| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹25.2 CrAdmitted-Finance SITA KUTIR BEHIND COURT NEAR SBI BANK PHALODI DISTRICT PHALODI 342301 | PHALODI | PHALODI | RAJASTHAN | 342301 | L1 | Admitted-Finance | ||
| 2 | L2₹26.3 Cr+₹1.1 Cr (4.37%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹26.8 Cr
EMD Value
₹53.5 L
Closing Date
16 Aug 2022, 6:00 pmClosed
Addl. Chief Engineer, PWD Zone-I Jodhpur
Addl. Chief Engineer, PWD Zone-I Jodhpur
Widening from single lane to two lane of Osian Ahu Dasori road(SH-136) km 67/0 to 98/0
2022_CEPWD_287291_1
NIT No.13/2022-23 of ACE PWD Zone-I Jodhpur (Bid)
Open Tender
Civil Works
Percentage
330 days
Jodhpur
Please refer Tender documents.
7 documents required · 7 mandatory
₹5,000
Executive Engineer, PWD Division Phalodi
₹53.5 L
Yes
Addl. Chief Engineer, PWD Zone-I Jodhpur
24 Aug 2022
20 Jul 2022
17 Aug 2022
20 Jul 2022
16 Aug 2022
20 Jul 2022
5 Aug 2022
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply & fixing of precast reinforced cement concrete M-15 grade boundary pillars 100mm x 100mm x 900mm of size of standard design as per IRC: 25-1967, fixed in position in cement concrete 1:4:8 including finishing and lettering but excluding painting. | 1,240 | Each | 302 | ₹3,74,480 |
| 2 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material upto a lead of 1000m including removal and disposal of top organic soil not exceeding in 150 mm thickness as per MORTH specification clause 201.By mechanical Means . A. In area of light jungle | 21.7 | Hect | 14,853 | ₹3,22,310.1 |
| 3 | Earth work in excavation, including stacking/disposal of surplus material with all lifts and lead upto 495 metres, exclusive of compensation of earth [MoRTH specification : Clause 301 to 305] In ordinary Soil Mechanically by power shovel, including mechanical loading and carriage by tipper/dumper (6T capacity) | 1,43,208.1 | Cum | 37 | ₹52,98,699.7 |
| 4 | Extra for laying earth as per specification for compaction in 200 mm thick loose layers and dressing [MoRTH Specification Clause 305.3.5].BY MECHANICAL MEANS, using Motor Grader, from earth in stock piles with all lead and lift but excluding rolling and watering. | 1,43,208.1 | Cum | 23 | ₹32,93,786.3 |
| 5 | Extra for rolling to specification with Power Roller, 8-10 tonne when earth is at suitable moisture content with dry field density not less than 100 % of maximum dry density (Ordi-nary Procter test).excluding watering. | 1,43,208.1 | Cum | 24 | ₹34,36,994.4 |
| 6 | Extra for watering the earth to bring the earth upto required O.M.C excluding rolling | 1,43,208.1 | Cum | 16.75 | ₹23,98,735.68 |
| 7 | Carriage of Sand, bajri, ballast, stone, boulders, kankar & gravelly material includind loading & unloading For lead above 495mt up to 1000mt ) to be included in the respective item). | 48,677.47 | Cum | 88 | ₹42,83,617.36 |
| 8 | Providing laying, spreading and compacting specified graded crushed stone in sub-base course including premixing the material at OMC in wet mix plant, carriage of mixed material, laying in uniform layers with motor grader, F.E.loader on a prepared surface and compacting with vibratory compactor to achieve the desired density including all material, labour, mach-nery, lighting barricading and maintenance of diversion complete.[MoRTH specification Clause 401] includiong 20 Km lead .a) For Grading I Material | 47,467 | Cum | 591 | ₹2,80,52,997 |
| 9 | Providing and laying granular sub-base material having P.I.not more than 6, including spreading in layers not exceeding 150 mm compacted thickness and consolidation by 8-10 tonne power roller to required camber and grade including cost of water and hire charges of machinery, including T&P with all lead (Compacted thickness to be measured).as per MORTH specification table 400-1, 400-2 :For grading-III with CBR value not less than 20 to attain 100% proctor density. | 23,178.75 | Cum | 300 | ₹69,53,625 |
| 10 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform laying with paver in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 55,783.75 | Cum | 1,014 | ₹5,65,64,722.5 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 4.56 MB
Tendernotice_2.pdf
PDF • 9.48 MB
Tendernotice_3.pdf
PDF • 3.73 MB
Tendernotice_4.pdf
PDF • 1.69 MB
Tendernotice_5.pdf
PDF • 0.18 MB
Tendernotice_6.pdf
PDF • 0.15 MB
BOQ_509909.xls
BOQ • 0.31 MB
PQ_Osian_aau_dasodi67_98.pdf
Tender Documents • 0.52 MB
FB_Osian_aau_dasori67_98.pdf
Tender Documents • 4.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .