Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical 583 PURVAVALI GANESHPUR ROORKEE 583 PURVAVALI GANESHPUR ROORKEE GANESHPUR ROORKEE ROORKEE HARIDWAR UTTARAKHAND 247667 | HARIDWAR | UTTARAKHAND | 247667 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical 4 KHEME KA KUA PAL ROAD JODHPUR RAJASTHAN 342001 | JODHPUR | JODHPUR | RAJASTHAN | 342001 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical KORBA CHHATTISGARH 495677 INDIA UDYAM CG 10 0000711 | KORBA | CHHATTISGARH | 495677 | Admitted-Fee/PreQual/Technical |
Tender Value
₹81.3 L
EMD Value
₹1.6 L
Closing Date
9 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AGM(CE)
FCI RO Delhi
Special Rehabilitation / Repairs to Depot Office Building, ancillaries structure, boundary wall and godown at FSD Okhla under divisional office Mayapuri(Cap acity 13,360 MT)
2026_FCI_931805_1
CE-02/2026-27
Open Tender
Civil Works
Percentage
120 days
FSD Okhla
Please refer tender documents
2 documents required · 2 mandatory
₹0
₹1.6 L
10 Nov 2026
26 Oct 2026
10 Nov 2026
26 Oct 2026
9 Nov 2026
26 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 1,445.3 | sqm | 53.17 | ₹76,846.6 |
| 2 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete | 2,271.21 | sqm | 19.22 | ₹43,652.66 |
| 3 | Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 metres lead. | 99 | kg | 35.81 | ₹3,545.19 |
| 4 | Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in:Channels, angles, tees and flats | 267 | kg | 2.24 | ₹598.08 |
| 5 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in- charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 58.89 | cum | 2,368.53 | ₹1,39,493.15 |
| 6 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar | 70 | cum | 2,004.57 | ₹1,40,319.9 |
| 7 | Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured) :From brick work in cement mortar. | 20,748 | 1000Nos. | 6,519.88 | ₹13,52,74,470.24 |
| 8 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 50.82 | cum | 253.27 | ₹12,871.18 |
| 9 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 91.63 | cum | 6,628.08 | ₹6,07,336.27 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations, footings, bases of columns, etc. for mass concrete | 26.58 | sqm | 381.56 | ₹10,141.86 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.59 MB
BOQ_979198.xls
BOQ • 0.35 MB
MTFOKHLA.pdf
Tender Documents • 2.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .