Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹52.9 LAccepted-AOC | ₹52.9 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | ALBERT CHERIAN L1 |
|---|---|---|---|---|
| 1.00Reactive maintenance | ||||
| 1.00 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 26.11 | cum | 2,400 ₹62,676 |
| 1.00 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 26.11 | cum | 5,000 ₹1.3 L |
| 1.00 | 55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | 13.62 | cum | 2,400 ₹32,676 |
| 1.00 | 55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface. | 13.62 | cum | 12,000 ₹1.6 L |
| 1.00 | 3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means <br> | 223 | sqm | 6 ₹1,338 |
| 1.01 | 4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 35.7 | cum | 3,600 ₹1.3 L |
| 1.01 | 55.22:Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete. | 266.75 | sqm | 1,250 ₹3.3 L |
| 1.01 | 10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete <br> For grading II- 13 mm (Nominal size) Material | 3,500 | sqm | 635 ₹22.2 L |
| 1.01 | 3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.<br> Ordinary soil - Mechanical Means - (Depth upto 3 m) <br> | 10.9 | cum | 50 ₹545 |
Tender Value
₹50.8 L
Closing Date
15 Oct 2025, 2:00 pmClosed
Executive Engineer, PWD Roads division
Office of the Executive Engineer, PWD Roads division, Kakkanad, Trikkakara. P.O
GENERAL GENERA RM 2025 26 RC 2 Phase 1 Cluster II Ernakulam Mulamthuruthy ZONE 1 One Year Running Contract for various Mulamthuruthy in Ernakuam District 7 road stretches for a length of 3123 m Estimate
2025_PWD_802771_2
PWD/RB/TR/14649/2025_5_1_1/1
Open Tender
Civil Works - Roads
365 days
Kakkanadu
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
28 Feb 2026
7 Oct 2025
17 Oct 2025
7 Oct 2025
15 Oct 2025
7 Oct 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid