Loading…
Loading…
Tender Value
₹19.0 L
EMD Value
₹20,000
Closing Date
27 Aug 2026, 6:00 pmDue today
Office of The Executive Engineer, Bhavnagar Irrigation Project Division
Providing Project Management consultancy Services including taking initial / intermediate and final levels, providing quality assurance, technical audit working out quantity, project progress monitoring etc for(1) Modification of canal by providing C.C. lining from Ch 0.00 Mt to 8500 Mt of L.B.M.C. and providing C.C. lining of its minors 1 to 6. (2) Modification of canal by providing C.C. lining from Ch 8500 Mt to 13635 Mt of L.B.M.C. & providing C.C. lining of its minors 7 to 9. (3 ) Modification of canal by providing C.C. lining from Ch 13651 Mt to 14535 Mt of L.B.M.C., Distributary and providing C.C. lining of its minors 9a to 13.
331632
04/2026-27
Open
Consultancy Services
Works
Bhavnagar
7 documents required · 6 mandatory · 1 optional
₹900
Executive Engineer, Bhavnagar Irrigation Project Division, Bhavnagar
₹20,000
5 Aug 2026
5 Aug 2026
5 Aug 2026
27 Aug 2026
5 Aug 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Name of work: Kalubhar irrigation scheme
Providing Project Management consultancy Services including taking initial /
intermediate and final levels, providing quality assurance, technical audit
working out quantity, project progress monitoring etc for(1) Modification of
canal by providing C.C. lining from Ch 0.00 Mt to 8500 Mt of L.B.M.C. and
providing C.C. lining of its minors 1 to 6. (2) Modification of canal by providing
C.C. lining from Ch 8500 Mt to 13635 Mt of L.B.M.C. & providing C.C. lining of its
minors 7 to 9. (3 ) Modification of canal by providing C.C. lining from Ch
Mt to 14535 Mt of L.B.M.C., Distributary and providing C.C. lining of its minors 9a
BILL OF QUANTITIES
MEMORANDUM SHOWING ITEMS OF WORKS TO BE CARRIED OUT
m Qty. Item Rate Unit Amount
1a 11 Team Leader/Project Manager M.E 40000 Forty thousand Mont
1b 33 Site Civil Engineer 25000 Twenty five Mont
B.E/B.Tech/Diploma (Civil) thousand hs
(Experience 5 Years )
1c 33 Tech. Assistance Diploma(Civil) 15000 Fifteen Mont
(Experience 2 Years ) thousand hs
2a 11 Project Office Rent 10000 Ten thousand Mont
3a 11 Office Equipment 1000 One thousand Mont
3b 11 Office Stationary and Misc. Office 2000 Two thousand Mont
Consumable Expenses hs
Ninteen Lakh Three Thousand Rupees and zero Paisa Only
I/We am/are willing to carry out the work at.....................................% above/below percentage (shold be written in
figures and words) of the estimated rates mentioned above. Amount of my/our tender works out as under.
* Estimated amount * Estimated amount
Put to tender Rs. 1903000/- Put to tender Rs. 1903000/-
1 The Contractor shall exhibit a board with brief details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R. NO.: MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R. therefore in
R.C.C. items where there is a change as per actual mix design the cost of difference of
cement consumption have been deducted from the rate of original item at the rate of
input rate mentioned in all the tender.
5 All work shall be carried out as per Public Works Department Handbook and other
specifications of Division or as directed
6 Rates quoted include clearance of site (prior commencement of work and at its close) in
all respects and hold good for work under all conditions, site, moisture, weather etc. To
be continued on additional sheets, if found necessary
Signature of the contractor: Executive Engineer
Bhavnagar Irri. Project Division Bhavnagar
(A) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with brief details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R. NO.: MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R. therefore in
R.C.C. items where there is a change as per actual mix design the cost of difference of
cement consumption have been deducted from the rate of original item at the rate of
input rate mentioned in all the tender.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Providing Project Management Kalubhar.pdf
BOQ.pdf
Tender Notice No.04 -2026-27.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].