Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4 LAccepted-AOC | ₹4 L Quoted ₹4.8 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹4.8 L+₹10,000 (2.11%)Rejected-AOC VILLAGE KHURAHAL PO DHAWAL TEHSIL SUNDER NAGAR DISTT MANDI HP | ₹4.8 L+₹10,000 (2.11%) | L2 | Rejected-AOC L2 |
| 3 | L3₹5.0 L+₹20,000 (4.21%)Rejected-AOC | ₹5.0 L+₹20,000 (4.21%) | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | NOKH RAM L1 | Shivani Thakur L3 | Mahender Singh L2 |
|---|---|---|---|---|---|---|
| 1.01 | Annual running and operation of water supply scheme from main source to storage tank/ sub storage tank and all distribution system by deploying the fitter/beldar at site of work as per IPH manaul of CPHEEO and specifications maintenance of source,treatment of water , keeping neat and clean all civil units and equal distribution of water through existing pipe network to consumers upto tail end including minor repair of work. The scope of work includes operation of gravity /distribution lines and source protection as per direction of the Engineer-in-charge. Operation & maintenance of LIS schemes ( by deputing skilled/ semiskilled/ unskilled manpower) from sump well to main storage tank, having structures/machinery/facilities as per attached annexure of detail in proper working condition, for a period of six Months starting w.e.f 15th day from the issuance of written orders to commence the work. Operation includes the regular i.e. daily supply of designed/required quantity of potable water to the beneficiaries of the scheme upto main storage/deivery tank as per the directions of Engineer in charge. keeping regular & proper record of water quantity pumped , time and hours of running of pumpng machinery including the cost of watch and ward of pump house and other departmental assests .The scope of work includes operation , watch & ward and well cleaning of campus of pump house as per direction of the Engineer-in-charge. | 1 | Job for 6 months | 4,75,000 ₹4,75,000 Lowest | 4,95,000 ₹4,95,000 | 4,85,000 ₹4,85,000 |
Tender Value
₹4.2 L
EMD Value
₹8,458
Closing Date
13 Jul 2026, 5:00 pmClosed
Executive Engineer Jal Shakti Division Larji
Executive Engineer Jal Shakti Division Larji
(SH- operation and maintenance of WSS and LIS schemes for Six months)
2026_HPIPH_138124_3
EE Larji NIT NO- 3647-3746 dated 04.07.2026
Open Tender
Civil Works
Item Rate
180 days
Bajaura
Please refer Tender documents.
2 documents required · 2 mandatory
₹350
₹8,458
25 Aug 2026
4 Jul 2026
14 Jul 2026
4 Jul 2026
13 Jul 2026
4 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Annual running and operation of water supply scheme from main source to storage tank/ sub storage tank and all distribution system by deploying the fitter/beldar at site of work as per IPH manaul of CPHEEO and specifications maintenance of source,treatment of water , keeping neat and clean all civil units and equal distribution of water through existing pipe network to consumers upto tail end including minor repair of work. The scope of work includes operation of gravity /distribution lines and source protection as per direction of the Engineer-in-charge. Operation & maintenance of LIS schemes ( by deputing skilled/ semiskilled/ unskilled manpower) from sump well to main storage tank, having structures/machinery/facilities as per attached annexure of detail in proper working condition, for a period of six Months starting w.e.f 15th day from the issuance of written orders to commence the work. Operation includes the regular i.e. daily supply of designed/required quantity of potable water to the beneficiaries of the scheme upto main storage/deivery tank as per the directions of Engineer in charge. keeping regular & proper record of water quantity pumped , time and hours of running of pumpng machinery including the cost of watch and ward of pump house and other departmental assests .The scope of work includes operation , watch & ward and well cleaning of campus of pump house as per direction of the Engineer-in-charge. | - | Job for 6 months | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
Form6.pdf
Tender Documents • 0.65 MB
Form8.pdf
Tender Documents • 1.44 MB
Terms.pdf
Tender Documents • 0.52 MB
BOQ_204567.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .