Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹17.4 LAccepted-AOC | 1 | Accepted-AOC Agreement executed by them | |
| 2 | 2₹20.3 L+₹2.9 L (16.8%)Rejected-AOC | 2 | Rejected-AOC second lowest |
Tender Value
₹24 L
EMD Value
₹50,000
Closing Date
5 Aug 2019, 5:00 pmClosed
Executive Engineer
Office of the Executive Engineer, Sabarimala Development Project, TDB Building, Kumbazha Road, Pathanamthitta
SDP-Nilackkal-Mand M festival in 1195 ME-Providing chemical treatment process for the sewage treatment process for the sewage generated from the permanent toilets at Nilackkal and for the operation of modular sewage treatment plant for the sewage gen
2019_TDB_288770_1
SDP/EE/ET-15/2019-20
Open Tender
Civil Works - Others
Item Rate
70 days
Nilackkal
Refer NIT
6 documents required · 6 mandatory
₹2,800
online
₹50,000
19 Apr 2021
27 Jul 2019
7 Aug 2019
27 Jul 2019
5 Aug 2019
27 Jul 2019
Amount
APPENDIX A - Engaging labours and supply of chemicals Part I Wages of Employees Skilled Mazdoor(1 no per shift per day)
Pump Operators ( 1 no per shift for 2 shifts per day )
Scavangers( 1 no per shift for 2 shifts per day )
Part II - Supply of chemicals Supply of Ferric Chloride at sewage treatment plant site having the following specification. Assay Iodometric 14.0 % Iron (II) chloride 1.0 % Free acid as hel. 1.0 % Sulphate (So4) 0.05% Heavy metals as PH 0.005% Arsenic 0.001% Phosphate (Po4) 0.005% Total nitrogen 0.005%
Do do supply of Hydrated lime (Ca2OH) having the following soecifications Assay (Acidemetric ) 96.0% Carbonate (CaCo3) max 3.0% Chloride(Cl) max 0.2% Sulphate So4 max 0.005% Heavy metals 0.05% (as PH) max Iron FC max 0.05% Substances not precipitated by Sulphate max 2.5%
Do do Supply of Hypochlorite at STP site
APPENDIX B - Engaging labours and supply of chemicals Part I Wages of Employees Plumber ( 1 No per shift for 3 shift for 67 days 1x3x67=201 days)
Elecrician Grade-1 ( 1 No per shift for 3 shift for 67 days 1x3x67=201 days)
Skilled mazdoor ( 1 No per shift for 3 shift for 67 days 1x3x67=201 days)
Pump operators( 1 No per shift for 3 shift for 67 days 1x3x67=201 days)
Part II - Supply of chemicals Supply of Ferric Chloride at sewage treatment plant site having the following specification. Assay Iodometric 14.0 % Iron (II) chloride 1.0 % Free acid as hel. 1.0 % Sulphate (So4) 0.05% Heavy metals as PH 0.005% Arsenic 0.001% Phosphate (Po4) 0.005% Total nitrogen 0.005%
Do do supply of Hydrated lime (Ca2OH) having the following soecifications Assay (Acidemetric ) 96.0% Carbonate (CaCo3) max 3.0% Chloride(Cl) max 0.2% Sulphate So4 max 0.005% Heavy metals 0.05% (as PH) max Iron FC max 0.05% Substances not precipitated by Sulphate max 2.5%
Do do Supply of Hypochlorite at STP site
CINZAC ENGINEERS (INDIA) PVT LTD
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_393111.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .