF ALL REPAIRS; SYSTEM TO BE TESTED FOR VACUUM. IF ANY DEFECT ARISES , SAME TO BE RECTIFIED BY YARD. ENGINE SET 1.00 1.00 EA 1 USD 0.00 0.00
i E26031: ACCOMODATION BLOWER (AIR HANDLING UNIT OF ACCOMODATION AIR CONDITIONING):HI AIR,KOREA ENGINE EA 1 USD 0.00 0.00
I TYPE /CAPACITY / DETAILS: AHU-HKA-06SO ENGINE EA 1 USD 0.00 0.00
I AIR VOLUME:11833M3/H TOTAL PRESSURE:2062 Pa,FAN MOTOR CAPACITY: 12.7KW HEATING CAPACITY:167.4 KW,COOLING CAPAITY:99.3 KW *2 HUMIDIFIER:56.6 KG/H ENGINE EA 1 USD 0.00 0.00
E26031.1 TWO NO. OF EVAPORATOR COILS TO FABRICATE AND INSTALL AS PER SAMPLE AS FINS ARE DAMAGED.SPECIFICATION.TRIAL TO BE GIVEN AFTER COMMISSIONING. ENGINE PCS 2.00 2.00 EA 1 USD 0.00 0.00
E26031.2 BOTH BLOWER FWD & AFT TO OVERHAUL, DYNAMIC BALANCING TO CARRY OUT, PEDASTAL BEARING TO RENEW AND FITTED BACK. SATISFACTORY TRIALS TO BE TO WHOWN TO SHIP STAFF. ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26031.3 AIR FILTER FRAMES OF BOTH THE BLOERS DAMAGED SAME TO BE RENEWED AND SUPPLY 1 SET SPARE.MESH SIZE: 1000 MICRON (CHECKED FROM MANUAL) HOUSING HEIGHT: 152 MM HOUSING DIAMETER: 100 MM FLANGE DIAMETER: 128 MM ENGINE SET 12.00 12.00 EA 1 USD 0.00 0.00
E26031.4 ALL BLOWER FLAPS TO BE OVERHAULED ENGINE SET 4.00 4.00 EA 1 USD 0.00 0.00
i E26032: WINDLASS & MOORING WINCH: ENGINE EA 1 USD 0.00 0.00
I TYPE /CAPACITY / DETAILS: MAKE - FLUTEK,LTD MARINE MACHINERY WORKS . ENGINE EA 1 USD 0.00 0.00
I CAPACITY:269.5KN X9M/MIN (WINDLASS) ENGINE EA 1 USD 0.00 0.00
I CAPACITY:147KN X 15M/MIN (MOORING WINCH) ENGINE EA 1 USD 0.00 0.00
E26032 SCOPE OF WORK: REPLACE BRAKE LININGS ON THE WINDLASS: FORWARD WINDLASS (PORT & STARBOARD – 2 NOS.) INSPECTION & RENEWAL: INSPECT BRAKE BAND LINK PINS AND BUSHES; RENEW IF REQUIRED (YARD SUPPLY). REMOVE OLD BRAKE LININGS AND FIT NEW ONES. BRAKE LINING DETAILS: LENGTH:2235 X2 MM(TOTAL-EACH HALVES OF 2235 MM ) X WIDTH:160 MM X THICKNESS:12.5 MM . SUPPLY & FITTING: SUPPLY AND FIT ALL BRAKE LININGS AND ACCESSORIES USING YARD-SUPPLIED MATERIALS. ENSURE PROPER ALIGNMENT, SECURE FASTENING, AND FUNCTIONAL TESTING OF BRAKES. ENGINE SET 2.00 2.00 EA 1 USD 0.00 0.00
E26032.1 HYDRAULIC OIL TANK COOLER AND FILETRS TO BE CLEANED AND FITTED BACK.ALL GASKETS OF COOLER TO BE RENEWED. (ALL CONSUMABLES- YARD SUPPLY). ENGINE SET 4.00 4.00 EA 1 USD 0.00 0.00
E26032.2 ALL CONNECTING PIPE LEAKAGES TO HYDRAULIC MOTORS TO BE RECTIFIED BY REPLACING HS BOLTS. ENGINE SET 4.00 4.00 EA 1 USD 0.00 0.00
E26032.3 OIL PRESSURE GAUGES TO BE TO BE RENEWED WITH GOOD QUALITY & ROBHUST PRESSURE GAUGES. ENGINE PCS 12.00 12.00 EA 1 USD 0.00 0.00
E26032.4 ALL GREASE POINT NIPPLES TO BE RENEWED. ENGINE PCS 12.00 12.00 EA 1 USD 0.00 0.00
E26032.5 SCOPE OF WORK: REPLACE BRAKE LININGS ON THE FOLLOWING WINCHES: FORWARD MOORING WINCHES (PORT & STARBOARD – 2 NOS.) AFT MOORING WINCHES (2 NOS.) SPRING WINCHES (2 NOS.) INSPECTION & RENEWAL: INSPECT BRAKE BAND LINK PINS AND BUSHES; RENEW IF REQUIRED (YARD SUPPLY). REMOVE OLD BRAKE LININGS AND FIT NEW ONES. BRAKE LINING DETAILS: FORWARD & AFT MOORING WINCHES: LENGTH:2235 X2 MM(TOTAL-EACH HALVES OF 2235 MM ) X WIDTH:160 MM X THICKNESS:12.5 MM . SPRING WINCHES: LENGHT:1735 X2 MM(TOTAL- EACH HALVES OF 1735 )X WIDTH:100 MM X THICKNESS:8 MM SUPPLY & FITTING: SUPPLY AND FIT ALL BRAKE LININGS AND OTHER ACESSORIES USING YARD-SUPPLIED MATERIALS. ENSURE PROPER ALIGNMENT, SECURE FASTENING, AND FUNCTIONAL TESTING OF BRAKES. ENGINE SET 6.00 6.00 EA 1 USD 0.00 0.00
E26032.6 WINDLASS BUSHES OF THE BRAKE BAND LINK PINS TO CHECK FOR BOTH WINDLASS & RENEW IF NECESSARY. ENGINE PCS 4.00 4.00 EA 1 USD 0.00 0.00
E26032.7 BRAKE TIGHTING HANDLE ALONG WITH PIN BUSHING TO BE RENEWED (4NOS) FOR DEFECTIVE WINCHES AND SUPPLY 2NOS. AS SPARE . ENGINE PCS 6.00 6.00 EA 1 USD 0.00 0.00
E26032.8 HYDRAULIC MOTOR MOTOR TO BE DISMANTLED AND OVERHAULRED WITH SHAFT SEALS AND ACCESSOREIS( YARD SUPLY). ENGINE SET 2.00 2.00 EA 1 USD 0.00 0.00
E26032.9 WINDLASS PEDESTAL BEARINGS TO CHECK AND RENEW (BEARING SHIP SUPPLY) . ENGINE SET 2.00 2.00 EA 1 USD 0.00 0.00
E26032.10 BOTH WINDLASS WORN OUT GYPSY TEETH TO BE REBUILD USING HIGH GRADE , FULLY COMPATIABLE MATERIALS. FIANL GRINDING AND FINISHING TO BE CARRIED OUT TO ENSURE SMOOTHNESS OF THE TOOTH AREA. THE JOB TO BE CARRIED OUT IN FULL COMPLIANCE WITH RECOGNIZED INDUSTRY BEST PRACTICES. ENGINE SET 2.00 2.00 EA 1 USD 0.00 0.00
E26032.11 UPON COMPLETION OF THE REPAIR , BRAKE HOLDING AND BRAKE RENDERING TESTS TO BE CARRIED OUT AND RELEVANT CERTIFICATES TO ISSUE. ENGINE SET 8.00 8.00 EA 1 USD 0.00 0.00
i E26033: ENGINE ROOM BILGES: ENGINE EA 1 USD 0.00 0.00
I TYPE / CAPACITY / DETAILS : ENGINE EA 1 USD 0.00 0.00
E26033.1 ENGINE ROOM BILGES TO BE PUMPED ASHORE USING YARD FACILITIES DURING REPAIR PERIOD AND CERTIFICATE REGARDING SAME TO BE ISSUED.YARD TO QUOTE FOR ALL INCLUSIVE BILGE PUMPING WITH CERTIFICATE ISSUE FROM CONCERN AUTHORITY.ENGINE ROOM BILGE WELL TO BE PROPERLY CLEANED OIL STAINS AND TRACES TO BE COMPLETELY REMOVED.ASSUME 100 MT OF OILY WATER FROM BILGES AND BILGE HOLDING TANK. ENGINE TON 100.00 100.00 EA 1 USD 0.00 0.00
i E26034:ENGINE ROOM BILGES (SCRAPPING & PAINTING) ENGINE EA 1 USD 0.00 0.00
I TYPE / CAPACITY / DETAILS : ENGINE EA 1 USD 0.00 0.00
E26034.1 ALL PIPELINES FRAMES BULK HEADS STOOLS STRUCTURES & TANK TOP BELOW THE FLOOR PLATE OF BOTTOM PLATFORM TO BE CLEANED OF ANY OIL STAINS AND SCRAPPED & TO BE APPLIED WITH PRIMER & THEN FINALLY TO APPLY ONE COAT OF PAINT(GREY COLOUR). COLOUR CODE PAINTING OF PIPE FLANGES FOR FRESH WATER, SEA WATER, F.O, LUB OIL, D.O. ETC TO BE CARRIED OUT. ENGINE M3 1500.00 1500.00 EA 1 USD 0.00 0.00
i E26035: SEWAGE TREATMENT PLANT (SURVEY): ENGINE EA 1 USD 0.00 0.00
I TYPE / CAPACITY / DETAILS : IL SEUNG ENGINE EA 1 USD 0.00 0.00
I TYPE -ISS 35N, CAPACITY: 2450L/DAY ENGINE EA 1 USD 0.00 0.00
E26035.1 PREPARATION & ENTRY OPEN TANK MANHOLE DOORS. ENSURE TANKS ARE VENTILATED AND SAFE FOR MAN ENTRY. CLEANING CLEAN HOLDING, AERATION, SETTLING, AND CHLORINATION COMPARTMENTS, INCLUDING INTERNAL STRAINERS AND SURFACE SKIMMERS. CLEAN AIR DIFFUSERS AND ASSOCIATED PIPELINES. INSPECTION & COATING INSPECT INTERNAL COATINGS OF TANKS. RECOAT WITH TAR EPOXY (YARD SUPPLY) WHERE REQUIRED. TANK CAPACITY: 23.1 M³ EACH. INSTRUMENTATION FIT A 5 M LEVEL GAUGE IN EACH TANK. ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26035.2 SEWAGE HOLDING TANKS TO BE CLEANED.,CPACITY:6 M3. ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
E26035.3 STP DISCHARGE PUMP TO BE OVERHAULED.AIR BLOWER TO BE OVERHAULED. CONSUMABLES- YARD SUPPLY. ENGINE SET 1.00 1.00 EA 1 USD 0.00 0.00
E26035.4 TANKS LEVEL SWITCH HAVE TO BE SERVICED. LOW LEVEL SWITCH TO BE INSTALLED; AND DICH P/P OPERATION (CUT IN/ CUT OFF) TO BE CONTROLLED BY RESPECTIVE SWITCHES. SATIS FACTORY TRIALS TO BE SHOWN TO SHIP STAFF. ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
E26035.5 STP ALL VALVES TO BE OVERHAULED.SEWAGE HOLDING TANK 5K 65 FC GATE V/V’S: 5 NOS. BOLT DIA: 20MM, PCD: 130MM, F-F: 190MM, NO. OF BOLTS: 4 STP V/V’S (2 NOS.) GATE V/V (5K 150): PCD: 230MM, NO. OF BOLTS: 8, PIPE DIA: 165MM, BOLT DIA: 25MM, F.T: 45MM STP V/V (1 NO.) GATE V/V (5K 100): PCD: 165MM, PIPE DIA: 115MM, F.T: 40MM, NO. OF BOLTS: 8, BOLT DIA: 25MM STP P/P SUCTION V/V’S (4 NOS.) 10K 40 BUTTERFLY V/V’S: F-F: 70MM, F.T: 10MM, BOLT DIA: 20MM, NO. OF BOLTS: 4, PCD: 95MM, FLANGE OD: 120MM, PIPE DIA: 50MM STP P/P DISCHARGE V/V’S (2 NOS.) 5K 40 GLOBE V/V: FLANGE OD: 120MM, F.T: 10MM, PCD: 95MM, BOLT DIA: 20MM, NO. OF BOLTS: 4, PIPE DIA: 50MM ENGINE NOS 14.00 14.00 EA 1 USD 0.00 0.00
E26035.6 DEFECTIVE PORTION OF TANK PLATE TO CROP AND RENEW APPROX STEEL REQUIREMENT -0.5MT AFTER EMPTYING BY FRESH WATER FLUSHING AND GAS FREEING . ENGINE MT 0.50 0.50 EA 1 USD 0.00 0.00
i E26036: FIRE AND SMOKE DETCTION SYSTEMS: ENGINE EA 1 USD 0.00 0.00
I Maker : CONSILIUM, TYPE :CS4000. ENGINE EA 1 USD 0.00 0.00
I TO CAARY OUT THE FOLLOWING JOBS ON FIRE & GENERAL ALARM SYSTEM IN PRESENCE OF COMPETENT ENGR/ MAKER SERVICE ENGINEER: ENGINE EA 1 USD 0.00 0.00
E26036.1 CHECK ALL SENSORS AND, IF REQUIRED, REMOVE THEM FROM THEIR LOCATIONS FOR CLEANING, INSPECTION, AND CALIBRATION. REFIT THE SENSORS IN PLACE AND CALIBRATE THE SYSTEM. THE SYSTEM SHALL BE COMMISSIONED AND PUT INTO SERVICE, WITH TRIALS CARRIED OUT IN THE PRESENCE OF THE SURVEYOR/SUPERINTENDENT. ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
i E26037: CO2 SYSTEMS: ENGINE EA 1 USD 0.00 0.00
I Maker :NK CO.LTD , FIXED CO2 FIRE FIGHTING SYSTEM ENGINE EA 1 USD 0.00 0.00
E26037.1 15 YEARLY SURVEY ITEMS ROUTINE TO BE CARRIED OUT. ALL CO2 CYLINDER TO BE WEIGHED. PIPING TO BE BLOWN THROUGH.ALL ALRMS AND CUT OUTS TO BE CHECKED. 10% BOTTLES TO BE PRESSURE TESTED . CO2 LINES MASTER VALVE TO BE PRESSURE TESTED. ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
E26037.2 ENTIRE CO2 TOTAL FLOODING SYSTEM 15 YEARLY ROUTINES & CHECKS TO BE CARRIED OUT BY DGS/IRS APPROVED SERVICE STATION AND CERTIFICATE TO BE ISSUED.LINES FROM BOTTLES TO THE MASTER VALVES TO BE TESTED AT 180 BAR.ALL LOW PRESSURE LINES FROM MAIN ISOLATING VALVES TO NOZZLES TO BE PRESSURE TESTED AT 25 BAR ENGINE SET 1.00 1.00 EA 1 USD 0.00 0.00
E26037.3 SPRING LOAD RELIEF V/V TO BE PR.TESTED AND ADJUESTED AT 180 BAR. ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26037.4 ENGINE ROOM AND HOLD MASTER V/VS TO BE CHECKED FOR OPERATION.ALL HOSE CONNECTIONS/UNIONS COPPER LOOPS OF CO2 CYLINDERS TO BE CHECKED AND COPPER LOOPS TO BE PR.TESTED.ENGINE ROOM AND HOLD LINES ARE TO BE BLOWN THROUGH AND ALL ALARMS AND CUT-OUTS TO BE CHECKED FOR PROPER OPERATION. ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26037.5 ENTIRE ALARM SYSTEM & CUT OUTS TO CHECK FOR PROPER FUNCTIONING. ENGINE SET 2.00 2.00 EA 1 USD 0.00 0.00
E26037.6 MAIN P.O.D VALVES TO E.R. & PURIFIER ROOM TO BE SERVICED. ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26037.7 AFTER COMPLETION OF ALL WORK SYSTEM TO BE BLOWN THROUGH WITH COMPRESSED AIR & CHECKED FOR LEAKAGE. ENGINE SET 1.00 1.00 EA 1 USD 0.00 0.00
i E26038: FUEL TANKS/ OTHER TANKS (SURVEY): ENGINE EA 1 USD 0.00 0.00
I TYPE / CAPACITY / DETAILS: ENGINE EA 1 USD 0.00 0.00
I PREPARATION & ENTRY: OPEN MANHOLE COVERS AND FORCE-VENTILATE TANKS UNTIL SAFE FOR MAN ENTRY. OBTAIN ALL NECESSARY MAN ENTRY CERTIFICATES PRIOR TO COMMENCING WORK. CLEANING & INSPECTION: REMOVE SLUDGE AND THOROUGHLY CLEAN TANKS. SURVEY TANKS INTERNALLY FOR CONDITION, CORROSION, OR DEFECTS. CARRY OUT REPAIR, RENEW PLATE & FITTING AS REQUIRED. MANHOLE COVER & FITTINGS: REFIT MANHOLE COVERS WITH NEW GASKETS (YARD SUPPLY). RENEW PACKING FOR ANY LEAKING GAUGE GLASS VALVES. ENGINE EA 1 USD 0.00 0.00
I HEAVY FUEL OIL TANKS-10NOS: SUBTOTAL=1994.7 M3 ENGINE EA 1 USD 0.00 0.00
E26038.1 NO.1 H.F.0.TK.P ENGINE CBM 368.00 368.00 EA 1 USD 0.00 0.00
E26038.2 NO.1 H.F.0.TK.S ENGINE CBM 368.00 368.00 EA 1 USD 0.00 0.00
E26038.3 NO.2 H.F.0.TK.S ENGINE CBM 368.00 368.00 EA 1 USD 0.00 0.00
E26038.4 H.F.O LS STOR. TK. ENGINE CBM 368.00 368.00 EA 1 USD 0.00 0.00
E26038.5 H.F.O STOR. TK. P ENGINE CBM 278.90 278.90 EA 1 USD 0.00 0.00
E26038.6 H.F.O STOR. TK. S ENGINE CBM 111.30 111.30 EA 1 USD 0.00 0.00
E26038.7 H.F.O SETT. TK. ENGINE CBM 34.40 34.40 EA 1 USD 0.00 0.00
E26038.8 H.F.O. SERV.TK ENGINE CBM 34.40 34.40 EA 1 USD 0.00 0.00
E26038.9 H.F.O. LS SETT.TK. ENGINE CBM 31.60 31.60 EA 1 USD 0.00 0.00
E26038.10 H.F.O. LS SERV.TK. ENGINE CBM 32.00 32.00 EA 1 USD 0.00 0.00
i DIESEL OIL TANKS DIESEL OIL TANKS-4 NOS: SUBTOTAL=160.2 M3 ENGINE EA 1 USD 0.00 0.00
E26038.11 M.D.0.TK. P ENGINE CBM 31.90 31.90 EA 1 USD 0.00 0.00
E26038.12 M.D.0.TK. S ENGINE CBM 57.30 57.30 EA 1 USD 0.00 0.00
E26038.13 M.D.0.SETT.TK. ENGINE CBM 35.50 35.50 EA 1 USD 0.00 0.00
E26038.14 M.D.0.SERV.TK. ENGINE CBM 35.50 35.50 EA 1 USD 0.00 0.00
I LUBRICATION OIL TANKS LUBRICATION OIL TANKS-7 NOS: SUBTOTAL= 124.5 M3 ENGINE EA 1 USD 0.00 0.00
E26038.15 M/E L.O. SUMP TK. ENGINE CBM 18.00 18.00 EA 1 USD 0.00 0.00
E26038.16 M/E L.O STOR. TK ENGINE CBM 22.10 22.10 EA 1 USD 0.00 0.00
E26038.17 CYL.O STOR. TK ENGINE CBM 31.60 31.60 EA 1 USD 0.00 0.00
I ENGINE ROOM DB TANKS ENGINE ROOM DB TANKS- 5 NOS: SUBTOTAL=72.2 ENGINE EA 1 USD 0.00 0.00
E26038.18 SLUDGE TK. ENGINE CBM 11.60 11.60 EA 1 USD 0.00 0.00
E26038.19 OILY BILGE TK ENGINE CBM 17.30 17.30 EA 1 USD 0.00 0.00
E26038.20 BILGE HOLD. TK. ENGINE CBM 29.80 29.80 EA 1 USD 0.00 0.00
E26038.21 F.O. OVERF. TK. ENGINE CBM 11.40 11.40 EA 1 USD 0.00 0.00
E26038.22 S/T LO DRAIN TK. ENGINE CBM 2.00 2.00 EA 1 USD 0.00 0.00
i MISC. TANKS ENGINE EA 1 USD 0.00 0.00
E26038.23 WASTE OIL TK. ENGINE CBM 2.00 2.00 EA 1 USD 0.00 0.00
E26038.24 SEWAGE TK. ENGINE CBM 6.00 6.00 EA 1 USD 0.00 0.00
E26038.25 S/T C.W TK ENGINE CBM 13.70 13.70 EA 1 USD 0.00 0.00
E26038.26 SC. DRAIN TK ENGINE CBM 0.50 0.50 EA 1 USD 0.00 0.00
i E26039: ELECTRIC MOTORS: ENGINE EA 1 USD 0.00 0.00
I 1. PRE-REMOVAL CHECKS: ALL MOTORS TO HAVE INSULATION RESISTANCE AND CABLE CONTINUITY CHECKED AND RECORDED. VERIFY AND MARK THE DIRECTION OF ROTATION BEFORE DISCONNECTION. DISCONNECT ALL POWER CABLES AND SECURE THEM WITH INSULATION TAPE. 2. REMOVAL & TRANSPORT: REMOVE MOTORS FROM THEIR INSTALLED LOCATIONS. TRANSPORT MOTORS TO THE YARD WORKSHOP ALONG WITH ASSOCIATED MOTOR-PUMP COUPLINGS. 3. DISMANTLING & CLEANING: COMPLETELY DISMANTLE ALL MOTORS. THOROUGHLY CLEAN AND DEGREASE ALL PARTS USING APPROVED ELECTRICAL CLEANER (YARD SUPPLY). INSPECT STATOR COILS AND ARMATURE WINDINGS. 4. WINDING & BALANCING: APPLY VARNISH TO STATOR COILS AND ARMATURE WINDINGS, BAKE IN OVEN, AND DRY THOROUGHLY. DYNAMICALLY BALANCE ALL ROTORS. CHECK CONDITION OF MOTOR TERMINAL CONNECTION BLOCKS (EBONITE); RENEW IF REQUIRED. 5. MECHANICAL INSPECTION & MACHINING: ERECT MOTOR ROTATING ELEMENTS ON LATHE AND CHECK TRUENESS. THOROUGHLY INSPECT MOTOR BEARING HOUSINGS; RESLEEVE TO CORRECT BEARING SIZE IF REQUIRED. INSPECT BEARING JOURNALS; BUILD UP AND MACHINE TO CORRECT SIZE WHERE REQUIRED. RENEW ALL MOTOR BEARINGS (YARD SUPPLY). 6. TERMINAL BOXES & COOLING FANS: PROVIDE FOR 10 NOS. TERMINAL BOXES AND INSULATORS. RENEW 10 NOS. COOLING FAN BLADES. 7. REASSEMBLY & TESTING: REASSEMBLE MOTORS IN ACCORDANCE WITH MANUFACTURER GUIDELINES. ENSURE PROPER ALIGNMENT OF ROTATING ELEMENTS AND CONNECTIONS. 8. SCOPE & COST INCLUSION QUOTATION FOR MOTOR OVERHAULING TO BE INCLUSIVE OF: ALL REPAIR TOOLS, CONSUMABLES, NEW JOINTS AND PACKINGS, MANPOWER, TRANSPORTATION, BEARINGS, AND ASSOCIATED WORKS. ENGINE INSTRUCTION EA 1 USD 0.00 0.00
E26039.1 F.O. SUPPLY P/P MOTOR 440 V; 60 Hz; 3 PHASE;2.5 KW 4.6 AMP ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26039.2 MSW WATER COOLING MOTOR 440 V; 60 Hz; 3 PHASE;50 KW ,83.8 AMP ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26039.3 BALLAST P/P MOTOR 440 V; 60 Hz; 3 PHASE;95 KW,163.1 AMP ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26039.4 BILGE; FIRE & G.S. P/P MOTOR 440 V;60 Hz; 3 PHASE; 70 KW,114.2 AMP ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26039.5 AHU (AIR HANDLING UNIT) FAN MOTOR 440 V;60 Hz; 3 PHASE; 12.7 KW,21.7 AMP ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26039.6 GALLEY SUPPLY FAN 1 NOS. 440 V; 60 Hz; 3 PHASE 1.27 KW,2.65 AMP ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26039.7 GALLEY EXH. BLOWERS1 NOS. 440 V; 60 Hz; 3 PHASE;1.73 KW,3.54 AMP ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26039.8 TOILET EXH. FAN 1 NOS. 440 V; 60 Hz;3 PHASE; 6.3KW,11.23 ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26039.9 ACC.LADDER WINCH MOTOR 440 V; 60 Hz; 3 PHASE; 5.5 KW ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26039.10 BOILER WATER FEED PUMP MOTOR 440v; 60hz; 3phase;11 KW,19.3 AMP ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26039.11 M/E LUBE OIL PUMP MOTOR 440V;60HZ ;3PHASE;60 KW,100.4 AMP ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26039.12 RESCUE BOAT MOTOR(WINCH HYDRAULIC PUMP MOTOR) ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26039.13 FREE FALL LIFE BOAT DEBIT MOTOR 440VAC;60HZ;3PHASE;15 KW,29.3 AMP ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26039.14 FORWARD DECK MACHINERY HYD.PUMP MOTOR(1;2;3) 440V;60HZ;3 PHASE;75 KW, ENGINE NOS 3.00 3.00 EA 1 USD 0.00 0.00
E26039.15 AFT DECK MACHINERY HYD.PUMP MOTOR(1;2;3) 440V;60HZ;3 PHASE;75 KW ENGINE NOS 3.00 3.00 EA 1 USD 0.00 0.00
E26039.16 EJECTOR PUMP MOTOR 440V;60HZ; 3 PH;22 KW ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26039.17 STEERING GEAR ROOM VENT FAN MOTOR 440 V; 60 Hz; 3 PHASE;2.53 KW,4.74 ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26039.18 ENGINE ROOM VENT FAN MOTOR 440 V; 60 Hz; 3 PHASE;15 KW ENGINE NOS 4.00 4.00 EA 1 USD 0.00 0.00
E26039.19 SEWAGE DISCHARGE P/P MOTOR 440 V; 60 Hz; 3 PHASE;1.5 KW,3.9 AMPS ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26039.20 ME AUX. BLOWER MOTORS MOTOR 440 V; 60 Hz; 3 PHASE;30 KW ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26039.21 DECK CRANE HYD.POWER PACK MOTOR 440 V; 60 Hz; 3 PHASE;152 KW ENGINE NOS 4.00 4.00 EA 1 USD 0.00 0.00
E26039.22 PROVISION CRANE HOISTING MOTOR 440 V; 60 Hz; 3 PHASE;7.5 KW ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26039.23 PROVISION CRANE SLEWING MOTOR 440 V; 60 Hz; 3 PHASE;5.5 KW ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26039.24 PROVISION CRANE LUFFING MOTOR 440 V; 60 Hz; 3 PHASE;11 KW ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26039.25 F.O. CIRCULATION P/P MOTOR 440 V; 60 Hz; 3 PHASE;4.6 KW,7.4 AMPS ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26039.26 PURIFIER ROOM EXHAUST FAN MOTOR 440 V; 60 Hz; 3 PHASE;4 KW,7.7 AMPS ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26039.27 CO2 ROOM EXHAUST FAN MOTOR 440 V; 60 Hz; 3 PHASE;0.63 KW,1.48 AMP ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26039.28 BOILER F.O. PUMP 440 V; 60 Hz; 3 PHASE;1.75 KW,3.4 AMP( HFO) AND 1.8 KW,3.26 AMP(MGO) ENGINE NOS 4.00 4.00 EA 1 USD 0.00 0.00
E26039.29 BOSUN STORE EXHAUST FAN 440 V; 60 Hz; 3 PHASE; 1.73 KW,3.3 AMP ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26039.30 PAINT STORE EXHAUST FAN 440 V; 60 Hz; 3 PHASE; 0.63 KW,1.48 AMP ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26039.31 CARGO HOLD EXHAUST FAN 440 V; 60 Hz; 3 PHASE; 8.6 KW,15.23 AMP EACH ENGINE NOS 20.00 20.00 EA 1 USD 0.00 0.00
i E26040: ENGINE ROOM BLOWERS: ENGINE EA 1 USD 0.00 0.00
I TYPE / CAPACITY / DETAILS : 18.5 KW 1440 RPM FLOW RATE:37000M3/Hr E.R. BLOWER: ENGINE EA 1 USD 0.00 0.00
I 4KW PURIFIER ROOM EXH.FAN ENGINE EA 1 USD 0.00 0.00
I REMOVAL & TRANSPORT: REMOVE THE BLOWER MOTOR ALONG WITH THE FAN FROM ITS INSTALLED LOCATION. TRANSPORT THE ASSEMBLY TO THE YARD WORKSHOP. DISMANTLING & CLEANING: DISMANTLE THE BLOWER AND MOTOR COMPLETELY. CLEAN THE FAN IMPELLER THOROUGHLY USING HIGH-PRESSURE JET WASHING. CLEAN THE FLAP AND ENSURE 100% CLOSING OPERATION. MOTOR OVERHAUL: OVERHAUL THE MOTOR, RENEWING BEARINGS AS REQUIRED (YARD SUPPLY). REASSEMBLE THE MOTOR WITH NEW BEARINGS. REASSEMBLY & INSTALLATION: REASSEMBLE THE BLOWER AND MOTOR. TRANSPORT BACK AND REINSTALL AT ITS ORIGINAL LOCATION. TESTING & TRIAL: CARRY OUT A SATISFACTORY OPERATIONAL TRIAL TO ENSURE PROPER FUNCTIONING OF BLOWER, FAN, AND FLAP. SCOPE & COST INCLUSION: QUOTATION FOR OVERHAULING TO INCLUDE ALL REPAIR TOOLS, CONSUMABLES, NEW JOINTS AND PACKINGS, MANPOWER, TRANSPORTA-TION, BEARINGS, AND ALL ASSOCIATED WORKS. ENGINE INCLUSIVE EA 1 USD 0.00 0.00
E26040.1 E/R BLOWER CASING 1 MTR.DIA HEIGHT 1.5 MTR IMPELLER AND DIFFUSER VANES TO CHIP CLEAN AND PAINTED INTERNALLY AND EXTERNALLY WITH TWO COATS OF PAINT. ENGINE NOS 5.00 5.00 EA 1 USD 0.00 0.00
E26040.2 MOTOR AND IMPELLER TO BALANCE DYNAMICALLY. ENGINE NOS 5.00 5.00 EA 1 USD 0.00 0.00
E26040.3 BLOWER DUCT TO OPEN BROKEN HINGE TO WELD ALIGNED WITH PROPER SEALING. ENGINE NOS 5.00 5.00 EA 1 USD 0.00 0.00
E26040.4 HINGE BUSH OF ALL E.R BLOWERS TO RENEW. ENGINE NOS 5.00 5.00 EA 1 USD 0.00 0.00
E26040.5 REMOVE ALL BLOWER ROOM FLAPS.DERUST, CLEAN, AND PAINT FLAP SURFACES.RENEW BUSHES TO ENSURE FREE OPENING AND 100% CLOSING OF FLAPS.OVERHAUL FLAP OPENING AND CLOSING MECHANISMS.RENEW BEARINGS IF REQUIRED.INSPECT AND RENEW DEFECTIVE LINKAGES AND SUPPORTING BEAMS TO ENSURE PROPER OPERATION.OVERHAUL ALL AIR CYLINDERS; DEFECTIVE PARTS TO BE RENEWED (YARD SUPPLY). RENEW ALL ACTUATOR FLEXIBLE PIPES USING YARD-SUPPLIED MATERIALS. AFTER OVERHAUL, ENSURE ALL FLAPS OPERATE SMOOTHLY AND ACHIEVE FULL OPENING AND CLOSING. VERIFY PROPER FUNCTIONING OF LINKAGES, ACTUATORS, AND SUPPORTING STRUCTURES. ENGINE NOS 4.00 4.00 EA 1 USD 0.00 0.00
i E26041: MAIN SWITCHBOARD AND EMERGENCY SWITCH BOARD: MAKE : KTE CO. LTD,BUSAN KOREA ENGINE EA 1 USD 0.00 0.00
I TYPE / CAPACITY / DETAILS : TYPE: DEAD FRONT SELF SUPPORTING; MACH. NO : M0291-09 ENGINE EA 1 USD 0.00 0.00
E26041.1 BOTH MAIN SWITCH BOARDS TO BE THOROUGHLY CLEANED USING DRY AIR AND ELECTRIC CLEANER (YARD SUPPLY). ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26041.2 INSULATION OF MSB & ESB TO BE CHECKED BEFORE AND AFTER THE CLEANING TO BE RECORDED AND SUBMIT. ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26041.3 IF ANY OF THE PANEL/CIRCUIT INSULATION FOUND POOR INSULATOR TO BE REMOVED BY SPARES(SHIP SUPPLY) ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
I E26041.4 TO CARRY OUT SERVICING AND CALIBRATION OF FOLLOWING MSB METERS; AS FOLLOWS : ENGINE EA 1 USD 0.00 0.00
E26041.5 a) AMMETER . ENGINE NOS 6.00 6.00 EA 1 USD 0.00 0.00
E26041.6 b) VOLTMETER. ENGINE NOS 6.00 6.00 EA 1 USD 0.00 0.00
E26041.7 c) WATTMETER. ENGINE NOS 4.00 4.00 EA 1 USD 0.00 0.00
E26041.8 d) INSULATION METER. ENGINE NOS 4.00 4.00 EA 1 USD 0.00 0.00
E26041.9 e) FREQUENCY METER. ENGINE NOS 4.00 4.00 EA 1 USD 0.00 0.00
E26041.10 TIGHTNESS OF ELECTRICAL CONNECTIONS & ALL NUTS & BOLTS IN M.S.B TO CHECK & TIGHTEN. ENGINE LS 2.00 2.00 EA 1 USD 0.00 0.00
E26041.11 ALL SWITCHBOARD SAFETIES TO BE TESTED AND SHOWN IN OPERATION AFTER CLEANING OF SWITCHBOARD.--REVERSE POWER TRIP;UNDERVOLTAGE; OVERCURRENT; SHORT CURCUIT;PREFERENTIAL TRIP;LOW INSULATION. ENGINE LS 2.00 2.00 EA 1 USD 0.00 0.00
E26041.12 ALL ALTERNATORS AUTO STARTING SYSTEM/STANDBY STARTING SYSTEM TO BE CHECKED AND REPAIRED. ENGINE LS 3.00 3.00 EA 1 USD 0.00 0.00
E26041.13 THE LIGHTING TRANSFORMERS IN ENGINE ROOM AND IN EMERGENCY GEN. ROOM TO BE CLEANED AND IMPROVE THE INUSLATION IF LOW AND TIGHTNESS OF THE CABLES TO BE CHECKED. ENGINE NOS 4.00 4.00 EA 1 USD 0.00 0.00
E26041.14 ALL THREE GENERATORS PARALLEL OPERATION TO BE CHECKED IF NECESSARY AND ANY ADJUSTMENT ON AVR TO BE CORRECTED IF REQUIRED. ENGINE NOS 3.00 3.00 EA 1 USD 0.00 0.00
E26041.15 EMERGENCY GENERATOR AUTO OPERATION TO BE CHECKED AND RECTIFY THE SAME. ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26041.16 BOTH 440 V AND 220 V INSULATION TO IMPROVE. ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
i E26042: CALIBERATION OF TEMPERATURE GAUGES: ENGINE EA 1 USD 0.00 0.00
I FOLLOWING TEMPERATURE GAUGES OF VARIOUS MACHINERIES IN ENGINE ROOM ARE TO BE TAKEN OUT FROM PLACE TO CHECK CALIBERATION WITH STANDARD GAUGES AND DEFECTIVE ONES TO RENEW WITH NEW ONES WITH CERTIFICATE OF STANDARDISATION.ALL OTHER GOOD ONES TO BE FITTED BACK IN PLACE & CERTIFICATE TO BE ISSUED FOR ALL TEMPERATURE GAUGES THAT ARE TESTED.YARD TO QUOTE FOR SUPPLY OF EACH TYPE OF TEMP.GAUGE FOR RENEWAL. ENGINE EA 1 USD 0.00 0.00
I PYROMETERS/THERMOMETERS ENGINE INSTRUCTION EA 1 USD 0.00 0.00
I SYSTEM RANGE( 0C) QTY. ENGINE INSTRUCTION EA 1 USD 0.00 0.00
E26042.1 M/E EXHAUST GAS OULET 0-600 6 ENGINE PCS 6.00 6.00 EA 1 USD 0.00 0.00
E26042.2 M/E PCO OUTLET TEMP 0-100 6 ENGINE PCS 6.00 6.00 EA 1 USD 0.00 0.00
E26042.3 M/E JACKET WATER OUTLET TEMP 0-100 6 ENGINE PCS 6.00 6.00 EA 1 USD 0.00 0.00
E26042.4 M/E TURBOCHARGER IN/OULET 0-600 2 ENGINE PCS 2.00 2.00 EA 1 USD 0.00 0.00
E26042.5 M/E AIR COOLER AIR IN/OULET 0-100/0-160 2 ENGINE PCS 2.00 2.00 EA 1 USD 0.00 0.00
E26042.6 A/E EXH GAS OULLET(3 AES) 0-500 18 ENGINE PCS 18.00 18.00 EA 1 USD 0.00 0.00
E26042.7 A/E TURBOCHARGER INLET(3 AES) 0-600 6 ENGINE PCS 6.00 6.00 EA 1 USD 0.00 0.00
E26042.8 A/E TURBOCHARGER OULET(3 AES) 0-600 6 ENGINE PCS 6.00 6.00 EA 1 USD 0.00 0.00
E26042.9 A/ES C.W. INLET 0-100 3 ENGINE PCS 3.00 3.00 EA 1 USD 0.00 0.00
E26042.10 A/ES C.W. OULET 0-100 18 ENGINE PCS 18.00 18.00 EA 1 USD 0.00 0.00
E26042.11 A/ES AIR COOLER AIR INLET 0-200 3 ENGINE PCS 3.00 3.00 EA 1 USD 0.00 0.00
E26042.12 A/ES AIR COOLER AIR OULT 0-100 3 ENGINE PCS 3.00 3.00 EA 1 USD 0.00 0.00
E26042.13 A/ES ALTERNATOR BEARING 0-100 3 ENGINE PCS 3.00 3.00 EA 1 USD 0.00 0.00
E26042.14 BOILER F.O HEATER IN/OULET 0-160 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26042.15 ME VISCOTHERM 0-200 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26042.16 ME LUB OIL COOLER L.O IN/OUT 0-100 2 ENGINE PCS 2.00 2.00 EA 1 USD 0.00 0.00
E26042.17 ME JACKET COOLER L.O IN/OUT 0-100 3 ENGINE PCS 2.00 2.00 EA 1 USD 0.00 0.00
E26042.18 BOTH LT COOLER S.W& F.W IN/OUT 0-100 8 ENGINE PCS 8.00 8.00 EA 1 USD 0.00 0.00
E26042.19 ME THRUST BEARING LUB OIL 0-100 2 ENGINE PCS 2.00 2.00 EA 1 USD 0.00 0.00
E26042.20 ME L.O INLET TEMP 0-100 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26042.21 ME T/C BEARING OIL TEMP 0-150 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26042.22 ME F.O. TEMP 0-200 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26042.23 ME FRESH COOL WATER INLET 0-150 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26042.24 FWD S/T BRG L.O.TEMP 0-100 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26042.25 AFT S/T BRG L.O.TEMP 0-100 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26042.26 A/E PUF UNIT OUTLET TEMP 0-100 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
i ARRANGE SUPPLY OF HIGH QUALITY SUITABLE PYROMETER/THERMOMETER APS: ENGINE INSTRUCTION EA 1 USD 0.00 0.00
E26042.27 SUPPLY PYROMETER/THERMOMETER APS 0-100. ENGINE PCS 6.00 6.00 EA 1 USD 0.00 0.00
E26042.28 SUPPLY PYROMETER/THERMOMETER APS 0-200. ENGINE PCS 6.00 6.00 EA 1 USD 0.00 0.00
E26042.29 SUPPLY PYROMETER APS 0-600. ENGINE PCS 6.00 6.00 EA 1 USD 0.00 0.00
E26042.30 SUPPLY DIAL TYPE PYROMETER APS 0-600. ENGINE PCS 6.00 6.00 EA 1 USD 0.00 0.00
i E26043: CALIBERATION OF PRESSURE GAUGES: ENGINE EA 1 USD 0.00 0.00
I FOLLOWING PRESSURE GAUGES OF VARIOUS MACHINERIES IN ENGINE ROOM ARE TO BE TAKEN OUT FROM PLACE TO CHECK CALIBERATION WITH STANDARD GAUGES AND DEFECTIVE ONES TO RENEW WITH NEW ONES WITH CERTIFICATE OF STANDARDISATION.ALL OTHER GOOD ONES TO BE FITTED BACK IN PLACE & CERTIFICATE TO BE ISSUED FOR ALL PRESSURE GAUGES THAT ARE TESTED.YARD TO QUOTE FOR SUPPLY OF EACH TYPE OF PRESSURE GAUGE FOR RENEWAL. ENGINE EA 1 USD 0.00 0.00
I PRESSURE GAUGES ENGINE INSTRUCTION EA 1 USD 0.00 0.00
I SYSTEM RANGE( BAR) QTY ENGINE INSTRUCTION EA 1 USD 0.00 0.00
E26043.1 STEERING GEAR 0-250 3 ENGINE PCS 3.00 3.00 EA 1 USD 0.00 0.00
E26043.2 AIR COMPRESSORS 0-10 4 ENGINE PCS 4.00 4.00 EA 1 USD 0.00 0.00
E26043.3 AIR RECEIVER(MAIN) 0-50 4 ENGINE PCS 4.00 4.00 EA 1 USD 0.00 0.00
E26043.4 AIR RECEIVER(CONTROL) 0-15 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26043.5 AUX.ENGINE 0-10 6 ENGINE PCS 6.00 6.00 EA 1 USD 0.00 0.00
E26043.6 AUX.ENGINE 0-16 2 ENGINE PCS 2.00 2.00 EA 1 USD 0.00 0.00
E26043.7 ME L.O.P/P DEL. 0-10 2 ENGINE PCS 2.00 2.00 EA 1 USD 0.00 0.00
E26043.8 ME ST.BY CONT AND SAFETY AIR 0-16 2 ENGINE PCS 2.00 2.00 EA 1 USD 0.00 0.00
E26043.9 ME EXH V/V SPRING(ECR & LOCAL) 0-10 2 ENGINE PCS 2.00 2.00 EA 1 USD 0.00 0.00
E26043.10 ME F.O.& L.O. AT EM STAND 0-25 2 ENGINE PCS 2.00 2.00 EA 1 USD 0.00 0.00
E26043.11 ME FUEL V/V TESTING UNIT 0-600 2 ENGINE PCS 2.00 2.00 EA 1 USD 0.00 0.00
E26043.12 VIBRATION DAMPER 0-250 4 ENGINE PCS 4.00 4.00 EA 1 USD 0.00 0.00
E26043.13 EXH.GAS ECONOMIZER 0-16 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26043.14 AE FUEL V/V TESTING UNIT P/P 0-500 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26043.15 HYD P/P FOR MAINTENANCE 0-1000 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26043.16 BUNKER LINE PRESSURE GAUGES 0-16 4 ENGINE PCS 4.00 4.00 EA 1 USD 0.00 0.00
i ECR PRESSURE GAUGES:- ENGINE EA 1 USD 0.00 0.00
E26043.17 ME COOL S.W.DISCH.PR 0-4 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26043.18 ME JCW COOLING PR 0-6 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26043.19 ME LO INLET PR 0-6 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26043.20 ME SCAVENGE AIR PR 0-6 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26043.21 STARTING AIR BEFORE V/V PR 0-40 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26043.22 CONTROL AIR PR 0-6 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26043.23 STARTING AIR AFTER V/V PR 0-40 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26043.24 CHARGE AIR 0-4 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26043.25 ME AIR RECEIVER 0-40 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26043.26 CONTROL AIR RECEIVER 0-10 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26043.27 EXH V/V AIR SPRING 0-10 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26043.28 BLR DRUM PR 0-10 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
i MANOEUVRING PLATFORM ENGINE EA 1 USD 0.00 0.00
E26043.29 AIR SPRING 0-10 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26043.30 CYL/COOLING WATER 0-6 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26043.31 STARTING AIR 0-40 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26043.32 SUPERCHARGE AIR 0-4 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26043.33 COOLING WATER AIR COOLER 0-10 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26043.34 MAIN S.W. P/P SUC -1-5 3 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26043.35 MAIN S.W. P/P DISCH 0-10 3 ENGINE PCS 3.00 3.00 EA 1 USD 0.00 0.00
E26043.36 BALLAST P/P SUC -1-7 2 ENGINE PCS 3.00 3.00 EA 1 USD 0.00 0.00
E26043.37 BALLAST P/P DISCH 1-9 2 ENGINE PCS 2.00 2.00 EA 1 USD 0.00 0.00
E26043.38 FIRE & G.S. P/P SUC -1-5 1 ENGINE PCS 2.00 2.00 EA 1 USD 0.00 0.00
E26043.39 FIRE & G.S. P/P DISCH 0-10 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26043.40 BILGE & G.S. P/P SUC -1-5 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26043.41 BILGE & G.S. P/P DISCH 0-10 1 ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
i ARRANGE SUPPLY OF HIGH QUALITY SUITABLE PYROMETER/THERMOMETER( APS); ENGINE PCS EA 1 USD 0.00 0.00
E26043.42 SUPPLY OF PRESSURE GAUGE APS 0 TO 1000 BAR. ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26043.43 SUPPLY OF PRESSURE GAUGE APS 0 TO 600 BA.R. ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26043.44 SUPPLY OF PRESSURE GAUGE APS 0 TO 250 BAR. ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
E26043.45 SUPPLY OF PRESSURE GAUGE APS 0 TO 100 BAR ENGINE PCS 2.00 2.00 EA 1 USD 0.00 0.00
E26043.46 SUPPLY OF PRESSURE GAUGE APS 0 TO 10 BAR. ENGINE PCS 6.00 6.00 EA 1 USD 0.00 0.00
E26043.47 SUPPLY OF VACUUM GAUGE . ENGINE PCS 1.00 1.00 EA 1 USD 0.00 0.00
i E26044: ICCP,MAKE:HWASEUNG R&A WILSON WALTON (AQUAMATIC) ENGINE EA 1 USD 0.00 0.00
E26044.1 GOUGE OUT EXISTING PLATE, FABRICATE AND WELD NEW BACK PLATE AS PER EXISTING SYSTEM (MILD STEEL PLATE - 1290X250X30MM) - 4 NOS. ENGINE SET 2.00 2.00 EA 1 USD 0.00 0.00
E26044.2 OPEN COFFERDAM, ARRANGED LIGHT AND VENTILATION, ISOLATE THE ICCP SYSTEM, REMOVE ALL OLD ANODES 06 NOS AND REF CELLS 04 NOS.INSTALLED ALL NEW ANODES, REF CELLS AND FUSES, CONNECT ,TEST AND FILL GREASE 4 LOCATION .PERFORM WET CONDITION INSPECTION & CONFIRM ALL SYSTEM WORKING NORMAL.CLOSE COFFERDAMS AFTER COMPLETION OF JOB USING YARD SUPPLIED GASKETS & CONSUMABLES. ENGINE NOS 4.00 4.00 EA 1 USD 0.00 0.00
E26044.3 REMOTE MONITOR PANEL OF ICCP IN ECR SHOWING COMMUNICATION FAIL ERROR. SAME FAULT TO TRACE AND RECTIFY.SYSTEM TO COMMISSION AND HANDED OVER TO SHIPSTAFF. ENGINE NOS 4.00 4.00 EA 1 USD 0.00 0.00
i E26045: MGPS,HWASEUNG R&A WILSON WALTON ENGINE EA 1 USD 0.00 0.00
E26045.1 MGPS CHAMBER TO BE CLEANED AND PAINTED INTERNALLY. ALL CHECKS TO BE CARRIED OUT FOR PROPER OPERATION AND ANODES TO BE CHANGED AS FOUND NECESSARY. ANODES SHIP SUPPLY. JOINTS & OTHER CONSUMABLES YARD SUPPLY. ENGINE SETS 2.00 2.00 EA 1 USD 0.00 0.00
E26045.2 ALL ANODE FLANGES BOLTS FOUND RUSTY, SAME TO REPLACE ALONG WITH NEW GASKETS,SILICONE SELANT ETC (CONSUMABLES- YARD SUPPLY). ENGINE SETS 2.00 2.00 EA 1 USD 0.00 0.00
E26045.3 ALL REQUIRED CONNECTION TO BE MADE AND SYSTEM TO BE MADE OPERATIONAL.ANY WATER LEAKAGES NOTED DURING FLOODING TO BE ATTENDED PRIOR HANDOVER THE SYSTEM FOR FURTHER OPERATION. ENGINE SETS 2.00 2.00 EA 1 USD 0.00 0.00
i E26046: MISCELLANEOUS (MECHANICAL): ENGINE EA 1 USD 0.00 0.00
E26046.1 LAGGING ON FUEL LINES; STEAM LINES; CONDENSATE LINES; EXHAUST LINES; MANIFOLDS; ETC TO BE RENEWED; ASSUME 100 MTR LENGTH & CONSIDER PIPE DIA 100MM. QUOTE FOR ASBESTOS FREE LAGGING ALL INCLUSIVE. ENGINE MTR 100.00 100.00 EA 1 USD 0.00 0.00
E26046.2 CALORIFIER STEAM IN AND OUT VALVES TO RENEW. VALVE SHIP SUPPLY ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26046.3 ME & AE VISCOSITY CONTROLLER IS NOT WORKING TO CHECK & MAKE IT OPERATIONAL .QUOTE FOR SUPPLY AND INSTALLATION OF CLASS APPROVE TYPE. ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
E26046.4 HFO PURIFIER AND LO PURIFIER M/E F.O HEATER STEAM CONTROLLER V/V TO RENEW (SHIP SUPPLY). ENGINE NOS 6.00 6.00 EA 1 USD 0.00 0.00
E26046.5 BUNKER MANIFOLD BOTH F.O & DO & L.O TO RENEW ON BOTH (S & P) SIDE, & PRESSURE TEST .PRESSURE GAUGE POINT TO FABRICATE AND FIT. MANIFOLD PIPE LINE SUPPORT TO CHANGE. ENGINE NOS 10.00 10.00 EA 1 USD 0.00 0.00
E26046.6 MAIN ENGINES; EXHAUST TRUNKING AND TURBOCHARGER LAGGING/INSULATION TO RENEW. ENGINE MTR 25.00 25.00 EA 1 USD 0.00 0.00
E26046.7 STEAM COIL OF BUNKER TANKS, DB TANKS, WOT TO BE PRESSURE TESTED AND DEFECTIVE TO BE RENEW. ENGINE NOS 16.00 16.00 EA 1 USD 0.00 0.00
E26046.8 AFU FILTER CASING FOR BOTH PORT AND STARBOARD BWTS TO BE REPAIRED. FILTER ELEMENTS TO BE REMOVED, CASINGS CLEANED, AND NEW FILTER ELEMENTS INSTALLED. SYSTEM TO BE RESTARTED AND CHECKED FOR LEAKS AND PROPER OPERATION. ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
E26046.9 ENGINE CONTROL ROOM 2NOS FIRE DOORS TO BE RENEWED WITH YARD SUPPLIED APPROVED DOORS. ENGINE NOS 2.00 2.00 EA 1 USD 0.00 0.00
i E26047: MISC PIPE LINES & VALVES : ENGINE EA 1 USD 0.00 0.00
I TYPE / CAPACITY / DETAILS : ENGINE EA 1 USD 0.00 0.00
I REMOVE THE FOLLOWING PIPELINES FROM THEIR INSTALLED LOCATIONS. FABRICATE NEW PIPELINES ALONG WITH FLANGES, AS PER APPROVED SAMPLES OR DRAWINGS. REFIT PIPELINES IN ORIGINAL LOCATIONS, USING NEW GASKETS AND JOINTS (YARD SUPPLY). EXISTING FLANGES MAY BE REUSED IF FOUND IN GOOD CONDITION. ENSURE PROPER ALIGNMENT, SUPPORT, AND CONNECTION OF ALL PIPELINES AFTER INSTALLATION. ENGINE INSTRUCTIONS EA 1 USD 0.00 0.00
E26047.1 SEA WATER PIPE FROM EJECTOR PUMP SUCTION V/V TO EJECTOR PUMP OVER BOARD V/V TO BE RENEW ( MATERIAL MS SCH80) AS PER LENGTH : 5000MM , DIA: 115MM, 90 DEG BEND: 6, 45 DEG BEND: 3 (MS SCH 80) LENGTH: 5000 MM, DIA: 90MM, 90 DEG BEND: 2, 45 DEG BEND: 5(MS SCH 80) LENGTH : 5000MM , DIA: 115MM, 90 DEG BEND:7, 45 DEG BEND: 2 ENGINE MTR 15.00 15.00 EA 1 USD 0.00 0.00
i SEA WATER PIPE FROM BALLAST P/P SUCTION TO DISCHAGRE V/V TO BE RENEW AS PER BELOW: ENGINE EA 1 USD 0.00 0.00
E26047.2 STP SEA WATER LINE TO RENEW.(MS SCH 40) LENGTH: 3000 MM , DIA : 50MM, 90 DEG BEND: 3 ENGINE MTR 3.00 3.00 EA 1 USD 0.00 0.00
E26047.3 ATMOSPHERIC CONDENSER SW LINE TO RENEW. (MS SCH 80) LENGTH: 2000 MM, DIA: 140MM, 90 DEG BEND: 4 ENGINE MTR 2.00 2.00 EA 1 USD 0.00 0.00
E26047.4 CONDENSATE LINE RETURN TO DUMP CONDENSOR (MS SCH 40) LENGTH: 5000MM, DIA: 140 MM, 90 DEG BEND: 1, 45 DEG BEND: 1 ENGINE MTR 5.00 5.00 EA 1 USD 0.00 0.00
E26047.5 LTFW COOLER SW LINES TO RENEW WITH 2 90 DEG BENDS(MS SCH 80) LENGTH: 3000MM, DIA: 230 MM, 90 DEG BEND: 2 ENGINE MTR 3.00 3.00 EA 1 USD 0.00 0.00
E26047.6 BUNKER MANIFOLD A TO RENEW FOR L.O, DO & FO. & PRESSURE TEST LENGTH: 1000MM, 90 DEG BEND:1, DIA: 70MM, MS SCH 40 (2NOS.) LENGTH: 1000MM, 90 DEG BEND:1, DIA: 70MM, MS SCH 40 (2NOS.) LENGTH: 1100MM, DIA.90MM, 90 DEG BEND: 1, MS SCH 40 (2 NOS) LENGTH: 2000 MM, DIA: 220MM, 90 DEG BEND: 1, 45 DEG BEND: 1, MS SCH 40(2 NOS.) LENGTH: 1400 MM, DIA: 190MM, 90 DEG BEND: 1, MS SCH 40 (02 NOS) ENGINE MTR 6.50 6.50 EA 1 USD 0.00 0.00
E26047.7 TESTING LINE FOR OWS TO BE FABRICATED , LENGTH: 2500MM, DIA: 50MM, 90 DEG BEND: 3 MS SCH 40 ENGINE MTR 2.50 2.50 EA 1 USD 0.00 0.00
i E26048: MISCELLANEOUS ENGINE EA 1 USD 0.00 0.00
E26048.1 COMPLETE OVERHAULING OF ALL FOUR ER BLOWERS. • INTERNAL AND EXTERNAL DERUSTING OF BLOWER BODIES. • RENEWAL OF FLAPS FOR ALL FOUR BLOWERS. • RENEWAL OF ACTUATORS, FLEXIBLE HOSES, AND MANUAL VALVES FOR ALL UNITS. ENGINE NOS. 4.00 4.00 EA 1 USD 0.00 0.00
E26048.2 FABRICATION AND INSTALLATION OF A CLOSED/COVERED CHEMICAL LOCKER WITH DOOR IN THE S/G ROOM. ENGINE LS 1.00 1.00 EA 1 USD 0.00 0.00
I FOLLOWING PNEUMATIC CONTROLLERS NEED OVERHAULING. DISMANTLING OF ACTUATORS AND CONTROLLERS.CLEANING AND INSPECTION OF ALL INTERNAL PARTS REPLACEMENT OF DEFECTIVE COMPONENTS.RENEWAL OF SEALS, DIAPHRAGMS, AND O-RINGS .CALIBRATION OF PID CONTROLLERS.FUNCTIONAL TESTING OF ACTUATORS REASSEMBLY AND INSTALLATION SETTING AND TESTING WITH 4–20 MA SIGNAL .AIR LEAK TEST AND STROKE CHECK.FINAL COMMISSIONING AND PERFORMANCE TEST.ALL CONSUMABLES REQUIRED FOR OVERHAULING SHOULD BE YARD SUPPLY. ENGINE EA 1 USD 0.00 0.00
E26048.3 M/E L.T. COOLER MODEL NO: EPR-FA2SN3NTF INPUT SIGNAL: 4–20 MA DC SUPPLY AIR PRESSURE: 1.4 – 7 BAR AMBIENT TEMPERATURE: -20°C TO +70°C ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26048.4 M/E L.O. COOLER MODEL NO: EPR-FA2SN3NTF INPUT SIGNAL: 4–20 MA DC SUPPLY AIR PRESSURE: 1.4 – 7 BAR AMBIENT TEMPERATURE: -20°C TO +70°C ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26048.5 EXCESS STEAM DUMP CONTROLLER MODEL NO: YT-1000 INPUT SIGNAL: 4–20 MA DC SUPPLY AIR PRESSURE: 1.4 – 7 BAR AMBIENT TEMPERATURE: 0°C TO 50°C ENGINE NOS 1.00 1.00 EA 1 USD 0.00 0.00
E26048.6 AUX. ENGINE PREHEATER TO BE DISMATLED FOR CLEANING AND PRESSURE TESTED TO RATED VALUE AS PER MAKER RECOMMENDED VALUE MODEL: SSE24000 CAPACITY: 24 KW ENGINE SET 3.00 3 EA 1 USD 0.00 0.00
DECK SIDE 0.00 0.00
ENGINE SIDE 0.00 0.00
TOTAL REPAIR COST 0.00 0.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.97 MB
3. VISHVA EKTA VISHVA VIKAS - DD Tender Declarations.pdf
Tender Documents • 0.38 MB
4. VISHVA EKTA VISHVA VIKAS - Integrity Pact and Banning Guidelines.pdf
Tender Documents • 4.87 MB
5. VISHVA EKTA VISHVA VIKAS - Vessels Particulars.pdf
Tender Documents • 0.38 MB
6. VISHVA EKTA VISHVA VIKAS - Draft Stem Order (for advance information).pdf
Tender Documents • 1.01 MB
1. VISHVA EKTA-VISHVA VIKAS FINAL DRY-DOCK REPAIRS 2026-27 SPECIFICATIONS 18092026.xlsx
Tender Documents • 1.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .