Loading…
Loading…
Tender Value
₹13.8 Cr
EMD Value
₹5 L
Closing Date
14 Sept 2026, 3:00 pm
Managing Director
KITCO Ltd, M M Gardens, Church Landing Road, Pallimukku, Ernakulam
Construction of Road and Retaining wall at Government Medical College Idukki
2026_KITCO_866556_1
RE02/HFWD/KITCO/CL/24/2023-24
Open Tender
Civil Works - Roads
Item Rate
365 days
Idukki
As per NIT
7 documents required · 7 mandatory
₹17,700
Yes
₹5 L
Yes
KITCO Ltd, Ernakulam
24 Aug 2026
24 Aug 2026
16 Sept 2026
24 Aug 2026
14 Sept 2026
5 Sept 2026
24 Aug 2026 - 29 Aug 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1ROAD WORKS | |||||
| 1.01 | 2.3.2.A : Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | - | Hecter | - | - |
| 1.02 | 2.1.1 : Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit.
Girth from 300 mm to 600 mm | - | each | - | - |
| 1.03 | 2.1.2 : Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit.
Girth from 600 mm to 900 mm | - | each | - | - |
| 1.04 | 3.6 : Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 0.6 | cum | - | - |
| 1.05 | 3.7 : Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site within all lifts and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. | 0.6 | cum | - | - |
| 1.06 | 3.8.A : Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. <br>
Mechanised | 0.4 | cum | - | - |
| 1.07 | 3.17 : Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. | 1 | cum | - | - |
| 1.08 | 2.5.2.A : Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately
Bituminous course - By Mechanical Means | 1 | cum | - | - |
| 1.09 | 2.6 : Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately | - | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.21 MB
BOQ_1466687.xls
BOQ • 0.36 MB
Technicalbididukkiroad2.pdf
Tender Documents • 9.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].