| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.8 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹58.1 L+₹9.8 L (20.4%)Rejected-AOC KOTHI NO 901 2ND FLOOR PHASE 3B 2 SAS NAGAR MOHALI PB 160059 | MOHALI | SAS NAGAR | PUNJAB | 160059 | L2 | Rejected-AOC Not lowest | |
| 3 | L3₹59.0 L+₹10.7 L (22.2%)Rejected-AOC | L3 | Rejected-AOC Not lowest | |
| 4 | L4₹61.5 L+₹13.2 L (27.4%)Rejected-AOC | L4 | Rejected-AOC Not lowest |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
20 Oct 2020, 6:00 pmClosed
CWE Ambala
Headquarter Commander Works Engineer Ambala Mansfield Road Ambala Cantt
Special repairs to internal roads in various locations and provision of road from Gate No 2 to MT washing point at 948 AD MSL Regt wksp under GE South Ambala Cantt
2020_MES_375550_1
CWE/AMB/SOUTH/T-26 OF 2020-21
Open Tender
Civil Works - Roads
Item Rate
90 days
AMBALA CANTT
All as per tender documents
8 documents required · 8 mandatory
₹1,000
GE SOUTH AMBALA CANTT
₹1.3 L
Yes
23 Nov 2020
8 Sept 2020
22 Oct 2020
8 Sept 2020
20 Oct 2020
23 Sept 2020
9 Sept 2020 - 23 Sept 2020
Amount
Material and labour for repair to pot holes of any depth not exceeding 1.00 Sqm each including sweeping free from dust and mud or water, scoring sunken surfaces in roads/path etc cutting around edges to at least 25mm and more as per site requirement in depth and making good by applying tack coat of paving bitumen @ of 5 Kg per 10 Sqm, putting in premixed bituminous macadam, well rammed and sealed with binder 9.8 Kg per 10 Sqm, blinded with 0.09 cum of stone chippings 6.3mm size and again well rammed (including supply of premixed macadam binder and chipping) depth of pot holes exceeding 30mm complete all as specified and directed.
Material and labour for scarifying or picking gravelled, macadam or bituminous macadam surfaces in area not exceeding 400 sqm/ road cutting for drainage chamber, drainage pipe etc. depth not exceeding 50 mm, including rubbish material not exceeding 500m and not exceeding 100mm deep complete all as specified and directed.
Material and labour for soiling (or sub base), 150mm thick (compacted thickness), with broken boulders or quarried stone, interstices filled, surface formed and rolled with power roller and compacted to required gradient and camber complete all as specified and directed.
Material and labour for water bound macadam, 75mm thick (compacted thickness), using course aggregates of limestone/ sandstone/ flint/ quartzite of grading 2 (63 to 40mm size), blinded with stone screening type 'A', spread, watered, rolled and consolidated to gradient and camber as required by using power roller 8 to 12 Tonne capacity complete all as specified and directed.
All as per Serial item No.4.00 above, but except material. Note: Material retrieved from Serial item No. 2.00 above shall be used in this item. Retreived material shall be cleaned before using. Quoted Rate shall deemed to include for cleaning of material retreived.
Material and labour for water bound macadam, 150mm thick (compacted thickness), using course aggregates of limestone/ sandstone/ flint/ quartzite of grading 2 (63 to 40mm size), blinded with stone screening type 'A', spread, watered, rolled and consolidated to gradient and camber as required by using power roller 8 to 12 Tonne capacity complete all as specified and directed. Note: WBM shall be done in two layers of 75mm thick each layer.
Material and labour for preparation of unsurfaced water bound macadam by brushing with wire brushes for removing caked mud etc, sweeping with air compressor to remove all loose dirt etc and applying evenly priming /tack coat using paving bitumen (Grade VG-10) at the rate of 10 Kgs per 10 Sqm on prepared surfaces complete all as specified and directed.
Material and labour for premixed,Bituminous Macadam with 4% binder content by weight of total mix, rolled and compacted to required camber (Consolidated thickness 75mm or less) and gradient with paving bitumen of grade VG-30 grade using mechanical paver and rolling with 10 to 12 tonne power roller/ tandem vibrating roller etc complete all as specified and directed.
Material and labour for preparation of black top bituminous macadam surface by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surfaces with air compressor to remove all loose dirt etc and applying evenly a bituminous tack coat of GRADE VG-10 @ of 5 Kg per 10 sqm complete all as specified and as directed.
Material and labour for laying bituminous premix semi dense asphaltic concrete 30mm (consolidated thickness) using with 5.5% of binder (grade VG-10) content by weight of total mix, rolled and compacted to required camber and gradient using mechanical paver and rolled with 10-12 tonne capacity vibratory road roller rolled to uniform smooth surface ,complete all as specified and as directed. Note- Bituminous premix semi dense asphaltic concrete shall prepared in central computerised hot mix plant. complete all as specified and as directed by the Engineer-in-Charge. (ii)Design mix shall be got done by the contractor at his own expenses from laboratory as decided by GE, before laying the SDAC. (iii) A recovery @ Rs 38.19 per kg shall be made if the bitumen content in design mix is found on lower side but no adjustment shall be made if the bitumen content is found on higher side than specified. Material and labour for laying bituminous premix semi dense asphaltic concrete 30mm (consolidated thickness) using with 5.5% of binder (grade VG-30) content by weight of total mix, rolled and compacted to required camber and gradient using mechanical paver and rolled with 10-12 tonne capacity vibratory road roller rolled to uniform smooth surface ,complete all as specified and as directed.
Material and labour for laying bituminous premix semi dense asphaltic concrete 40mm (consolidated thickness) using with 5.5% of binder (grade VG-10) content by weight of total mix, rolled and compacted to required camber and gradient using mechanical paver and rolled with 10-12 tonne capacity vibratory road roller rolled to uniform smooth surface ,complete all as specified and as directed. Note- Bituminous premix semi dense asphaltic concrete shall prepared in central computerised hot mix plant. complete all as specified and as directed by the Engineer-in-Charge. (ii)Design mix shall be got done by the contractor at his own expenses from laboratory as decided by GE, before laying the SDAC. (iii) A recovery @ Rs 38.19 per kg shall be made if the bitumen content in design mix is found on lower side but no adjustment shall be made if the bitumen content is found on higher side than specified. Material and labour for laying bituminous premix semi dense asphaltic concrete 30mm (consolidated thickness) using with 5.5% of binder (grade VG-30) content by weight of total mix, rolled and compacted to required camber and gradient using mechanical paver and rolled with 10-12 tonne capacity vibratory road roller rolled to uniform smooth surface ,complete all as specified and as directed.
Material and labour for retro-reflective thermoplastic road marking paint with glass beads exc 10cm width or girth hot applied on road surface mechanically confirming to BS-3262 and according to the specification laid down by IRC and MOST(Ministry of surface transport) specification 2001(4th revision) etc, complete all as specified and directed.
Supply and fixing (in repairs), cat eye, dual (62 beads minimum), aluminium casted body, of size 100mm x 100mm x18.5mm, having ABS plastic strip containing 62 mini retro reflective glass beads of colour white/red/yellow on both sides (minimum 31 beads on each sides) and fixed complete with steel zinc plated nails/stud of dia 12mm and of length 120mm complete all as specified and directed . Note:- (i) Fixing arrangement shall be as per manufacturer's instructions. (ii) Designed to bear 25 Tonnes load and having impact strength of 253 KN.
Material and labour for surface excavation not exceeding 30cm deep and averaging 15cm deep and getting out in soft/loose soil, complete all as specified and directed.
Material and labour for surface excavation not exceeding 30cm deep and averaging 15cm deep and getting out in hard/dense soil, complete all as specified and directed.
Material and labour for 100mm thick PCC 1:4:8 type D-2 (using 40 mm graded mechanically crushed stone aggregate), complete all as specified and as directed.
Material and labour for machine pressed precast concrete interlocking paver block (50% grey and 50% coloured) any shape and size confirming to IS-15658-2006 of 80mm thickness, M-40 grade with grey cement and no piment over and including 50mm sand cushioning complete all as specified and as directed.
Material and labour for removing excavated soil not excluding 50m and depositing where directed, at a level not excluding 1.5m above the starting point complete all as specified and directed.
Material and labour for providing and laying of precast PCC solid concrete block, Grade-C confirming to IS-2185 (Part-I) 2005 of 30cm height, 10cm thick suitable width including chamfers, weatherings, throating, etc. as in kerb continuous edging jointed in CM 1:4 and struck flush pointing as the work proceeds and finish with neat cement flush joint, complete all as specified and as directed.
Material and labour for preparation of black top bituminous macadam surface by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surfaces with air compressor to remove all loose dirt etc and applying evenly a bituminous tack coat of gradeVG-10 @ of 3 Kg per 10 sqm and laying bituminous premix semi dense asphaltic concrete 30mm (consolidated thickness) using with 5.5% of binder (grade VG-10) content by weight of total mix, rolled and compacted to required camber and gradient using mechanical paver and rolled with 10-12 tonne capacity vibratory road roller rolled to uniform smooth surface ,complete all as specified and as directed.
Material and labour for moorum/ red bajri, kankar or laterite, spread with spread thickness of 100mm, rolled and consolidated to gradient and camber required using hand roller complete all as specified and directed.
Supply and fixing vibratory compacted precast concrete coloured(using red colour pgment ), rubber moulded , interlocking designer paver blocks, confirming to IS-15658-2006 of 60mm thickness, M-35 grade in path, hard standing, etc. laid over and including 50 mm thick screed or bedding layer of sand, complete all as specified and as directed.
Supply and fixing speed bumps made up of polyethylene plastic of size 495mm x 420mm x 70mm each (black and yellow colour pattern interlocked alternately), UV stabilized, studded with reflectors on both sides, interlocking type, including drilling 4 Nos holes to road surface and fixing with lag bolts with anchor and washers,complete all as specified and as directed. Make: Dark Eye or equivalent as approved by GE Note:- (i) Fixing arrangement shall be as per manufacturer instructions. (ii) Designed to bear 25 tonnes load and having impact strength of 253 KN.
Material and labour for rolling and consolidating of formation surface in cutting rolled with 8 to 12 tonne power roller and compacted to required gradient and camber complete all as specified and directed.
Dismantaling of brick work or stone masonary, PCC walling built in CM including all quions, arches, pillars etc., complete all as specified and as directed.
Material and labour for continuous brick edging using burnt clay bricks of subclass 'B' bricks, with width equal to the the depth of the brick, laid dry on end vertically complete all as specified and as directed.
Note:- Amount of credit of Rs. 42,950.00 for retrieved materials is mentioned in Schedule of Credit Page No. 49 of tender documents in pdf form which will be deducted offline while acceptance of tender.
M/s VARINDER PAL SINGH AND CO
Bal Singh and Sons
Laxmi Builders
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .