Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹32.8 L
EMD Value
₹32,800
Closing Date
2 Dec 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, K.R.B.C. Division, Surat
Improvement to existing irrigation infrastructure works on Orma Minor Ex Kundiyana Distry Canal.
366424
17 of 2026-27
Open
Civil - All
Works
Surat
6 documents required · 5 mandatory · 1 optional
₹1,500
Executive Engineer, K.R.B.C. Division, Surat
₹32,800
18 Nov 2026
18 Nov 2026
18 Nov 2026
2 Dec 2026
18 Nov 2026
120 days
Bill of Quantities
Name of Work Improvement to existing irrigation infrastructure works on Orma Minor Ex
:- Kundiyana Distry Canal.
Item RATE in (Rs) Per Amount
No In figure In words In Rs
Clearing the canal land width including
removing the shrub, bushes, cactus, weeds
other vegetation including cutting down trees
Rupees Fourteen
1 9880.00 upot 0.50 mt girth and depositing the removed 14.60 SM
Paise Sixty Only
materials outside the canal land width up to
lead of 50 meter as directed etc. complete.
(Without water pool)
Dismentalling the R.C.C. work & disposing off Thousand Seven
the stuff including stacking of the useful Hundred
materials etc. complete as directed. (a) Light FourtySeven
reinforcement. (Main bar upto 16mm dia.) Paise Seventy
Dismantling the existing brick masonry including
sorting out and stacking the useful materials Rupees Seven
3 23.36 and removing the debries and making good the 757.40 CM
FiftySeven Paise
damage etc. complete as directed. (b) In cement Fourty Only
Dismentalling the existing R.C.C.pipes of the
following diameter including sorting out and
4 stacking of the useful materials including
refilling the trenches etc. complete as directed.
17.50 A(c) 650 mm to 900 mm dia. 873.90 Rmt.
Paise Ninety Only
12.50 A(d) 1000 mm to 1200 mm dia. 1281.70 Hundred Rmt.
EightyOne Paise
Dewatering the foundation trenches during
excavation of canals, drains, foundation
tranches,concrete, masonary etc. till completion
and diversion of surface and sub surface water
5 140.00 45.80 FourtyFive Paise Hp/Hr.
by using pumps of suitable capacity either Eighty Only
diesel or electrical driven including cost of
labour, pipelines etc. for delivery distance
Providing temporary all weather and fair
weather diversion of road suitable for traffic
during the construction period of the strcture
including providing necessary drains and all
safety measures including sign boards on both Rupees Eighteen
the sides, red lamps, signals at night for traffic
6 2.00 18218.20 Hundred Nos.
etc. comp. ( I ) O.D.R. / V.R.B. (Providing Eighteen Paise
Diversion for V.R.B. Work including Fixing and Twenty Only
Removing 600 mm dia NP 2 pipe with filing of
Soil and after Completion work cleaning of all
the item as per Engineer Required etc
completion.)(R.A.)
Excavation for foundation in all sorts of soil
including yellow, sandy, gravelly soil, soft & hard
murrum, etc. dry condition including depositing Rupees
7 256.80 the excavated stuff in uniform layers in banks or 81.50 EightyOne Paise CM
as directed etc. complete for lead uo to 1.0 Km Fifty Only
and all lifts. (By machinery) (a) Above water
Providing and filling rubbles including hand Rupees One
packing and filling interstices with quarry spauls Thousand
behind abutments and between returns as NinetyFour Paise
Directed. Eleven Only
Providing and filling sand Below R.C.C Raft in Rupees Five
9 18.90 Layers including Ramming and watering 504.42 CM
Paise FourtyTwo
Supplying of graded stone aggregates of Rupees Four
following sizes (for WBM Road) (3)Crushed
10 31.50 442.79 FourtyTwo Paise CM
stone aggregate for hard Quality upto 63 mm SeventyNine
Spreading the stone aggregate for soiling and
W.B.M. including filling the interstics, forming Rupees Two
11 31.50 the surface to required camber & gradient. 268.92 CM
SixtyEight Paise
(Excluding spreading of blindage) (1)40 mm to NinetyTwo Only
63 mm size aggregates (HB)
Providing and laying plain / reinforced Nominal
Mix cement concrete of various grade with
cement, sand and coarse aggregates including
centering, shuttering, batching, mixing,
transporting, placing, vibrating, smooth Rupees Four
finishing, curing etc. complete for all lead and
12 24.70 4559.30 Hundred CM
lift. (Manually With Conventional Mixer, FiftyNine Paise
Excluding dewatering) (B) Raft, Thirty Only
Bottomslabofbarel, footing of columns, piers,
abutment and bottom slab of sump etc. (i) M-15
Providing and placing in position reinforcement Rupees Seven
bars including cutting, bending welding, joints Thousand One
where necessary, hooking etc. complete as per Hundred
drawing for all lead and lifts. TMT NinetyFour Only
Providing and laying Plain/Reinforced Nominal
Mix cement concrete of various grade with
cement,sand and coarse aggregates including
centering, shuttering, batching, mixing, Rupees Four
transporting, placing, vibrating, smooth Thousand Eight
14 44.70 finishing, curing etc. Complete for all lead and 4899.60 Hundred CM
lift.(Manually With Conventional Mixer, NinetyNine Paise
Excluding dewatering) (B)(Raft, Bottom slab of
barel, footing of columns, piers, abutment and
bottom slab of sump etc. (ii) M -
Grade.(1:1.5:3)
Providing and laying Plain/Reinforced Nominal
Mix cement concrete of various grade with
cement,sand and coarse aggregates including
centering, shuttering, batching, mixing, Rupees Five
transporting, placing, vibrating, smooth
15 26.10 5146.50 Hundred CM
finishing, curing etc. Complete for all lead and FourtySix Paise
lift.(Manually With Conventional Mixer, Fifty Only
Excluding dewatering) (C) Piers, abutment,
wingwalls, headwall, returnwall etc. (iii) M-20
grade.(1:1.5:3)
Providing and laying Plain/Reinforced Nominal
Mix cement concrete of various grade with
cement,sand and coarse aggregates including
centering, shuttering, batching, mixing, Rupees Five
transporting, placing, vibrating, smooth Thousand Two
16 24.80 finishing, curing etc. Complete for all lead and 5204.70 Hundred Four CM
lift.(Manually With Conventional Mixer, Paise Seventy
Excluding dewatering) (D) Walls of barrel, brest
wall,staunching rings, pedastal of bearings,
stoplog piers, well staining, transition wall etc.
Providing and laying Plain/Reinforced Nominal
Mix cement concrete of various grade with
cement,sand and coarse aggregates including
centering, shuttering, batching, mixing,
transporting, placing, vibrating, smooth Rupees Five
17 56.00 finishing, curing etc. Complete for all lead and 5456.00 CM
Hundred FiftySix
lift.(Manually With Conventional Mixer, Only
Excluding dewatering) (E) Roadway slab,
approch slab, chut floor slab, kerb pier cap,
abutment cap, hoisting platform, top slab of
barrel etc. (ii) M - 20 Grade.(1:1.5:3)
Providing & Fixing in position 110 mm dia PVC Rupees Two
18 46.40 pipe weep holes in abutmnets,wing wall and 263.70 Rmt
SixtyThree Paise
laying training etc. complete. Seventy Only
De-silting of canal/drain with lead up 50 meter&
lift upto 1.50 mt. including dewatering if any Rupees One
19 3837.00 required for following depth etc. complete as 174.80 CM
directed. (C) For canals between (20 to 250 Paise Eighty Only
Cusecs) 0.56 to 7.0 cumecs.
Total Amount Rs.
Total Amount Rs.
I/We am/are willing to carry out the work at _______ % above/below ( percent should be
written in figures and in words ) of the estimated rates mentioned above. Amount of my/our
tender works out as under.
*Estimated amount
put to tender Rs.
Rupees Thirty-Two Lakh Seventy-Eight Thousand Six
Hundred Sixteen Paise Seventy-Eight Only
Deduct ____ % below Rs. _________ Add ____ % above Rs. _________
Net Rs. _________ Total Rs. _________
*( Please strike out which ever is not applicable )
Note 1:- All work shall be carried out as per Public Works Department Handbook and other specifications of
Division or as directed.
Note 2:- All the columns is Schedule should be filled in ink and the total of the entries in the last column
should be struck by the contractor under his signature.
Note 3:- Rates quoted include clearance of site (prior commencement of work and at its close) in all
respects and hold good for work under all conditions, site, moisture, weather etc.
Note 4:- To be continued on additional sheets, if found necessary.
Deputy Executive Engineer Executive Engineer
Rander Irri. Sub Division K R B C Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. SBD BOOK 00 RD Orma Mr.pdf
2. Work and SIte Condition Itemwise Specification.pdf
3. Sch - B 00 and 5 RD Box Orma Mr.pdf
4. Cement Con. 00 and 5 RD Box Orma Mr.pdf
5. Steel Con. 00 and 5 RD Box Orma Mr.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .