Loading…
Loading…
Tender Value
₹4.4 L
EMD Value
₹8,900
Closing Date
25 Jul 2026, 6:00 pmClosed
CE, MDA
MDA Office, Sec-13, New Moradabad
Horticulture Work
2026_MDA_1170994_1
08/MDA/CE/2026-27
Open Tender
Miscellaneous Works
Percentage
120 days
Moradabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹236
CAO
₹8,900
20 Jul 2026
20 Jul 2026
27 Jul 2026
20 Jul 2026
25 Jul 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Complete maintenance of the entire garden features having as per yard stick in the garden area i.e. lawn trees, shrubs, herbs, edge, flower beds, foliages, creepers etc. including hoeing, weeding, pruning, replacement of plants, gap filling, watering, mowing of lawn, grass cutting by lawn mover and brush cutter, removal of garden waste, applying insecticide, pesticide & fertilizers (whenever required) top dressing of lawn with good earth and manure and maintenance of other garden related works as directed by office-in-charge (Cost of Good Earth, Manure, Fertilizer, Insecticide, Pesticide will be provided by the Department & lawn mover and brush cutter with fuel and other T & P material/articles shall be provided by the contractor.) and as per direction of officer in charge. Play grounds/ Public parks (2.00 Acre = One Mali) As per yard stick. (Item No. 2.40.5 DSR 2020) Per Month Rate= 1.65
For First Month | 12,347.91 | Sqm | 1.65 | ₹20,374.05 |
| 1.01 | Same as abave item for Second month | 12,347.91 | Sqm | 1.65 | ₹20,374.05 |
| 1.02 | Same as abave item for Third month | 12,347.91 | Sqm | 1.65 | ₹20,374.05 |
| 1.03 | Same as abave item for Fourth month | 12,347.91 | Sqm | 1.65 | ₹20,374.05 |
| 2 | Cutting of Hedge/Edge including removing of cut material, cleaning, hoeing of hedge/edge bed watering, manureing and applying insecticides and fungicides etc.(excluding the cost of material which shall be supplied by the department) and as per direction of officer in charge. (Item No. 2.36 DSR 2020) Per Month Rate= 13.95 For First Month | 5,135.54 | Sqm | 13.95 | ₹71,640.78 |
| 2.01 | Same as abave item for Second month | 5,135.54 | Sqm | 13.95 | ₹71,640.78 |
| 2.02 | Same as abave item for Third month | 5,135.54 | Sqm | 13.95 | ₹71,640.78 |
| 2.03 | Same as abave item for Fourth month | 5,135.54 | Sqm | 13.95 | ₹71,640.78 |
| 3 | Topiary cutting/shaping of plant removing of cut materials, cleaning, hoeing of plants complete sensing hoeing of trees (topiary) watering manure department and as per discretion of officer in charge. (height of topiary above 120cm.) item no 2.38.2. DSR 2020 Per Month Rate= 65.55 For First Month | 88 | Nos | 65.55 | ₹5,768.4 |
| 3.01 | Same as abave item for Second month | 88 | Nos | 65.55 | ₹5,768.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.63 MB
TDfor01.pdf
Tender Documents • 2.90 MB
BOQ_2197798.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .