| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.3 LAccepted-Finance | 1 | Accepted-Finance ACCEPTED | |
| 2 | 2₹6.5 L+₹19,000.34 (3.01%)Accepted-Finance KARINGAPPARA HOUSE KUPPAKKAYAM P O KOMBUKUTHI MUNDAKKAYAM | KERALA | 2 | Accepted-Finance ACCEPTED | |
| 3 | 3₹6.6 L+₹31,625.16 (5.01%)Accepted-Finance | 3 | Accepted-Finance ACCEPTED |
Tender Value
₹6.3 L
EMD Value
₹15,800
Closing Date
21 Aug 2026, 3:00 pmClosed
Executive Engineer KSEBL PMU Pala
Executive Engineer KSEBL PMU Pala Vydhyuthi Bhavan Pala
Stringing of one km 3 PH 11kV line with XLPE Insulated ACSR Raccoon 865mtr and allied works
2026_KSEB_859166_1
E-TENDER/2026-27/5157/13 dt. 29-05-2026
Open Tender
Electrical Works
Percentage
180 days
Erumeli
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,534
₹15,800
8 Oct 2026
4 Jul 2026
22 Aug 2026
4 Jul 2026
21 Aug 2026
4 Jul 2026
4 Jul 2026 - 21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Stringing of 865 mtr 3 PH 11kV line with XLPE Insulated ACSR Raccoon or equivalant (3 conductors) and allied works | |||||
| 1.01 | Cleaning and levelling of transformer yard/RMU, spreading 40 mm broken stone in yard for a thickness of 10 cm above bed of 10 cm thick 6 mm broken stone, after constructing a curb wall of height 20cm above ground and 10cm below level including cost of all materials and charges for conveying, spreading, consolidating etc. | 8 | sq.m | 1 | ₹8 |
| 1.02 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. | 1 | No | - | - |
| 1.03 | Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. | 0.06 | km | - | - |
| 1.04 | Dismantling (without damage) one HT stay including digging pit in all classes of soil and backfilling, and bringing back to section store. | 1 | No | - | - |
| 1.05 | Drilling hole of various sizes on existing Channel/Cross Arm. | 9 | No | - | - |
| 1.06 | Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing. | 1 | No | - | - |
| 1.07 | Fitting one Additional V cross arm in existing single pole including conveyance of materials. | 2 | No | 1 | ₹2 |
| 1.08 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. | 15 | No | - | - |
| 1.09 | Dismantling (without damage) LT stay including digging pit in all classes of soil and backfilling. | 5 | No | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1452653.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
GCC.pdf
Tender Documents • 0.42 MB
BOQ_1452653.xls
BOQ • 0.44 MB
Splcndtns.pdf
Tender Documents • 0.29 MB
Indemnity.pdf
Tender Documents • 0.49 MB
Corrigendum5.pdf
PDF • 0.37 MB
Corrigndum4.pdf
PDF • 0.37 MB
Corrigendm3.pdf
PDF • 0.37 MB
Corrigendum2.pdf
PDF • 0.37 MB
Corrigendum1.pdf
PDF • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .