| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.6 LAccepted-AOC | ₹18.6 L | L1 | Accepted-AOC Work has been awarded to in lottery system |
| 2 | L1₹18.6 LRejected-Finance | ₹18.6 L | L1 | Rejected-Finance Not Selected in lottery system |
| 3 | L2₹19.7 LRejected-Finance AT BHIANPADA PO BAULANGA PS GOP DIST PURI | ₹19.7 L | L2 | Rejected-Finance Not Selected in lottery system |
| 4 | L3₹19.8 LRejected-Finance AL KHEDARPUN DIST PURI P O BHILLIGRAM PIN 757106 | MAYURBHANJ | ODISHA | 757106 | ₹19.8 L | L3 | Rejected-Finance Not Selected in lottery system |
| 5 | L4₹20.5 LRejected-Finance AT PO BIRATUNGA PS GOP DIST PURI | BIRATUNGA | PURI | ODISHA | ₹20.5 L | L4 | Rejected-Finance Not Selected in lottery system |
Tender Value
₹23.3 L
EMD Value
₹23,280
Closing Date
5 Mar 2026, 5:00 pmClosed
SUPERINTENDING ENGINEER, R.W DIVISION, NIM
O/O THE SUPERINTENDING ENGINEER, R.W DIVISION, NIM
Building
2026_CERWI_126559_1
Tender Online Divn.NPR-18/2025-26
Open Tender
Civil Works - Buildings
180 days
Nimapara
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹23,280
Yes
1 Jul 2026
24 Feb 2026
6 Mar 2026
24 Feb 2026
5 Mar 2026
24 Feb 2026
24 Feb 2026 - 5 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation of foundation in hard soil including dressing and levelling the bed up to the required depth & removing the excavated earth & depositing the same away from the work site within initial lead of 50 mtr & initial lift of 1.5 mtr, including cost of labour T&P articles required for the work including shoring, shuttering, propping & dewatering if required, etc. complete in all respect as per the specification & direction of the Engineer-in-Charge. | 82.09 | Cum | 276.89 | ₹22,729.9 |
| 2 | Supplying and filling in foundation trenches and plinth with sand, well watered and rammed in layers not exceeding 15cm in depth with all lead and lift including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, sundries, T&P required for the work etc. complete in all respect as directed by the Engineer-in-Charge. | 117.04 | Cum | 1,063.17 | ₹1,24,433.42 |
| 3 | Providing Plain cement concrete (1:3:6) using 40mm. Size black hard hand broken granite stone chips of approved quality from approved quarry using ordinary Portland cement (OPC), screened and washed sharp sand for mortar including lowering, laying and compacting concrete in layers not exceeding 15cm.thick, watering and curing, including cost, conveyance, royalty and taxes of all materials, all labour sundries and T&P required for the work, including shoring, shuttering, dewatering if required including hire and running charges of all machineries etc. complete as directed by the Engineer-in-charge. | 21.48 | Cum | 6,414.35 | ₹1,37,780.24 |
| 4 | Fly Ash Brick Work in C.M (1:6 ) using Fly Ash Bricks of approved quality in Foundation and Plinth including providing key bricks, splays cutting, circular moulding, champering, chiselling including watering, curing with cost , conveyance , royalty taxes of all materials, labour and T&P articles required for the work etc. complete in all respect as per direction of the Engineer in charge. | 27.91 | Cum | 6,010.76 | ₹1,67,760.31 |
| 5 | Fly Ash Brick Work in C.M (1:6) using Fly Ash Bricks of approved quality in superstructure including providing key bricks, splays cutting, circular moulding, champering, chiselling including watering, curing with cost , conveyance , royalty taxes of all materials, labour and T&P articles required for the work etc. complete in all respect as per direction of the Engineer in charge . | 31.74 | Cum | 6,044.09 | ₹1,91,839.42 |
| 6 | R.C.C.Work of M-20 nominal mix (1:1/2:3) using 20mm & 10mm H.G stone aggregate with approved quality from approved quarry for cement concrete including centring & shuttering work cost of all materials, labour T&P required for the work with royality etc. Complete in all respect as per direction of the Engineer in charge. (Foundation) | 10.97 | Cum | 7,328.16 | ₹80,389.92 |
| 6.01 | Plinth Band | 4.4 | Cum | 7,328.16 | ₹32,243.9 |
| 6.02 | Lintel | 3.23 | Cum | 14,363.4 | ₹46,393.78 |
| 6.03 | Chajja | 26.34 | Sqm | 1,249.56 | ₹32,913.41 |
| 6.04 | Column | 5.76 | Cum | 15,962.96 | ₹91,946.65 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.92 MB
DTCN.pdf
Tender Documents • 1.71 MB
BOQ_582724.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid