Loading…
Loading…
| Sl No | Description | Qty | Unit | L PRAKASH L2 | AJESH C L1 |
|---|---|---|---|---|---|
| 1.00Appendix-A | |||||
| 1.00 | OD37685/2026-2027:Cutting branches of trees overhanging above any structures of girth below 30cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 250 | each | 286.55 ₹71,637.5 | 268.5 ₹67,125 Lowest |
| 1.00 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 175 | each | 386.04 ₹67,557 | 361.72 ₹63,301 Lowest |
| 1.00 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 65 | each | 691 ₹44,915 | 647.47 ₹42,085.55 Lowest |
| 1.00 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 13 | each | 939.52 ₹12,213.76 | 880.33 ₹11,444.29 Lowest |
| 1.00 | 50.2.33.8:Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 3 | each | 1,271.38 ₹3,814.14 | 1,191.28 ₹3,573.84 Lowest |
| 1.01 | OD37686/2026-2027:Labour engaged for stacking the cutting branches in designated locations beyond the initial lead and lift as per the direction of engineer in charge | 10 | Day | 1,106.22 ₹11,062.2 | 1,036.53 ₹10,365.3 Lowest |
| 1.01 | 15.60:Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved | 22.5 | cum | 281.16 ₹6,326.1 | 263.45 ₹5,927.63 Lowest |
| 1.01 | OD37684/2026-2027:Providing and engaging 20 Tonne capacity crane including hire charges, Operator charges, fuel, minor maintenance and all operating expenses complete. | 24 | hour | 1,509.78 ₹36,234.72 | 1,414.66 ₹33,951.84 Lowest |
Tender Value
₹2.5 L
EMD Value
₹6,344
Closing Date
28 Jul 2026, 11:00 amClosed
Assistant Executive Engineer
O/o Office of the Assistant Executive Engineer Buildings Sub Division Maintenance
Maintenance Work
2026_PWD_861827_1
E15/PWD/BLDG/TR/8433/2026 5 1 1/1
Open Tender
Civil Works - Buildings
Item Rate
120 days
Vellayambalam
Please refer Tender documents.
7 documents required · 7 mandatory
₹560
Yes
₹6,344
Yes
16 Sept 2026
22 Jul 2026
30 Jul 2026
22 Jul 2026
28 Jul 2026
22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix-A | |||||
| 1.001 | OD37685/2026-2027:Cutting branches of trees overhanging above any structures of girth below 30cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | - | each | - | - |
| 1.002 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - |
| 1.003 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | - | each | - | - |
| 1.004 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - |
| 1.005 | 50.2.33.8:Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - |
| 1.006 | OD37686/2026-2027:Labour engaged for stacking the cutting branches in designated locations beyond the initial lead and lift as per the direction of engineer in charge | - | Day | - | - |
| 1.007 | 15.60:Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved | - | cum | - | - |
| 1.008 | OD37684/2026-2027:Providing and engaging 20 Tonne capacity crane including hire charges, Operator charges, fuel, minor maintenance and all operating expenses complete. | - | hour | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1457513.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1457513.xls
BOQ • 0.30 MB
form_of_tender.pdf
Tender Documents • 0.18 MB
TenderDocuments.pdf
Tender Documents • 1.13 MB
Declaration.pdf
Tender Documents • 0.04 MB
integrity_pact.pdf
Tender Documents • 0.05 MB
PreliminaryAgreement.pdf
Tender Documents • 0.03 MB
SBD.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .